1.

00 TRABAJOS PRELIMINARES
1.01 LIMPIEZA DE TERRENO
1.01.01 ELIMINACION DE MALEZA Y ARBUSTOS

LARGO (m) ANCHO (m) AREA (m2)


20.60 7.00 144.20

2.00 TRAZOS NIVELES Y REPLANTEO


2.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR
LARGO (m) ANCHO (m) AREA (m2)
17.60 7.00 123.20

2.02 REPLANTEO DURANTE EL PROCESO


PRIMER NIVEL SEGUNDO NIVEL
LARGO (m) ANCHO (m) AREA (m2) LARGO (m) ANCHO (m) AREA (m2)
17.60 7.00 123.20 11.20 7.00 78.40

TOTAL: 201.60 m2

3.00 MOVIMIENTO DE TIERRAS


3.01 NIVELACION( 10 cm)

LARGO (m) ANCHO (m) AREA (m2)


17.60 7.00 123.20

3.02 EXCAVACIONES
3.02.01 EXCAVACIONES DE ZANJAS PARA CIMIENTOS CORRIDOS

ELEMENTO DESCRIPCION N° DE VECES LONGITUD ANCHO ( m) ALTURA (m) VOLUMEN


QUE REPITE (m) (m3)
DESDE A-A
1 6.75 0.4 0.9 2.43
EJE 1-1 HASTA C-C
DESDE C-C
1 11.01 0.6 0.9 5.9454
EJE 1-1 HASTA G-G
DESDE C-C
1 10.56 0.7 0.9 6.6528
EJE 2-2 HASTA G-G
DESDE A-A
1 6.75 0.4 0.9 2.43
EJE 3-3 HASTA C-C
DESDE C-C
1 10.86 0.6 0.9 5.8644
EJE 3-3 HASTA G-G
DESDE 1-1
1 6.21 0.4 0.9 2.2356
EJE A-A HASTA 3-3
DESDE 1-1
1 5.81 0.45 0.9 2.35305
EJE D-D HASTA 3-3
DESDE 1-1
1 2.63 0.4 0.9 0.9468
EJE E-E HASTA 2-2
DESDE 2-2
1 2.48 0.4 0.9 0.8928
EJE E-E HASTA 3-3
DESDE 1-1
1 2.63 0.4 0.9 0.9468
EJE F-F HASTA 2-2
DESDE 2-2
1 2.48 0.4 0.9 0.8928
EJE F-F HASTA 3-3
EJE F-F SS.HH. 1 1.73 0.4 0.9 0.6228
EJE F-F VANO(SS.HH.) 1 0.7 0.4 0.9 0.252
DESDE 1-1
1 2.63 0.45 0.9 1.06515
EJE G-G HASTA 2-2
DESDE 2-2
1 2.48 0.45 0.9 1.0044
EJE G-G HASTA 3-3
CIMIENTO 1 0.93 0.4 0.9 0.3348
ESCALERA
TOTAL 34.8696

