3rd F 4th F. 5th F 6th F 7th F 8th F 9th F 10th F 11th F 12th F
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
Total
13th F 14th F
fixtures
1 1 15
1 1 15
1 1 15
1 1 15
1 1 15
1 1 15
1 1 15
1 1 15
1 1 15
1 1 15
1 1 15
1 1 15
1 1 15
1 1 15
1 1 15
1 1 15
Project : Example Date : May 30, 2009
Location : Egypt Designed : Zanitty
Pump Discharge
Q (GPM) = 97
Pump Head
T (Hr) = 0.38
Power
Pump Discharge
Q (L/s) = 10
Pump Head (m) = 22
Power
RE Reynolds number
DN Nominal diameter
V Mean Velocity
GH Static head
1.0 Multimedia filter
DH Total loss
Q Flow rate
2.0 Strainer
0.5 reducer
0.9 tee
no. DN mm m mm GPM l/s 1/1 m m/s 1/1 1/1 m m m m m
PUMP TO A 300 PVC 267.4 10 0.01 40 2.52 3 1 1 1 1 1 6.9 10 0.04487 11999.116 0.029497 0.001 0 0.001 0.001 10
A TO B 300 PVC 267.4 83 0.01 400 25.2 1 0.9 0 0.44873 119991.16 0.017545 0.067 0.056 0.009 0.065 0.065
B TO C 350 PVC 302.4 879 0.01 350 22.05 8 1 2.9 0 0.30701 92840.383 0.01844 0.029 0.257 0.014 0.271 0.271
C TO D 250 PVC 212.8 195 0.01 100 6.3 2 1 1.1 0 0.17714 37694.592 0.02241 0.017 0.033 0.002 0.035 0.035
D TO E 200 PVC 170.2 322 0.01 100 6.3 3 1 1 3.4 0 0.27691 47129.313 0.021369 0.049 0.158 0.013 0.171 0.171
E TO F 150 PVC 136.2 47 0.01 50 3.15 2 1 1.1 0 0.21621 29447.17 0.023774 0.042 0.02 0.003 0.022 0.022
F TO G 63 PVC 53.6 32 0.01 50 3.15 1 1 1 1.8 30 1.39602 74826.578 0.019934 3.694 1.182 0.179 1.361 31.36
10
10.066
10.337
10.372
10.543
10.565
41.926
41.93
###
###
###
###
###
###
Head Loss Calculations:
J = l . V² / ( 2 g D ) ………..…………………………………………………………….. (3)
1 k 2.51
= - 2 x log [ + )
sqr(l) 3.7 x D Re x sqr( l )
RE = V x D / n …………………………………………………………………………. ( 5 )
V = Q/A ………………………………………...………………………………………. ( 6 )
Where: Q : flow rate (m³/s)
A : cross section are of the pipe (m²)
Data for the First pipe : 300 PVC Pipe type & size 300
315 mm Out side diameter (mm)
23.8 mm Wall thickness (mm)
V =Q /A = 0.449 m/s
1 0.00001 2.51
= - 2 log [ + ]
sqr(l) 3.7 x 0.267 119991.2 x sqr( l )
l= 0.01754
HS2 = SUM ZE . V ² / ( 2 . g )
0.4487 X 0.4487
HS(2) = SUM ZE.x V² / ( 2 g ) = 6.9 x = 0.0708 m
2 x 9.81
V =Q /A = 0.177 m/s
1 0.00001 2.51
= - 2 log [ + ]
sqr(l) 3.7 x 0.267 37694.6 x sqr( l )
HS2 = SUM ZE . V ² / ( 2 . G )
0.1771 X 0.1771
HS(2) = SUM ZE.x V² / ( 2 g ) = 0.9 x = 0.0018 m
2 x 9.81
V =Q /A = 0.307 m/s
1 0.00001 2.51
= - 2 log [ + ]
sqr(l) 3.7 x 0.302 47129.3 x sqr( l )
