REINFORCED CONCRETE

Project Spreadsheets to BS 8110


COUNCIL
Client Advisory Group Made by Date Page
Location3rd Floor slab from 1 to 5a rmw 5-Feb-18 43
RIBBED SLABS to BS 8110:1997 (Analysis & Design) Checked Revision Job No
Originated from RCC32.xls v2.2 on CD © 2000-2003 BCA for RCC chg - R68

LOCATION
Supports from grid 1 to grid 5a 

MATERIALS COVERS (to links, or if no links, to reinf)


fcu 35 N/mm² h agg 20 mm Top cover 20 mm
fy 460 N/mm² gm 1.05 steel Btm cover 20 mm
fyv 460 N/mm² gm 1.50 concrete Side cover 20 mm
Density 23.6 kN/m³ (Normal weight concrete) RIBS
slab depth, hf 100 mm
SPANS Solid (mm) Rib width 150 mm
L (m) H (mm) Left Right Centres 900 mm
SPAN 1 2.000 275 450 1100 1 in 10 taper
SPAN 2 7.000 275 1100 1100 SUPPORTS
SPAN 3 7.500 275 1100 450 Support No Type
SPAN 4 1 C
SPAN 5 4 K
SPAN 6 K(nife), C(antilever) or E(ncastre)

LOADIN UDLs (kN/m²) PLs (kN/m) Position (m)


Self Add Dead Imposed Position Self Add Dead Imposed Position
Span 1 Weight Load Load from left Span 4 Weight Load Load from left
UDL 5.73 2.50 4.00 ~~~~ UDL ~~~~
PL 1 ~~~~ PL 1 ~~~
PL 2 ~~~~ PL 2 ~~~
Span 2 ~ ~ ~ ~ Span 5 ~ ~ ~ ~
UDL 4.19 2.50 4.00 ~~~~ UDL
PL 1 ~~~~ 8.50 1.00 1.450 PL 1 ~~~
PL 2 ~~~~ PL 2 ~~~
Span 3 ~ ~ ~ ~ Span 6 ~ ~ ~ ~
UDL 3.82 2.50 4.00 ~~~~ UDL ~~~~
PL 1 ~~~~ PL 1 ~~~~
PL 2 ~~~~ PL 2 ~~~~

LOADING PATTERN min max


DEAD 1 1.4
IMPOSED 0 1.6
LOADING DIAGRAM

1 5a
REACTIONS (kN/m)
SUPPORT 1 2 3 4
Characteristic Dead 43.0 58.0 18.2 ~ ~ ~
Max Imposed 21.7 32.4 13.2 ~ ~ ~
Min Imposed -0.3 11.3 -7.8 ~ ~ ~
MAX ULTIMATE 94.9 133.0 46.6 ~ ~ ~
REINFORCED CONCRETE
Project Spreadsheets to BS 8110 COUNCIL
Client Advisory Group Made by Date Page
Location 3rd Floor slab, from 1 to 5a rmw Feb-2018 44
RIBBED SLABS to BS 8110:1997 (Analysis & Design) Checked Revision Job No
Originated from RCC32.xls v2.2 on CD © 2000-2003 BCA for RCC chg - R68

BENDING MOMENT DIAGRAMS (kNm/m)

150 150

100 100

50 50

0 0

-50 -50

-100 -100
0 2 4 6 8 10 12 14 16 18 0 2 4 6 8 10 12 14 16 18

1 Elastic Moments 5a 1 Redistributed Envelope 5a

SUPPORT No 1 2 3 4
Elastic M 0.0 35.9 97.9 0.0 ~ ~ kNm/m
Redistributed M 0.0 35.9 83.2 0.0 ~ ~ kNm/m
ßb 1.000 1.000 0.850 1.000 ~ ~ ~
Redistribution 0.0% 15.0%

SPAN No 1 2 3
Elastic M 0.00 66.48 75.34 ~ ~ ~
Redistributed M 0.00 62.29 71.04 ~ ~ ~
ßb 1.000 0.937 0.943 #VALUE! #VALUE! #VALUE!
SHEAR FORCE DIAGRAMS (kN/m)

80 80

60 60

40 40

20 20

0 0

-20 -20
-40 -40
-60 -60
-80 -80
0 2 4 6 8 10 12 14 16 18 0 2 4 6 8 10 12 14 16 18

1 Elastic Shears 5a 1 Redistributed Shears 5a

SPAN No 1 2 3
Elastic V 0.0 35.9 58.2 66.8 70.3 47.9
Redistributed V 0.0 35.9 59.1 67.1 68.3 46.6

SPAN No
Elastic V ~ ~ ~ ~ ~ ~
Redistributed V ~ ~ ~ ~ ~ ~
REINFORCED CONCRETE
Project Spreadsheets to BS 8110 COUNCIL
Client Advisory Group Made by Date Page
Location 3rd Floor slab, from 1 to 5a rmw Feb-2018 /46
RIBBED SLABS to BS 8110:1997 (Analysis & Design) Checked Revision Job No
Originated from RCC32.xls v2.2 on CD © 2000-2003 BCA for RCC chg - R68

SPAN 3 LEFT CENTRE RIGHT


ACTIONS M kNm/m 83.2 @col face 71.0 0.0
ßb 0.85 0.94 1.00
DESIGN d mm 239.0 236.5 (x=26.3<hf/0.9) 239.0
As mm² 753 650 (872 mm² for defln) 0
As' mm² 0 As T 263 As' 0
TOP STEEL 2T 20 /rib 3T 12 /rib 2T 20 /rib
+ 4 T8 between + 4 T8 between
As prov mm² 829 As T prov 339 As prov 829
BTM STEEL 3T 12 /rib 2T 25 /rib 3T 16 /rib
As' prov mm² 339 As prov 982 As' prov 603
SHEAR V kN/m 68.30 V 46.55
v N/mm² 1.152 v 0.890
vc N/mm² 0.935 Link Ø 6 vc 0.935
LINKS 2T6 @ 175 for 700 2T6 @ 1,200 .
DEFLECTION L/d 31.712 Allowed 33.985 ok (As increased by 34.2%)
& CHECKS % As ok ok ok
Bar Ø & cover ok ok ok
Bar spacing ok ok ok

Dist to link ok ok ok
Project Spreadsheets to BS 8110 REINFORCED CONCRETE COUNCIL
Client Advisory Group Made by Date Page
Location 3rd Floor slab, from 1 to 5a rmw Feb-2018 /47
RIBBED SLABS to BS 8110:1997 (Analysis & Design) Checked Revision Job No
Originated from RCC32.xls v2.2 on CD © 2000-2003 BCA for RCC chg - R68

APPROXIMATE WEIGHT of REINFORCEMENT

TOP STEEL No Type Dia Length Unit Wt Weight


Support 1 2 T 12 1025 0.888 1.8
4 T 8 1025 0.395 1.6
Span 1 1 T 16 2225 1.578 3.5
Support 2 2 T 20 2250 2.466 11.1
4 T 8 2250 0.395 3.6
Span 2 4 T 12 4425 0.888 15.7
Support 3 2 T 20 3625 2.466 17.9
4 T 8 3625 0.395 5.7
Span 3 3 T 12 4675 0.888 12.5
Support 4 2 T 20 2400 2.466 11.8
4 T 8 2400 0.395 3.8

BOTTOM STEEL Support 1 1 T 16 1150 1.578 1.8


Span 1 1 T 20 400 2.466 1.0
Support 2 1 T 12 3175 0.888 2.8
Span 2 3 T 20 4750 2.466 35.1
Support 3 3 T 12 3175 0.888 8.5
Span 3 2 T 25 5900 3.853 45.5
Support 4 3 T 16 1725 1.578 8.2

LINKS Span 1 1 T 6 800 0.222 0.2


Span 2 10 T 6 800 0.222 1.8
Span 3 9 T 6 800 0.222 1.6

SUMMARY All figures approximate - see User Guide.


