CHAPTER - II PLANTATIONS

02 – PLANTATIONS IN SANDY SOILS


Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

02-01 : ADVANCE OPERATIONS FOR RAISING PLANTATIONS


IN SANDY SOILS : (Pre-planting Operatoins)
(Casuarina & Eucalyptus plantations in sandy soils at
2mx2m espacement i.e., 2500 plants per Ha). In
other espacements i.e., 1mx1m etc., proportionate
rates of similar type plantations may be followed
1 02-01-001 Survey with GPS (Only staff to carry out. One manday is Wage rate fixed by
allowed for assistance) the Dist.Collector
per day.
2 02-01-002 Clearing re-growth in plantation areas limiting to the 4938.42 Ha.
extents having fair amount of thorny unsaleable growth.
3 02-01-003 Clearing re-growth in conversion areas where uprootal is 273.75 Ha.
not done.
Re-cutting growth :
4 02-01-004 (a) For conversion area 254.98 Ha.
5 02-01-005 (b) Plantation areas 135.48 Ha.
Heaping and burning debris :
6 02-01-006 (a) For conversion areas 415.70 Ha.
7 02-01-007 (b) For plantation areas 158.52 Ha.
8 02-01-008 Ploughing to a minimum depth of 15cm. In areas having 2171.48 Ha
fair amount of clay (with prior permission of Circle
Head).
9 02-01-009 Alignment and stacking including laying base line for 51.07 100 Nos.
Teak, Casuarina with espacement 2mx2m (2500 Nos.)
10 02-01-010 Cost of 0.45 M Stake preparation and transportation to 48.25 100 nos
site.
11 02-01-011 Digging 30 cms cube pits CSSR Ha
12 02-01-012 Removal of growth of Spinifix Lictoralies 1830.86 Ha.
13 02-01-013 Removal of Euc./Cau./Misc., stumps in old plantations 13506.68 Ha.
and also in natural forest areas in sandy soils (with the
prior permission of DFO)
02-02 : RAISING OPERATIONS IN PLANTATIONS IN SANDY
SOILS:
14 02-02-001 Digging new Doruvus @ 4 per ha in conversion areas 3584.20 Ha
15 02-02-002 Digging old Doruvus @ 4 per ha in plantation areas 1794.46 Ha
Note: After 7 years of plantation and 5 years of last
maintenance Doruvus can be created with new rate in
old plantation sites.
Transport of Bag plants / Root trainer plants from
nursery site to plantation site including loading and
unloading upto 5 Km lead
16 02-02-003 10 X 17.5cm (4"X7") bag plants 39.70 100 Nos
17 02-02-004 12.5 X 22.5cm (5"X9") bag plants 62.96 100 Nos
18 02-02-005 15X30cm (6"X12") bag plants 126.81 100 Nos
19 02-02-006 20 X 30cm (8"X12") bag plants 227.25 100 Nos

32
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

20 02-02-007 Root trainer plants with stands and returning root 4"X7" Rates may be
trainers to the nursery. adopted
Transport of Bag plants / Root trainer plants from
nursery site to plantation site including loading and
unloading beyond 5 Km - extra for every each Km.
21 02-02-008 10 X 17.5cm (4"X7") bag plants 1.49 100 nos
per km
22 02-02-009 12.5 X 22.5cm (5"X9") bag plants 2.38 100 nos
per km
23 02-02-010 15 X 30cm (6"X12") bag plants 4.45 100 nos
per km
24 02-02-011 20 X 30cm (8"X12") bag plants 8.88 100 nos
per km
25 02-02-012 Root trainer plants with stands and returning root 4"X7" Rates may be
trainers to the nursery. adopted
26 02-02-013 Carrying the bag seedlings from Tractor to the boat, 47.99 100 Nos
loading into the boat and unloading from the boat at
other end of creek, carrying to the Doruvu point and
arranging them in the form of beds to facilitate watering
till completion of planting.
27 02-02-014 Loading the bag seedlings into the basket, transport of 78.10 100 Nos
Kavadi loads to planting points (internal transport) over
the lengthy stretch.
28 02-02-015 Transport of bag seedlings by private boats 39.33 100 Nos
Internal transport of bag plants/root trainers to
planting points on head loads.
29 02-02-016 10 X 17.5cm (4"X7") bag plants 31.60 100 Nos
30 02-02-017 12.5 X 22.5cm (5"X9") bag plants 48.25 100 Nos
31 02-02-018 15X30cm (6"X12") bag plants 74.64 100 Nos
32 02-02-019 20 X 30cm (8"X12") bag plants 115.41 100 Nos
33 02-02-020 Root trainer plants with stands 4" X 7" Rates may be
adopted
Planting bag plants
34 02-02-021 30cmX30cmX30cm pits 114.28 100 Nos
35 02-02-022 45cmX45cmX45 cm pits 355.54 100 Nos
36 02-02-023 Scooping soil and planting casuarina seedlings 42.21 100 Nos
37 02-02-024 Formation of saucer around plants with diameter of 1 194.01 100 Nos
Mt.
Watering schedule:
38 02-02-025 (a) Watering twice a day for 7 days after planting (14 23.31 100 Nos/
waterings). time
39 02-02-026 (b) Thereafter, watering once a day for 14 days (14 23.31 100 Nos/
waterings). time
40 02-02-027 (c) Watering once in 7 days thereafter upto end of 23.31 100 Nos/
December (5 waterings) time
41 02-02-028 (d) Watering once in 7 days upto end of March (7 23.31 100 Nos/
waterings) time

33
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

42 02-02-029 Replacement of Casualties 20% during Raising & 25% in 50% of rate of original
1st year (In case of Eucalyptus 10% during raising and pitting rate during
no casuality replacement for further maintenance) raising year and 100%
during maintenance
years. Planting,
Transportation and
internal transportation
as prescribed above.
43 02-02-030 1st weeding and cutting of coppice and weed growth all 1369.43 Ha
over the plantation area.
44 02-02-031 Clearing / removal of growth of spinifix lictoralies 1980.81 Ha
45 02-02-032 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.

46 02-02-033 Contingencies for enumeration of survivals, fixing 10th As per actuals subject
line stones, cost of numbering with paint/ white to maximum of 10% of
washing, sector stones, plantation boards, journals etc. estimate cost during
raising year
02-03 : 1st YEAR MAINTENANCE OF PLANTATIONS IN
SANDY SOILS:
47 02-03-001 Watering once every week from Apr to Jun (12 waterings) 23.31 100 Nos/
time
48 02-03-002 Watering once every week as and when required during 23.31 100 Nos/
non-rainy weeks from July to January limiting to time
maximum of 12 waterings.
49 02-03-003 Watering once every week during Feb & Mar (8 23.31 100 Nos/
waterings) time
50 02-03-004 Deepening doruvus (2 Doruvus) 543.32 Ha
51 02-03-005 Replacement of Casualties 20% during Raising & 25% in 50% of rate of original
1st year (In case of Eucalyptus 10% during raising and pitting rate during
no casuality replacement for further maintenance) raising year and 100%
during maintenance
years. Planting,
Transportation and
internal transportation
as prescribed above.
52 02-03-006 1st weeding and cutting coppice and weed growth all 971.53 Ha
over the plantation area.
53 02-03-007 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.

54 02-03-008 Contingencies for Enumeration of survivals in plantation As per actuals subject


including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year

34
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

02-04 : 2nd YEAR MAINTENANCE OF PLANTATIONS IN


SANDY SOILS:
55 02-04-001 Watering once every week only in patches having 23.31 100 Nos/
predominantly backward plants of less than 1m. tall time
from April to June (12 waterings).
Note : For plantations having more than 30% of such
areas specific approval of the Circle Head must be
obtained prior to commencement of the works.
56 02-04-002 Deepening of old doruvus (4 doruvus) 217.21 Ha
57 02-04-003 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.
58 02-04-004 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year
PLANTATIONS IN SOILS OTHER THAN SANDY SOILS:
Note:Only the rates of different operations are given here
under. Out of them, only those operations, which are
approved in the scheme concerned, should be carried
02-05 : out.
Plantation Works - Common & General Items
Advance operations (Preplanting operations)
59 02-05-001 Survey with GPS (Only staff to carry out. One manday is Wage rate fixed by
allowed for assistance) the Dist.Collector
per day.
Preparation of site for planting by clearing thorny
unsaleable, unusable jungle growth, creepers, bushes
etc., spreading the cut material allover the site and
burning the same.
60 02-05-002 Sparse Jungle gowth (<10% ground area covered Jungle 1691.62 Ha
growth)
61 02-05-003 Very Light Jungle growth (>10% and upto 20% ground 2543.02 Ha
area covered with Jungle growth)
62 02-05-004 Light Jungle growth (>20% and upto 30% ground area 5095.63 Ha
covered with Jungle growth)
63 02-05-005 Medium Jungle growth (>30% ground area covered with 7672.21 Ha
Jungle growth)
64 02-05-006 Formation of sector lines/ inspection paths/ fire lines of 4.96 Rmt
a width of 3m by giving surface treatment (sector to be in
conformity with slope direction ). All stumps to be cut to
ground level. Applicable for plantations other than Semi
Mechanicle Plantaion.
Uprootal of stumps to a depth of 45 cm (excluding
unsuitable patches) with heavy machinery fitted with
0.90 cum and above capacity bucket, filling the pits
caused by uprootal and leveling.
65 02-05-007 Sparse Jungle gowth (<10% ground area covered Jungle 7110.73 Ha
growth)

35
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

66 02-05-008 Very Light Jungle growth (>10% and upto 20% ground 11394.96 Ha
area covered with Jungle growth)
67 02-05-009 Light Jungle growth (>20% and upto 30% ground area 14814.03 Ha
covered with Jungle growth)
68 02-05-010 Medium Jungle growth (>30% ground area covered with 19376.75 Ha
Jungle growth)
Collection and removal of uprooted stumps of all
sizes, other debris etc., to outside the plantation
site.
69 02-05-011 Sparse Jungle gowth (<10% ground area covered Jungle 4740.49 Ha
growth)
70 02-05-012 Very Light Jungle growth (>10% and upto 20% ground 7522.57 Ha
area covered with Jungle growth)
71 02-05-013 Light Jungle growth (>20% and upto 30% ground area 8771.40 Ha
covered with Jungle growth)
72 02-05-014 Medium Jungle growth (>30% ground area covered with 10021.70 Ha
Jungle growth)
Tilling the soil to a depth of 45 cm in the entire area
(excluding unsuitable patches) with heavy machinery
fitted with 0.90 cum and above capacity bucket and
leveling - Light jungle growth areas.
73 02-05-015 Sparse Jungle gowth (<10% ground area covered Jungle 17776.84 Ha
growth)
74 02-05-016 Very Light Jungle growth (>10% and upto 20% ground 15154.76 Ha
area covered with Jungle growth)
75 02-05-017 Light Jungle growth (>20% and upto 30% ground area 10486.86 Ha
covered with Jungle growth)
76 02-05-018 Medium Jungle growth (>30% and upto 60 % ground 9118.04 Ha
area covered with Jungle growth)
Deep ploughing the plantation area to a depth of 30
cm with heavy duty tractor of 45 HP and above
across the slope with mould board plough (Untilled
areas)
77 02-05-019 Ordinary Soils 3316.87 Ha
78 02-05-020 Hard /Gravelly Soils 4976.04 Ha
79 02-05-021 Black Clayey, Bouldary Soils and Soft Disintigrated 7464.80 Ha
Rocks.
Deep ploughing the plantation area to a depth of 30
cm with heavy duty tractor of 45 HP and above
across the slope with mould board plough (Tilled
Areas)
80 02-05-022 Ordinary Soils 3316.87 Ha
81 02-05-023 Hard Gravellary, Black Clayey and Bouldary soils 4147.93 Ha
82 02-05-024 Removing congestion of root suckers and other uprooted 853.00 Ha
material hindering the effective ploughing (For non-tilled
areas only)

