Вы находитесь на странице: 1из 99

East Hampton

Hamlet Report

Montauk
Prepared by:
Dodson & Flinker, Landscape Architects and Planners
Fine Arts & Sciences
RKG Associates Inc.
L.K. McLean Associates

Prepared For:
The Town of East Hampton, New York

January 31, 2018


Table of Contents

p. 1 Introduction

p. 4 Existing Conditions

p. 23 Charrette Process

p. 31 Planning & Design Recommendations

p. 57 Implementation Tools and Techniques

Appendix A New York State Grants and Programs

Appendix B Water Quality Plans and Recommendations

Appendix C Public Comments for Montauk

Appendix D Model Shared Parking Agreements


Introduction

E
ast Hampton is defined by the unique char- The commercial centers within each hamlet form the
stage on which this dynamic interaction of social, eco-
acter of its hamlets, villages and countryside. nomic and environmental elements plays out over the
With large expanses of pristine ocean beach- course of the year. While future change in the town’s
conservation areas and residential neighborhoods will be
es, scenic vistas, preserved farmland, historic landscapes, relatively modest under current zoning, potential change
within the commercial and industrial zones could be
significant fish and wildlife habitats, and high quality
more significant – driven by the individual decisions of
drinking water resources, the unique natural and cultural hundreds of local businesses, each reacting in real time
to challenges as diverse as the explosion of on-line retail,
features of the town are largely intact. This world-class labor shortages and rising sea levels.
landscape has become the centerpiece of a vibrant sum-
These trends have been evolving for decades, and were
mer community, attracting tens of thousands of second reflected in The 2005 East Hampton Comprehensive
Plan. One recommendation of that plan was the creation
homeowners and tourists, as well as the small army of of detailed plans for the Town’s commercial areas and an
evaluation of the Town’s ability and desire to meet future
workers and professional needed to serve their needs. As
commercial needs. As a result, in 2016 the Town of East
a result East Hampton, and Montauk in particular, faces Hampton commissioned the preparation of this Master
Plan for Montauk’s main commercial business districts.
ongoing challenges created by seasonal swings in popula- At the same time, the Town commissioned the prepara-
tion and activity, with related impacts on traffic, parking, tion of Master Plans for five additional hamlet centers,
together with a Townwide business district analysis and
housing, water supply, wastewater treatment, and a host an economic strategy to sustain the hamlet commercial
districts in the future. The Town of East Hampton re-
of other factors. tained a consulting team led by Dodson & Flinker, Inc.,

Hamlet Study - Montauk | Introduction & Existing Conditions 1


0 2.5 5

o
Miles
Sag
Harbor
Springs

East Hampton

Wainscott

East Hampton Amagansett


Village NY 27 Montauk

The Montauk District Boundary is shown in orange.