3.02.02 RELLENO

ELEMENTO DESCRIPCION N° DE VECES LONGITUD ANCHO ( m) ALTURA (m) VOLUMEN


QUE REPITE (m) (m3)
DESDE A-A
1 6.6 0.25 0.1 0.165
EJE 1-1 HASTA C-C
EJE 1-1 COLUMNAS -2 0.1 0.1 0.1 -0.002
EJE 1-1 COLUMNAS -1 0.25 0.1 0.1 -0.0025
DESDE C-C
1 10.71 0.35 0.1 0.37485
EJE 1-1 HASTA G-G
DESDE C-C
1 10.56 0.225 0.1 0.2376
EJE 2-2 HASTA G-G
DESDE C-C
1 10.41 0.225 0.1 0.234225
EJE 2-2 HASTA G-G
EJE 2-2 VANO 1 1.5 0.25 0.1 0.0375
DESDE A-A
1 6.6 0.25 0.1 0.165
EJE 3-3 HASTA C-C
EJE 3-3 COLUMNAS -2 0.1 0.1 0.1 -0.002
EJE 3-3 COLUMNAS -1 0.25 0.1 0.1 -0.0025
DESDE C-C
1 10.11 0.35 0.1 0.35385
EJE 3-3 HASTA G-G
DESDE 1-1
1 6.21 0.25 0.1 0.15525
EJE A-A HASTA 3-3
EJE A-A COLUMNA -1 0.25 0.1 0.1 -0.0025
DESDE 1-1
2 5.81 0.15 0.1 0.1743
EJE D-D HASTA 3-3
EJE D-D MURO -1 0.25 0.1 0.1 -0.0025
EJE D-D VANO 1 1 0.15 0.1 0.015
DESDE 1-1
1 2.63 0.4 0.1 0.1052
EJE E-E HASTA 2-2
DESDE 2-2
2 2.48 0.125 0.1 0.062
EJE E-E HASTA 3-3
VANO 1 0.68 0.15 0.1 0.0102
DESDE 1-1
1 2.63 0.4 0.1 0.1052
EJE F-F
1 2.63 0.4 0.1 0.1052
EJE F-F HASTA 2-2
DESDE 2-2
1 2.48 0.125 0.1 0.031
EJE F-F HASTA 3-3
EJE F-F SS.HH. 1 1.73 0.125 0.1 0.021625
EJE F-F VANO(SS.HH.) 1 0.7 0.4 0.1 0.028
MOCHETA -1 0.15 0.1 0.1 -0.0015
DESDE 1-1
1 2.63 0.15 0.1 0.03945
EJE G-G HASTA 2-2
DESDE 1-1
1 3.23 0.15 0.1 0.04845
EJE G-G HASTA 2-2
DESDE 2-2
2 2.48 0.15 0.1 0.0744
EJE G-G HASTA 3-3
VANO 1 0.78 0.15 0.1 0.0117
TOTAL 2.4343

3.03 CONCRETO SIMPLE


3.03.01 CONCRETO CIMIENTOS CORRIDOS

ELEMENTO DESCRIPCION N° DE VECES LONGITUD ANCHO ( m) ALTURA (m) VOLUMEN


QUE REPITE (m) (m3)
DESDE A-A
1 6.75 0.4 0.8 2.16
EJE 1-1 HASTA C-C
DESDE C-C
1 11.01 0.6 0.8 5.2848
EJE 1-1 HASTA G-G
DESDE C-C
1 10.56 0.7 0.8 5.9136
EJE 2-2 HASTA G-G
DESDE A-A
1 6.75 0.4 0.8 2.16
EJE 3-3 HASTA C-C
DESDE C-C
1 10.86 0.6 0.8 5.2128
EJE 3-3 HASTA G-G
DESDE 1-1
1 6.21 0.4 0.8 1.9872
EJE A-A HASTA 3-3
DESDE 1-1
1 5.81 0.45 0.8 2.0916
EJE D-D HASTA 3-3
DESDE 1-1
1 2.63 0.4 0.8 0.8416
EJE E-E HASTA 2-2
DESDE 2-2
1 2.48 0.4 0.8 0.7936
EJE E-E HASTA 3-3
DESDE 1-1
1 2.63 0.4 0.8 0.8416
EJE F-F HASTA 2-2
DESDE 2-2
1 2.48 0.4 0.8 0.7936
EJE F-F HASTA 3-3
EJE F-F SS.HH. 1 1.73 0.4 0.8 0.5536
EJE F-F VANO(SS.HH.) 1 0.7 0.4 0.8 0.224
DESDE 1-1
1 2.63 0.45 0.8 0.9468
EJE G-G
1 2.63 0.45 0.8 0.9468
EJE G-G HASTA 2-2
DESDE 2-2
1 2.48 0.45 0.8 0.8928
EJE G-G HASTA 3-3
TOTAL 30.6976