36
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

02-06 : Raising of plantations


Alignment & Staking
83 02-06-001 Alignment and staking including laying base line for 51.07 100 Nos
teak, Casuarina with espacement 2m X 2m (2500 Nos)
84 02-06-002 Alignment and staking including laying base line for 61.23 100 Nos
Eucalyptus with espacement 3mX 2m (1666 Nos)
85 02-06-003 Alignment and staking including laying base line for 68.00 100 Nos
Misc speacies with espacement 3mX3m (1111 Nos)
86 02-06-004 Alignment and staking including laying base line for 90.57 100 Nos
Usiri, Kanuga, Kunkudu, Bamboo etc. with espacement
5mX5m (400 Nos)
87 02-06-005 Cost of 0.45M Stake preparation and transportation to 48.25 100 Nos
site.
88 02-06-006 Preparation of teak stumps of a minimum length of 23cm 60.67 100 Nos
and minimum girth of 4cm at the collar, including
uprootal from nursery beds, dressing of lateral root,
cutting slant 2cm above collar and root and bundling
them into bundles of 100 Nos each and transport to
planting site.
Transport of Bag plants / Root trainer plants from
nursery site to plantation site including loading and
unloading upto 5 Km lead
89 02-06-007 10 X 17.5cm (4"X7") bag plants 39.70 100 Nos
90 02-06-008 12.5 X 22.5cm (5"X9") bag plants 62.96 100 Nos
91 02-06-009 15X30cm (6"X12") bag plants 126.81 100 Nos
92 02-06-010 20 X 30cm (8"X12") bag plants 227.25 100 Nos
93 02-06-011 Root trainer plants with stands and returning root 4"X7" Rates may be
trainers to the nursery. adopted
Transport of Bag plants / Root trainer plants from
nursery site to plantation site including loading and
unloading beyond 5 Km - extra for every each Km.
94 02-06-012 10 X 17.5cm (4"X7") bag plants 1.49 100 nos
per km
95 02-06-013 12.5 X 22.5cm (5"X9") bag plants 2.38 100 nos
per km
96 02-06-014 15 X 30cm (6"X12") bag plants 4.45 100 nos
per km
97 02-06-015 20 X 30cm (8"X12") bag plants 8.88 100 nos
per km
98 02-06-016 Root trainer plants with stands and returning root 4"X7" Rates may be
trainers to the nursery. adopted
Internal transport of bag plants/root trainers to
planting points on head loads.
99 02-06-017 10 X 17.5cm (4"X7") bag plants 31.60 100 Nos
100 02-06-018 12.5 X 22.5cm (5"X9") bag plants 48.25 100 Nos
101 02-06-019 15X30cm (6"X12") bag plants 74.64 100 Nos
102 02-06-020 20 X 30cm (8"X12") bag plants 115.41 100 Nos
103 02-06-021 Root trainer plants with stands 4" X 7" Rates may be
adopted

37
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

Digging of pits in ordinary soils


104 02-06-022 Digging of 30 cm. cube pits 3.95 Each
105 02-06-023 Digging of 45 cm. cube pits 14.96 Each
Digging of pits in hard gravellary soils
106 02-06-024 Digging of 30 cm. cube pits 4.37 Each
107 02-06-025 Digging of 45 cm. cube pits 16.93 Each
Digging of pits in ploughed areas
108 02-06-026 Digging of 30 cm. cube pits 1.97 Each
109 02-06-027 Digging of 45 cm. cube pits 7.47 Each
Digging of trenches
110 02-06-028 Digging of trenches in ordinary soils. 156.89 Cmt
111 02-06-029 Digging of trenches in hard gravellary soils. 164.22 Cmt
112 02-06-030 Digging crow-bar holes 23cm (9") deep and planting 45.84 100 Nos
stumps in crow-bar holes and closing and compacting so
that it can not be pulledup easily.
Application of Fertilizers
113 02-06-031 Cost of Chemical fertilisers (50 grm SSP for basal As per actuals
3 3
dressing, 20 grm DAP after planting for 30 cm & 45 cm
pits).
114 02-06-032 Application of fertilizer after planting by making 3 holes 31.94 100 Nos
of 10 cmts depth with crow bar . 10 cmts away from
plant amd putting fertilizers and closing
Planting bag plants
115 02-06-033 30cmX30cmX30cm pits 114.28 100 Nos
116 02-06-034 45cmX45cmX45 cm pits 355.54 100 Nos
117 02-06-035 Scooping soil and planting casuarina seedlings 43.46 100 Nos
118 02-06-036 Replacement of Casualties 20% during Raising & 25% in 50% of rate of original
1st year (In case of Eucalyptus 10% during raising and pitting rate during
no casuality replacement for further maintenance) raising year and 100%
during maintenance
years. Planting,
Transportation and
internal transportation
as prescribed above.
Weeding & Soil working
Strip weeding in strips of 0.5 m. width on either side of
the planting lines by cutting all growth in the lines flush
to the ground and scrapping grasses etc., if two strip
weedings are done the strips should be perpendicular to
each other for labour intensive plantations only.
119 02-06-037 i) 2Mx2M planting 1653.28 Ha
120 02-06-038 ii) 3Mx3M planting 1101.88 Ha
121 02-06-039 Circular weeding to a radius of 0.5 M around the plant 101.58 100 Nos

38
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

122 02-06-040 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.
123 02-06-041 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.
Inter ploughing
124 02-06-042 Inter ploughing with heavy duty tractor of 45 HP to a 2211.74 Ha
depth of 30 cm in tilled areas in ordinary soils
125 02-06-043 Inter ploughing with heavy duty tractor of 45 HP to a 2765.79 Ha
depth of 30 cm in Tilled areas in Hard Gravellary, Black
Clayey and Bouldary soils
126 02-06-044 Inter ploughing with heavy duty tractor of 45 HP to a 2211.74 Ha
depth of 30 cm in ordinary soils
127 02-06-045 Inter ploughing with heavy duty tractor of 45 HP to a 3316.87 Ha
depth of 30 cm in hard gravellary soils
128 02-06-046 Inter ploughing with heavy duty tractor of 45 HP to a 4976.04 Ha
depth of 30 cm in black clayey soils & Bouldary Soils
Coppice cutting
Cutting of coppice growth flush to the ground over
the entire area including retaining useful species just
after planting and placing the cut material in
between the planting rows.
129 02-06-047 Low rainfall zone <800 mm 792.78 Ha
130 02-06-048 High rainfall zone >800 mm 1189.24 Ha
131 02-06-049 Creation of sectorlines/inspection paths/ fire lines 3 4.96 Rmt
mts wide around the plantation
132 02-06-050 Pruning of lower foliage/ branches of NTFP species like 100.95 100 Nos
kanuga, Neem, Usiri, Seethaphal etc., plants upto 1/3rd
height.
133 02-06-051 Brush wood fencing around the planting area: Thorny 24.12 Rmt
fencing with sturdy thorn material of 10 cm. girth (at the
butt end) and fixing in crow bar holes and strengthening
with stone packing. The average height of fence should
be 1.5 m and fenceing material should be fixed in 2 rows
(staggered) at 30 cm apart. The fence should be
tightened horizontally by tying with thorny reapers on
both sides.
134 02-06-052 Maintenace of brushwood fencing 8.05 Rmt
135 02-06-053 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.

39
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

136 02-06-054 Provision of watering during planting as per PCCF's 2.06 Plant
Circular 6B/06/G1 (Rc.No.17309/2000-G1, Dt.16-8-
2005). Prior intimation to Circle Head.
137 02-06-055 Removing congestion of root suckers and other uprooted 434.20 Ha
material hindering effective inter ploughing.
138 02-06-056 Contingencies for enumeration of survivals, fixing 10th As per actuals subject
line stones, cost of numbering with paint/ white to maximum of 10% of
washing, sector stones, plantation boards, journals etc. estimate cost during
raising year
02-07 : 1st YEAR MAINTENANCE OF PLANTATIONS IN
OTHER THAN SANDY SOILS:
139 02-07-001 Replacement of Casualties 20% during Raising & 25% in 50% of rate of original
1st year (In case of Eucalyptus 10% during raising and pitting rate during
no casuality replacement for further maintenance) raising year and 100%
during maintenance
years. Planting,
Transportation and
internal transportation
as prescribed above.
Application of Fertilizers
140 02-07-002 Cost of Chemical fertilisers (50 grm SSP for basal As per actuals
dressing, 20 grm DAP for replacement of casualties).

141 02-07-003 Application of fertilizer after planting by making 3 holes 31.94 100 Nos
of 10 cmts depth with crow bar. 10 cmts away from plant
amd putting fertilizers and closing
Inter ploughing
142 02-07-004 Inter ploughing with heavy duty tractor of 45 HP to a 2211.74 Ha
depth of 30 cm in tilled areas in ordinary soils
143 02-07-005 Inter ploughing with heavy duty tractor of 45 HP to a 2765.79 Ha
depth of 30 cm in Tilled areas in Hard Gravellary, Black
Clayey and Bouldary soils
144 02-07-006 Inter ploughing with heavy duty tractor of 45 HP to a 2211.74 Ha
depth of 30 cm in ordinary soils
145 02-07-007 Inter ploughing with heavy duty tractor of 45 HP to a 3316.87 Ha
depth of 30 cm in hard gravellary soils
146 02-07-008 Inter ploughing with heavy duty tractor of 45 HP to a 4976.04 Ha
depth of 30 cm in black clayey soils & Bouldary Soils
147 02-07-009 Circular weeding to a radius of 0.5 M around the plant 101.58 100 Nos
148 02-07-010 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.

40
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

149 02-07-011 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.
Cutting of coppice growth flush to the ground over
the entire area including retaining useful species just
after planting and placing the cut material in
between the planting rows.
150 02-07-012 Low rainfall zone <800 mm 792.78 Ha
151 02-07-013 High rainfall zone >800 mm 1189.24 Ha
152 02-07-014 Creation of Fire lines 3 mts wide 4.96 Rmt
153 02-07-015 Pruning of lower foliage/ branches of NTFP species like 100.95 100 Nos
kanuga, Neem, Usiri, Seethaphal etc., plants upto 1/3rd
height.
154 02-07-016 Clearence and decongestion of Bamboo clumps (1st time) 11.18 Clump
(with the prior permission of Circle Head) as per FSR
of APFDC.
155 02-07-017 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.
156 02-07-018 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year
02-08 : 2nd YEAR MAINTENANCE OF PLANTATIONS IN
OTHER THAN SANDY SOILS/SEMI MECHANICAL
METHOD:
Application of Fertilizers
157 02-08-001 Cost of Chemical fertilisers (50 grm SSP for basal As per actuals
dressing, 20 grm DAP for replacement of casualties)
(with the prior permission of Circle Head).
158 02-08-002 Application of fertilizer after planting by making 3 holes 31.94 100 Nos
of 10 cmts depth with crow bar . 10 cmts away from
plant amd putting fertilizers and closing
159 02-08-003 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.
160 02-08-004 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.