Community Design and Rural Preservation Specialists, But Montauk is at risk of becoming a victim of its own
together with subcontractors LK McLean Associates success and its recent popularity as a “Hamptons Hot-
P.C., Consulting Engineers, Fine Arts & Sciences LLC, spot” is putting tremendous pressures on the peace and
Environmental and Community Planning Consultants tranquility of the community. Travel + Leisure Magazine
and RKG Associates, Economic, Planning and Real Es- rated Montauk the most expensive beach town in the
tate Consultants. The Economic and Business analysis, US for August 2017 and soaring real estate values have
which informed this Plan for Montauk, is provided in a made it increasingly difficult for workers and families to
companion document. live in Montauk. The Town has stepped up enforcement
and enacted new legislation in response to local out-
Montauk’s extraordinary scenic and natural resourc- rage over the behavior and traffic jams resulting from Montauk’s history and culture are shaped by its coastal landscape.
es have made it a desirable destination for tourists and throngs of partiers. But improved infrastructure, pedes-
place to live for year round and second home owners. trian amenities, coordinated parking, coastal resiliency and walking tours which were open and advertised to The purpose of this exercise is not to require a particular
Touched by many of the most significant events in- and more are needed to protect and preserve Montauk. the general public, business owners, year round resi- use or arrangement of uses on a particular lot. Rather, it
cluding both world wars, and influential people of their dents, second homeowners and other stakeholders. The is meant to explore and illustrate the fundamental plan-
times, Montauk has a rich and colorful history. Mon- This master plan is designed to help the town under- charrettes provided detailed public input and the oppor- ning and design principles that can protect Montauk’s
tauk’s development as a beach resort dates to the 1881 stand how Montauk’s commercial districts look and tunity for citizens to work together with town staff and main commercial centers into more attractive, cohesive,
Frederick Law Olmsted subdivision improved with function today, and to explore ways that they could be the consulting team to develop creative recommenda- functional and economically-vibrant places.
Shingle Style summer cottages designed by McKim, improved to better serve the community in the future. tions for the Hamlet.
Meade and White- now recognized on the National Reg- The Methodology for the preparation of the Montauk The ultimate goal of this study is to provide the Town
ister of Historic Places. Another era which adds to the Master Plan Study featured data gathering, detailed Based on the results of the charrettes, the consulting of East Hampton with an inspirational, achievable plan
unique character of Montauk and not typically seen in analysis and extensive public participation. As described team prepared illustrative master plans for Montauk’s which will enhance Montauk’s strengths while signifi-
a beach-oriented community is the Tudor Revival Style in the following section, an inventory and analysis was Downtown, Harbor Area and Station Area. The Plans cantly improving the Hamlet’s aesthetics, walkability,
developed by Carl Fisher in the 1920s and 30s. Montauk conducted with regard to historic and cultural resourc- are intended to capture the community’s shared vision functionality and vitality. The 2005 Town Comprehen-
Harbor is the number one commercial fishing port in es, demographics, natural resources and environment, of more attractive, walkable, and economically vibrant sive Plan Vision and Goals, developed through a consen-
New York State and also supports a robust recreational environmental challenges, demographics, zoning, land commercial centers. The illustrative master plans show sus building process, is the touchstone for the Montauk
fishing industry. The rich cultural heritage, small town use, business uses and hamlet economy, residential and one potential way that the Montauk’s main commer- Master Plan. Specific objectives and recommendations
character, quaint fishing village setting, pristine beaches commercial buildout and transportation and infrastruc- cial areas could be redeveloped over coming decades, for Montauk put forth in this report build on that long-
and natural environment all contribute to what makes ture. Public participation included an intensive four-day but they are not the only possible result of changes the term vision of what it is essential to East Hampton now
the hamlet so special. charrette process consisting of workshops, focus groups Town might make in planning policy or regulations. and in the future.

2 Town of East Hampton, New York


Legend
Pedestrian and Bicycle Connections: Townwide Hamlet Boundaries

Water Bodies

Rivers and Streams

Wetlands

Permanent protection

Open Space

ath
tP
es
rt h

w
No

ad
8

Ro
or
7

rb
Ha
E.Hampton

le
Mi
a d
2 Ro
Three
ce

ail
la
ep

o Amagansett Tr
to
S ag 12
ir
H
sF
ing
ar

3
bo

Spr
r Tr
ail

st

g
rin
1 4 Sp 11
5 6
Paumanok Path Montauk
10 Lighthouse

Town
Beach
o

RTH
NO
0 0.5 1

0 2,000 4,000

1. Wainscott Commercial Center, Wainscott 5. Pantigo Road Neighborhood Business District, East Hamp- 9. West Fort Pond Boulevard Neighborhood Business
ton District, Springs
2. Three Mile Harbor, Springs
6. Amagansett Commercial Center, Amagansett 10. Downtown Montauk Commercial Center, Montauk
3. Future Sand Pit Mixed Use Center and Contractor Park and
Ride, East Hampton 7. Springs Historic District 11. Montauk Train Station, Montauk

4. North Main Street District, East Hampton 8. East Fort Pond Boulevard Neighborhood Business 12. Montauk Harbor Commercial Center
District, Springs

