Академический Документы
Профессиональный Документы
Культура Документы
Introduction Evaluation
Strongly loaded organic industrial waste water,
i.e. from sugar- or paper-factories, need to be
pre-treated before determining the BOD value.
BODn =
Vtotal
Vs [
· BODtotal – ( Vtotal – Vs
Vtotal
· BODDW )]
Because of the very high content of organic mate-
BODn: Biochemical Oxygen Demand of the
rial in the sample, there is a disparity between the
sample after n days [mg/l O2]
nutrients ratio (C:N:P). The lack of nitrogen (N)
n: test duration in days
and phosphorus (P) causes a strong decrease in
(commonly 5 days)
microbial capability and abundance, what lead to
a subestimate of the BOD as a consequence. Vtotal: Total volume, consists of
In the following the pretreatment of a sample with volume of sample water (Vs) and
so called dilutionwater is described, which con- volume of dilution water
tains the missing nutrients and microorganisms Vs: Volume of sample water
and with which an adequate BOD measurement BODtotal: Biochemical Oxygen Demand of the
will be obtained. sample, consists of sample water and
dilution water, after n days
Preparation1 BODDW: Biochemical Oxygen Demand of the
A beaker2 for storage and ventilation with air is dilution water after n days
needed.
Composition:
• Drinking water with 1 % settled wastewater, Example
taken from the effluent of a well working do- n: 5 days
mestic treatment plant
Vtotal: 21.7 ml (corresponds to range
• 4 mg/l urea 0 - 4000 mg/l)
• 1,6 mg/l penta-sodium-tri-phosphate. Vs: 10 ml
This composition should be aerated for 3 to 10 BODtotal: 3445 mg/l O2
days at 20 °C before use.
BODVW: 14 mg/l O2
Sample preparation
To determine the full BOD content, a sample with
unresolved ingredients or particles should be ho-
BODn = 21.7 ml
10 ml [
· 3445 mg/l O2 –
( 21.7 ml – 10 ml
21.7 ml )]
· 14 mg/l O2
Tintometer GmbH, Schleefstr. 8a, D-44287 Dortmund, Tel.: (+49) 2 31 / 9 45 10 - 0, Fax: (+49) 2 31 / 9 45 10 - 20