SAFETY INDUCTION TRAINING
Fire Safety Arrangements (In case of fire follow the following steps)
Ø Toilets
11/13/16 2
SAFETY INDUCTION TRAINING
11/13/16 3
Railway Strategic Business Group
WDFC EMP-4 Project
11/13/16 4
SAFETY INDUCTION TRAINING
11/13/16 5
Contents
11/13/16 9
Larsen & Toubro Limited-History
Henning Holck-LarseN
(4.7.1907 - 27.7.2003)
A. M. NAIK
Group Executive Chairman
11/13/16 10
SHE TARGETS AND GOALS
11/13/16 12
SHE Objectives
11/13/16 13
How To Achieve SHE Objectives
11/13/16 14
How To Achieve Objectives
11/13/16 15
Some Important Definitions
11/13/16 16
Reporting Incidents & Accidents
11/13/16 17
Some Important Definitions
11/13/16 18
Reporting Unsafe Acts &
Unsafe Conditions
11/13/16 19
Some Important Definitions
11/13/16 21
Various Conditions
Safe Unsafe
Near Accident
working working Incident
Miss
condition condition
11/13/16 22
Why Incidents &
Accidents Reporting
Material Damage
30
1 2 3 4 5
Minor injury (2)
(treatment off site)
2 4 6 8 10
Severity
11/13/16 24
Evaluating Risks
11/13/16 25
Risk Assessment Template
11/13/16 26
Hierarchy of Risk Controls
q EL: Elimination.
q SU: Substitution.
q IS: Isolation.
11/13/16 27
Hierarchy of Risk Controls
11/13/16 28
Motivators to Manage SHE Risks
11/13/16 29
Hidden Cost of Accidents
11/13/16 30
Responsibilities-To Prevent Injury
11/13/16 31
Possible Causes of Accidents
11/13/16 32
Minimum PPE to Visit Worksite
q Safety Helmet
q Safety Shoes
11/13/16 33
Optional PPE’s
11/13/16 34
Ready To Move Worksite
11/13/16 35
Basic Safety Rules for Worksite
11/13/16 36
Basic Safety Rules for Worksite
11/13/16 37
Basic Safety Rules for Worksite
11/13/16 38
Emergencies at Worksite
11/13/16 39
In case of Fire
q Raise Alarm.
11/13/16 40
In Case of Siren /
Alarm or Evacuation
11/13/16 41
Need First Aid ???
11/13/16 42
SHE Organization Chart
Emergency Contact Numbers
11/13/16 44
Short Cuts
11/13/16 45
Falls & Slips…
11/13/16 46
Alertness on Job …
11/13/16 47
Railway Strategic Business Group
WDFC EMP-4 PROJECT
Safety, While working near Indian Railway Track
11/13/16 48
Railway Strategic Business Group
WDFC EMP-4 PROJECT
q रे #वे लाइन पर बरती जाने वाल/ सरु 2ा
q Safety Guidelines to work near Indian Railway Track
q रे लवे 3ै क के पास काम क7 श9
ु आत से पहले <भार/ / इंजी?नयर से उBचत वकD परEमट
Eलया जाना चाह/ए
q Proper Work Permit to be taken from Engineer / In-charge before
start of work near Indian Railway Track
ü
Railway Strategic Business Group
WDFC EMP-4 PROJECT
q आईआर 3ै क के पास काम करते हुए रे लवे सरु 2ा क7 आवIयकता नस
ु ार बेर/केडींग का
<ावधान होना चाह/ए
q Indian Railway Safety requirement of provision of Barricading to
be insured while working near Indian Railway Track
ü
Railway Strategic Business Group
WDFC EMP-4 PROJECT
Øहमेशा रे #वे लाईन के पास कायD ØकायD Uथल पर 3े ऩो के आवागमऩ को
करते समय उNच चमक7ल/ सु?ऩIचीत कर सतकD करऩे हे तु एक Pलेगमेऩ,
(OरPलेQट/व) जैकेट को पहऩे ताक7 सीट/ तथा सुर2ा बंदोबUत के उपकरणX के साथ
कामगार को पहचाऩा जा सके तथा उपUथीत हो I
उसे सतकD Tकया जा सके I ØFlagman or Signal man to be deputed to alert for
ØAlways wear hi visibility approaching trains on Indian Railway Track
reflective red-orange color jacket
while working near IRT
Railway Strategic Business Group
WDFC EMP-4 PROJECT
Measures to be ensured during plying road vehicles near Track
Railway Strategic Business Group
WDFC EMP-4 PROJECT
Øकाम करने से पहले रे लवे EसYनल केबल, [बजल/ के तारX क7 तरह भूEमगत
उपयोBगताओं क7 पहचान क7 जानी चाह/ए
ØUnderground utilities like Indian railway signal cables, electrical
cables to be identified before work
Cable
ü
Detector
Railway Strategic Business Group
WDFC EMP-4 PROJECT
Øआईआर 3ै क से 6.50 मीटर क7 दरू / के भीतर काम करने के Eलए आईआर /
ड`लुडीएफसी / पीएमसी से पूवD अनुम?त ल/ जानी चाह/ए
ØPrior permission from IR/WDFC/PMC to be taken to work within
6.50 meter distance from IR Track
3500 mm
6500 mm
ü
Contractor supervisor
11/13/16 56
SAFETY INDUCTION TRAINING
11/13/16 57
SAFETY INDUCTION TRAINING
Thank You
WDFC EMP-4
SAFETY INDUCTION TRAINING