Reinforcement density (kg/m²) 12.48 Total rebar per rib, excluding mesh (kg) 195.4
Project Spreadsheets to BS 8110
Location 3rd Floor slab, from 1 to 5a ANALYSIS I
RIBBED SLABS to BS 8110:1997 (Analysis & Design) Made by rmw Job No R68
Originated from RCC32.xls v2.2 on CD © 2000-2003 BCA for RCC Date 5-Feb-18

SELF WEIGHT 1 2 3 4 5 6
ave bw 167.5 167.5 167.5 140.0 140.0 140.0 mm
rib area 0.119 0.119 0.119 0.076 0.076 0.076 mm²
net self wt 3.129 3.129 3.129 1.993 1.993 1.993 kN/m²
E/O solid 3.361 3.361 3.361 -1.993 -1.993 -1.993 kN/m²
cross rib 0 0 0 0 0 0 kN/m²
addn. solid 2.605055 1.056428 0.69468 #DIV/0! #DIV/0! #DIV/0! kN/m²
total SW 5.734 4.185 3.823 0.000 0.000 0.000 kN/m²
ANALYSIS
Min load 1.0 x dead load
Max load 0.4 x dead load + 1.6 x imposed load (Table 2.1)

Distribution Factors
SUPT 1 SUPT 2 SUPT 3 SUPT 4 SUPT 5 SUPT 6 SUPT 7
R L R L R L R L R L R L
Af 90000 90000 90000 90000 90000 90000
h -hf 175 175 175 -100 -100 -100
Aw1 26250 26250 26250 -15000 -15000 -15000
Aw2 6125 6125 6125 2000 2000 2000
A sum 122375 122375 122375 77000 77000 77000
sum Ax 10391667 10391667 10391667 3883333.3 3883333.3 3883333.3
x bar 84.916582 84.916582 84.916582 50.4329 50.4329 50.4329
sum Ad² 539513578 539513578 539513578 8902944.1 8902944.1 8902944.1
Ix 686716269 686716269 686716269 0 0 0
Stiffness 0 98102324 98102324 91562169 91562169 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Sum 98102324 189664493 #DIV/0! #DIV/0! #DIV/0!
Factor 1 0 1 0.51724 0.482759 1 0 1 0 1 0 1

Fixed End Moments


SPAN 1 SPAN 2 SPAN 3 SPAN 4 SPAN 5 SPAN 6
Min load L R L R L R L R L R L R
Cant 16.46739 176.1091 177.8434 0 0 0
UDL 2.7446 2.744565 27.29736 27.2974 29.64056 29.64056 0 0 0 0 0 0
PL 1 0 0 7.747772 2.02419 0 0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! ###
PL 2 0 0 0 0 0 0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! ###
FEM 0.00 16.47 35.05 29.32 29.64 29.64 0.00 0.00 0.00 0.00 0.00 0.00
Live load
Cant 19.38696 229.5637 251.1374 0 0 0
UDL 3.2312 3.231159 37.05228 37.0523 41.85623 41.85623 0 0 0 0 0 0
PL 1 0 0 4.557513 1.1907 0 0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! ###
PL 2 0 0 0 0 0 0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! ###
FEM 0.00 19.39 41.61 38.24 41.86 41.86 0.00 0.00 0.00 0.00 0.00 0.00

Moment Distribution
SUPT 1 SUPT 2 SUPT 3 SUPT 4 SUPT 5 SUPT 6 SUPT 7
Min load 0 16.46739 -35.0451 29.3215 -29.6406 29.64056 0 0 0 0 0 0
0 0 18.57774 0.16501 0.154007 -29.6406 0 0 0 0 0 0
0 0 0.082504 9.28887 -14.8203 0.077004 0 0 0 0 0 0
0 0 -0.0825 2.86108 2.670337 -0.077 0 0 0 0 0 0
0 0 1.430538 -0.0413 -0.0385 1.335168 0 0 0 0 0 0
0 0 -1.43054 0.04125 0.038502 -1.33517 0 0 0 0 0 0
0 0 0.020626 -0.7153 -0.66758 0.019251 0 0 0 0 0 0
0 0 -0.02063 0.71527 0.667584 -0.01925 0 0 0 0 0 0
0 0 0.357634 -0.0103 -0.00963 0.333792 0 0 0 0 0 0
0 0 -0.35763 0.01031 0.009625 -0.33379 0 0 0 0 0 0
0 0 0.005156 -0.1788 -0.1669 0.004813 0 0 0 0 0 0
0 0 -0.00516 0.17882 0.166896 -0.00481 0 0 0 0 0 0
0 0 0.089409 -0.0026 -0.00241 0.083448 0 0 0 0 0 0
0 0 -0.08941 0.00258 0.002406 -0.08345 0 0 0 0 0 0
Sum 0.00 16.47 -16.47 41.64 -41.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Project Spreadsheets to BS 8110
Location 3rd Floor slab, from 1 to 5a ANALYSIS II
RIBBED SLABS to BS 8110:1997 (Analysis & Design) Made by rmw Job No R68
Originated from RCC32.xls v2.2 on CD © 2000-2003 BCA for RCC Date 5-Feb-18

Live on 0 19.38696 -41.8562 41.85623 0 0


Odd Spans 0 0 -19.387 21.6498 20.20645 -41.8562 0 0 0 0 0 0
0 0 10.82489 -9.6935 -20.9281 10.10323 0 0 0 0 0 0
0 0 -10.8249 15.8388 14.78284 -10.1032 0 0 0 0 0 0
0 0 7.919377 -5.4124 -5.05161 7.391418 0 0 0 0 0 0
0 0 -7.91938 5.41244 5.051613 -7.39142 0 0 0 0 0 0
0 0 2.706221 -3.9597 -3.69571 2.525807 0 0 0 0 0 0
0 0 -2.70622 3.95969 3.695709 -2.52581 0 0 0 0 0 0
0 0 1.979844 -1.3531 -1.2629 1.847855 0 0 0 0 0 0
0 0 -1.97984 1.35311 1.262903 -1.84785 0 0 0 0 0 0
0 0 0.676555 -0.9899 -0.92393 0.631452 0 0 0 0 0 0
0 0 -0.67656 0.98992 0.923927 -0.63145 0 0 0 0 0 0
0 0 0.494961 -0.3383 -0.31573 0.461964 0 0 0 0 0 0
0 0 -0.49496 0.33828 0.315726 -0.46196 0 0 0 0 0 0
Sum 0.00 19.39 -19.39 27.80 -27.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Live on -41.6098 38.243 0 0 0 0
Even Spans 0 0 41.60979 -19.781 -18.4621 0 0 0 0 0 0 0
0 0 -9.89043 20.8049 0 -9.23106 0 0 0 0 0 0
0 0 9.890425 -10.761 -10.0437 9.231063 0 0 0 0 0 0
0 0 -5.38058 4.94521 4.615532 -5.02187 0 0 0 0 0 0
0 0 5.380576 -4.9452 -4.61553 5.021871 0 0 0 0 0 0
0 0 -2.47261 2.69029 2.510936 -2.30777 0 0 0 0 0 0
0 0 2.472606 -2.6903 -2.51094 2.307766 0 0 0 0 0 0
0 0 -1.34514 1.2363 1.153883 -1.25547 0 0 0 0 0 0
0 0 1.345144 -1.2363 -1.15388 1.255468 0 0 0 0 0 0
0 0 -0.61815 0.67257 0.627734 -0.57694 0 0 0 0 0 0
0 0 0.618152 -0.6726 -0.62773 0.576941 0 0 0 0 0 0
0 0 -0.33629 0.30908 0.288471 -0.31387 0 0 0 0 0 0
0 0 0.336286 -0.3091 -0.28847 0.313867 0 0 0 0 0 0
Sum 0.00 0.00 0.00 28.51 -28.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Elastic Support Moments (3.2.1.2.2)


Support 1 2 3 4 5 6 7
All spans 0 35.85434 97.93742 0 0 0 0
Odd Spans 0 35.85434 69.43155 0 0 0 0
Even Spans 0 16.46739 70.14237 0 0 0 0

Redistribution (3.2.2.1) method 1


ßb - 1 1 0.85 1 1 1 1
ßb + 1 1 1.15 1 1 1 1
Max M 0 35.85434 83.2468 0 0 0 0
Dead only 0 16.46739 41.6365 0 0 0 0
All spans 0 35.85434 83.2468 0 0 0 0
Odd Spans 0 35.85434 79.84628 0 0 0 0
Even Spans 0 16.46739 80.66373 0 0 0 0

Total Ultimate Loads


Span 1 2 3
UDL PL1 PL2 UDL PL1 PL2 UDL PL1 PL2
Dead only 16.467 0 0 46.7955 8.5 0 47.4249 0 0
All spans 35.854 0 0 110.314 13.5 0 114.3949 0 0
Odd Spans 35.854 0 0 46.7955 8.5 0 114.3949 0 0
Even Spans 16.467 0 0 110.314 13.5 0 47.4249 0 0
Span 4 5 6
Dead only 0 0 0 0 0 0 0 0 0
All spans 0 0 0 0 0 0 0 0 0
Odd Spans 0 0 0 0 0 0 0 0 0
Even Spans 0 0 0 0 0 0 0 0 0

Elastic Shears
Span 1 2 3
All spans 0 35.85434 56.9914 66.82227 70.25575 44.13911
Odd Spans 0 35.85434 25.3403 29.95519 66.45497 47.93989
Even Spans 0 16.46739 58.1925 65.62111 33.06477 14.36013
Span 4 5 6
All spans 0 0 0 0 0 0
Odd Spans 0 0 0 0 0 0
Even Spans 0 0 0 0 0 0
Project Spreadsheets to BS 8110
Location 3rd Floor slab, from 1 to 5a ANALYSIS III
RIBBED SLABS to BS 8110:1997 (Analysis & Design) Made by rmw Job No R68
Originated from RCC32.xls v2.2 on CD © 2000-2003 BCA for RCC Date 5-Feb-18

Redistributed Shears
Span 1 2 3
Dead only 0 16.46739 26.5414 28.75404 29.26398 18.16092
All spans 0 35.85434 59.09 64.72361 68.297 46.09786
Odd Spans 0 35.85434 23.8525 31.44301 67.8436 46.55126
Even Spans 0 16.46739 56.6895 67.12416 34.46761 12.95729
Span 4 5 6
Dead only 0 0 0 0 0 0
All spans 0 0 0 0 0 0
Odd Spans 0 0 0 0 0 0
Even Spans 0 0 0 0 0 0

Imposed Reactions
Support 1 2 3 4 5 6 7
All spans 0 21.70753 32.37212 12.9204 #VALUE! #VALUE! #VALUE!
Odd Spans 0 -0.31597 11.28837 13.2037 #VALUE! #VALUE! #VALUE!
Even Spans 0 8.090334 12.72909 -7.7925 #VALUE! #VALUE! #VALUE!