41
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

Inter ploughing
161 02-08-005 Inter ploughing with heavy duty tractor of 45 HP to a 2211.74 Ha
depth of 30 cm in tilled areas in ordinary soils
162 02-08-006 Inter ploughing with heavy duty tractor of 45 HP to a 2765.79 Ha
depth of 30 cm in Tilled areas in Hard Gravellary, Black
Clayey and Bouldary soils
163 02-08-007 Inter ploughing with heavy duty tractor of 45 HP to a 2211.74 Ha
depth of 30 cm in ordinary soils
164 02-08-008 Inter ploughing with heavy duty tractor of 45 HP to a 3316.87 Ha
depth of 30 cm in hard gravellary soils
165 02-08-009 Inter ploughing with heavy duty tractor of 45 HP to a 4976.04 Ha
depth of 30 cm in black clayey soils & Bouldary Soils
Cutting of coppice growth flush to the ground over
the entire area including retaining useful species just
after planting and placing the cut material in
between the planting rows.
166 02-08-010 Low rainfall zone <800 mm 792.78 Ha
167 02-08-011 High rainfall zone >800 mm 1189.24 Ha
168 02-08-012 Creation of sectorlines/inspection paths/ fire lines 3 4.96 Rmt
mts wide around the plantation
169 02-08-013 Clearing of Bamboo clumps to a height of 1.50 Mt and 9.79 Clump
removal of growth around the clump to radius of 1 Mt,
removal of dead, dried, lean and lanky clumps from the
clump, heaping the debris in every alternate row (with
prior permission of Circle Head) as per FSR of APFDC.
170 02-08-014 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.
171 02-08-015 Pruning of lower foliage/ branches of NTFP species like 100.95 100 Nos
kanuga, Neem, Usiri, Seethaphal etc., plants upto 1/3rd
height.
172 02-08-016 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year
02-09 : 3rd YEAR MAINTENANCE OF PLANTATIONS IN
OTHER THAN SANDY SOILS:
173 02-09-001 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.
174 02-09-002 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.

42
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

Inter ploughing
175 02-09-003 Inter ploughing with heavy duty tractor of 45 HP to a 2211.74 Ha
depth of 30 cm in tilled areas in ordinary soils
176 02-09-004 Inter ploughing with heavy duty tractor of 45 HP to a 2765.79 Ha
depth of 30 cm in Tilled areas in Hard Gravellary, Black
Clayey and Bouldary soils
177 02-09-005 Inter ploughing with heavy duty tractor of 45 HP to a 2211.74 Ha
depth of 30 cm in ordinary soils
178 02-09-006 Inter ploughing with heavy duty tractor of 45 HP to a 3316.87 Ha
depth of 30 cm in hard gravellary soils
179 02-09-007 Inter ploughing with heavy duty tractor of 45 HP to a 4976.04 Ha
depth of 30 cm in black clayey soils & Bouldary Soils
180 02-09-008 Creation of sectorlines/inspection paths/ fire lines 3 4.96 Rmt
mts wide around the plantation
181 02-09-009 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.
182 02-09-010 Pruning of lower foliage/ branches of NTFP species like 100.95 100 Nos
kanuga, Neem, Usiri, Seethaphal etc., plants upto 1/3rd
height.
183 02-09-011 Clearing of Bamboo clumps and decongestion (with the 6.29 Clump
prior permission of Circle Head) as per FSR of APFDC.
184 02-09-012 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year
02-10 : 4th YEAR MAINTENANCE OF PLANTATIONS IN
OTHER THAN SANDY SOILS:
185 02-10-001 Creation of sectorlines/inspection paths/ fire lines 3 4.96 Rmt
mts wide around the plantation
186 02-10-002 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.
187 02-10-003 Pruning of lower foliage/ branches of NTFP species like 100.95 100 Nos
kanuga, Neem, Usiri, Seethaphal etc., plants upto 1/3rd
height.
188 02-10-004 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year
02-11 : 5th YEAR MAINTENANCE OF PLANTATIONS IN
OTHER THAN SANDY SOILS:
189 02-11-001 Creation of sectorlines/inspection paths/ fire lines 3 4.96 Rmt
mts wide around the plantation
190 02-11-002 Pruning of lower foliage/ branches of NTFP species like 100.95 100 Nos
kanuga, Neem, Usiri, Seethaphal etc., plants upto 1/3rd
height.

43
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

191 02-11-003 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year
02–12: BABUL PLANTATIONS
RAISING OF TANK FORESHORE AREAS:
(3mx3m Espacement) 1100 Plants per Ha.
192 02-12-001 Clearing the growth wherever necessary 204.97 Ha.
193 02-12-002 Removal and uprootal of Ipomea cornea and other 8821.26 Ha.
miscellaneous growth (with the prior permission of
Circle Head).
194 02-12-003 Alignment and staking including laying base line for 68.00 100 nos
Misc speacies with espacement 3mX3m (1111 Nos)
195 02-12-004 Cost of 0.45 M Stake preparation and transportation to 48.25 100 nos
site.
Digging of pits in ordinary soils
196 02-12-005 Digging of 30 cm. cube pits 3.95 Each
197 02-12-006 Digging of 45 cm. cube pits 14.96 Each
Transport of Bag plants / Root trainer plants from
nursery site to plantation site including loading and
unloading upto 5 Km lead
198 02-12-007 12.5 X 22.5cm (5"X9") bag plants 62.96 100 Nos
Transport of Bag plants / Root trainer plants from
nursery site to plantation site including loading and
unloading beyond 5 Km - extra for every each Km.
199 02-12-008 12.5 X 22.5cm (5"X9") bag plants 2.38 100 nos
per km
Internal transport of bag plants/root trainers to
planting points on head loads.
200 02-12-009 12.5 X 22.5cm (5"X9") bag plants 48.25 100 Nos.
Planting bag plants
201 02-12-010 30cmX30cmX30cm pits 114.28 100 Nos.
202 02-12-011 Watering from 15th Dec.-31st Mar.(30 waterings) with 4 8370.52 Ha/1100
Lts of water per watering (specific sanction from the Nos.
Circle Head has to be obtained to carry out this work).

203 02-12-012 Replacement of Casualties 20% during Raising & 25% in 50% of rate of original
1st year (In case of Eucalyptus 10% during raising and pitting rate during raising
year and 100% during
no casuality replacement for further maintenance)
maintenance years.
Planting, Transportation
and internal
transportation as
prescribed above.

204 02-12-013 Circular weeding to a radius of 0.5 M around the plant 101.58 100 Nos

44
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

205 02-12-014 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.
206 02-12-015 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.

207 02-12-016 Contingencies for enumeration of survivals, fixing 10th As per actuals subject
line stones, cost of numbering with paint/ white to maximum of 10% of
washing, sector stones, plantation boards, journals etc. estimate cost during
raising year

208 02-12-017 Transport of removed impomia for about 1 KM to avoid 2327.92 Ha


its early regeneration (Strict precautions should be taken
that the impomia cornia is removed totally and transport
out and should not regenerate again)
02-13 : 1st YEAR MAINTENANCE OF BABUL PLANTATIONS:
(3.00M X 3.00M ESPACEMENT)
209 02-13-001 Replacement of Casualties 20% during Raising & 25% in 50% of rate of original
1st year (In case of Eucalyptus 10% during raising and pitting rate during
no casuality replacement for further maintenance) raising year and 100%
during maintenance
years. Planting,
Transportation and
internal transportation
as prescribed above.
210 02-13-002 Circular weeding to a radius of 0.5 M around the plant 101.58 100 Nos
211 02-13-003 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.

212 02-13-004 Watering the Babul plants (10 waterings) each plant to 2788.19 Ha./1100
be given 4 Lts of water per watering 3.00M x 3.00M Nos.
espacement (with the prior permission of Circle Head).

213 02-13-005 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.

214 02-13-006 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year

45
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

02-14 : 2nd YEAR MAINTENANCE OF BABUL PLANTATIONS:


(3.00M X 3.00M ESPACEMENT)
215 02-14-001 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.
216 02-14-002 Watering the Babul plants (10 waterings) each plant to 2788.19 Ha./1100
be given 4 Lts. of water of 3.00 M x 3.00 M and for 2.50 Nos.
M x 2.50 M espacement (Subject to approval by the
Circle Head).
217 02-14-003 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.
218 02-14-004 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year
02–15 : AVENUE PLANTATION (10 M SPACING) @ 200
PLANTS PER KM.
Raising of Avenue Plantations : (8”x12”) Bags.
219 02-15-001 Alignment and staking including laying base line for 90.57 100 nos
Usiri, Kanuga, Kunkudu, Bamboo etc. with espacement
5mX5m (400 Nos)
220 02-15-002 Cost of 0.45 M Stake preparation and transportation to 48.25 100 nos
site.
221 02-15-003 Digging of circular trench 1.5 M from centre of pit and 50 RSSR Km/200
Cms. width and 50 cms. depth trench and formation 30 Nos.
cms wide mound in the place between mound and pit.
Digging 30 cm cube pits in the un-ploughed areas:
Digging of pits in ordinary soils
222 02-15-004 Digging of 30 cm. cube pits 3.95 Each
223 02-15-005 Digging of 45 cm. cube pits 14.96 Each
Digging of pits in hard gravellary soils
224 02-15-006 Digging of 30 cm. cube pits 4.37 Each
225 02-15-007 Digging of 45 cm. cube pits 16.93 Each
226 02-15-008 Cost and conveyance of dry Cow dung power at ½ cft per 5742.10 Km/200
plant and FYM at ½ cft per plant. Nos.
227 02-15-009 Cost of chemical, fertilisers and pesticides of 100 Grms As per Km/200
of SPP/50Grmsof DAP for basal dressing. actuals Nos.
Transport of Bag plants / Root trainer plants from
nursery site to plantation site including loading and
unloading upto 5 Km lead
228 02-15-010 20 X 30cm (8"X12") bag plants 227.25 100 nos
per km
46
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

Transport of Bag plants / Root trainer plants from


nursery site to plantation site including loading and
unloading beyond 5 Km - extra for every each Km.
229 02-15-011 20 X 30cm (8"X12") bag plants 8.88 100 nos
Internal transport of bag plants/root trainers to per km
planting points on head loads.
230 02-15-012 20 X 30cm (8"X12") bag plants 115.41 100 nos
Planting bag plants
231 02-15-013 45cmX45cmX45 cm pits 355.54 100 nos
per km
232 02-15-014 Providing tree guards 1.6 M height and 0.90 M dia with 16035.73 200 Nos.
locally available thorny branches (Preferably Prosophis)
233 02-15-015 Providing fencing to MAIN row plants where the planted 42.21 1 No.
seedlings are of minimum 2 Mt., height by preparing
Eucalyptus/other jungle wood posts (stakes) of size 3
meter length and 15 cm. midle girth, drying, debarking
the post and applying coal tar, cutting, collection and
transportation of Prosophis / other thorny branches,
fixing and tying both the stakes and thorny branches to
a height of 2 Mt. of the plant, with the help of Agave
fibre, if the stakes are purchased from the market.
234 02-15-016 Watering the avenue plants first 10 days alternative days 23842.64 200 Nos./
5 waterings in July next 12 days once in 4 days 3 36
waterings Aug to Sep once in 15 days 4 waterings Oct to watering
Mar once in 7 days 24 waterings total 36 waterings.
Note: The above watering regime is only indicative.
Depending upon locality, moisture availability and range
it can be rearranged by the DFOs. The cost should be
restricted to the no.of surviving plants in any given
month and the stretch. Log books should be maintained
for each tractor/ cart and verified by the DFO
periodically and satisfy that the watering regime is
followed before admitting the vouchers. Abstract of
watering every month should be recorded in plantation
Journals. This will apply to all years. The DFOs will be
personally held responsible for regulating the
expenditure.

