Вы находитесь на странице: 1из 1

CURICULUM VITAE

Personal Detail's
Name SUMARNO
Place & Date of Birth Cilacap, DESEMBER 301 , h1973
Sex Male
Marital Status
MARRIED
Nationality
Indonesia
Religion
Moslem
Home Address J I. Baruna Timur v No. 192 RT. 07 RW. 16
Cilacap Centra Java - Indonesia

Education Contact Technical High School

Number 082136058030

Qualifications Summary
Application of welding using by SMAW/ GTAW Including Castrion using by SMAW electrodes
(E6010/E6070/E7016/E8018-B2/ E9018-B3/) and Stainless steel (E308/E316/E347) Deplex (E2209) GTAW
(ER 705-G/ER80S-G/ER90S-G/ Er 308 / ER 316/ ER 2209/ ERBNiCu7) We encounter of this pipe line.
Water steam pipe line and heavy wall pipe, gas line an chemical pipe line.
DUTIES and RESPONSIBILITIES
 Qualified to weld Carbon steel, alloy steel, stainless steel using GTAW/ SMAW Process
 Responsible for full welding of different size of pipe small bore or carbon steel pipe, alloy steel and stainless steel
 Checked the type full welding preparation and fit up including root gap, root face, bevel angle aligment and joint
clean lines
 Ensure that the filler root and electrodes should be compatible to the base metal and be sure that all surface to
welder shall be free from any kind of dirt (pain, grease, rush and etc)
 Ensure that all work must be done right and the same time with quality and with absorvence of safety rule and
regulation

Working of Experiences
- -- - - - - - - -- -- - - - =- - -- - - - -- - -
01 PT. KARYA TERPADU WELDER PLTU SINTANG April 01th , 2016 Job
ENG. KAL.BAR June 15th , 2017 Completed
3X7 MW
02 PT. DAEAH E & C WELDER RFCC Project Mei , 2013 Job
INDONESIA SPV. Pertamina UP IV June , 2015 Completed
Cilacap
03 PT. RAFLIN ENG. WELDER WILMAR NABATI DES 25th, 2011 Contract
GRESIK JAN 30th, 2013 Completed
04 PT. SEKAWAN WELDER PETROKIMIA SEMEN MEI 03th,2010 Job
KONTRINDO TUBAN JULI 31th,2Q13 completed
05 PT. VASA INDUSTRI WELDER CONOCO PHILIPHS MARET 17th, 2009 Job
NUSANTARA SUBAN JULI 15th, 2009 Completed
06 PT. KYPJO WELDER TANGGUH LNG WEST DES 16th, 2007 Contract
(PROMITS) PAPUA JAN 28th, 2009 Completed
07 PT. ENERGIKON ENG. WELDER KILANG PERTAMINA FEB 05th, 2007 Job
co UP IV CILACAP AUGUST 31th, 2007 Completed
08 PT. TRUBA JURONG WELDER CILACAP 2X300 MW MEI 03th·2005 Job
ENG. COAL FIRE STEAM JAN 26th,2Q06 Completed
POWER PLANT
ClLACAP
09 PT. INDONESIA WELDER PARTIAL RETUBING MARET 01th, 2005 Job
MARINE BOILER 528-207 MEI 08th, 2005 Completed
PERTAMINA UP IV
ClLACAP

Вам также может понравиться