Hamlet Study - Montauk | Planning & Design Recommendations 3


Two major commercial centers exist in Montauk today.
Existing Conditions One is Montauk Downtown—an area of ocean-side hotels
and retail that is the descendant of Carl Fisher’s never-ful-
ly-realized 1920 resort plan for the area. The other com-
Geography mercial center is Montauk Dock, an area of restaurants,
retail, and a working waterfront at the inlet and harbor
In this report the boundaries of the Montauk Hamlet are that Fisher created at Lake Montauk. These commercial
defined by the 12,415.8 acre Montauk School District. centers are among the most heavily visited areas of East
Montauk is almost completely surrounded by water, with Hampton in the summer. Montauk’s commercial are-
a narrow strip of land to the west between Napeague Har- as will likely also experience the largest impact in Town
bor and the Atlantic Ocean providing the hamlet’s only from rising seas and climate change.
land connection to the other hamlets of East Hampton.
Montauk is bounded by Napeague Harbor and Napeague Historic and Cultural Resources
Bay to the west. To the north is Fort Pond Bay and Block
Island Sound. To the South is the Atlantic Ocean. Archaeological evidence suggests that Native Americans
occupied the South Fork of Long Island as far back as the
Montauk is a glacially-sculpted peninsula with a relative- Archaic Age (ca 4500-1300 BC)1. The visual and cultural
ly flat southwestern coastal plain flanked by dunes and character of Montauk today bears the mark of the Mon-
beaches that rises to dramatic coastal bluffs and high hills tauk Tribe that occupied the hamlet as well as the strong
in the eastern half of the hamlet. Lake Montauk and Fort influence of European settlers that supplanted them in Montauk’s sandy bluffs, dunes, water bodies and beaches are fundamental to the scenic beauty of area. Historic structures like the
Pond—a water body that extends from ocean to sound Montauk lighthouse (below) also are central to the iconic character of the landscape.
bordered by narrow, low-lying land—further subdivide
1
East Hampton Comprehensive Plan: Geography and
the land area of Montauk into three contiguous land areas. History the 17th century and 20th century resort development.

The earliest European land uses of the Montauk penin-


sula were agricultural. Early roads were connected from
meadows at the major ponds, harbors and landings.
Soon after the early settlement of East Hampton, differ-
ent groups of East Hampton men acquired land on the
Montauk peninsula from the Montaukett tribe. From the
mid-17th century to the late 19th century, Montauk was
used as common pasture for livestock.2

The Montauketts continued to live at Indian Field, east


of Lake Montauk; the hamlet was the last area in East
Hampton with reserve land for the Montauk tribe. Many
known Native American burial grounds exist in the ham-
let. European settlers in the region, like the native tribes
that occupied this land previously, recognized the impor-
tant opportunities for fishing and shell-fishing in the re-
gion. Among other pursuits the Montauketts, displaced
by livestock companies, joined the burgeoning whaling
industry out of Northwest Harbor and Sag Harbor in the
17th and 18th centuries.
Major buildings designed and constructed as part of Carl Fisher’s development plans in the 1920s have left a lasting mark on the
character of Montauk’s Downtown.
2

4 Town of East Hampton, New York


Population and
P oDemographics
pulation & Demographics | Montauk Montauk Following the extension of the Long Island Railroad
to Bridgehampton in 1870, the Town of East Hampton
began to develop its reputation as a summer resort and
tected, undeveloped land. Among other things, Montauk
contains the largest block of maritime forest left on Long
Island. The areas dunes and beaches are fundamental to
began to see an increase in population, especially in the the scenic beauty of the peninsula.
Population: 3,326 Age summer months. In 1920, developer Carl Fisher pur-
Demographics
47.8
Census 2010 chased 9,000 acres at Montauk and began the process of
creating what he hoped would become one of the most
2000-2010: -14% important resorts on the east coast. Fisher’s plans for the Montauk has the third highest total population of East
Census 2010 Median Age
area were never fully realized because of the 1929 stock Hampton’s hamlets, at 3,3263, but also experienced the
25000
market crash and subsequent depression. However, the largest drop in population, -14%, between 2000 and 2010.
Wainscott 60 Town road network, major buildings, and surrounding residen- The median age in Montauk is 47.8, which is the third
Median
20000 Springs tial subdivisions constructed by Fisher contribute to the highest median age in town and above the town-wide
50 Age
distinctive visual character of the hamlet today. median age. The median household income in Montauk
Northwest is $73,000.
15000 40
Historic Buildings and Structures:
Napeague