HS2 = SUM ZE . V ² / ( 2 . G )
HS2 = SUM ZE . V ² / ( 2 . g )
0.307 X 0.307
HS(2) = SUM ZE.x V² / ( 2 g ) = 2.9 x = 0.0 m
2 x 9.81
V =Q /A = 0.177 m/s
1 0.00001 2.51
= - 2 log [ + ]
sqr(l) 3.7 x 0.213 0.0 x sqr( l )
l= 0.02241
HS2 = SUM ZE . V ² / ( 2 . g )
0.1771 X 0.1771
HS(2) = SUM ZE.x V² / ( 2 g ) = 1.1 x = 0.0018 m
2 x 9.81
V =Q /A = 0.277 m/s
1 0.00001 2.51
= - 2 log [ + ]
sqr(l) 3.7 x 0.17 47129.3 x sqr( l )
l= 0.02137
HS2 = SUM ZE . V ² / ( 2 . g )
0.2769 X 0.2769
HS(2) = SUM ZE.x V² / ( 2 g ) = 3.4 x = 0.0133 m
2 x 9.81
V =Q /A = 0.216 m/s
1 0.00001 2.51
= - 2 log [ + ]
sqr(l) 3.7 x 0.136 0.0 x sqr( l )
l= 0.02377
SUM ZE = 0 0 x 0.2 = 0
0 0 x 1 = 0
0 0 x 1 = 0
0 0 x 2 = 0
0 0 x 0.3 = 0
0 2 x 0.3 = 0.6
0 0 x 0.9 = 0
0 1 x 0.5 = 0.5
0 0 x 2 = 0
0 0 x 1 = 0
0 = 1.10
HS2 = SUM ZE . V ² / ( 2 . g )
0.2162 X 0.2162
HS(2) = SUM ZE.x V² / ( 2 g ) = 1.1 x = 0.0026 m
2 x 9.81
= HS1 + HS2 = 0.02 + 0.003 = 0.022 m
V =Q /A = 1.396 m/s
1 0.00001 2.51
= - 2 log [ + ]
sqr(l) 3.7 x 0.054 0.0 x sqr( l )
l= 0.01993
SUM ZE = 0 0 x 0.2 = 0
0 0 x 1 = 0
0 0 x 1 = 0
0 0 x 2 = 0
0 0 x 0.3 = 0
0 1 x 0.3 = 0.3
0 0 x 0.9 = 0
0 1 x 0.5 = 0.5
0 0 x 2 = 0
0 1 x 1 = 1
0 = 1.80
HS2 = SUM ZE . V ² / ( 2 . g )
1.396 X 1.396
HS(2) = SUM ZE.x V² / ( 2 g ) = 1.8 x = 0.1788 m
2 x 9.81
= HS1 + HS2 = 1.182 + 0.179 = 1.361 m
Given Data:
Number of persons = 656
Boiler Design
Q (m3/h) = 4
Q (l/s) = 2
Head (m) = 22
Pump Efficiency = 0.8
Power (Hp) = 1
Project : Example Date : May 30, 2009
Location : Egypt Designed : Zanitty
Drain Sump
Sewer Drainage
No. of Drainage Fixtures = 48
Fixtures Flow Rate (L / min) = 285
Laundry Drainage
Laundry Demand (L / bed / day) = 130
No. of beds = 656
Laundry Drainage (L / min) = 60
Kitchen Drainage
Kitchen Demand (L / person / day) = 160
No. of persons = 656
Kitchen Drainage (L / min) = 73
Sump Dimension
Sump depth (m) =2
Sump Length (m) =3
Sump Width (m) =3
LOWED to change
Project : Example Date : May 30, 2009
Location : Egypt Designed : Zanitty
Q (L/S) = 30
Q (m3/s) = 0.03
Main Pipe Velocity (m/s) = 1
Main Pipe Diameter (mm) = 200 * Take the larger Standard Size
Pump Head
Power
Q (m3/day) = 263
Q Sewer (m3/day) = 237
Sewerage Flow to Be Treated (m3/day) = 214
Assume
Filter Design
Filtration Pump
Capacity (m3) = 23
Pump working hours = 12
Working time (h) = 1.2
Qpump (L/S) = 6
Pump Head (m) = 22
Pump Efficiency = 0.8
Power (Hp) = 3