SPAN MOMENTS
SPAN 1 Left < > PL1 < > PL2 < > Right
Elastic V All 0 35.85434
Odd 0 35.85434
Even 0 Loadings 16.46739
Redist V All 0 17.9272 0 0 35.85434
Odd 0 17.9272 0 0 35.85434
Even 0 8.23369 0 0 16.46739
Elastic X- All 0 0 0 0 0
Odd 0 0 0 0 0
Even 0 0 0 0 0
Redist X- All 0 0 0 0 0
Odd 0 0 0 0 0 (3.2.2.1b)
Even 0 0 0 0 0 Max
Elastic M All 0 0 0 0 0 0 35.85434 0
Odd 0 0 0 0 0 0 35.85434 0
Even 0 0 0 0 0 0 16.46739 0 ßb
Redist M All 0 0 0 0 0 0 35.85434 0 0
Odd 0 0 0 0 0 0 35.85434 0 0
Even 0 0 0 0 0 0 16.46739 0 0

SPAN 2 Left < > PL1 < > PL2 < > Right
Elastic V All 56.99139 66.82227
Odd 25.34028 29.95519
Even 58.19254 Loadings 65.62111
Redist V All 59.09005 15.7591 13.5 0 64.72361
Odd 23.85246 6.68507 8.5 0 31.44301
Even 56.68949 15.7591 13.5 0 67.12416
Elastic X- All 3.616413 1.45 2.759765 0 2.759765
Odd 3.790579 1.45 2.519089 0 2.519089
Even 3.692633 1.45 2.835984 0 2.835984
Redist X- All 3.749584 1.45 2.892936 0 2.892936
Odd 3.568021 1.45 2.29653 0 2.29653 (3.2.2.1b)
Even 3.597256 1.45 2.740608 0 2.740608 Max
Elastic M All 35.85434 0 30.2164 43.73365 -16.2793 43.73365 97.93742 43.73365
Odd 35.85434 0 -6.1386 -2.31827 -23.5293 -2.31827 69.43155 0
Even 16.46739 0 51.3451 66.48129 3.107613 66.48129 70.14237 66.48129 ßb
Redist M All 35.85434 0 33.2595 49.6652 -16.2793 49.6652 83.2468 49.6652 1.135629
Odd 35.85434 0 -8.296 -5.90065 -23.5293 -5.90065 79.84628 0 0
Even 16.46739 0 49.1656 62.29034 3.107613 62.29034 80.66373 62.29034 0.93696
Project Spreadsheets to BS 8110
Location 3rd Floor slab, from 1 to 5a ANALYSIS IV
RIBBED SLABS to BS 8110:1997 (Analysis & Design) Made by rmw Job No R68
Originated from RCC32.xls v2.2 on CD © 2000-2003 BCA for RCC Date 5-Feb-18

SPAN 3 Left < > PL1 < > PL2 < > Right
Elastic V All 70.25575 44.13911
Odd 66.45497 47.93989
Even 33.06477 Loadings 14.36013
Redist V All 68.297 15.2526 0 0 46.09786
Odd 67.8436 15.2526 0 0 46.55126
Even 34.46761 6.32332 0 0 12.95729
Elastic X- All 4.606135 0 4.606135 0 4.606135
Odd 4.356946 0 4.356946 0 4.356946
Even 5.22902 0 5.22902 0 5.22902
Redist X- All 4.477715 0 4.477715 0 4.477715
Odd 4.447988 0 4.447988 0 4.447988 (3.2.2.1b)
Even 5.450873 0 5.450873 0 5.450873 Max
Elastic M All 97.93742 0 -97.937 63.86632 -97.9374 63.86632 0 63.86632
Odd 69.43155 0 -69.432 75.33882 -69.4315 75.33882 0 75.33882
Even 70.14237 0 -70.142 16.30579 -70.1424 16.30579 0 16.30579 ßb
Redist M All 83.2468 0 -83.247 69.66044 -83.2468 69.66044 0 69.66044 1.090723
Odd 79.84628 0 -79.846 71.03749 -79.8463 71.03749 0 71.03749 0.942907
Even 80.66373 0 -80.664 13.27556 -80.6637 13.27556 0 13.27556 0.814163

SPAN 4 Left < > PL1 < > PL2 < > Right
Elastic V All 0 0
Odd 0 0
Even 0 Loadings 0
Redist V All 0 0 0 0 0
Odd 0 0 0 0 0
Even 0 0 0 0 0
Elastic X- All #DIV/0! 0 #DIV/0! 0 #DIV/0!
Odd #DIV/0! 0 #DIV/0! 0 #DIV/0!
Even #DIV/0! 0 #DIV/0! 0 #DIV/0!
Redist X- All #DIV/0! 0 #DIV/0! 0 #DIV/0!
Odd #DIV/0! 0 #DIV/0! 0 #DIV/0! (3.2.2.1b)
Even #DIV/0! 0 #DIV/0! 0 #DIV/0! Max
Elastic M All 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! 0 #DIV/0!
Odd 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! 0 #DIV/0!
Even 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! ßb
Redist M All 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! #DIV/0!
Odd 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! #DIV/0!
Even 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! #DIV/0!

SPAN 5 Left < > PL1 < > PL2 < > Right
Elastic V All 0 0
Odd 0 0
Even 0 Loadings 0
Redist V All 0 0 0 0 0
Odd 0 0 0 0 0
Even 0 0 0 0 0
Elastic X- All #DIV/0! 0 #DIV/0! 0 #DIV/0!
Odd #DIV/0! 0 #DIV/0! 0 #DIV/0!
Even #DIV/0! 0 #DIV/0! 0 #DIV/0!
Redist X- All #DIV/0! 0 #DIV/0! 0 #DIV/0!
Odd #DIV/0! 0 #DIV/0! 0 #DIV/0! (3.2.2.1b)
Even #DIV/0! 0 #DIV/0! 0 #DIV/0! Max
Elastic M All 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! 0 #DIV/0!
Odd 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! 0 #DIV/0!
Even 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! ßb
Redist M All 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! #DIV/0!
Odd 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! #DIV/0!
Even 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! #DIV/0!
Project Spreadsheets to BS 8110
Location 3rd Floor slab, from 1 to 5a ANALYSIS V
RIBBED SLABS to BS 8110:1997 (Analysis & Design) Made by rmw Job No R68
Originated from RCC32.xls v2.2 on CD © 2000-2003 BCA for RCC Date 5-Feb-18

SPAN 6 Left < > PL1 < > PL2 < > Right
Elastic V All 0 0
Odd 0 0
Even 0 Loadings 0
Redist V All 0 0 0 0 0
Odd 0 0 0 0 0
Even 0 0 0 0 0
Elastic X- All #DIV/0! 0 #DIV/0! 0 #DIV/0!
Odd #DIV/0! 0 #DIV/0! 0 #DIV/0!
Even #DIV/0! 0 #DIV/0! 0 #DIV/0!
Redist X- All #DIV/0! 0 #DIV/0! 0 #DIV/0!
Odd #DIV/0! 0 #DIV/0! 0 #DIV/0! (3.2.2.1b)
Even #DIV/0! 0 #DIV/0! 0 #DIV/0! Max
Elastic M All 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! 0 #DIV/0!
Odd 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! 0 #DIV/0!
Even 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! ßb
Redist M All 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! #DIV/0!
Odd 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! #DIV/0!
Even 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! 0 #DIV/0! #DIV/0!
UDLs at solid(for shear)
1 2 3 4 5 6
UDL 15.486 15.486 15.486 0 0 0
PL left 0 0 0 0 0 0
PL right 0 0 0 0 0 0
Project Spreadsheets to BS 8110
Location 3rd Floor slab, from 1 to 5a CALCS I
RIBBED SLABS to BS 8110:1997 (Analysis & Design) Made by rmw Job No R68
Originated from RCC32.xls v2.2 on CD © 2000-2003 BCA for RCC Date 5-Feb-18