In case any infrastructure is to be developed for creation


of water sources etc., it should be done as per I.D.S.S.R.
following other financial rules. If departmental vehicles
are used, expenditure is to be booked as per actuals,
with in scheme proposals which has to be certified by the
concerned Dy.CF/DFO.
235 02-15-017 Repairs to tree guards twice during the year of planting 5214.63 200 Nos.

47
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

236 02-15-018 Replacement of Casualties 20% during Raising & 25% in 50% of rate of original
1st year (In case of Eucalyptus 10% during raising and pitting rate during
no casuality replacement for further maintenance) raising year and 100%
during maintenance
years. Planting,
Transportation and
internal transportation
as prescribed above.
237 02-15-019 Circular weeding to a radius of 0.5 M around the plant 101.58 100 Nos
238 02-15-020 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.
239 02-15-021 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.
240 02-15-022 Cost of NPK 28 : 28 : 0 Gromore or 15 : 15: 15 Suphala As per 200 Nos.
at the ratio of 50 Grms,. Per plant including transport to actuals
site 3 times.
241 02-15-023 Application once in a month from August to October 657.09 200 Nos/
Km
242 02-15-024 Watch & Ward-10 months for every 5 Kms plantation. Wage rate fixed by
the Dist.Collector
per day.
243 02-15-025 Mulching with ground nut husk to a depth of 25 - 30cms 16.28 Per plant.
for each pit in main row Avenue subject to condition of
proportionate reduction of watering regim depending on
the local conditions.
244 02-15-026 Creation of Fire lines 3 mts wide (in multiple rows with 4.96 Rmt
the prior permission of Circle Head)
245 02-15-027 Contingencies for enumeration of survivals, fixing 10th As per actuals subject
line stones, cost of numbering with paint/ white to maximum of 10% of
washing, sector stones, plantation boards, journals, estimate cost during
cycle allowance etc. raising year

02-16 : 1st YEAR MAINTENANCE OF AVENUE PLANTATIONS:


(10 M apart)
246 02-16-001 Replacement of Casualties 20% during Raising & 25% in 50% of rate of original
1st year (In case of Eucalyptus 10% during raising and pitting rate during
no casuality replacement for further maintenance) raising year and 100%
during maintenance
years. Planting,
Transportation and
internal transportation
as prescribed above.

48
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

247 02-16-002 Repair to tree guards by providing new supports etc. 8005.83 200 Nos.
248 02-16-003 Subsequent repairs to tree guards 2586.22 200 Nos.
249 02-16-004 Application of fertilizers excluding cost of chemical 657.09 200 Nos.
fertilizers and application 3 times at the rate of 0.12 each
as in the case of raising year.
250 02-16-005 Cost of chemical fertilizers (As per raising year) As per 200 Nos.
actuals
251 02-16-006 Circular weeding to a radius of 0.5 M around the plant 101.58 100 Nos
252 02-16-007 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.
253 02-16-008 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.
254 02-16-009 Desilting of trenches 3243.31 200 Nos.
255 02-16-010 Watering once in a week from April to July (16 waterings) 23845.63 200 Nos.
November to March ( 20 waterings) i.e., (36 waterings).

256 02-16-011 Watch & Ward 12 months for every 5 Kms plantation. Wage rate fixed by
the Dist.Collector
per day.
257 02-16-012 Creation of Fire lines 3 mts wide (in multiple rows with 4.96 Rmt
the prior permission of Circle Head)
258 02-16-013 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards, cycle allowance etc. estimate cost during
maint. year
02-17 : 2nd YEAR MAINTENANCE OF AVENUE PLANTATIONS
: (10 M apart)
259 02-17-001 Tying thorns around the plants with thorny material 2366.19 200 Nos.
260 02-17-002 Watering from April to June 3 months once in a week 12 7951.56 200 Nos.
waterings
261 02-17-003 Repairs to tree guards 2553.09 200 Nos.
262 02-17-004 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.

49
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

263 02-17-005 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.
264 02-17-006 Watch & Ward -12 months for every 5 Kms plantation. Wage rate fixed by
the Dist.Collector
per day.
265 02-17-007 Creation of Fire lines 3 mts wide (in multiple rows with 4.96 Rmt
the prior permission of Circle Head)
266 02-17-008 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards, cycle allowance etc. estimate cost during
maint. year
02-18 : 3rd YEAR MAIANTENANCE OF AVENUE
PLANTATIONS : (10 M apart)
267 02-18-001 Watch & Ward-12 months for every 5 Kms plantation. Wage rate fixed by
the Dist.Collector
per day.
268 02-18-002 Creation of Fire lines 3 mts wide (in multiple rows with 4.96 Rmt
the prior permission of Circle Head)
269 02-18-003 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards, cycle allowance etc. estimate cost during
maint. year
02–19 : AVENUE PLANTATION (5 M SPACING) @ 400 PLANTS
PER KM ON BOTH SIDES.
Raising of Avenue Plantations : (8”x12”) Bags.
270 02-19-001 Alignment and staking including laying base line for 90.57 100 Nos
Usiri, Kanuga, Kunkudu, Bamboo etc. with espacement
5mX5m (400 Nos)
271 02-19-002 Cost of 0.45 M Stake preparation and transportation to 48.25 100 Nos
site.
272 02-19-003 Digging of circular trench 1.5 M from centre of pit and 50 RSSR 100 Nos
Cms. width and 50 cms. depth trench and formation 30
cms wide mound in the place between mound and pit.
Digging 30 cm cube pits in the un-ploughed areas:
Digging of pits in ordinary soils
273 02-19-004 Digging of 30 cm. cube pits 3.95 Each
274 02-19-005 Digging of 45 cm. cube pits 14.96 Each
Digging of pits in hard gravellary soils
275 02-19-006 Digging of 30 cm. cube pits 4.37 Each
276 02-19-007 Digging of 45 cm. cube pits 16.93 Each
277 02-19-008 Cost and conveyance of dry Cow dung power at ½ cft per 2871.05 100 Nos
plant and FYM at ½ cft per plant.

50
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

278 02-19-009 Cost of chemical, fertilisers and pesticides of 100 Grms As per 100 Nos
of SPP/50Grmsof DAP for basal dressing. actuals
Transport of Bag plants / Root trainer plants from
nursery site to plantation site including loading and
unloading upto 5 Km lead
279 02-19-010 20 X 30cm (8"X12") bag plants 227.25 100 nos
Transport of Bag plants / Root trainer plants from per km
nursery site to plantation site including loading and
unloading beyond 5 Km - extra for every each Km.
280 02-19-011 20 X 30cm (8"X12") bag plants 8.88 100 nos
Internal transport of bag plants/root trainers to per km
planting points on head loads.
281 02-19-012 20 X 30cm (8"X12") bag plants 115.41 100 nos
Planting bag plants
282 02-19-013 45cmX45cmX45 cm pits 355.54 100 nos
283 02-19-014 Providing tree guards 1.6 M height and 0.90 M dia with per km
8017.87 100 nos
locally available thorny branches (Preferably Prosophis) per km
284 02-19-015 Providing fencing to MAIN row plants where the planted 42.21 1 No.
seedlings are of minimum 2 Mt., height by preparing
Eucalyptus/other jungle wood posts (stakes) of size 3
meter length and 15 cm. midle girth, drying, debarking
the post and applying coal tar, cutting, collection and
transportation of Prosophis / other thorny branches,
fixing and tying both the stakes and thorny branches to
a height of 2 Mt. of the plant, with the help of Agave
fibre, if the stakes are purchased from the market.
285 02-19-016 Watering the avenue plants first 10 days alternative days 11921.30 100 Nos./
5 waterings in July next 12 days once in 4 days 3 36
waterings Aug to Sep once in 15 days 4 waterings Oct to watering
Mar once in 7 days 24 waterings total 36 waterings.
Note: The above watering regime is only indicative.
Depending upon locality, moisture availability and range
it can be rearranged by the DFOs. The cost should be
restricted to the no.of surviving plants in any given
month and the stretch. Log books should be maintained
for each tractor/ cart and verified by the DFO
periodically and satisfy that the watering regime is
followed before admitting the vouchers. Abstract of
watering every month should be recorded in plantation
Journals. This will apply to all years. The DFOs will be
personally held responsible for regulating the
expenditure.
In case any infrastructure is to be developed for creation
of water sources etc., it should be done as per I.D.S.S.R.
following other financial rules. If departmental vehicles
are used, expenditure is to be booked as per actuals,
with in scheme proposals which has to be certified by the
concerned Dy.CF/DFO.

51
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

286 02-19-017 Repairs to tree guards twice during the year of planting 2607.30 100 Nos.
287 02-19-018 Replacement of Casualties 20% during Raising & 25% in 50% of rate of original
1st year (In case of Eucalyptus 10% during raising and pitting rate during
no casuality replacement for further maintenance) raising year and 100%
during maintenance
years. Planting,
Transportation and
internal transportation
as prescribed above.
288 02-19-019 Circular weeding to a radius of 0.5 M around the plant 101.58 100 Nos
289 02-19-020 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.
290 02-19-021 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.
291 02-19-022 Cost of NPK 28 : 28 : 0 Gromore or 15 : 15: 15 Suphala As per 100 Nos
at the ratio of 50 Grms,. Per plant including transport to actuals
site 3 times.
292 02-19-023 Application once in a month from August to October 328.54 100 Nos
293 02-19-024 Watch & Ward-10 months for every 5 Kms plantation. Wage rate fixed by
the Dist.Collector
per day.
294 02-19-025 Mulching with ground nut husk to a depth of 25 - 30cms 16.28 Per plant.
for each pit in main row Avenue subject to condition of
proportionate reduction of watering regim depending on
the local conditions.
295 02-19-026 Creation of Fire lines 3 mts wide (in multiple rows with 4.96 Rmt
the prior permission of Circle Head)
296 02-19-027 Contingencies for enumeration of survivals, fixing 10th As per actuals subject
line stones, cost of numbering with paint/ white to maximum of 10% of
washing, sector stones, plantation boards, journals, estimate cost during
cycle allowance etc. raising year

02-20 : 1st YEAR MAINTENANCE OF AVENUE PLANTATIONS


(5 M SPACING) @ 400 PLANTS PER KM ON BOTH
SIDES
297 02-20-001 Replacement of Casualties 20% during Raising & 25% in 50% of rate of original
1st year (In case of Eucalyptus 10% during raising and pitting rate during
no casuality replacement for further maintenance) raising year and 100%
during maintenance
years. Planting,
Transportation and
internal transportation
as prescribed above.

