Вы находитесь на странице: 1из 1

Date Approval(Supervisor & above)

PARADIGM PRECISION COMPONENTS SDN BHD(Company No:217167-U) Job No. Name Signature
OUTGOING INSPECTION CHECKLIST Job Qty
Customer COHERENT Inspector Name Signature Badge No. Lot Qty YH LIM
Part Number 1150788 Rev AB RUBY Shipped qty
i. Dimensional : AQL 1.0 as per Zero Acceptance
Sampling Plans (C=0) ASQ H1331 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Result
ltem Specification Min Max Equipt
1 ø 0.207 0.202 0.212 C
2 0.175 0.170 0.180 C
3 ø 0.185 0.180 0.190 C
4 4-40 Thread Go NoGo TPG
5
6
7
8
9
10
ii. Surface Finish
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Result
Item Specification Min Max Equipt
Surface
1 - 63 RT
finish

iii. Cosmetic : 100% Visual Inspection


Inspected Qty Reject Qty Defect Result
Item Specification Equipt
1 No burr, scratches, dents, etc. V

iv. Assembly : 100% Visual Inspection


Inspected Qty Reject Qty Defect Result
Item Specification Equipt

V - Visual C - Caliper TPG - Thread Plug Gage GM - Groove Meter P - Profile Projector SC-Smart Scope REMARK:
Equipt.

M - Micrometer DI - Depth Indicator TRG - Thread Ring Gage IDC - ID Dial Caliper PG - Pin Gage
JF- Jig & Fixture S-Screw RT - Roughness Tester CMM - Coordinate Measuring Machine H - Holematic Gun P/F
COC-Certificate of Compliance FPC -Finishing/Plating Certificate MFG DRW- Manufacturing Drawing
Doc.
MC - Mill Material Certificate CMMR -Coordinate Measuring Machine Report CUS DRW- Customer Drawing OVERALL
(√) RESULT
In-Process Checklist Verification

QA-033/G
Eff. Date: 29 MAY 2017
Page Of DCN: 17-010

Вам также может понравиться