REINFORCEMENT DESIGN SPAN 1 L= 2.000 h = 275


bw = 167.5 BS8110
MAIN STEEL LEFT SPAN RIGHT Ref
ßb 1.000 1.000 1.000
M/m kNm/m 0.00 0.00 35.85
M/rib kNm 0.00 0.00 32.27 -=-
d mm 243.0 239.0 239.0
bf mm 900 900 900
K' 0.1558 0.1558 0.1558 3.4.4.4
Web Mres kNm 48.29 46.71 46.71 Fig 3.3
Flange Mres kNm 289.75 265.92 280.29 -=-
K 0.0000 0.0000 0.0179 3.4.4.4
z mm 230.85 227.05 227.05 -=-
x mm 27.00 26.56 26.56 -=-
d' mm 34.0 34.0 32.0
net fsc N/mm² 0.0 0.0 0.0 Fig 3.3
Excess M kNm 0.00 0.00 0.00
As' req mm² 0 0 0
fst N/mm² 438.1 438.1 438.1 Fig 3.3
As req mm² 0 0 324
bw/b 0.19
Min % % 0.13% 0.18% 0.13% Table 3.25
Min As mm² 322 83 322
At Edge of Solid dmid = 239.0 d'mid = 36.0
M/m kNm/m 1.82 20.17 7.26
M/rib kNm 1.63 18.15 6.53
bf mm 150 150 150
K 0.0053 0.0605 0.0218 3.4.4.4
z mm 230.85 221.67 227.05 -=-
x mm 27.00 38.51 26.56 -=-
net fsc N/mm² 0.0 45.6 0.0 Fig 3.3
Excess M kNm 0.00 0.00 0.00
As' req mm² 0 0 0
fst N/mm² 438.1 438.1 438.1 Fig 3.3
As req mm² 16 187 66
TENSION STEEL
As deflection mm² 0 0 324
As to provide mm² 120 187 120
Ø in rib mm ok 12 ok 20 ok 20
No 2 1 2
As prov mm² 226 314 628
=% % ok 0.556 ok 0.785 ok 1.570
Clear dist mm 122.6 25.0 105.8 between bars
Min S mm ok 25.0 ok 25.0 ok 25.0 3.12.11.1
Max S mm ok 152.2 ok 300.0 ok 152.2 3.12.11.2.4
Residual
Min % 0.26% 0.26%
As resid mm² 96 0
Ø extra mm 8 8
No 4 4
As prov mm² 201 201
COMPRESSION STEEL
Required mm² 157 187 94 Table 3.25
Ø mm ok 16 ok 16 ok 12
No 1 1 1
As' prov mm² 201 201 113
=% % ok 0.494 ok 0.502 ok 0.283 3.12.6.1
Clear dist mm 0.0 0.0 0.0 between bars
Min S mm ok 0.0 ok 0.0 ok 0.0 3.12.11.1
Project Spreadsheets to BS 8110
Location 3rd Floor slab, from 1 to 5a CALCS II
RIBBED SLABS to BS 8110:1997 (Analysis & Design) Made by rmw Job No R68
Originated from RCC32.xls v2.2 on CD © 2000-2003 BCA for RCC Date 5-Feb-18
SPAN 1 cont

DEFLECTION
fs N/mm² 0.0 0.0 120.0 Eqn 8
Base ratio 20.80 7.00 3.4.6.3/4
Tens Mod 2.00 2.00 Table 3.10
Comp Mod 1.03 1.00 Table 3.11
Perm L/d 0.00 14.00 3.4.6.3
Actual L/d ok 0.00 ok 8.37 3.4.5.1
As req increased by % 0.00 0.00

RIB SHEAR
V cl kN/m 0.00 35.85
distance from cl m 0.450 1.100 3.4.5.10
V rib kN -6.27 16.94
v N/mm² -0.1541 0.4231 Eqn 3
vc N/mm² 0.6584 NOMINAL 0.9345 Table 3.8
(v-vc)bv N/mm 67.0 0.0 67.0 Table 3.7
Link Ø mm 6 6 6 3.12.7.1
@ mm 175 1200 175 Spacing
for mm 0 0 0 from solid
As Dist mm ok 0 3.4.5.5
As' Dist mm ok 0.0 ok 0.0 ok 0.0 3.12.7.2

REINFORCEMENT DESIGN SPAN 2 L= 7.000 h = 275


- bw = 167.5
MAIN STEEL LEFT SPAN RIGHT
ßb 1.000 0.937 0.850
M/m kNm/m 35.85 62.29 83.25
M/rib kNm 32.27 56.06 74.92 -=-
d mm 239.0 239.0 239.0
bf mm 900 900 900
K' 0.1558 0.1558 0.1445 3.4.4.4
Web Mres kNm 46.71 43.32 43.32 Fig 3.3
Flange Mres kNm 280.29 265.92 259.91 -=-
K 0.0179 0.0312 0.0416 3.4.4.4
z mm 227.05 227.05 227.05 -=-
x mm 26.56 26.56 26.56 -=-
d' mm 32.0 32.0 32.0
net fsc N/mm² 0.0 0.0 0.0 Fig 3.3
Excess M kNm 0.00 0.00 0.00
As' req mm² 0 0 0
fst N/mm² 438.1 438.1 438.1 Fig 3.3
As req mm² 324 564 753
bw/b 0.19
Min % % 0.13% 0.18% 0.13% Table 3.25
Min As mm² 322 83 322
At Edge of Solid dmid = 239.0 d'mid = 36.0
M/m kNm/m 13.66 35.06 49.30
M/rib kNm 12.29 31.55 44.37
bf mm 150 150 150
K 0.0410 0.1052 0.1480 3.4.4.4
z mm 227.05 206.69 191.00 -=-
x mm 26.56 71.79 106.67 -=-
net fsc N/mm² 0.0 333.4 422.5 Fig 3.3
Excess M kNm 0.00 0.00 1.05
As' req mm² 0 0 12
fst N/mm² 438.1 438.1 438.1 Fig 3.3
As req mm² 124 348 489
Project Spreadsheets to BS 8110
Location 3rd Floor slab, from 1 to 5a CALCS III
RIBBED SLABS to BS 8110:1997 (Analysis & Design) Made by rmw Job No R68
Originated from RCC32.xls v2.2 on CD © 2000-2003 BCA for RCC Date 5-Feb-18
SPAN 2 cont

TENSION STEEL
As deflection mm² 324 630 753
As to provide mm² 124 630 489
Ø in rib mm ok 20 ok 20 ok 20
No 2 3 2
As prov mm² 628 942 628
=% % ok 1.570 ok 2.354 ok 1.570
Clear dist mm 105.8 22.6 105.8 between bars
Min S mm ok 25.0 !!! 25.0 ok 25.0 3.12.11.1
Max S mm ok 152.2 ok 240.1 ok 152.2 3.12.11.2.4
Residual
Min % 0.26% 0.26%
As resid mm² 0 125
Ø extra mm 8 8
No 4 4
As prov mm² 201 201
COMPRESSION STEEL
Required mm² 283 348 283 Table 3.25
Ø mm ok 12 ok 12 ok 12
No 3 4 3
As' prov mm² 339 452 339
=% % ok 0.848 ok 1.130 ok 0.848 3.12.6.1
Clear dist mm 34.2 32.9 34.2 between bars
Min S mm ok 25.0 ok 25.0 ok 25.0 3.12.11.1
DEFLECTION
fs N/mm² 120.0 195.7 327.7 Eqn 8
Base ratio 7.00 20.80 3.4.6.3/4
Tens Mod 2.00 1.73 Table 3.10
Comp Mod 1.00 1.07 Table 3.11
Perm L/d - 0.00 38.29 3.4.6.3
Actual L/d ok 0.00 ok 29.29 3.4.5.1
As req increased by % 0.00 0.12

RIB SHEAR
V cl kN/m 59.09 67.12
distance from c/L m 1.100 1.100 3.4.5.10
V rib kN 37.85 45.08
v N/mm² 0.9455 1.1261 Eqn 3
vc N/mm² 0.9345 NOMINAL 0.9345 Table 3.8
(v-vc)bv N/mm 67.0 0.0 67.0 Table 3.7
Link Ø mm 6 6 6 3.12.7.1
@ mm 175 1200 140 Spacing
for mm 175 2400 560 from solid
As Dist mm ok 42.6 3.4.5.5
As' Dist mm ok 46.2 ok 44.9 ok 46.2 3.12.7.2
Project Spreadsheets to BS 8110
Location 3rd Floor slab, from 1 to 5a CALCS IV
RIBBED SLABS to BS 8110:1997 (Analysis & Design) Made by rmw Job No R68
Originated from RCC32.xls v2.2 on CD © 2000-2003 BCA for RCC Date 5-Feb-18