52
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

298 02-20-002 Repair to tree guards by providing new supports etc. 4002.90 100 Nos.
299 02-20-003 Subsequent repairs to tree guards 1293.11 100 Nos.
300 02-20-004 Application of fertilizers excluding cost of chemical 328.54 100 Nos.
fertilizers and application 3 times at the rate of 0.12 each
as in the case of raising year.
301 02-20-005 Cost of chemical fertilizers (As per raising year) As per 100 Nos.
actuals
302 02-20-006 Circular weeding to a radius of 0.5 M around the plant 101.58 100 Nos
303 02-20-007 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.
304 02-20-008 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.
305 02-20-009 Desilting of trenches 1621.66 100 Nos
306 02-20-010 Watering once in a week from April to July (16 waterings) 11922.82 100 Nos
November to March ( 20 waterings) i.e., (36 waterings).
307 02-20-011 Watch & Ward-12 months for every 5 Kms plantation. Wage rate fixed by
the Dist.Collector
per day.
308 02-20-012 Creation of Fire lines 3 mts wide (in multiple rows with 4.96 Rmt
the prior permission of Circle Head)
309 02-20-013 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards, cycle allowance etc. estimate cost during
maint. year

02-21 : 2nd YEAR MAINTENANCE OF AVENUE PLANTATIONS


(5 M SPACING) @ 400 PLANTS PER KM ON BOTH
SIDES
310 02-21-001 Tying thorns around the plants with thorny material 1183.09 100 Nos.
311 02-21-002 Watering from April to June 3 months once in a week 12 3975.78 100 Nos.
waterings
312 02-21-003 Repairs to tree guards 1276.51 100 Nos.
313 02-21-004 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.

53
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

314 02-21-005 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.
315 02-21-006 Watch & Ward-12 months for every 5 Kms plantation. Wage rate fixed by
the Dist.Collector
per day.
316 02-21-007 Creation of Fire lines 3 mts wide (in multiple rows with 4.96 Rmt
the prior permission of Circle Head)
317 02-21-008 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards, cycle allowance etc. estimate cost during
maint. year

02-22 : 3rd YEAR MAIANTENANCE OF AVENUE


PLANTATIONS (5 M SPACING) @ 400 PLANTS PER
KM ON BOTH SIDES
318 02-22-001 Watch & Ward-12 months for every 5 Kms plantation. Wage rate fixed by
the Dist.Collector
per day.
319 02-22-002 Creation of Fire lines 3 mts wide (in multiple rows with 4.96 Rmt
the prior permission of Circle Head)
320 02-22-003 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards, cycle allowance etc. estimate cost during
maint. year

02-23 : RAISING STRIP PLANTATIONS


(Wind Breaks) along roads, canals & Railway sides
(Two rows on either side @ 750 plants per row per Km
3,000 plants per Km)
ADVANCE OPERATIONS : ESPACEMENT : 3 m Long
trenches with 0.5 Mts. wide 0.25 Mts. depth 1 M
apart within the row and 2 Mts. apart row to row. In
every trench, 3 planting points. Only two rows on
either side.
Alignment & Staking
321 02-23-001 Alignment and staking including laying base line for 51.07 100 nos
teak, Casuarina with espacement 2m X 2m (2500 Nos)
322 02-23-002 Alignment and staking including laying base line for 68.00 100 nos
Misc speacies with espacement 3mX3m (1111 Nos)
323 02-23-003 Alignment and staking including laying base line for 90.57 100 nos
Usiri, Kanuga, Kunkudu, Bamboo etc. with espacement
5mX5m (400 Nos)
324 02-23-004 Cost of 0.45 M Stake preparation and transportation to 48.25 100 nos
site.

54
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

325 02-23-005 Digging of staggered trenches of 3.0 x 0.5 x 0.25 M with RSSR 100 Nos.
3 central pits of 30 cms cube pits 1 M apart within the
trench, leaving 0.5 m on either side of the trenches from
the ends.
02-24 : RAISING OF PLANTATIONS :
Application of Fertilizers
326 02-24-001 Cost of Chemical fertilisers (50 grm SSP for basal As per actuals
3 3
dressing, 20 grm DAP after planting for 30 cm & 45 cm
pits).
327 02-24-002 Application of fertilizer after planting by making 3 holes 31.94 100 Nos
of 10 cmts depth with crow bar . 10 cmts away from
plant amd putting fertilizers and closing

Transport of Bag plants / Root trainer plants from


nursery site to plantation site including loading and
unloading upto 5 Km lead
328 02-24-003 10 X 17.5cm (4"X7") bag plants 39.70 100 Nos
329 02-24-004 12.5 X 22.5cm (5"X9") bag plants 62.96 100 Nos
Transport of Bag plants/Root trainer plants from
nursery site to plantation site including loading and
unloading beyond 5Km extra for every each Km
330 02-24-005 10 X 17.5cm (4"X7") bag plants 1.49 100 nos
331 02-24-006 12.5 X 22.5cm (5"X9") bag plants per km
2.38 100 nos
Internal transport of bag plants/root trainers to per km
planting points on head loads.
332 02-24-007 10 X 17.5cm (4"X7") bag plants 31.60 100 Nos
333 02-24-008 12.5 X 22.5cm (5"X9") bag plants 48.25 100 Nos
Application of Fertilizers
334 02-24-009 Cost of Chemical fertilisers (50 grm SSP for basal As per actuals
3 3
dressing, 20 grm DAP after planting for 30 cm & 45 cm
pits).
335 02-24-010 Application of fertilizer after planting by making 3 holes 31.94 100 Nos
of 10 cmts depth with crow bar . 10 cmts away from
plant amd putting fertilizers and closing
336 02-24-011 Replacement of Casualties 20% during Raising & 25% in 50% of rate of original
1st year (In case of Eucalyptus 10% during raising and pitting rate during
no casuality replacement for further maintenance) raising year and 100%
during maintenance
years. Planting,
Transportation and
internal transportation
as prescribed above.

337 02-24-012 Circular weeding to a radius of 0.5 M around the plant 101.58 100 Nos

55
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

338 02-24-013 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.

339 02-24-014 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.

340 02-24-015 Weeding with spades to a width of 0.5 M on either side of 45.23 100 Nos.
the trench.
341 02-24-016 Watering the plants by cart 30 waterings, 1,000 trenches 275.26 100
or 30,000 plants as per the watering regime shown below trenches/
July 1st week planting, watering on alternate days for watering
four days - 2 waterings Balance month once in 15 days - or
300
4 waterings During August to November once in 15 days -
plants/
8 waterings December to March once in 7 days - 16
watering
waterings. TOTAL : 30 waterings

342 02-24-017 Cost of bore well fixed with hand pumpset or pumpset As per local rate
for every 2 Km (if feasible).
343 02-24-018 Construction of cistern for every 2 Kms. (if feasible) As per local rate
344 02-24-019 Contingencies for enumeration of survivals, fixing 10th As per actuals subject
line stones, cost of numbering with paint/ white to maximum of 10% of
washing, sector stones, plantation boards, journals etc. estimate cost during
raising year

02-25 : 1st YEAR MAINTENANCE OF STRIP (SHELTER


BELT PLANTATIONS )
345 02-25-001 Circular weeding to a radius of 0.5 M around the plant 101.58 100 Nos
346 02-25-002 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.
347 02-25-003 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.
348 02-25-004 Weeding with spades to a width of 0.5 M on either side of 45.23 100 Nos.
the trench.

56
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

349 02-25-005 Watering the plants from April to June monthly thrice (9) 275.26 100
waterings. Trenches or
300 plants
per watering

350 02-25-006 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year

02-26 : 2nd YEAR MAINTENANCE OF STRIP (SHELTER


BELT PLANTATIONS)
351 02-26-001 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.

352 02-26-002 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.
353 02-26-003 Weeding with spades to a width of 0.5 m on either side of 45.23 100 Nos.
the trench.
354 02-26-004 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year

02-27 : MANGROVE PLANTATIONS


RAISING :
355 02-27-001 Survey with GPS (Only staff to carry out. One manday is Wage rate fixed by
allowed for assistance) the Dist.Collector
per day.
356 02-27-002 Alignment of field channels 12.5 Mts. apart by giving peg 501.87 Ha.
marking including preparation of alignment by pegs.

357 02-27-003 Earth work excavation for digging of feeder channels in RSSR 10 Cum.
charger soils in wet condition with 4 Mts. width at top
and 2 Mts. width at bottom and 50 Cms. depth over
length as per guide-lines.
358 02-27-004 Earth work excavation for digging of field channels in RSSR 10 Cum.
charger soils in wet condition with 2 Mts. at the top and
40 Cms. Width at the bottom and 40 Cms. depth over
length of 900 Mts.

57
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

Alignment & Staking


359 02-27-005 Alignment and staking including laying base line for 51.07 100 nos
teak, Casuarina with espacement 2m X 2m (2500 Nos)
360 02-27-006 Cost of 0.45 M Stake preparation and transportation to 48.25 100 nos
site.
Digging of pits in ordinary soils
361 02-27-007 Digging of 30 cm. cube pits 3.95 Each
362 02-27-008 Taking out the bag seedlings from the beds and keeping 98.22 1000 Nos.
them on the banks of the beds.
363 02-27-009 Carrying the bag seedlings from the nursery to the boat, 685.76 1000
loading into the boat and unloading from the boat after Bags
transport, carrying to the bank of creek or river and
arranging them in the form of beds to facilitate
watering.(This item is permitted only for the plantations
which are away from the nursery).

364 02-27-010 Loading bag seedlings into the baskets transport of 1115.82 1000
Kavadi loads to planting site including internal Bags
transport.
365 02-27-011 Transport of bag seedlings by private boats wherever 561.63 1000
necessary Bags
Planting bag plants
366 02-27-012 30cmX30cmX30cm pits 114.28 100 Nos
367 02-27-013 45cmX45cmX45 cm pits 355.54 100 Nos
368 02-27-014 Replacement of Casualties 20% during Raising & 25% in 50% of rate of original
1st year (In case of Eucalyptus 10% during raising and pitting rate during
no casuality replacement for further maintenance) raising year and 100%
during maintenance
years. Planting,
Transportation and
internal transportation
as prescribed above.
369 02-27-015 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.

370 02-27-016 Planting Pre-germinated mangrove seedlings / 730.91 1000 Nos.


Propogules
371 02-27-017 Contingencies for enumeration of survivals, fixing 10th As per actuals subject
line stones, cost of numbering with paint/ white to maximum of 10% of
washing, sector stones, plantation boards, journals etc. estimate cost during
raising year

372 02-27-018 Digging of supplimentary channels to the field channels RSSR 10 Cum.
as per the diagram given below

58
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

FIELD
FIELD CHANNEL

F
FE
EE
ED 10 mts
S
S
U
DE U
B

11 mts ER B
C
C
H
RC H
A

CH
A
N
5 mts N
HA N
E
E
L
AN 5 mts L

NN
NE
EL
L

02-28 : 1st YEAR MAINTENANCE OF PLANTATIONS


373 02-28-001 Replacement of Casualties 20% during Raising & 25% in 50% of rate of original
1st year (In case of Eucalyptus 10% during raising and pitting rate during
no casuality replacement for further maintenance) raising year and 100%
during maintenance
years. Planting,
Transportation and
internal transportation
as prescribed above.
374 02-28-002 Desilting the feeder and field channels CSSR Cum
375 02-28-003 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.
376 02-28-004 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year
02-29 : 2nd YEAR MAINTENANCE OF PLANTATIONS
377 02-29-001 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approved of Circle the Dist.Collector
Head is required. per day.

