Вы находитесь на странице: 1из 1

8 7 6 5 4 3 1

D
D

ENGAGE CABLE
BLACK - L1
RED - L2
WHITE - NEUTRAL
C GREEN - GROUND C

JUNCTION BOX
METER

TERMINATOR CAP
INSTALLED ON
NOTE: The grounding method shown is one of multiple allowable methods. END OF CABLE
TO METER A GEC (grounding electrode conductor) is required only for M215-60-2LL.
OR AC DISTRIBUTION It is not required for M215-60-2LL-IG.
PANEL UP TO 17 M215s
PER BRANCH CIRCUIT
B B

ONE 2-POLE 20 AMP


CIRCUIT BREAKER
PER BRANCH CIRCUIT
ETHERNET CONNECTION
ENVOY COMMUNICATIONS GATEWAY TO BROADBAND ROUTER

NEUTRAL GROUND
120 VAC POWER CABLE
AC DISTRIBUTION PANEL
OR SUBPANEL

A IMPORTANT: Make sure to measure the line-to-line and the line-to-neutral voltage A
of all service entrance conductors prior to installing any solar equipment. The voltages FIELD WIRING DIAGRAM
for the 240 VAC rated microinverters should be within the following ranges:
line to line - 211 to 264 VAC, line to neutral - 106 to 132 VAC . 240 VAC SINGLE PHASE

8 7 6 5 4 3 2 1

Вам также может понравиться