Вы находитесь на странице: 1из 1

hb1.Engineering 80 marks. 50 marks conventional + 30 marks objectives (merit really depend on this part).

Survey Engineering: math: Method of rise fall, height of instrument method,traverse survey with latitude longitude
Theory: Types of survey
Strength of mechanics: Torsional stress,shearing stress,definition of mechanical properties such as stress ,strain,Modulus
of elasticity,rigidity,Poisson ratio,MS strain stress diagram...etc

Materials: SIZE and strength of brick,quality of good brick,field test of brick,estimation,cement types,test of
cement,strength of cement,types of curing,workability,slump test,initial and final setting time of cement,segregation and
bleeding,constituent of cement,lime and brick.

***GEO-TECHNICAL:Phase relationship (theory +math), earth pressure (active+ passive),Flow net,pile foundation with
math (single and group action),types of pile foundation,consolidation,over consolidation ratio,un-drained shear
strength,failure envelope,diff between compaction and consolidation,compaction tools,5 lab test and field test of
soil,different type of footing footings and their suitability,bearing capacity etc

***STRUCTURAL:different types of truss,truss analysis,properties of truss,principle of portal method,Influence line,SFD,


BMD,different types of bridge with length,

***RCC: calculation of column load,simple column design,Beam design with MKS unit,detailing of reinforcement,load
carried by concrete and load carried by steel in column,interaction diagram of column,BASIC theory.....

WATER RESOURCES: OPEN CHANNEL FLOW,CRITICAL DEPTH ,RIVER PROFILE,REGIME CHANNEL BY LACYS
THEORY,CALCULATION OF IRRIGATION DEPTH,IRRIGATION THEORY,river ENGINEERING,FLOOD FORECASTING,RISK
ANALYSIS,GUMBEL METHOD,NAVIGATION THEORY,POINT BAR WITH OTHERS BAR,SHIELD DIAGRAM,TYPES OF
SCOURING,BRIDGE SCOUR,MILD/STEEP SLOPE BY CRITICAL DEPTH,FROUD NO, HYDRAULIC JUMP,CLASSIFICATION OF
JUMP BY FROUD NO,ENERGY AND MOMENTUM EQUATION,E=1.5 Yc,E=1.25 Yc,TYPES OF RIVER,CROSS SECTION OF
RIVER,TYPES OF WATERWAY IN BANGLADESH WITH PROBABLE DEPTH,SEQUENT DEPTH,BERNOULLI,S EQUATION WITH
VALIDATING PROPERTIES, ENERGY CURVE,CURVE OF ENERGY LINE AND HYDRAULIC GRADIENT LINE,RISK,r=hd, H=1/T;
storativity,specific yield, specific retension,influent and effluent of GW,River training work , typas of RTW,guide
bank related problem,meandering of river,meandering parameter,types of river,typaes of flood,structural and
non structural measure of flood,DIVERSION head work,etc.HYDOR GRAPH ,UNIT HYDROGRAPH and its use

TRANSPORT: cover leaf,fly over and difference with interchange,passing site distance,OSD,reaction time,time mean
speed,space mean speed,curve of marshal mixed design,fig of U vs Q vs k etc.super elevation,cross section of flexible
pavement, diff bet tar and bitumen ,properties of bitumen ,why its preferable in BD,types of pavement with difference, what
types is best practice in BD and why?.85th percentile speed,type of flow..1.free flow, force flow,steady flow, unsteady
flow,test name of bitumen,structural no,WBM roads,fig or rural road,CBR,how etc............

ENVIRONMENT : BOD ,COD, COD>BOD why?....Why bod taken in 5 days?........bod cod related math,DO sag
curve,coagulation,flocculation,curve of optimum coagulation dose,pond details layout,diagram of ASP,Sewerage
treatment,storm sewer by mannings equation,septic tank design,mainly class note of RK sir......sanitary significant of
fe,mn,z,PH.alkaline,fluride........BD and WHO guide line from ITN.chlorination,chloroniation curve,............trickling filter
layout.......math from ITN......

2.Banali+English+General knowledge: 20 marks

There is no hard and fast syllabus,indication of marks distribution. its totally recall from previous experience......
best of luck..............

Вам также может понравиться