REINFORCEMENT DESIGN SPAN 3 L= 7.500 h = 275


- bw = 167.5 BS8110
MAIN STEEL LEFT SPAN RIGHT Ref
ßb 0.850 0.943 1.000
M/m kNm/m 83.25 71.04 0.00
M/rib kNm 74.92 63.93 0.00 -=-
d mm 239.0 236.5 239.0
bf mm 900 900 900
K' 0.1445 0.1558 0.1558 3.4.4.4
Web Mres kNm 43.32 42.42 46.71 Fig 3.3
Flange Mres kNm 259.91 262.41 280.29 -=-
K 0.0416 0.0363 0.0000 3.4.4.4
z mm 227.05 224.68 227.05 -=-
x mm 26.56 26.28 26.56 -=-
d' mm 32.0 32.0 34.0
net fsc N/mm² 0.0 0.0 0.0 Fig 3.3
Excess M kNm 0.00 0.00 0.00
As' req mm² 0 0 0
fst N/mm² 438.1 438.1 438.1 Fig 3.3
As req mm² 753 650 0
bw/b 0.19
Min % % 0.13% 0.18% 0.13% Table 3.25
Min As mm² 322 83 322
At Edge of Solid dmid = 236.5 d'mid = 38.5
M/m kNm/m 46.57 27.15 0.00
M/rib kNm 41.92 24.44 0.00
bf mm 150 150 150
K 0.1398 0.0832 0.0000 3.4.4.4
z mm 193.04 212.12 227.05 -=-
x mm 102.12 54.18 26.56 -=-
net fsc N/mm² 422.5 187.0 0.0 Fig 3.3
Excess M kNm 0.00 0.00 0.00
As' req mm² 0 0 0
fst N/mm² 438.1 438.1 438.1 Fig 3.3
As req mm² 462 263 0
TENSION STEEL
As deflection mm² 753 872 0
As to provide mm² 462 872 120
Ø in rib mm ok 20 ok 25 ok 20
No 2 2 2
As prov mm² 628 982 628
=% % ok 1.570 ok 2.478 ok 1.570
Clear dist mm 105.8 55.7 105.8 between bars
Min S mm ok 25.0 ok 25.0 ok 25.0 3.12.11.1
Max S mm ok 152.2 ok 218.4 ok 152.2 3.12.11.2.4
Residual
Min % 0.26% 0.26%
As resid mm² 125 0
Ø extra mm 8 8
No 4 4
As prov mm² 201 201
COMPRESSION STEEL
Required mm² 295 263 491 Table 3.25
Ø mm ok 12 ok 12 ok 16
No 3 3 3
As' prov mm² 339 339 603
=% % ok 0.848 ok 0.857 ok 1.507 3.12.6.1
Clear dist mm 34.2 55.3 28.4 between bars
Min S mm ok 25.0 ok 25.0 ok 25.0 3.12.11.1
Project Spreadsheets to BS 8110
Location 3rd Floor slab, from 1 to 5a CALCS V
RIBBED SLABS to BS 8110:1997 (Analysis & Design) Made by rmw Job No R68
Originated from RCC32.xls v2.2 on CD © 2000-2003 BCA for RCC Date 5-Feb-18
SPAN 3 cont

DEFLECTION
fs N/mm² 327.7 215.2 1.0 Eqn 8
Base ratio 7.00 20.80 3.4.6.3/4
Tens Mod 1.08 1.56 Table 3.10
Comp Mod 1.00 1.05 Table 3.11
Perm L/d - 0.00 33.99 3.4.6.3
Actual L/d ok 0.00 ok 31.71 3.4.5.1
As req increased by % 0.00 0.34

RIB SHEAR
V cl kN/m 68.30 46.55
distance from c/L m 1.100 0.450 3.4.5.10
V rib kN 46.14 35.62
v N/mm² 1.1525 0.8899 Eqn 3
vc N/mm² 0.9345 NOMINAL 0.9345 Table 3.8
(v-vc)bv N/mm 67.0 0.0 67.0 Table 3.7
Link Ø mm 6 6 6 3.12.7.1
@ mm 175 1200 175 Spacing
for mm 700 3600 0 from solid
As Dist mm ok 0 3.4.5.5
As' Dist mm ok 46.2 ok 67.3 ok 44.4 3.12.7.2

REINFORCEMENT DESIGN SPAN 4 L= 0.000 h=0


- No Span 4 - bw = 140
MAIN STEEL LEFT SPAN RIGHT
ßb 1.000 #VALUE! ~
M/m kNm/m 0.00 ~ ~
M/rib kNm 0.00 #VALUE! #VALUE! -=-
d mm -36.0 -36.0 -36.0
bf mm 900 900 900
K' 0.1558 #VALUE! 0.1558 3.4.4.4
Web Mres kNm 1.06 1.06 1.06 Fig 3.3
Flange Mres kNm 6.36 #VALUE! 6.36 -=-
K 0.0000 #VALUE! #VALUE! 3.4.4.4
z mm -34.20 #VALUE! #VALUE! -=-
x mm -4.00 #VALUE! #VALUE! -=-
d' mm 34.0 34.0 34.0
net fsc N/mm² 438.1 #VALUE! #VALUE! Fig 3.3
Excess M kNm 0.00 #VALUE! #VALUE!
As' req mm² 0 #VALUE! #VALUE!
fst N/mm² 438.1 #VALUE! #VALUE! Fig 3.3
As req mm² 0 #VALUE! #VALUE!
bw/b 0.16
Min % % 0.13% 0.18% 0.13% Table 3.25
Min As mm² 0 0 0
At Edge of Solid dmid = -36.0 d'mid = 36.0
M/m kNm/m 0.00 0.00 0.00
M/rib kNm 0.00 0.00 0.00
bf mm 150 150 150
K 0.0000 0.0000 0.0000 3.4.4.4
z mm -34.20 #VALUE! -34.20 -=-
x mm -4.00 #VALUE! -4.00 -=-
net fsc N/mm² 438.1 #VALUE! 438.1 Fig 3.3
Excess M kNm 0.00 0.00 0.00
As' req mm² 0 #VALUE! 0
fst N/mm² 438.1 #VALUE! 438.1 Fig 3.3
As req mm² 0 #VALUE! 0
Project Spreadsheets to BS 8110
Location 3rd Floor slab, from 1 to 5a CALCS VI
RIBBED SLABS to BS 8110:1997 (Analysis & Design) Made by rmw Job No R68
Originated from RCC32.xls v2.2 on CD © 2000-2003 BCA for RCC Date 5-Feb-18
SPAN 4 cont

TENSION STEEL
As deflection mm² 0 #VALUE! #VALUE!
As to provide mm² 0 #VALUE! 0
Ø in rib mm ok 20 ok 20 ok 20
No 2 #VALUE! 2
As prov mm² 628 #VALUE! 628 #DIV/0!
=% % ok -12.467 #VALUE! #VALUE! ok -12.467
Clear dist mm 50.8 #VALUE! 50.8 between bars
Min S mm ok 25.0 #VALUE! 25.0 ok 25.0 3.12.11.1
Max S mm ok 152.2 #VALUE! #VALUE! ok 152.2 3.12.11.2.4
Residual
Min % 0.26% 0.26%
As resid mm² 0 #VALUE!
Ø extra mm 8 #VALUE!
No 4 #VALUE!
As prov mm² 0 #VALUE!
COMPRESSION STEEL
Required mm² #VALUE! #VALUE! #VALUE! Table 3.25
Ø mm ok 16 ok 16 ok 16
No #VALUE! #VALUE! #VALUE!
As' prov mm² #VALUE! #VALUE! #VALUE!
=% % #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 3.12.6.1
Clear dist mm #VALUE! #VALUE! #VALUE! between bars
Min S mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 3.12.11.1
DEFLECTION
fs N/mm² 0.0 #VALUE! #VALUE! Eqn 8
Base ratio 7.00 20.80 3.4.6.3/4
Tens Mod 2.00 #VALUE! Table 3.10
Comp Mod 1.00 #VALUE! Table 3.11
Perm L/d - 0.00 #VALUE! 3.4.6.3
Actual L/d ok 0.00 #VALUE! 0.00 3.4.5.1
As req increased by % 0.00 #VALUE!