East Hampton Village


In terms of race, 90.3% of Montauk residents identify

East Hampton North


30
10000 Montauk • Montauk Point Lighthouse as White, 2.8% as Black or African American, 0.2% as
East Hampton 20 American Indian or Alaska Native, 0.9% as Asian, .1%

Amagansett
North • Historic Montauk Association: National Register as Native Hawaiian or Other Pacific Islander, and 4.4%

Northwest
Napeague

Wainscott
5000

Montauk
Amagansett as Some Other Race. In terms of ethnicity 16.1% of the

Springs
10

Montauk
Sag Harbor (part) ACS 2014 • Carl Fisher’s Downtown Plan (“Miami of the North”) population identify as Hispanic or Latino (of any race).

Ethnicity
0 East Hampton 0
1990 2000 2010 Village Census 2010 In addition to the rich history of human settlement of the Montauk contains 898 families, and 318 families with
Montauk Peninsula, the area also is unique for its pro- children. School Taxes, which make up a large portion
of property taxes within each school district, support the
Families and Children Household Income Ethnicity Not Hispanic/Latino
hamlet’s public schools. However, the amount paid in
Census 2010 Median H.I. school taxes by a family with children is often less than

898
East Hampton ACS 2014 the amount of money required to support the children
Hispanic/Latino
East Village in schools, meaning that families with children represent
Hampton $73,000 100%
Wainscott a tax burden for residents. School taxes in Montauk are
North

Napeague
Northwest
Wainscott
Amagansett

Montauk
East Hampton North
East Hampton Village

Springs
the second highest town-wide. For this reason, the Town
0 20k 40k 60k 80k 100k 80% has pursued a strategy of encouraging senior housing and
North-
west
single room apartments and concentrating new develop-
Springs ment in the East Hampton school district where the high
# of Families 60%
school is located.

318 Sag
Harbor
40% Natural Resources and Environment
Amagansett
Montauk Surface Water: The largest surface water body in Mon-
Napeague 20%
tauk is Lake Montauk, a 1,072.2 Acre bay off of Block Is-
# of Families # of Families with land Sound. Lake Montauk is a NYS Local Significant
with Children Children by Hamlet 0% Coastal Fish and Wildlife Habitat. Other surface water
bodies include Fort Pond and Oyster Pond. Fort Pond is
the second largest fresh water pond on Long Island and
Data from the US Census Bureau as collected in the 2010 US Census and
Community Housing Opportunity Fund Implementation Plan 2014
3
As of the 2010 U.S. Census