3.04 SOBRECIMIENTO
3.04.01 CONCRETO SOBRECIMIENTOS
ELEMENTO DESCRIPCION N° DE VECES N° DE ELEM. L (m) H (m) A (m) V (m3)
QUE REPITE ESTRUC.
EJE 1-1; EJE DESDE A-A
3-3 HASTA B-B 1 2 3.05 0.3 0.15 1.83
EJE 1-1; EJE DESDE B-B
3-3 HASTA C-C 1 2 3.08 0.3 0.15 1.848
EJE 1-1; EJE DESDE D-D
2-2; EJE 3-3 HASTA E-E 1 3 3.25 0.3 0.25 2.925
EJE 1-1; EJE DESDE E-E
3-3 HASTA F-F 1 2 2.65 0.3 0.25 1.59
DESDE E-E
EJE 2-2 HASTA F-F 1 1 1.1 0.3 0.25 0.33
EJE 1-1; EJE DESDE F-F
2-2; EJE 3-3 HASTA G-G 1 3 3.8 0.3 0.25 3.42
EJE A-A; EJE DESDE 1-1
D-D; EJE G-G HASTA 2-2 1 3 3.2 0.3 0.15 2.88
DESDE 2-2
EJE A-A HASTA 3-3 1 1 3.05 0.3 0.15 0.915
EJE D-D; EJE DESDE 2-2
E-E HASTA 3-3 1 2 2.15 0.3 0.15 1.29
DESDE 2-2
EJE F-F HASTA 3-3 1 2 1.95 0.3 0.15 1.17
EJE F-F MOCHETA 1 1 0.15 0.3 0.1 0.0045
DESDE 2-2
EJE G-G HASTA 3-3 1 1 2.05 0.3 0.15 0.615
TOTAL 18.8175

3.04.02 ENCOFRADO Y DESENCOFRADO


ELEMENTO DESCRIPCION N° DE VECES N° DE ELEM. L (m) H (m) S (m2)
QUE REPITE ESTRUC.
EJE 1-1; EJE DESDE A-A
3-3 HASTA B-B 2 2 3.05 0.3 3.66
EJE 1-1; EJE DESDE B-B
3-3 HASTA C-C 2 2 3.08 0.3 3.696
EJE 1-1; EJE DESDE D-D
2-2; EJE 3-3 HASTA E-E 2 3 3.25 0.3 5.85
EJE 1-1; EJE DESDE E-E
3-3 HASTA F-F 2 2 2.65 0.3 3.18
DESDE E-E
EJE 2-2 HASTA F-F 2 1 1.1 0.3 0.66
EJE 2-2 VANO 1 1 0.25 0.3 0.075
EJE 1-1; EJE DESDE F-F
2-2; EJE 3-3 HASTA G-G 2 3 3.8 0.3 6.84
MURO -1 1 0.15 0.3 -0.045
EJE A-A; EJE DESDE 1-1
D-D; EJE G-G HASTA 2-2 2 3 3.2 0.3 5.76
DESDE 2-2
EJE A-A HASTA 3-3 2 1 3.05 0.3 1.83
EJE D-D; EJE DESDE 2-2
E-E HASTA 3-3 2 2 2.15 0.3 2.58
VANO 1 2 0.15 0.3 0.09
DESDE 2-2
EJE F-F HASTA 3-3 2 2 1.95 0.3 2.34
EJE F-F MOCHETA 2 1 0.15 0.3 0.09
MURO 1 1 0.15 0.3 0.045
DESDE 2-2
EJE G-G HASTA 3-3 2 1 2.05 0.3 1.23
VANO 1 1 0.15 0.3 0.045
TOTAL 37.926

3.05 CONCRETO ARMADO


3.05.01 COLUMNAS
3.05.01.01 CONCRETO
PRIMER NIVEL
COLUMNA DETALLE N° DE VECES ANCHO (m) LONGITUD ALTURA (m) VOLUMEN
N° DE COLUMAS LADO (m) (m3)
C-1 1 0.25 0.28 2.85 0.9975
5
1 0.03 0.15 2.85 0.064125
C-2 3 1 0.25 0.31 2.85 0.662625
C-3 2 1 0.25 0.28 2.85 0.399
C-4 1 0.25 0.31 2.85 0.44175
2
1 0.03 0.15 2.85 0.02565
C-5 1 0.25 0.25 3.15 0.39375
2
1 0.03 0.15 3.15 0.02835
C-6 1 0.25 0.25 3.15 0.196875
1
2 0.03 0.15 3.15 0.02835
C-7 1 0.25 0.25 3.15 0.39375
2
2 0.03 0.15 3.15 0.0567
SUB TOTAL 3.688425

