Scope:

The Qualification of Damper before ILRT Testing in Operation


Basis.

Details of Operation

Operation-I:

Removal of Spectacle Flange then Placing Dummy Flange and


condition testing.

Operation-II:

After The Testing Removal of Dummy Flange Then Replacing


of Spectacle Flange and normalizing the system.

Total Operation:

6 Line x 2 Operation=12 Operation.

For Line no Fb-004-Dia 1600-ai:

Dmp rb 80-014, dmp rb 80-015, Normalizing spool piece then


removal it for damper condition checking. After Checking the Condition replace
the spool piece.

Testing of line nos;

1. RCB recirculation supply & retun lines-04 nos


2. RCB fresh air supply & exhaust lines -02 nos
\

DETAILS OF LINES;

ISOLATION
SPECTACLE FLANGE
SINO DESCRIPTION LINE NO DAMPER TAG
TAG NO
NOS

DMP rb 80-014
01 RCB EXHAUST FB-004-DIA1600-AI SPF rb 80-001
DMP rb 80-015

DMP rb 80-001
02 RCB FRESH AIR FB-005-DIA1400-AI SPF rb 80-002
DMP rb 80-002

RCB
DMP rb 80-030
03 RECIRCULATION FB-011-DIA1400-AI SPF rb 80-009
DMP rb 80-032
SUPPLY WEST

RCB
DMP rb 80-029
04 RECIRCULATION FB-009-DIA1400-AI SPF rb 80-008
DMP rb 80-031
SUPPLY EAST

RCB
DMP rb 80-049
05 RECIRCULATION FB-010-DIA1400-AI SPF rb 80-007
DMP rb 80-050
RETURN WEST
RCB
DMP rb 80-047
06 RECIRCULATION FB-008-DIA1400-AI SPF rb 80-006
DMP rb 80-048
RETURN EAST

OBSERVATION:

Before ILRT witnessed by AERB damper qualification is


satisfactory.

M/S SUN GOLD ENGINEERING BHAVINI- EXECUTION


\

NAME OF THE
M/S SUN GOLD ENGINNEERING
CONTRACTOR

SITE PFBR BHAVINI ,KALPAKKAM

NAME OF THE QUALIFICATION OF DAMPERS


WORK BEFORE ILRT

LOCATION FB 45M EL & 55 EL

SYSTEM AC VENTILATION SYSTEM

DATE

REPORT NO SGE/QUALIFICATION/DMP/01