RIB SHEAR
V cl kN/m 0.00 0.00
distance from c/L m -0.036 -0.036 3.4.5.10
V rib kN 0.00 0.00
v N/mm² 0.0000 0.0000 Eqn 3
vc N/mm² #VALUE! NOMINAL #VALUE! Table 3.8
(v-vc)bv N/mm #VALUE! 0.0 #VALUE! Table 3.7
Link Ø mm 6 6 6 3.12.7.1
@ mm #VALUE! 1200 #VALUE! Spacing
for mm #VALUE! #VALUE! #VALUE! from solid
As Dist mm #VALUE! #VALUE! 3.4.5.5
As' Dist mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 3.12.7.2
Project Spreadsheets to BS 8110
Location 3rd Floor slab, from 1 to 5a CALCS VII
RIBBED SLABS to BS 8110:1997 (Analysis & Design) Made by rmw Job No R68
Originated from RCC32.xls v2.2 on CD © 2000-2003 BCA for RCC Date 5-Feb-18

REINFORCEMENT DESIGN SPAN 5 L= 0.000 h=0


- No Span 5 - bw = 140 BS8110
MAIN STEEL LEFT SPAN RIGHT Ref
ßb ~ #VALUE! ~
M/m kNm/m ~ ~ ~
M/rib kNm #VALUE! #VALUE! #VALUE! -=-
d mm -36.0 -38.5 -34.0
bf mm 900 900 900
K' 0.1558 #VALUE! 0.1558 3.4.4.4
Web Mres kNm 1.06 1.21 0.95 Fig 3.3
Flange Mres kNm 6.36 #VALUE! 5.67 -=-
K #VALUE! #VALUE! #VALUE! 3.4.4.4
z mm #VALUE! #VALUE! #VALUE! -=-
x mm #VALUE! #VALUE! #VALUE! -=-
d' mm 34.0 32.0 36.0
net fsc N/mm² #VALUE! #VALUE! #VALUE! Fig 3.3
Excess M kNm #VALUE! #VALUE! #VALUE!
As' req mm² #VALUE! #VALUE! #VALUE!
fst N/mm² #VALUE! #VALUE! #VALUE! Fig 3.3
As req mm² #VALUE! #VALUE! #VALUE!
bw/b 0.16
Min % % 0.13% 0.18% 0.13% Table 3.25
Min As mm² 0 0 0
At Edge of Solid dmid = -38.5 d'mid = 38.5
M/m kNm/m 0.00 0.00 0.00
M/rib kNm 0.00 0.00 0.00
bf mm 150 150 150
K 0.0000 0.0000 0.0000 3.4.4.4
z mm -34.20 #VALUE! -32.30 -=-
x mm -4.00 #VALUE! -3.78 -=-
net fsc N/mm² 438.1 #VALUE! 438.1 Fig 3.3
Excess M kNm 0.00 0.00 0.00
As' req mm² 0 #VALUE! 0
fst N/mm² 438.1 #VALUE! 438.1 Fig 3.3
As req mm² 0 #VALUE! 0
TENSION STEEL
As deflection mm² #VALUE! #VALUE! #VALUE!
As to provide mm² 0 #VALUE! 0
Ø in rib mm ok 20 ok 25 ok 16
No 2 #VALUE! 2
As prov mm² 628 #VALUE! 402
=% % ok -12.467 #VALUE! #VALUE! ok -8.448
Clear dist mm 50.8 #VALUE! 59.2 between bars
Min S mm ok 25.0 #VALUE! 25.0 ok 25.0 3.12.11.1
Max S mm ok 152.2 #VALUE! #VALUE! ok 152.2 3.12.11.2.4
Residual
Min % 0.26% 0.26%
As resid mm² #VALUE! #VALUE!
Ø extra mm #VALUE! #VALUE!
No #VALUE! #VALUE!
As prov mm² 0 #VALUE!
COMPRESSION STEEL
Required mm² #VALUE! #VALUE! #VALUE! Table 3.25
Ø mm ok 16 ok 12 ok 20
No #VALUE! #VALUE! #VALUE!
As' prov mm² #VALUE! #VALUE! #VALUE!
=% % #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 3.12.6.1
Clear dist mm #VALUE! #VALUE! #VALUE! between bars
Min S mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 3.12.11.1
Project Spreadsheets to BS 8110
Location 3rd Floor slab, from 1 to 5a CALCS VII
RIBBED SLABS to BS 8110:1997 (Analysis & Design) Made by rmw Job No R68
Originated from RCC32.xls v2.2 on CD © 2000-2003 BCA for RCC Date 5-Feb-18
SPAN 5 cont

DEFLECTION
fs N/mm² #VALUE! #VALUE! #VALUE! Eqn 8
Base ratio 7.00 20.80 3.4.6.3/4
Tens Mod #VALUE! #VALUE! Table 3.10
Comp Mod 1.00 #VALUE! Table 3.11
Perm L/d - 0.00 #VALUE! 3.4.6.3
Actual L/d ok 0.00 #VALUE! 0.00 3.4.5.1
As req increased by % 0.00 #VALUE!

RIB SHEAR
V cl kN/m 0.00 0.00
distance from c/L m -0.036 -0.034 3.4.5.10
V rib kN 0.00 0.00
v N/mm² 0.0000 0.0000 Eqn 3
vc N/mm² #VALUE! NOMINAL #VALUE! Table 3.8
(v-vc)bv N/mm #VALUE! 0.0 #VALUE! Table 3.7
Link Ø mm 6 6 6 3.12.7.1
@ mm #VALUE! 1200 #VALUE! Spacing
for mm #VALUE! #VALUE! #VALUE! from solid
As Dist mm #VALUE! #VALUE! 3.4.5.5
As' Dist mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 3.12.7.2

REINFORCEMENT DESIGN SPAN 6 L= 0.000 h=0


- No Span 6 - bw = 140 BS8110
MAIN STEEL LEFT SPAN RIGHT Ref
ßb ~ #VALUE! ~
M/m kNm/m ~ ~ kNm/m
M/rib kNm #VALUE! #VALUE! #VALUE! -=-
d mm -34.0 -34.0 -32.0
bf mm 900 900 900
K' 0.1558 #VALUE! 0.1558 3.4.4.4
Web Mres kNm 0.95 0.95 0.84 Fig 3.3
Flange Mres kNm 5.67 #VALUE! 5.02 -=-
K #VALUE! #VALUE! #VALUE! 3.4.4.4
z mm #VALUE! #VALUE! #VALUE! -=-
x mm #VALUE! #VALUE! #VALUE! -=-
d' mm 36.0 32.0 34.0
net fsc N/mm² #VALUE! #VALUE! #VALUE! Fig 3.3
Excess M kNm #VALUE! #VALUE! #VALUE!
As' req mm² #VALUE! #VALUE! #VALUE!
fst N/mm² #VALUE! #VALUE! #VALUE! Fig 3.3
As req mm² #VALUE! #VALUE! #VALUE!
bw/b 0.16
Min % % 0.13% 0.18% 0.13% Table 3.25
Min As mm² 0 0 0
At Edge of Solid dmid = -34.0 d'mid = 34.0
M/m kNm/m 0.00 0.00 0.00
M/rib kNm 0.00 0.00 0.00
bf mm 150 150 150
K 0.0000 0.0000 0.0000 3.4.4.4
z mm -32.30 #VALUE! -30.40 -=-
x mm -3.78 #VALUE! -3.56 -=-
net fsc N/mm² 438.1 #VALUE! 438.1 Fig 3.3
Excess M kNm 0.00 0.00 0.00
As' req mm² 0 #VALUE! 0
fst N/mm² 438.1 #VALUE! 438.1 Fig 3.3
As req mm² 0 #VALUE! 0
Project Spreadsheets to BS 8110
Location 3rd Floor slab, from 1 to 5a CALCS IX
RIBBED SLABS to BS 8110:1997 (Analysis & Design) Made by rmw Job No R68
Originated from RCC32.xls v2.2 on CD © 2000-2003 BCA for RCC Date 5-Feb-18
SPAN 6 cont

TENSION STEEL
As deflection mm² #VALUE! #VALUE! #VALUE!
As to provide mm² 0 #VALUE! 0
Ø in rib mm ok 16 ok 16 ok 12
No 2 #VALUE! 2
As prov mm² 402 #VALUE! 226
=% % ok -8.448 #VALUE! #VALUE! ok -5.049
Clear dist mm 59.2 #VALUE! 67.6 between bars
Min S mm ok 25.0 #VALUE! 25.0 ok 25.0 3.12.11.1
Max S mm ok 152.2 #VALUE! #VALUE! ok 152.2 3.12.11.2.4
Residual
Min % 0.26% 0.26%
As resid mm² #VALUE! #VALUE!
Ø extra mm #VALUE! #VALUE!
No #VALUE! #VALUE!
As prov mm² 0 #VALUE!
COMPRESSION STEEL
Required mm² #VALUE! #VALUE! #VALUE! Table 3.25
Ø mm ok 20 ok 12 ok 16
No #VALUE! #VALUE! #VALUE!
As' prov mm² #VALUE! #VALUE! #VALUE!
=% % #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 3.12.6.1
Clear dist mm #VALUE! #VALUE! #VALUE! between bars
Min S mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 3.12.11.1
DEFLECTION
fs N/mm² #VALUE! #VALUE! #VALUE! Eqn 8
Base ratio 7.00 20.80 3.4.6.3/4
Tens Mod #VALUE! #VALUE! Table 3.10
Comp Mod 1.00 #VALUE! Table 3.11
Perm L/d - 0.00 #VALUE! 3.4.6.3
Actual L/d ok 0.00 #VALUE! 0.00 3.4.5.1
As req increased by % 0.00 #VALUE!

