KOP PERUSAHAAN

BUILDING BUDGET CIVIL CONSTRUCTION

DIMENSI KISARAN BIAYA


NO URAIAN PEKERJAAN USER DESIGN & RAB KLASIFIKASI BANGUNAN SCHEDULE DIKERJAKAN OLEH REMARK
M M2 HARGA SATUAN JUMLAH HARGA

1 Building Maintenance & Repair ALL DEPT. continou 1,500,000.00 18,000,000.00 Sederhana SETIAP BULAN KONTRAKTOR
2 Shelter Rest Crew Survey ENGINEERING on progress 3x6 18 1,550,000.00 27,900,000.00 Sederhana FEBRUARI KONTRAKTOR

3 Skidding ViewPoint ENGINEERING on progress 4x5 20 4,500,000.00 90,000,000.00 Sederhana AGUSTUS KONTRAKTOR
4 Rehab Container Pengawas & admin subkon Hauling crusher BRE ENGINEERING Ada 2,5 x 6 15 688,900.00 10,333,500.00 Sederhana FEBRUARI KONTRAKTOR

5 Rehab All Pos Security (Office, Parkiran, Mess, pos produksi) HRGS on progress 37,500,000.00 Sederhana JUNI KONTRAKTOR

6 Rehab masjid Al Fattah & Instalasi tandon air wudhu HRGS on progress 10 x 10 100 350,000.00 35,000,000.00 Sederhana APRIL KONTRAKTOR
7 Rehab WC Masjid Al fattah HRGS Open 1.5 x 3 4.5 750,000.00 3,375,000.00 Sederhana JULI KONTRAKTOR

8 Rehab Interior & eksterior mine office HRGS Open 13 x 12 156 550,000.00 85,800,000.00 Sederhana JUNI KONTRAKTOR

9 Pembuatan pagar mess Sinergi 1, Sinergi 2 & Sinergi 3 HRGS Open 65 300,000.00 19,500,000.00 Sederhana SEPTEMBER KONTRAKTOR
10 Perbaikan drainase depan mess sinergi 6 HRGS Open 10 350,000.00 3,500,000.00 Sederhana SEPTEMBER KONTRAKTOR
11 Gudang GS, Gudang Survey, Gudang Civil & Extend Small Office Civil HRGS & ENGINEERING on progress 8 x 12 96 1,360,000.00 130,560,000.00 Sederhana FEBRUARI KONTRAKTOR

12 Pembuatan Urinoir Area Logistik LOGISTIC Open 1x1 1 1,150,000.00 1,150,000.00 Sederhana JULI KONTRAKTOR

13 Gudang komponen bekas LOGISTIC Open 8x8 64 1,950,000.00 124,800,000.00 Sederhana MEI KONTRAKTOR
14 Gudang Oli & Grease LOGISTIC on progress 12 x 15 168 1,350,000.00 226,800,000.00 Sederhana (K-250) MEI KONTRAKTOR

15 Open Storage LOGISTIC Open 12 x 16 192 1,550,000.00 297,600,000.00 Sederhana (K-250) JUNI KONTRAKTOR

16 Gudang Tyre LOGISTIC Open 12 x 16 192 1,550,000.00 297,600,000.00 Sederhana (K-250) JUNI KONTRAKTOR
17 Main Tank Kap. 150000 Liter LOGISTIC on progress 10 x 30 300 1,550,000.00 465,000,000.00 Sederhana (K-250) JULI KONTRAKTOR

18 Penambahan/Extend Shelter logistik LOGISTIC Open 3x8 24 1,050,000.00 25,200,000.00 Sederhana AGUSTUS KONTRAKTOR
19 Perbaikan atap teras logistik LOGISTIC Open 16.5 x 3.5 49.5 450,000.00 22,275,000.00 Sederhana AGUSTUS KONTRAKTOR

20 Rehab TPS LB3 LOGISTIC on progress 6.5 x 10 65 750,000.00 48,750,000.00 Sederhana MARET KONTRAKTOR

21 Urugan batu base waterfill LOGISTIC on progress 8 x 30 x 0.6 144 365,000.00 52,560,000.00 Sederhana MARET KONTRAKTOR
22 Penambahan ruang tabung kosong Acetylene & oksigen LOGISTIC on progress 2.5 x 4 10 1,850,000.00 18,500,000.00 Sederhana MEI KONTRAKTOR

23 Pembuatan Rak Spare Part Warehouse Logistik Tahap 2 LOGISTIC Open 5x6x2 60 250,000.00 15,000,000.00 Sederhana APRIL KONTRAKTOR