SEGUNDO NIVEL
COLUMNA DETALLE N° DE VECES ANCHO (m) LONGITUD ALTURA (m) VOLUMEN
N° DE COLUMAS LADO (m) (m3)
C-1 1 0.25 0.28 2.55 0.8925
5
1 0.03 0.15 2.55 0.057375
C-2 3 1 0.25 0.31 2.55 0.592875
C-3 2 1 0.25 0.28 2.55 0.357
C-4 1 0.25 0.31 2.55 0.39525
2
1 0.03 0.15 2.55 0.02295
SUB TOTAL 2.31795

AZOTEA

COLUMNA DETALLE N° DE VECES ANCHO (m) LONGITUD ALTURA (m) VOLUMEN


N° DE COLUMAS LADO (m) (m3)
C-1 1 0.25 0.28 1.1 0.385
5
1 0.03 0.15 1.1 0.02475
C-2 2 1 0.25 0.31 1.1 0.1705
C-2 1 1 0.25 0.25 2.15 0.134375
C-3 1 1 0.25 0.25 1.1 0.06875
C-3 1 1 0.25 0.25 2.15 0.134375
C-4 1 0.25 0.31 2.39 0.37045
2
1 0.03 0.15 2.39 0.02151
SUB TOTAL 0.89996

TOTAL: 6.906335

3.05.01.02 ENCOFRADO Y DESENCOFRADO


PRIMER NIVEL
N° DE VECES ANCHO (m) ALTURA (m) AREA
COLUMNA DETALLE N° DE COLUMAS LADO (m2)
C-1 2 0.31 2.85 8.835
5
2 0.06 2.85 1.71
C-2 3 1 0.37 2.85 3.1635
C-3 1 0.25 2.85 1.425
2
1 0.28 2.85 1.596
C-4 1 0.37 2.85 2.109
2 3 0.06 2.85 1.026
1 0.16 2.85 0.912
C-5 2 0.25 3.15 3.15
2 2 0.06 3.15 0.756
1 0.31 3.15 1.953
C-6 1 0.25 3.15 0.7875
1 2 0.06 3.15 0.378
1 0.31 3.15 0.9765
C-7 2 0.31 3.15 3.906
2 2 0.06 3.15 0.756
1 0.1 3.15 0.63
SUB TOTAL 34.0695

SEGUNDO NIVEL
COLUMNA DETALLE N° DE VECES ANCHO (m) ALTURA (m) AREA
N° DE COLUMAS LADO (m2)

C-1 1 1 0.37 2.55 0.9435


C-2 1 0.37 2.55 4.7175
5 3 0.06 2.55 2.295
1 0.16 2.55 2.04
C-3 1 0.25 2.55 1.275
2
2 0.31 2.55 3.162
C-4 2 0.31 2.55 4.743
3 1 0.06 2.55 0.459
1 0.16 2.55 1.224
C-5 1 0.25 2.55 0.6375
1
2 0.16 2.55 0.816
SUB TOTAL 22.3125

AZOTEA
COLUMNA DETALLE N° DE VECES ANCHO (m) ALTURA (m) AREA
N° DE COLUMAS LADO (m2)
C-1 1 1 0.37 1.1 0.407
C-2 1 0.37 1.1 2.035
5 3 0.06 1.1 0.99
1 0.16 1.1 0.88
C-2 1 2 0.25 2.39 1.195
C-3 1 0.25 1.1 0.55
2
2 0.31 1.1 1.364
C-3 1 2 0.25 2.15 1.075
C-4 2 0.31 1.1 2.046
3 1 0.06 1.1 0.198
1 0.16 1.1 0.528
C-5 1 0.25 1.1 0.275
1
2 0.16 1.1 0.352
SU TOTAL 11.895