378 02-29-002 Desilting of fedder and field channels CSSR Cum


Note : Desilting Operation restricted to 40% of the total
area and upto a depth of 15 cms.
59
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

379 02-29-003 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year

02-30 : BARREN HILL AFFORESTATION


RAISING OF PLANTATIONS :
(Where slope percent is less than 20%)
Digging soil and moisture conservation trenches and
formation of mound including alignment of trench at the
rate of 95/60/48 trenches per Ha.
380 02-30-001 Each trench 0.675 Cum of earth work 6.00 M long 0.45 RSSR 95 Nos.
M width and top 0.30 M width at bottom and 0.30 Depth.
95 trenches for 10M apart contour intervals as per
design enclosed
381 02-30-002 Each trench 0.675 Cum of earth work 6.00 M long 0.45 RSSR 60 Nos.
M width and top 0.30 M width at bottom and 0.30 Depth.
60 trenches per Ha. for 15.00 M contour intervals as per
design enclosed
382 02-30-003 Each trench 0.675 Cum of earth work 6.00 M long 0.45 RSSR 48 Nos.
M width and top 0.30 M width at bottom and 0.30 Depth.
48 trenches per Ha. for 20.00 M contour intervals as per
design enclosed
Digging of pits in ordinary soils
383 02-30-004 Digging of 30 cm. cube pits 3.95 Each
384 02-30-005 Digging of 45 cm. cube pits 14.96 Each
Digging of pits in hard gravellary soils
385 02-30-006 Digging of 30 cm. cube pits 4.37 Each
386 02-30-007 Digging of 45 cm. cube pits 16.93 Each
387 02-30-008 Racking of soil to a depth of 10 to 15 Cms in the trench 723.42 380 Nos.
and planting of bag plants 2.00 M spacing (Plants in the
trench) for 10,00 M apart contour trenches including
transport of the bag plants to planting point (95
trenches).
388 02-30-009 Racking of soil to a depth of 15.00 m apart contour 452.13 240 Nos.
trenches including transport of bag plants to planting
point (60 trenches)
389 02-30-010 Racking of soil to a depth of 20.00 M apart contour 370.75 192 Nos.
trenches including transport of bag plants to planting
point ( 48 trenches)
Transport of Bag plants / Root trainer plants from
nursery site to plantation site including loading and
unloading upto 5 Km lead
390 02-30-011 10 X 17.5cm (4"X7") bag plants 39.70 100 Nos
391 02-30-012 12.5 X 22.5cm (5"X9") bag plants 62.96 100 Nos
392 02-30-013 15X30cm (6"X12") bag plants 126.81 100 Nos
393 02-30-014 20 X 30cm (8"X12") bag plants 227.25 100 Nos

60
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

394 02-30-015 Root trainer plants with stands and returning root 4"X7" Rates may be
trainers to the nursery. adopted
Transport of Bag plants / Root trainer plants from
nursery site to plantation site including loading and
unloading beyond 5 Km - extra for every each Km.
395 02-30-016 10 X 17.5cm (4"X7") bag plants 1.49 100 nos
per km
396 02-30-017 12.5 X 22.5cm (5"X9") bag plants 2.38 100 nos
per km
397 02-30-018 15 X 30cm (6"X12") bag plants 4.45 100 nos
per km
398 02-30-019 20 X 30cm (8"X12") bag plants 8.88 100 nos
per km
399 02-30-020 Root trainer plants with stands and returning root 4"X7" Rates may be
trainers to the nursery. adopted
Internal transport of bag plants/root trainers to
planting points on head loads.
400 02-30-021 10 X 17.5cm (4"X7") bag plants 31.60 100 Nos
401 02-30-022 12.5 X 22.5cm (5"X9") bag plants 48.25 100 Nos
402 02-30-023 15X30cm (6"X12") bag plants 74.64 100 Nos
403 02-30-024 20 X 30cm (8"X12") bag plants 115.41 100 Nos
404 02-30-025 Root trainer plants with stands 4" X 7" Rates may be
adopted
405 02-30-026 Replacement of Casualties 20% during Raising & 25% in 50% of rate of original
1st year (In case of Eucalyptus 10% during raising and pitting rate during
no casuality replacement for further maintenance) raising year and 100%
during maintenance
years. Planting,
Transportation and
internal transportation
as prescribed above.
406 02-30-027 Circular weeding to a radius of 0.5 M around the plant 101.58 100 Nos
407 02-30-028 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.
408 02-30-029 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.

61
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

409 02-30-030 Contingencies for enumeration of survivals, fixing 10th As per actuals subject
line stones, cost of numbering with paint/ white to maximum of 10% of
washing, sector stones, plantation boards, journals etc. estimate cost during
raising year

02-31 : 1st YEAR MAINTENANCE OF PLANTATIONS


(2.50 M X 2.50 M ESPACEMENT)
410 02-31-001 Replacement of Casualties 20% during Raising & 25% in 50% of rate of original
1st year (In case of Eucalyptus 10% during raising and pitting rate during
no casuality replacement for further maintenance) raising year and 100%
during maintenance
years. Planting,
Transportation and
internal transportation
as prescribed above.
411 02-31-002 Desilting of contour trenches and repairs to mound 1449.84 95 Nos.
10.00 spacing trenches intervals and replacement of
casualities.
412 02-31-003 Desilting of contour trenches and repairs to mound 988.66 60 Nos.
15.00 M spacing contour trenches interval and
replacement of casualities.
413 02-31-004 Desilting of contour trenches and repairs to mound 801.79 48 Nos.
20.00 M spacing contour trenches interval and
replacement casualities.
414 02-31-005 Circular weeding to a radius of 0.5 M around the plant 101.58 100 Nos
415 02-31-006 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.
416 02-31-007 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.

417 02-31-008 Racking of soil and weeding the plant to a diametre of 2040.62 1560 Nos.
1.00 M during October/November.
418 02-31-009 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year

02-32 : 2nd YEAR MAINTENANCE OF PLANTATIONS


( 2.50 M X 2.50 M ESPACEMENT )
419 02-32-001 Desilting of contour trenches and repairs to mound for 1449.84 95 Nos.
10.00 M contour trenches interval.

62
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

420 02-32-002 Desilting of contour trenches and repairs to mound for 967.58 60 Nos.
15.00 M contour trenches interval.
421 02-32-003 Desilting of contour trenches and repairs to mound for 801.79 47 Nos.
20.00 M contour trenches interval.
422 02-32-004 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.
423 02-32-005 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.
424 02-32-006 Racking of soil and weeding around each plant to a 2040.62 1560 Nos.
diameter of 1.00 M during October/November.
425 02-32-007 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year

02-33 : BARREN HILL AFFORESTATION (WHERE SLOPE


PERCENT IS MORE THAN 20% )
RAISING OF PLANTATIONS :
426 02-33-001 Alignment and staking including laying base line for 90.57 100 nos
Usiri, Kanuga, Kunkudu, Bamboo etc. with espacement
5mX5m (400 Nos)
427 02-33-002 Cost of 0.45 M Stake preparation and transportation to 48.25 100 nos
site.
Digging of pits in ordinary soils
428 02-33-003 Digging of 45 cm. cube pits 14.96 Each
Digging of pits in hard gravellary soils
429 02-33-004 Digging of 45 cm. cube pits 16.93 Each
430 02-33-005 Cost of FYM at 0.029 Cmt per pit transport of FYM 35.41 Each
431 02-33-006 Transport of F.Y.M. by head loads down hill to the 7.81 Each Pit
planting point and internal distribution.
432 02-33-007 Sterilization the pit with BHC 10% As per actuals
Note : Instead of sterilising the pit with BHC 10% it is
preferable to trench the bag plants with 1-2% aldrex
solution in the nurseries itself atleast 2 days before the
transport of seedlings to the plantation site excluding
cost of chemicals.

63
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

Transport of Bag plants / Root trainer plants from


nursery site to plantation site including loading and
unloading upto 5 Km lead
433 02-33-008 15X30cm (6"X12") bag plants 126.81 100 Nos
434 02-33-009 20 X 30cm (8"X12") bag plants 227.25 100 Nos
Transport of Bag plants / Root trainer plants from
nursery site to plantation site including loading and
unloading beyond 5 Km - extra for every each Km.
435 02-33-010 15 X 30cm (6"X12") bag plants 4.45 100 nos
per km
436 02-33-011 20 X 30cm (8"X12") bag plants 8.88 100 nos
per km
Internal transport of bag plants/root trainers to
planting points on head loads.
437 02-33-012 15X30cm (6"X12") bag plants 74.64 100 Nos
438 02-33-013 20 X 30cm (8"X12") bag plants 115.41 100 Nos
439 02-33-014 Circular weeding to a radius of 0.5 M around the plant 101.58 100 Nos
440 02-33-015 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.

441 02-33-016 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.

442 02-33-017 Replacement of Casualties 20% during Raising & 25% in 50% of rate of original
1st year (In case of Eucalyptus 10% during raising and pitting rate during
no casuality replacement for further maintenance) raising year and 100%
during maintenance
years. Planting,
Transportation and
internal transportation
as prescribed above.

443 02-33-018 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.

444 02-33-019 Contingencies for enumeration of survivals, fixing 10th As per actuals subject
line stones, cost of numbering with paint/ white to maximum of 10% of
washing, sector stones, plantation boards, journals etc. estimate cost during
raising year

64
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

02-34 : 1st MAINTENANCE : BARREN HILL


AFFORESTATION
WHERE SLOPE/PERCENTAGE IS MORE THAN 20%
(10MX10M)
445 02-34-001 Replacement of Casualties 20% during Raising & 25% in 50% of rate of original
1st year (In case of Eucalyptus 10% during raising and pitting rate during
no casuality replacement for further maintenance) raising year and 100%
during maintenance
years. Planting,
Transportation and
internal transportation
as prescribed above.
446 02-34-002 Circular weeding to a radius of 0.5 M around the plant 101.58 100 Nos
447 02-34-003 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.
448 02-34-004 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.
449 02-34-005 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.

450 02-34-006 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year
02-35 : 2nd YEAR MAINTENANCE : BARREN HILL
AFFORESTATION
WHERE SLOPE PERCENTAGE IS MORE THAN 20%
451 02-35-001 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.
452 02-35-002 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.

65
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

453 02-35-003 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.
454 02-35-004 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year
IMPROVEMENT TO NATURAL FORESTS
455 02-35-005 Clearing line to a width of 2 Mts. for demarcation 77.97 100 RMT
456 02-35-006 Laying permanent Sample Plots (PSP) of 0.1 Ha size 721.95 Each
including survey, demarcation with corner stones
(excluding cost of stone) & total enumeration of growth &
regeneration and recording of heights & girths and
numbering with paint on stones /stem etc.
457 02-35-007 (a) 100 to 250 stems/stumps per ha. 1298.61 Ha.
458 02-35-008 (b) 250 to 500 stems/stumps per ha. 2337.54 Ha.
459 02-35-009 (c) 500 to 1500 stems/stumps per ha. (with prior 3168.38 Ha.
permission of DFO)
460 02-35-010 (d) Above 1500 stems/ stumps per ha. (with prior 6932.73 Ha.
permission of DFO).
461 02-35-011 For cutting high stumps, coppicing, singling, multiple 6028.48 Ha
shoot climber cutting, cutting back damaged trees
having throrny growth in less than 0.5 density areas and
more than 0.5 density areas. (with the prior permission
of DFO).
462 02-35-012 Site preparation for gap planting - eradication of 754.25 Ha
obnoxious weeds / throny growth, tending and cultural
operations in degraded forests.
463 02-35-013 Seed sowing in Natural Forests : Raking the soil and 36.44 100
dibbling of seeds and covering the seed with Soil, Points
preferably in natural blanks of not less than 0.25 Ha.
and by forming rows 3 M apart and dibbling seeds (4 to 5
at each spot) 1 M apart.
464 02-35-014 Dibbling of Babul / NTFP species seeds on the mounds 17.13 20 Rmt.
of peripheral / Contour trenches at an espacement of 20
cms to develop live hedge after forming a group and
covering with soil after dibbling. (Not exceeding 10-15
Kgs. of seeds per km).
465 02-35-015 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.
466 02-35-016 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.

