DCR-58 was first introduced in 1991 which deals with the development of land of
cotton textile mills in Mumbai. In interest of mill workers, the said DCR-58 revised on
20/03/2001. According to which the open land and the balance FSI is allocated almost
equally i.e. 1/3 to Mill owner, 1/3 to MCGM & 1/3 to MHADA. The land earmarked for
MHADA shall be utilized equally for construction of houses, for Mill workers and for
Public housing.
As per the Government order dated 07/11/2006, an additional FSI to the extent of
200% over and above the permissible FSI i.e. 3.99 in city & 3.00 in suburb is permitted.
The 100% additional FSI permitted for public housing shall be utilized for construction of
mill workers houses. Similarly transit T/s shall be constructed in lieu of public housing.
Thus approximately 2/3 T/s will be constructed for mill workers and 1/3 for Transit T/s.
The carpet area for mill worker t/s & transit t/s is 225 sq.ft.
Vide G.R. dated 12/12/2006; a committee of Senior Officers has been constituted
under the Chairmanship of Hon Chief Secretary, to decide the cost of tenements to be
given to textile workers, to formulate mechanism for allotments of tenements and to
decide the eligibility of workers for allotment. A meeting of said committee was held on
26/03/2010 wherein the Hon Chief Secretary formulated a committee of
Secretary/Housing and Secretary/Labour under Chairmanship of Principal Secretary/UDD
for making recommendations on the above issues.
The detail information given by the MCGM Officer after the meeting held with
Horn. Chief Minister on 21/07/2011 & Dy.C.E.(B.P.) City, MCGM letter no.4538 dated
22/11/2011 has given the details regarding the allocation of Mill land to MHADA under
D.C.R.58 (1) (b) & 58(2). According to which there are 25 NTC Mills, 1 MSTC Mill & 32
Private Mills. Out of 58 Mills, in 12 Mills (9 NTC & 3 Private) MHADA share is yet not
decided. In 46 Mills (Annexure-1/1&1/2) MHADA's share is decided, out of which share
is nil in 10 Mills (3 NTC + 7Private).The allocated share of MHADA from remaining 36
Mills (13 NTC + 22Private +1MSTC) is 15.78 Ha (Annexure1/2).
Approximately 24500 T/s (16500 T/s for Mill workers + 8000 Transit T/s) can be
generated on MHADA's share of 15.78 Ha lands of 36 Mills. MHADA has received
9.63Ha of land from 26 Mills at 21 different locations. At present construction of 10165
T/s (6948 T/s for Mill workers+ 3204 Transit T/s & 13 shops) is physically completed on
6.83 Ha (Annexure-1/3A) lands of 18 Mills at 11 different locations and MHADA has
obtained Occupancy Certificate for Swan Mill Kurla,Simplex Mill Byculla, Standard Mill
Prabhadevi, Standard Mill (China Mill) Sewree, Swan Mill Sewree, Shriram Mill Worli,
Morarji Mill Kandivali, Piramal Mill Lower Parel and New Hind Mill Mazgaon (part) for
total 6016 T/s (254+139+177+192+714+286+810+236+3200+8 Shops). The carpet area
of tenement is 225 Sq ft and the approximate average built up area is 423.07 sq.ft.
The plot area of 5 mills (Matulya Mill, Mafatlal Mill Unit No. 3, Hindustan Mill
(Unit 1 & 2), Victoria Mill, MSTC (Free Hold) which are in possession of MHADA. The
areas of these 5 plots are small.The housing scheme on these plots is not feasible. The
proposal to obtain a big R.G. plot of MCGM adjacent to MHADA's share at Western India
lease hold land in lieu of above 5 Mills is submitted and same is tentatively accepted by
UDD.The area of land which are in possession of MHADA & where the work of
construction is not yet started compromises of 2.25 Ha.(Annexture-1/4-B).
Besides above mentioned mill lands there are 10 mills where MHADA's share of
land is yet to be obtained having about 4.83 Hectare of land in all. (Annexture-1/5C). In
this regard Hon'ble Housing Minister for state & Hon'ble Principal Secretary (UDD)
called meetings & persuaded to mill owner to handover the MHADA's share of land.
In the meeting dated 05/08/2010 the Hon Chief Minister directed to collect the data
of mill workers of 58 mills in the Mumbai. Accordingly during the first campaign dated
06/9/2010 to 28/10/2010, total 1,24,173 forms were sold out & between 06/9/2010 to
29/10/2010 total 1,10,323 forms were received.
As per the direction in the letter of GoM dated 5/10/2011, a campaign was launched
to collect the data from the legal heirs of the deceased mill workers and from such mill
workers who were unable to submit their data during previous campaign was called from
31/10/2011 to 9/12/2011.During this period of campaign total 46,336 applications were
sold. In response on 31/10/2011 to 12/12/2011, total 38,544 applications i.e. 22,701 filled
up applications from heirs and 15,843 filled up applications from mill workers were
received.
Therefore the total applications sold out during present & previous campaign is
1,70,509.Similarly the total 1,26,166 filled up application from mill workers and 22,701
applications from legal heirs are received i.e. total 1,48,867 filled up applications are received.
The compiled information of both the campaign is submitted by MHADA to GoM vide letter no.
159 dated 07/2/2012. The Lottery for eligible mill worker T/s. on 28/06/2012.