TOTAL 68.277
3.05.01.03 ACERO
PRIMER NIVEL
N° DE ELEMNT. N° VECES Q LONGITUD
COLUMNA DETALLE Ø 1/2" 1/4"
ESTRUCT. REPITE (m)
C-1
C-2
12 4 4.5 1/2" 216
C-3
C-4
C-5
C-6 7 4 4.25 1/2" 119
C-7
ESTRIBOS 12 23 1 1/4" 276
ESTRIBOS 7 19 1 1/4" 133
SUB TOTAL 335 409
FACTOR 0.994 0.395
PESO 332.99 161.555
PESO TOTAL 494.545 KG

SEGUNDO NIVEL
N° DE ELEMNT. N° VECES Q LONGITUD
COLUMNA DETALLE Ø 1/2" 1/4"
ESTRUCT. REPITE (m)
C-1
C-2
12 4 2.8 1/2" 134.4
C-3
C-4
ESTRIBOS 12 16 1 1/4" 192
SUB TOTAL 134.4 192
FACTOR 0.994 0.395
PESO 133.5936 75.84
PESO TOTAL 209.4336 KG

AZOTEA
N° DE ELEMNT. N° VECES Q LONGITUD
COLUMNA DETALLE Ø 1/2" 1/4"
ESTRUCT. REPITE (m)
C-1
C-2
8 4 1.1 1/2" 35.2
C-3
C-4
ESTRIBOS 8 6 1 1/4" 48
C-2 1 4 2.15 1/2" 8.6
C-3 1 4 2.15 1/2" 8.6
ESTRIBOS 2 11 1 1/4" 22
C-4 2 4 2.39 1/2" 19.12
ESTRIBOS 2 12 1 1/4" 24
SUB TOTAL 71.52 94
FACTOR 0.994 0.395
PESO 71.09088 37.13
PESO TOTAL 108.22088 KG

TOTAL KG: 812.19948 KG


PARTIDA DESCRIPCION UNIDAD METRADO
OE.1 OBRAS PROV. TRAB. PRELIM. SEGURIDAD Y SALUD
OE.1.1 OBRAS PROVICIONALES Y TRABAJOS PRELIMINARES
OE.1.1.1 CONSTRUCCIONES PROVICIONALES
OE.1.1.2 INSTALACIONES PROVICIONALES
OE.1.1.3 TRABAJOS PRELIMINARES
OE.1.1.3.1 LIMPIEZA DE TERRENO m2 144.20
OE.1.1.9 TRAZOS NIVELES Y REPLANTEO
OE.1.1.9.1 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 123.20
OE.1.1.9.2 REPLANTEO DURANTE EL PROCESO m2 201.60
OE.2 ESTRUCTURAS
OE.2.1 MOVIMIENTO DE TIERRAS
OE.2.1.1 NIVELACION DE TERRENO
OE.2.1.1.1 NIVELACION
OE.2.1.2 EXCAVACIONES
OE.2.1.2.1 EXCAVACION PARA CIMIENTO CORRIDO m3 34.8696
OE.2.1.4 RELLENO
OE.2.1.4.1 RELLENO CON MATERIAL PROPIO m3 2.4343
OE.2.1.6 ELIMINACION DE MATERIAL EXCEDENTE m3 32.4353
OE.2.2 OBRAS DE CONCRETO SIMPLE
OE.2.2.1 CIMIENTOS CORRIDOS m3 30.6976
OE.2.2.6 SOBRECIMIENTOS
OE.2.2.6.1 CONCRETO m3 18.8175
OE.2.2.6.1 ENCONFRADO Y DESENCOFRADO m2 37.926
OE.2.3 OBRAS DE CONCRETO ARMADO
OE.2.3.7 COLUMNAS
OE.2.3.7.1 CONCRETO m3 6.906335
OE.2.3.7.2 ENCOFRADO Y DESENCOFRADO m2 68.277
OE.2.3.7.3 ACERO kg 812.19948