66
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

Note : The No.of stems / stumps shall be arrived at by


laying a sample plot and test checked by FRO before
execution of work.
467 02-35-017 Contingencies for enumeration of survivals, fixing 10th As per actuals subject
line stones, cost of numbering with paint/ white to maximum of 10% of
washing, sector stones, plantation boards, journals etc. estimate cost during
raising year
468 02-35-018 Creation of Fire lines 3 mts wide (in multiple rows with 4.96 Rmt
the prior permission of Circle Head)
469 02-35-019 Maintenance of existing fire lines for Natural Forests 0.96 Sq.Mt
470 02-35-020 Soil loosening around bamboo clumps in natural forests 46.09 Each
(Rs.4.95 per Rmt) clump
02-36 : RAISING PLANTATIONS IN OTHER THAN SANDY
SOILS BY TRENCH (1Mx1Mx0.15M) CUM PIT
METHOD(Pre-planting Operations) :
471 02-36-001 Survey with GPS (Only staff to carry out. One manday is Wage rate fixed by
allowed for assistance) the Dist.Collector
per day.
Preparation of site for planting by clearing thorny
unsaleable, unusable jungle growth, creepers, bushes
etc. spreading the cut material allover the site and
burning the same.
472 02-36-002 Sparse Jungle gowth (<10% ground area covered Jungle 1691.62 Ha
growth)
473 02-36-003 Very Light Jungle growth (>10% and upto 20% ground 2543.02 Ha
area covered with Jungle growth)
474 02-36-004 Light Jungle growth (>20% and upto 30% ground area 5095.63 Ha
covered with Jungle growth)
475 02-36-005 Medium Jungle growth (>30% ground area covered with 7672.21 Ha
Jungle growth)
Alignment & Staking
476 02-36-006 Alignment and staking including laying base line for 51.07 100 nos
teak, Casuarina with espacement 2m X 2m (2500 Nos)
477 02-36-007 Alignment and staking including laying base line for 61.23 100 nos
Eucalyptus with espacement 3mX 2m (1666 Nos)
478 02-36-008 Alignment and staking including laying base line for 68.00 100 nos
Misc speacies with espacement 3mX3m (1111 Nos)
479 02-36-009 Alignment and staking including laying base line for 90.57 100 nos
Usiri, Kanuga, Kunkudu, Bamboo etc. with espacement
5mX5m (400 Nos)
480 02-36-010 Cost of 0.45 M Stake preparation and transportation to 48.25 100 nos
site.
Digging of 1Mx1Mx0.15M trench comprising
centrally dug up pit of size
Digging of pits in ordinary soils
481 02-36-011 Digging of 30 cm. cube pits 3.95 Each
482 02-36-012 Digging of 45 cm. cube pits 14.96 Each

67
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

Digging of pits in hard gravellary soils


483 02-36-013 Digging of 30 cm. cube pits 4.37 Each
484 02-36-014 Digging of 45 cm. cube pits 16.93 Each
02-37 : RAISING PLANTATIONS IN OTHER THAN SANDY
SOILS BY TRENCH CUM PIT METHOD (Raising
Operations) :
Application of Fertilizers
485 02-37-001 Cost of Chemical fertilisers (50 grm SSP for basal As per actuals
3 3
dressing, 20 grm DAP after planting for 30 cm & 45 cm
pits).
486 02-37-002 Application of fertilizer after planting by making 3 holes 31.94 100 Nos
of 10 cmts depth with crow bar . 10 cmts away from
plant amd putting fertilizers and closing
487 02-37-003 Drenching the bag plants in 1-2% Aldrex or any other 14.80 100 Nos.
anti-termite/ anti-fungal solution at the nursery site, at
least 2 days before the transport of seedlings to the
plantation site, excluding cost of chemicals.
Transport of Bag plants / Root trainer plants from
nursery site to plantation site including loading and
unloading upto 5 Km lead
488 02-37-004 12.5 X 22.5cm (5"X9") bag plants 62.96 100 Nos
489 02-37-005 15X30cm (6"X12") bag plants 126.81 100 Nos
490 02-37-006 20 X 30cm (8"X12") bag plants 227.25 100 Nos
Transport of Bag plants / Root trainer plants from
nursery site to plantation site including loading and
unloading beyond 5 Km - extra for every each Km.
491 02-37-007 12.5 X 22.5cm (5"X9") bag plants 2.38 100 nos
per km
492 02-37-008 15 X 30cm (6"X12") bag plants 4.45 100 nos
per km
493 02-37-009 20 X 30cm (8"X12") bag plants 8.88 100 nos
per km
Internal transport of bag plants/root trainers to
planting points on head loads.
494 02-37-010 12.5 X 22.5cm (5"X9") bag plants 48.25 100 Nos
495 02-37-011 15X30cm (6"X12") bag plants 74.64 100 Nos
496 02-37-012 20 X 30cm (8"X12") bag plants 115.41 100 Nos
Planting bag plants
497 02-37-013 30cmX30cmX30cm pits 114.28 100 Nos
498 02-37-014 45cmX45cmX45 cm pits 355.54 100 Nos
499 02-37-015 Provision of watering during plantations as per PCCF's 1.76 Plant
Circular 6B/06/G1 (Rc.No.17309/2000-G1, Dt.16-8-
2005). Prior intimation to Circle Head.

68
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

500 02-37-016 Replacement of Casualties 20% during Raising & 25% in 50% of rate of original
1st year (In case of Eucalyptus 10% during raising and pitting rate during
no casuality replacement for further maintenance) raising year and 100%
during maintenance
years. Planting,
Transportation and
internal transportation
as prescribed above.

Cutting of coppice growth flush to the ground over


the entire area including retaining useful species just
after planting and placing the cut material in
between the planting rows.
501 02-37-017 Low rainfall zone <800 mm 792.78 Ha
502 02-37-018 High rainfall zone >800 mm 1189.24 Ha
503 02-37-019 Circular weeding to a radius of 0.5 M around the plant 101.58 100 Nos
504 02-37-020 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.
505 02-37-021 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.

506 02-37-022 Formation of sector lines/ inspection paths/ fire lines of 4.96 Rmt
a width of 3 m by giving surface treatment (sector to be
in conformity with slope direction). All stumps to be cut
to ground level. Applicable for plantations other than
Semi Mechanicle Plantaion.
507 02-37-023 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.
508 02-37-024 Pruning of lower foliage/ branches of NTFP species like 100.95 100 Nos
kanuga, Neem, Usiri, Seethaphal etc., plants upto 1/3rd
height.
509 02-37-025 Contingencies for enumeration of survivals, fixing 10th As per actuals subject
line stones, cost of numbering with paint/ white to maximum of 10% of
washing, sector stones, plantation boards, journals etc. estimate cost during
raising year

69
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

02-38 : 1st YEAR MAINTENANCE OF PLANTATIONS IN BY


TRENCH CUM PIT METHOD OTHER THAN SANDY
SOILS:
510 02-38-001 Replacement of Casualties 20% during Raising & 25% in 50% of rate of original
1st year (In case of Eucalyptus 10% during raising and pitting rate during
no casuality replacement for further maintenance) raising year and 100%
during maintenance
years. Planting,
Transportation and
internal transportation
as prescribed above.
Application of Fertilizers
511 02-38-002 Cost of Chemical fertilisers (50 grm SSP for basal As per actuals
3 3
dressing, 20 grm DAP after planting for 30 cm & 45 cm
pits).
512 02-38-003 Application of fertilizer after planting by making 3 holes 31.94 100 Nos
of 10 cmts depth with crow bar . 10 cmts away from
plant amd putting fertilizers and closing
513 02-38-004 Circular weeding to a radius of 0.5 M around the plant 101.58 100 Nos
514 02-38-005 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.
515 02-38-006 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.
Cutting of coppice growth flush to the ground over
the entire area including retaining useful species just
after planting and placing the cut material in
between the planting rows.
516 02-38-007 Low rainfall zone <800 mm 792.78 Ha
517 02-38-008 High rainfall zone >800 mm 1189.24 Ha
518 02-38-009 Creation of Fire lines 3 mts wide (in multiple rows with 4.96 Rmt
the prior permission of Circle Head)
519 02-38-010 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.
520 02-38-011 Pruning of lower foliage/ branches of NTFP species like 100.95 100 Nos
kanuga, Neem, Usiri, Seethaphal etc., plants upto 1/3rd
height.
521 02-38-012 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year

70
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

02-39 : 2nd YEAR MAINTENANCE OF PLANTATIONS IN BY


TRENCH CUM PIT METHOD OTHER THAN SANDY
SOILS:
Application of Fertilizers
522 02-39-001 Cost of Chemical fertilisers (50 grm SSP for basal As per actuals
3 3
dressing, 20 grm DAP after planting for 30 cm & 45 cm
pits).
523 02-39-002 Application of fertilizer after planting by making 3 holes 31.94 100 Nos
of 10 cmts depth with crow bar . 10 cmts away from
524 02-39-003 plant amdweeding
Circular putting cum
fertilizers
deep and
soil closing
working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.
525 02-39-004 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.
Cutting of coppice growth flush to the ground over
the entire area including retaining useful species just
after planting and placing the cut material in
between the planting rows.
526 02-39-005 Low rainfall zone <800 mm 792.78 Ha
527 02-39-006 High rainfall zone >800 mm 1189.24 Ha
528 02-39-007 Creation of Fire lines 3 mts wide (in multiple rows with 4.96 Rmt
the prior permission of Circle Head)
529 02-39-008 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.
530 02-39-009 Pruning of lower foliage/ branches of NTFP species like 100.95 100 Nos
kanuga, Neem, Usiri, Seethaphal etc., plants upto 1/3rd
height.
531 02-39-010 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year
02-40 : 3rd YEAR MAINTENANCE OF PLANTATIONS IN BY
TRENCH CUM PIT METHODOTHER THAN SANDY
SOILS:
532 02-40-001 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.

71
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

533 02-40-002 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.