24 Rehab WC Logistik LOGISTIC Open 1,5 x 4,5 6.75 750,000.00 5,062,500.00 Sederhana JULI KONTRAKTOR
25 Pembuatan Skidding WC & Tempat Cuci Tangan Area Plant PLANT Open 1,5 x 3 4.5 2,250,000.00 10,125,000.00 Sederhana JUNI KONTRAKTOR

26 Workshop HD (3 Base) PLANT on progress 24 x 36 864 5,850,000.00 5,054,400,000.00 Bangunan Sedang (K-350) MARET KONTRAKTOR
27 Ruang Engine Over haul PLANT on progress 8x8 64 1,350,000.00 86,400,000.00 Sederhana (K-250) MEI KONTRAKTOR

28 Rehab. Bangunan Workshop DT (Perbaikan Atap & Lantai) PLANT on progress 29x24 696 900,000.00 626,400,000.00 Atap Galvalum, Beton (K-250) JULI KONTRAKTOR

29 Rabat beton depan workshop (10 x 30) PLANT on progress 30 x 12 x 0.3 104.4 3,950,000.00 412,380,000.00 Beton Mutu (K-250) APRIL KONTRAKTOR
30 Perbaikan atap rest house mechanic plant PLANT on progress 12 x 13 x 2 312 185,000.00 57,720,000.00 Sederhana JULI KONTRAKTOR

31 Relokasi Fabrikasi PLANT Open 9 x 10 90 450,000.00 40,500,000.00 Beton K-200 MEI KONTRAKTOR

32 Relokasi Shelter SSE PLANT Open 5x7 35 750,000.00 26,250,000.00 Sederhana MEI KONTRAKTOR
33 Skidding Shelter Crew Mechanic HD PLANT on progress 4x6 24 4,500,000.00 108,000,000.00 Sederhana FEBRUARI KONTRAKTOR
34 Skidding Shelter PIT STOP + Container PLANT on progress 4x5 20 4,500,000.00 90,000,000.00 Sederhana FEBRUARI KONTRAKTOR

35 Urugan dan Penebalan beton Lantai washingpad PLANT on progress 12 x 25 300 675,000.00 202,500,000.00 Sederhana FEBRUARI KONTRAKTOR

36 Urugan batu area workshop plant dan logistik PLANT & LOGISTIK on progress 1769.95 365,000.00 646,031,750.00 Sederhana APRIL KONTRAKTOR Split 3/4
37 Workshop Tyre HD (Repair + Assembling) PLANT/TYRE on progress 12 x 12 144 4,750,000.00 684,000,000.00 Sederhana APRIL KONTRAKTOR

38 Workshop Tyre DT (Repair + Assembling) PLANT/TYRE on progress 6 x 20 120 1,150,000.00 138,000,000.00 Sederhana MARET KONTRAKTOR

39 Shelter Tyre (Staff, Tyre man, Tyre Stock, dll) PLANT/TYRE on progress 10 x 8 80 950,000.00 76,000,000.00 Sederhana MARET KONTRAKTOR
40 Gudang Admin Produksi PRODUKSI on progress 3x4 12 1,100,000.00 13,200,000.00 Sederhana APRIL KONTRAKTOR

41 Skidding Shelter OB produksi PRODUKSI Open 4x8 32 2,100,000.00 67,200,000.00 Sederhana SEPTEMBER KONTRAKTOR
42 Rehab WC Produksi PRODUKSI Open 1.5 x 3 4.5 750,000.00 3,375,000.00 Sederhana JULI KONTRAKTOR

43 Rehab Skidding Operator dozer TDC PRODUKSI on progress 2x3 6 750,000.00 4,500,000.00 Sederhana MARET KONTRAKTOR

44 Skidding Pos pengawas produksi PRODUKSI Open 1,5 x 2,5 x 5 18.75 2,250,000.00 42,187,500.00 Sederhana AGUSTUS KONTRAKTOR
45 Pagar area gudang handak BRE PT BRE Ada 120 308,317.50 36,998,100.00 Sederhana FEBRUARI KONTRAKTOR

GRAND TOTAL ###

Noted : Jadwal pelaksanaan dapat berubah mengikuti kondisi lapangan dan urgenitas pekerjaan

PT. …………….

Dibuat oleh, Diperiksa Oleh, Diketahui Oleh,


…………………………… …………………. ……………………
Civil Construction GL HRGS Dept. Head Project Manager