*******
13a Jublee Mill(Swan Process) Sewree 1629.85 814.93 814.93 Possession received
13b Swan Mill (Kurla) Kurla 3246.22 1623.11 1623.11 Possession received
ANNEXURE-1/2
Total MHADA' Mill
MHADA s Share Workera
S.N 's Share for Transit Share
Name Of Mill Place Remarks
o. in Sq Ts (50%) (50%) in
Mts in Sq Sq Mts
Mts
Hindustan Mill Unit 3 (Crown
27 602.17 301.09 301.09
Mill)
As the entire land is under CRZ,
hence no area is expected for
28 Hindustan Mill Process House 0.00 0.00 0.00 MHADA.
37 Modern Mill 0.00 0.00 0.00 No land allocation under new DCR
PLANS ARE NOT APPROVED & MHADA SHARE IS YET NOT DECIDED
Lower
13 Piramal Mill 6 1424.54 160 76 236 13/09/2007 Work
Parel
completed.
14 Sriram Mill 7 Worli 2056.06 214 72 286 19/09/2007 Occupation
Certificate
obtained.
15 Simplex Mill 8 Byculla 1126.00 98 41 139 24/04/2008
Standard Mill
17 10 Prabhadevi 1020.93 122 55 177 11/10/2007
(Prabha Devi)
Work is
12612.1
18 Swadeshi Mill, Kurla 11 Kurla 1108 545 1653 4/1/2008 physically
0
completed.
Total 8 shops
at New Hind
Mill & 5
68363.2 shops at
Sub Total-A 6948 3217 10165
2 Swadeshi
Mill,Kurla are
included in
Transit T/s
Sr
Total Mill
No Place/locat
MHAD worker Transit Total Ts Date of
Sr. for ion of
Name Of Mill A's s Ts in Ts in In taking Remarks
No. Loc work in
Share in Numbe Number Numbers Possession
atio progress
Sq Mts r
ns
Jubilee Mill(Swan
Scheme is
12a Process) ( part 12 Parel 1629.85 158 78 236 19/04/2011
proposed.
of Swan Mill Sewree)
Lower
19 Matulya Mill 13 388.30 43 21 64 2/6/2006
Parel
Lower
20 Mafatlal Mill no 3 14 481.43 53 27 80 26/11/2007 Small plot to
Parel
be exchanged
with MCGM's
Hindustan Mill Unit R.G. plot.
21 15 Byculla 542.10 60 30 90 5/12/2007
1&2 Proposal
principally
approved by
22 Victoria Mill 16 Worli 850.00 94 47 141 14/05/2010
UDD
Possession
Lower
24 Bharat Mill (NTC) 19 1938.12 215 108 323 13/09/2011 has taken
Parel
recently.
Mhada has
taken
possession of
13091.90
25 Century Mill 20 Worli 13091.90 1336 652 1988 8/12/2011
sq.mts of land
out of
18971.60
sq.mts.
Possession
Lower
26 Prakash Cotton Mill 21 5067.78 512 246 758 30/04/2012 has taken
Parel
recently.
B) Transit Tenements :-
Under this category it is proposed to construct 6832 DU's and the project cost is
Rs.245.53 Crores. G.O.I share is amounting of Rs. 114.20Crores. These transit tenements
will be allotted to the tenants residing in old dilapidated cessed buildings. Total 5843 T/s
have been completed upto March -2011 with total expenditure amounting to Rs. 201.10
crores. Rs. 114.20 Crores GOI share is released.
*******
DU
Total Expd. Till
Sr Project Tackle Compl in
Scheme DU GOI end of Remark
No. Cost d DU ete DU progr
Share March-12
ess
A EWS Possession given to
CTS No.6A/ S.No.263 2170
1 77.43 2198 33.81 76.13 2170 2170 0
Malwani ,Malad. Beneficiaries
Shailendra Nagar, Dahisar 381
2 14.94 424 6.52 15.12 424 424 0
(E) Benficiaries
272
3 Kanara Engr, Ghatkopar (E) 10.39 295 4.54 11.03 295 295 0
Benficiaries
CTS N.61 (pt), Turbhe Beneficiaries
4 25.89 735 11.30 29.85 763 763 0
Mandale, Mankhurd. are fixed.
Total 128.65 3652 56.16 132.13 3652 3652 0 2823
LIG
CTS N.61 (pt), Turbhe Beneficiaries
5 6.09 93 2.66 7.05 93 93 0
Mandale, Mankhurd. are fixed.
Kanara Engineering, Possession
6 4.06 62 1.77 4.04 62 62 0
Ghatkopar (East) to the
Beneficiaries
Shailendra Nagar, Dahisar
7 6.09 93 2.66 7.31 93 93 0 is in
(East)
Progress .
8 Colaba 18.26 279 7.97 0.20 210 0 210
2910T/S
Total 34.50 527 15.07 18.60 458 248 210
Possesion
EWS+LIG given to
163.153 4179 71.23 150.73 4110 3900 210
Total Beneficiaries
1848Ts.Han
1 Dharavi 77.63 2160 36.11 68.41 2159 2159 0 ded over to
R. R..B
2 Sahakar Nagar, Chembur 18.69 520 8.69 19.96 520 520 0 Completed
4644 T/s
Handed
245.53 6832 114.20 211.92 6788 6279 509
Total over to
R.R.Board
C)MILL WORKER + TRANSIT SHELTER
Completed
OC in
1 New Hind Mill, Mazgaon. 320.93 5220 107.64 458.25 5216 5216 0
process
Possession
Bombay Dyeing Lower
2 50.66 824 16.99 0.00 0 0 0 awaited
Parel
Completed
3 Swan Mill Kurla/Sewree 59.51 968 19.96 76.96 968 968 0 OC received
Completed
Morarji Mill , OC in
4 79.87 1299 26.79 114.55 1298 1298 0
Kandivali/Goregaon process
OC awaited
5 Swadeshi Mill , Kurla 101.10 1644 33.91 145.89 1653 1653 0