Due to persistence quality issue experience by the Netkrom link during previous
installation, below is best installation and planning practice for quality perfo
rming link
Installation survey should be done for minimum line of sight clearance and there
should not be any obstruction in between the link
After installation the RSSI should be increase at best as possible at both ends,
panning the antenna
IF cable length may permit the it preferable to use cable supply with Netkrom eq
uipment as it robust enough for outdoor condition
Minimum RSSI for link to be accepted and connected to customer should be 45
After installing Netkrom the link should properly commissioned and all performan
ce data that filled in to be develop form for reference to changes in the future
.
Data cable should be separated as much possible from signal cable
After installation it should be ensure that the CPE is Stable on the boom or any
construction it installed on.
The cable entry into the CPE must be ensured that it water seal and all unit of
the RJ 45 waterproof connector system is used.
Physical data
Height of Near end CPE
Configuration data
Channel
Frequency
Antenna Control ……………………
Outdoor …………………..
Distance
Slot time
Ack timeout
CTS timeout