RIB SHEAR
V cl kN/m 0.00 0.00
distance from c/L m -0.034 -0.032 3.4.5.10
V rib kN 0.00 0.00
v N/mm² 0.0000 0.0000 Eqn 3
vc N/mm² #VALUE! NOMINAL #VALUE! Table 3.8
(v-vc)bv N/mm #VALUE! 0.0 #VALUE! Table 3.7
Link Ø mm 6 6 6 3.12.7.1
@ mm #VALUE! 1200 #VALUE! Spacing
for mm #VALUE! #VALUE! #VALUE! from solid
As Dist mm #VALUE! #VALUE! 3.4.5.5
As' Dist mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 3.12.7.2
Project Spreadsheets to BS 8110
Location 3rd Floor slab, from 1 to 5a GRAPH DATA I
RIBBED SLABS to BS 8110:1997 (Analysis & Design) Made by rmw Job No R68
Originated from RCC32.xls v2.2 on CD © 2000-2003 BCA for RCC Date 5-Feb-18

LOADING DIAGRAM
Beam 0 16.5 -5.046
0 0
Supports 0 0 2 2 9 9 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5
0 0 -5.0463 0 -5.0463 0 -5.0463 0 -5.0463 0 -5.0463 0 -5.0463 0
UDL's 0 0 2 2 2 9 9 9 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5
Dead 0 8.23 8.2337 0 6.69 6.6851 0 6.32 6.3233 0 0.00 0 0 0.00 0 0 0.00 0 0
Imposed 8.2337 12.23 12.234 8.2337 10.69 10.685 6.6851 10.32 10.323 6.3233 0.00 0 0 0.00 0 0 0.00 0 0
PL's 0 0 0 0 3.45 3.45 2 2 9 9 9 9 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5
Dead 12.234 12.23 12.234 12.23 10.685 19.19 10.685 10.69 10.323 10.32 10.323 10.32 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
Imposed 12.234 12.23 12.234 12.23 19.185 20.19 10.685 10.69 10.323 10.32 10.323 10.32 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
MOMENT DIAGRAMS
SPAN 1 Edge of solid
X 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 0.45 0.9
M(e) all 0 0.0896 0.3585 0.8067 1.4342 2.2409 3.2269 4.3922 5.7367 7.2605 8.9636 10.846 12.908 15.148 17.569 20.168 22.947 25.905 29.042 32.359 35.854 1.8151 7.2605
M(e) odd 0 0.0896 0.3585 0.8067 1.4342 2.2409 3.2269 4.3922 5.7367 7.2605 8.9636 10.846 12.908 15.148 17.569 20.168 22.947 25.905 29.042 32.359 35.854 1.8151 7.2605
M(e) even 0 0.0412 0.1647 0.3705 0.6587 1.0292 1.4821 2.0173 2.6348 3.3346 4.1168 4.9814 5.9283 6.9575 8.069 9.2629 10.539 11.898 13.339 14.862 16.467 0.8337 3.3346
Beam 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
M(r) all 0 0.0896 0.3585 0.8067 1.4342 2.2409 3.2269 4.3922 5.7367 7.2605 8.9636 10.846 12.908 15.148 17.569 20.168 22.947 25.905 29.042 32.359 35.854 1.8151 7.2605
M(r) odd 0 0.0896 0.3585 0.8067 1.4342 2.2409 3.2269 4.3922 5.7367 7.2605 8.9636 10.846 12.908 15.148 17.569 20.168 22.947 25.905 29.042 32.359 35.854 1.8151 7.2605
M(r) even 0 0.0412 0.1647 0.3705 0.6587 1.0292 1.4821 2.0173 2.6348 3.3346 4.1168 4.9814 5.9283 6.9575 8.069 9.2629 10.539 11.898 13.339 14.862 16.467 0.8337 3.3346
70% max 0 0.0627 0.251 0.5647 1.0039 1.5686 2.2588 3.0745 4.0157 5.0824 6.2745 7.5922 9.0353 10.604 12.298 14.118 16.063 18.133 20.329 22.651 25.098 1.2706 5.0824
70% min 0 0.0288 0.1153 0.2594 0.4611 0.7204 1.0374 1.4121 1.8443 2.3343 2.8818 3.487 4.1498 4.8702 5.6483 6.484 7.3774 8.3284 9.337 10.403 11.527 0.5836 2.3343
Lower bound 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Upper bound 0 0.0896 0.3585 0.8067 1.4342 2.2409 3.2269 4.3922 5.7367 7.2605 8.9636 10.846 12.908 15.148 17.569 20.168 22.947 25.905 29.042 32.359 35.854 1.8151 7.2605
Beam 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SPAN 2
Local X 0 0.35 0.7 1.05 1.4 1.75 2.1 2.45 2.8 3.15 3.5 3.85 4.2 4.55 4.9 5.25 5.6 5.95 6.3 6.65 7 1.1 5.9
X 2 2.35 2.7 3.05 3.4 3.75 4.1 4.45 4.8 5.15 5.5 5.85 6.2 6.55 6.9 7.25 7.6 7.95 8.3 8.65 9
M(e) all 35.854 16.873 -0.1787 -15.299 -28.49 -35.699 -40.304 -42.978 -43.721 -42.534 -39.416 -34.368 -27.389 -18.48 -7.6405 5.1296 19.83 36.461 55.023 75.515 97.937 -17.302 33.967
M(e) odd 35.854 27.395 19.754 12.932 6.9293 4.2954 2.9053 2.3342 2.582 3.6488 5.5344 8.239 11.762 16.105 21.266 27.246 34.046 41.664 50.101 59.357 69.432 12.025 40.525
M(e) even 16.467 -2.9348 -20.406 -35.948 -49.558 -57.188 -62.213 -65.307 -66.471 -65.704 -63.007 -58.379 -51.821 -43.332 -32.913 -20.563 -6.2833 9.9274 28.069 48.14 70.142 -38.01 7.4934
Beam 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
M(r) all 35.854 16.138 -1.6477 -17.503 -31.428 -39.372 -44.711 -48.119 -49.597 -49.145 -46.761 -42.448 -36.204 -28.029 -17.924 -5.8884 8.0777 23.974 41.801 61.559 83.247 -19.61 21.585
M(r) odd 35.854 27.915 20.795 14.494 9.0123 6.8991 6.0298 5.9794 6.7479 8.3354 10.742 13.967 18.011 22.874 28.557 35.058 42.377 50.516 59.474 69.251 79.846 13.661 49.303
M(r) even 16.467 -2.4087 -19.354 -34.369 -47.454 -54.558 -59.057 -61.625 -62.263 -60.97 -57.746 -52.593 -45.508 -36.493 -25.548 -12.672 2.1338 18.871 37.538 58.136 80.664 -36.357 16.361
70% max 25.098 19.176 13.828 9.0525 4.8505 3.0068 2.0337 1.634 1.8074 2.5541 3.8741 5.7673 8.2337 11.273 14.886 19.073 23.832 29.165 38.516 52.86 68.556 8.4172 28.368
70% min 11.527 -2.0543 -14.284 -25.163 -34.691 -40.032 -43.549 -45.715 -46.53 -45.993 -44.105 -40.866 -36.275 -30.333 -23.039 -14.394 -4.3983 6.9492 19.648 33.698 48.602 -26.607 5.2454
Lower bound 0 -2.4087 -19.354 -34.369 -47.454 -54.558 -59.057 -61.625 -62.263 -60.97 -57.746 -52.593 -45.508 -36.493 -25.548 -14.394 -4.3983 0 0 0 0
Upper bound 35.854 27.915 20.795 14.494 9.0123 6.8991 6.0298 5.9794 6.7479 8.3354 10.742 13.967 18.011 22.874 28.557 35.058 42.377 50.516 59.474 69.251 83.247 13.661 49.303
Beam 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SPAN 3
Local X 0 0.375 0.75 1.125 1.5 1.875 2.25 2.625 3 3.375 3.75 4.125 4.5 4.875 5.25 5.625 6 6.375 6.75 7.125 7.5 1.1 7.05
X 9 9.375 9.75 10.125 10.5 10.875 11.25 11.625 12 12.375 12.75 13.125 13.5 13.875 14.25 14.625 15 15.375 15.75 16.125 16.5
M(e) all 97.937 72.664 49.535 28.552 9.713 -6.9808 -21.53 -33.934 -44.193 -52.307 -58.276 -62.101 -63.78 -63.315 -60.705 -55.95 -49.049 -40 -28.815 -15.48 0 29.884 -18.318
M(e) odd 69.432 45.583 23.88 4.3218 -13.092 -28.36 -41.484 -52.463 -61.296 -67.985 -72.529 -74.929 -75.183 -73.292 -69.256 -63.076 -54.751 -44.28 -31.665 -16.905 0 5.5589 -20.029
M(e) even 70.142 58.188 47.122 36.946 27.659 19.261 11.753 5.1332 -0.597 -5.4379 -9.3897 -12.452 -14.625 -15.91 -16.304 -15.81 -14.426 -12.154 -8.9917 -4.9404 0 37.597 -5.8218
Beam 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
M(r) all 83.247 58.708 36.314 16.065 -2.0395 -18 -31.813 -43.483 -53.007 -60.387 -65.622 -68.712 -69.657 -68.457 -65.112 -59.622 -51.988 -42.208 -30.284 -16.214 0 17.348 -19.2
M(r) odd 79.846 55.477 33.253 13.174 -4.7599 -20.549 -34.194 -45.693 -55.048 -62.257 -67.322 -70.242 -71.017 -69.647 -66.132 -60.472 -52.668 -42.718 -30.624 -16.384 0 14.446 -19.404
M(r) even 80.664 68.183 56.591 45.889 36.076 27.152 19.117 11.972 5.7158 0.3488 -4.129 -7.7176 -10.417 -12.227 -13.148 -13.18 -12.322 -10.575 -7.9395 -4.4144 0 46.575 -5.1905
70% max 68.556 50.865 34.675 25.862 19.361 13.483 8.2268 3.5932 -0.4179 -3.8066 -6.5728 -8.7165 -10.238 -11.137 -11.413 -11.067 -10.099 -8.5076 -6.2942 -3.4583 0 26.318 -4.0753
70% min 48.602 31.908 16.716 3.0252 -9.1642 -19.852 -29.039 -36.724 -42.908 -47.59 -50.771 -52.45 -52.628 -51.304 -48.48 -44.153 -38.325 -31 -22.166 -11.834 0 3.8913 -14.02
Lower bound 0 0 0 0 -9.1642 -20.549 -34.194 -45.693 -55.048 -62.257 -67.322 -70.242 -71.017 -69.647 -66.132 -60.472 -52.668 -42.718 -30.624 -16.384 0
Upper bound 83.247 68.183 56.591 45.889 36.076 27.152 19.117 11.972 5.7158 0.3488 0 0 0 0 0 0 0 0 0 0 0 46.575 0
Beam 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SPAN 4
Local X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
X 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5
M(e) all 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
M(e) odd 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
M(e) even 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Beam 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
M(r) all 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
M(r) odd 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
M(r) even 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
70% max 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
70% min 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Lower bound 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Upper bound 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Beam 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