534 02-40-003 Creation of Fire lines 3 mts wide (in multiple rows with 4.96 Rmt
the prior permission of Cricle Head)
535 02-40-004 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.
536 02-40-005 Pruning of lower foliage/ branches of NTFP species like 100.95 100 Nos
kanuga, Neem, Usiri, Seethaphal etc., plants upto 1/3rd
height.
537 02-40-006 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year

02-41 : 4th YEAR MAINTENANCE OF PLANTATIONS IN BY


TRENCH CUM PIT METHOD OTHER THAN SANDY
SOILS:
538 02-41-001 Creation of Fire lines 3 mts wide (in multiple rows with 4.96 Rmt
the prior permission of Circle Head)
539 02-41-002 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.
540 02-41-003 Pruning of lower foliage/ branches of NTFP species like 100.95 100 Nos
kanuga, Neem, Usiri, Seethaphal etc., plants upto 1/3rd
height.
541 02-41-004 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year

02-42 : 5th YEAR MAINTENANCE OF PLANTATIONS IN BY


TRENCH CUM PIT METHOD OTHER THAN SANDY
SOILS:
542 02-42-001 Creation of Fire lines 3 mts wide (in multiple rows with 4.96 Rmt
the prior permission of Circle Head)
543 02-42-002 Pruning of lower foliage/ branches of NTFP species like 100.95 100 Nos
kanuga, Neem, Usiri, Seethaphal etc., plants upto 1/3rd
height.
544 02-42-003 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year

72
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

02-43 : PLANTATIONS UNDER CATCH PIT (1MX0.3MX0.3M)


METHOD IN OTHER THAN SANDY SOILS:
(Pre-planting Operations)
545 02-43-001 Survey with GPS (Only staff to carry out. One manday is Wage rate fixed by
allowed for assistance) the Dist.Collector
per day.
Preparation of site for planting by clearing thorny
unsaleable, unusable jungle growth, creepers, bushes
etc. spreading the cut material allover the site and
burning the same.
546 02-43-002 Sparse Jungle gowth (<10% ground area covered Jungle 1691.62 Ha
growth)
547 02-43-003 Very Light Jungle growth (>10% and upto 20% ground 2543.02 Ha
area covered with Jungle growth)
548 02-43-004 Light Jungle growth (>20% and upto 30% ground area 5095.63 Ha
covered with Jungle growth)
549 02-43-005 Medium Jungle growth (>30% ground area covered with 7672.21 Ha
Jungle growth)
Alignment & Staking
550 02-43-006 Alignment and staking including laying base line for 51.07 100 nos
teak, Casuarina with espacement 2m X 2m (2500 Nos)
551 02-43-007 Alignment and staking including laying base line for 61.23 100 nos
Eucalyptus with espacement 3mX 2m (1666 Nos)
552 02-43-008 Alignment and staking including laying base line for 68.00 100 nos
Misc speacies with espacement 3mX3m (1111 Nos)
553 02-43-009 Alignment and staking including laying base line for 90.57 100 nos
Usiri, Kanuga, Kunkudu, Bamboo etc. with espacement
5mX5m (400 Nos)
554 02-43-010 Cost of 0.45 M Stake preparation and transportation to 48.25 100 nos
site.
Digging of pits in ordinary soils
555 02-43-011 Digging of 45 cm. cube pits 14.96 Each
Digging of pits in hard gravellary soils
556 02-43-012 Digging of 45 cm. cube pits 16.93 Each
02-44 : RAISING OPERATIONS UNDER CATCH PIT METHOD
IN PLANTATIONS IN OTHER THAN SANDY SOILS :
Application of Fertilizers
557 02-44-001 Cost of Chemical fertilisers (50 grm SSP for basal As per actuals
3 3
dressing, 20 grm DAP after planting for 30 cm & 45 cm
pits).
558 02-44-002 Application of fertilizer after planting by making 3 holes 31.94 100 Nos
of 10 cmts depth with crow bar . 10 cmts away from
plant amd putting fertilizers and closing

73
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

559 02-44-003 Drenching the bag plants in 1-2% Aldrex or any other 13.82 100 Nos
anti-termite/ anti-fungal solution at the nursery site, at
least 2 days before the transport of seedlings to the
plantation site, excluding cost of chemicals.
Transport of Bag plants / Root trainer plants from
nursery site to plantation site including loading and
unloading upto 5 Km lead
560 02-44-004 12.5 X 22.5cm (5"X9") bag plants 62.96 100 Nos
561 02-44-005 15X30cm (6"X12") bag plants 126.81 100 Nos
562 02-44-006 20 X 30cm (8"X12") bag plants 227.25 100 Nos
Transport of Bag plants / Root trainer plants from
nursery site to plantation site including loading and
unloading beyond 5 Km - extra for every each Km.
563 02-44-007 12.5 X 22.5cm (5"X9") bag plants 2.38 100 nos
per km
564 02-44-008 15 X 30cm (6"X12") bag plants 4.45 100 nos
per km
565 02-44-009 20 X 30cm (8"X12") bag plants 8.88 100 nos
per km
Internal transport of bag plants/root trainers to
planting points on head loads.
566 02-44-010 12.5 X 22.5cm (5"X9") bag plants 48.25 100 Nos
567 02-44-011 15X30cm (6"X12") bag plants 74.64 100 Nos
568 02-44-012 20 X 30cm (8"X12") bag plants 115.41 100 Nos
Planting bag plants
569 02-44-013 30cmX30cmX30cm pits 114.28 100 Nos
570 02-44-014 45cmX45cmX45 cm pits 355.54 100 Nos
571 02-44-015 Digging of rectangular shaped catch pit of size 11.15 Plant
1.0Mx0.3Mx0.3M on upstreem side beyond 0.5 M and
forming a semilunar mound on down streem side of
width 0.3 M and hight of 0.15 M with the soil obtained
from the catch pit (@Rs.60 per Cum as per RSSR)
572 02-44-016 Provision of watering in plantations as per PCCF's 2.06 Plant
Circular 6B/06/G1 (Rc.No.17309/2000-G1, Dt.16-8-
2005). Prior intimation to Circle Head.
573 02-44-017 Replacement of Casualties 20% during Raising & 25% in 50% of rate of original
1st year (In case of Eucalyptus 10% during raising and pitting rate during
no casuality replacement for further maintenance) raising year and 100%
during maintenance
years. Planting,
Transportation and
internal transportation
as prescribed above.
574 02-44-018 Circular weeding to a radius of 0.5 M around the plant 101.58 100 Nos

74
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

575 02-44-019 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.
576 02-44-020 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.
577 02-44-021 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.
578 02-44-022 Pruning of lower foliage/ branches of NTFP species like 100.95 100 Nos
kanuga, Neem, Usiri, Seethaphal etc., plants upto 1/3rd
height.
Cutting of coppice growth flush to the ground over
the entire area including retaining useful species just
after planting and placing the cut material in
between the planting rows.
579 02-44-023 Low rainfall zone <800 mm 792.78 Ha
580 02-44-024 High rainfall zone >800 mm 1189.24 Ha
581 02-44-025 Creation of Fire lines 3 mts wide (in multiple rows with 4.96 Rmt
the prior permission of Circle Head)
582 02-44-026 Contingencies for enumeration of survivals, fixing 10th As per actuals subject
line stones, cost of numbering with paint/ white to maximum of 10% of
washing, sector stones, plantation boards, journals etc. estimate cost during
raising year
02-45 : 1st YEAR MAINTENANCE OF PLANTATIONS UNDER
CATCH PIT METHOD IN OTHER THAN SANDY SOILS:
583 02-45-001 Replacement of Casualties 20% during Raising & 25% in 50% of rate of original
1st year (In case of Eucalyptus 10% during raising and pitting rate during
no casuality replacement for further maintenance) raising year and 100%
during maintenance
years. Planting,
Transportation and
internal transportation
as prescribed above.
Application of Fertilizers
584 02-45-002 Cost of Chemical fertilisers (50 grm SSP for basal As per actuals
3 3
dressing, 20 grm DAP after planting for 30 cm & 45 cm
pits).
585 02-45-003 Application of fertilizer after planting by making 3 holes 31.94 100 Nos
of 10 cmts depth with crow bar . 10 cmts away from
plant amd putting fertilizers and closing

75
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

586 02-45-004 Circular weeding to a radius of 0.5 M around the plant 101.58 100 Nos
587 02-45-005 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.
588 02-45-006 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.
Cutting of coppice growth flush to the ground over
the entire area including retaining useful species just
after planting and placing the cut material in
between the planting rows.
589 02-45-007 Low rainfall zone <800 mm 792.78 Ha
590 02-45-008 High rainfall zone >800 mm 1189.24 Ha
591 02-45-009 Creation of Fire lines 3 mts wide (in multiple rows with 4.96 Rmt
the prior permission of Circle Head)
592 02-45-010 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.
593 02-45-011 Pruning of lower foliage/ branches of NTFP species like 100.95 100 Nos
kanuga, Neem, Usiri, Seethaphal etc., plants upto 1/3rd
height.
594 02-45-012 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year
02-46 : 2nd YEAR MAINTENANCE OF PLANTATIONS UNDER
CATCH PIT METHOD IN OTHER THAN SANDY SOILS:
Application of Fertilizers
595 02-46-001 Cost of Chemical fertilisers (50 grm SSP for basal As per actuals
3 3
dressing, 20 grm DAP after planting for 30 cm & 45 cm
pits).
596 02-46-002 Application of fertilizer after planting by making 3 holes 31.94 100 Nos
of 10 cmts depth with crow bar . 10 cmts away from
plant amd putting fertilizers and closing
597 02-46-003 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.

76
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

598 02-46-004 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.
Cutting of coppice growth flush to the ground over
the entire area including retaining useful species just
after planting and placing the cut material in
between the planting rows.
599 02-46-006 Low rainfall zone <800 mm 792.78 Ha
600 02-46-007 High rainfall zone >800 mm 1189.24 Ha
601 02-46-008 Creation of Fire lines 3 mts wide (in multiple rows with 4.96 Rmt
the prior permission of Circle Head)
602 02-46-009 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.
603 02-46-010 Pruning of lower foliage/branches of NTFP species 100.95 100 Nos
Kanuga, Neem, Usiri, Seethaphal etc, plants upto 1/3rd
height.
604 02-46-011 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year
02-47 : 3rd YEAR MAINTENANCE OF PLANTATIONS UNDER
CATCH PIT METHOD IN OTHER THAN SANDY SOILS:
605 02-47-001 Circular weeding cum deep soil working to a radius of 355.54 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in ordinary soils.
606 02-47-002 Circular weeding cum deep soil working to a radius of 533.31 100 Nos
0.5 m and to a depth of 15 cm around the plant to be
done with pick axes for the plants planted in pits without
disturbing the soil atround the plant to 10 cm wide but
weeding that part of area by hand and formation of
saucer in hard gravellary soils.
607 02-47-003 Creation of Fire lines 3 mts wide (in multiple rows with 4.96 Rmt
the prior permission of Circle Head)
608 02-47-004 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.

609 02-47-005 Pruning of lower foliage/ branches of NTFP species like 100.95 100 Nos
kanuga, Neem, Usiri, Seethaphal etc., plants upto 1/3rd
height.

77
Sl. Zonal Description of work with detailed specifications Rate Per/ Unit
No. FSR Code in Rs.

610 02-47-006 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year

02-48 : 4th YEAR MAINTENANCE OF PLANTATIONS UNDER


CATCH PIT METHOD IN OTHER THAN SANDY SOILS:
611 02-48-001 Creation of Fire lines 3 mts wide (in multiple rows with 4.96 Rmt
the prior permission of Circle Head)
612 02-48-002 Cost of Protection. One watcher is allowed for 20 Ha Wage rate fixed by
plantation. If the area is less prior approval of Circle the Dist.Collector
Head is required. per day.

613 02-48-003 Pruning of lower foliage/ branches of NTFP species like 100.95 100 Nos
kanuga, Neem, Usiri, Seethaphal etc., plants upto 1/3rd
height.
614 02-48-004 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year
02-49 : 5th YEAR MAINTENANCE OF PLANTATIONS UNDER
CATCH PIT METHOD IN OTHER THAN SANDY SOILS:
615 02-49-001 Creation of Fire lines 3 mts wide (in multiple rows with 4.96 Rmt
the prior permission of Circle Head)
616 02-49-002 Pruning of lower foliage/ branches of NTFP species like 100.95 100 Nos
kanuga, Neem, Usiri, Seethaphal etc., plants upto 1/3rd
height.
617 02-49-003 Contingencies for Enumeration of survivals in plantation As per actuals subject
including cost of paints, replacement of broken stones, to maximum of 5% of
plantation boards etc. estimate cost during
maint. year