378333227.xls 17:03:28 02/05/2018


Project Spreadsheets to BS 8110
Location 3rd Floor slab, from 1 to 5a GRAPH DATA II
RIBBED SLABS to BS 8110:1997 (Analysis & Design) Made by rmw Job No R68
Originated from RCC32.xls v2.2 on CD © 2000-2003 BCA for RCC Date 5-Feb-18

SPAN 5
Local X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
X 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5
M(e) all 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
M(e) odd 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
M(e) even 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Beam 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
M(r) all 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
M(r) odd 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
M(r) even 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
70% max 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
70% min 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Lower bound 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Upper bound 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Beam 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SPAN 6
Local X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
X 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5
M(e) all 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
M(e) odd 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
M(e) even 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Beam 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
M(r) all 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
M(r) odd 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
M(r) even 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
70% max 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
70% min 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Lower bound 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Upper bound 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Beam 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SHEAR FORCE DIAGRAMS


SPAN 1 SPAN 2 SPAN 3 SPAN 4 SPAN 5 SPAN 6
Local X 0 0 0 0 0 0 2 0 1.45 1.45 1.45 1.45 7 0 0 0 0 0 7.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
X 0 0 0 0 0 0 2 2 3.45 3.45 3.45 3.45 9 9 9 9 9 9 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5
V(e) all 0 0 0 0 0 0 -35.854 56.991 34.141 20.641 20.641 20.641 -66.822 70.256 70.256 70.256 70.256 70.256 -44.139 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
V(e) odd 0 0 0 0 0 0 -35.854 25.34 15.647 7.1469 7.1469 7.1469 -29.955 66.455 66.455 66.455 66.455 66.455 -47.94 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
V(e) even 0 0 0 0 0 0 -16.467 58.193 35.342 21.842 21.842 21.842 -65.621 33.065 33.065 33.065 33.065 33.065 -14.36 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
V(r) all 0 0 0 0 0 0 -35.854 59.09 36.239 22.739 22.739 22.739 -64.724 68.297 68.297 68.297 68.297 68.297 -46.098 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
V(r) odd 0 0 0 0 0 0 -35.854 23.852 14.159 5.6591 5.6591 5.6591 -31.443 67.844 67.844 67.844 67.844 67.844 -46.551 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
V(r) even 0 0 0 0 0 0 -16.467 56.689 33.839 20.339 20.339 20.339 -67.124 34.468 34.468 34.468 34.468 34.468 -12.957 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Lower bound 0 0 0 0 0 0 -35.854 23.852 14.159 5.6591 5.6591 5.6591 -67.124 34.468 34.468 34.468 34.468 34.468 -46.551 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Upper bound 0 0 0 0 0 0 -16.467 59.09 36.239 22.739 22.739 22.739 -31.443 68.297 68.297 68.297 68.297 68.297 -12.957 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Beam 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

GRIDS 2 2 9 9 16.5 16.5 16.5 16.5 16.5 16.5 16.5 16.5


-75.34 97.937 -75.339 97.937 -75.339 97.937 -75.339 97.937 -75.339 97.937 -75.339 97.937

378333227.xls 17:03:28 02/05/2018


Disclaimer
All advice or information from the British Cement Association and/or Reinforced Concrete Counc
intended for those who will evaluate the significance and limitations of its contents and t
responsibility for its use and application. No liability (including that for negligence) for any
resulting from such advice or information is accepted by the BCA, RCC or their subcontract
suppliers or advisors. Users should note that all BCA software and publications are subjec
revision from time to time and should therefore ensure that they are in possession of the la
version.

This spreadsheet should be used in compliance with the accompanying publication 'Spreadshe
for concrete design to BS 8110 and EC2' available from British Cement Association, Telford Aven
Crowthorne, Berkshire RG45 6YS.

Status of spreadsheet
Public release version.

Revision history RCC32 Ribbed Slabs (A & D)

Date Version
21-Jan-03 RCC32 v2.2
1-Dec-02 RCC32 v2.1
11-Oct-02 RCC32 v2.0
8-Apr-02 RCC32 v1.6

5-Apr-02 RCC32 v1.5

5-May-01 RCC32 v1.4

1-Jun-00 RCC32 v1.3

15-Feb-00 RCC32 v1.2

2-Feb-00 RCC32 v1.1

4-Aug-99 RCC32 v1.0


formation from the British Cement Association and/or Reinforced Concrete Council is
hose who will evaluate the significance and limitations of its contents and take
or its use and application. No liability (including that for negligence) for any loss
such advice or information is accepted by the BCA, RCC or their subcontractors,
visors. Users should note that all BCA software and publications are subject to
me to time and should therefore ensure that they are in possession of the latest

et should be used in compliance with the accompanying publication 'Spreadsheets


sign to BS 8110 and EC2' available from British Cement Association, Telford Avenue,
rkshire RG45 6YS.

This spreadsheet is shareware. It may be distributed freely, but may not


be used for commercial purposes until the user has registered with the
RCC.
ry RCC32 Ribbed Slabs (A & D)

Action Size (kB)


DETR logo replaced by DTI. 834
Correction for cantilever at span 1. 852
Version 2 enhancements 856
Similar correction at BAR!G563. 833
Deflection base ratio bug for spans >10m fixed at Bar!G74,
833
E164 etc (v1.2 fix had reverted).
Warning message corrected in MAIN:L30 etc 762
Compresion steel mod factor now based on bf, and in spans, x
762
limit of hf/0.9 checked.
Deflection base ratio bug for spans >10m fixed at Bar!G74,
758
G164 etc.
Single span deflection base ratio added 758