Hamlet Study - Montauk | Introduction & Existing Conditions 5


RTH
NO
Montauk Downtown
Orthophotography

6 Town of East Hampton, New York


no sign ie
irv

irmont S
15

80 y
Fa 75 75

70

a
ew
oad th

75
FR u 80

Th

iv
So

Dr
e

South Fa
Lo

60

90
55
o

95
35

Fort

p
Fort

Sou
65
Pond
oad House
ssy R

th
Debu
Pond
90

St rm th
et t
Fer

re on
70

i u
75

Fa So
Mon-Den

ris
Cottages 20 75

Stre
e wa

et
eet
al Str

Stre
45 75
Feder

et
Driv
35 South

40
e
ac

Edin
50
Pl

40

30
85
ey 80

th
ew

70
80

75
5

Sou
D

80
Sou South Fisk Street 85
th 80

70
De b 70
usy
Ro a
d

15

20
t

80
tree

th
15 rS

et
Fran
75
25
abe

Sou
60 5
30

Sou

Stre
hF

30
t

Street
Sou

6
50
30 80

20
55

15

th
25

70
30
35 75

35
75

80
45

Edis
70 55

55

South Fran Street


60
70 70 70

60
Edgemere
65
10
68

75
5
5

Elm

75

70
60 85

on S

65
80 65 60

Sou

75

95
60 Montauk
10

S
15

e
85
10 5
Downs

tree
H
l ac
60

70
30

t
80
State Park

ee
ad

Fa
tree
th
0

Sou

Sou

So

t
80

80
e

tP

Str

irfi
20

Ro
an

ce

65
Egm

25
tL

eld

75
25
Sou

25

y
25

70
o

t
r
90

la

75
th

Fa
th

60
Fo

hE

Elli
Montauk

Dr

75
P
Ruschmeyers 85

85
65

Ea s

Elr

ive
65
tt
ont

th

70

70
md

75
85

co

n
Public South Forest Street
So

oy
t

25

n Extensio
Eliz
e

di
ton
re 85

Pla

Sou
en
St 85
u

En
School

Driv
ell
th

abe

th
85

ce
Elw

Ro a
Pla

th

20
Do

So

Fay
85

75
u
75 80

e
e 50 55 u

65
So
Lan

th
60 th
rs

ce

d
er t

90

Stree
Fli

70 5
et

Pla
Eld 85 60 nt

et
7
South Ediso
55 St90

90
Dr

th

tre
Sou ree

t
En race
ce
80

S
ive

90
t

95

x Street

90
Pathfinder

Ter

lls

90
Street

80
dic
South Forbes
5

80

Fa
et
Country 75

r Stre
Day Camp
25 Avalon
80

ott
25
Lake Front 60 85
90

Fabe
Resort
Montauk

ay
7n5ue

South Fo
30
80

ew
25 e
80 85

95
25
Av

25
100 90

riv
110
w

80
no sign

80 y D
t ie

20
75 15 ee irv

Essex Street
Str Fa 75

70

a
90

ew
Sec

105 oad th

7
East
F R by Ely u 80

85
Th

iv
So
th

Dr
Northeast

e
75 u 50
o

So
85

Lo

60
nd

90
My-Mo

55
o

95
75 35

Fort

p
Fort 75

Sou
Apartments

65
Ho u

Pond
y Ro
ad House 75

th
ss
Pond

80
90
Debu

St rm th
se

Ferr
100 70

i u
75

r o
Fa So
Mon-Den
Ro a

is S
Cottages 20 80 75

y
e wa

tree
mp

50
reet

Stree
25

50
105 ral St
80
d

45 75

40

55
Fede
Ra

35
Driv
South
110 35

t
25
85

40
e

60
115
ac

20

Edin
50
Pl

40
So

30
85
80 ey
u

th
th ew 80

15
70 75

5
55

Sou
D

80
De 85

Sout

125
Sh
85

Sout South Fisk Street


lre h Deb 80

70
a
witt Place

h Du
usy
y Roa 60 70 d
Ro 12
5 d 50 La

15

75
20
bois

75
ad 55 85 eet n

80
50 15 No Str e

65
er

75
25

60 5
Fab

Drive
30
rth 70

Sou
12
80outh

30

Street
0

6
30
Su 70 S

5
55

th
South De

35
rfs

80
85

Edis
id
70 70

Edgemere
85

75
120 eA 85

on S

65
Fort Pond

Far
Sou

95
10
ve

e
85
10 5

H
Montauk

c
nu

30
Lodge

Pla

65
ad
tree
th
0

Sou

Sou
75

So

80
55 e
40

20
Place
Elihu

Motel

Ro
South Dun

ce

day
Egm

25
can Drive

iot
u

25
Sou
25

70
t
Unnam

la

75
th

th

th
9
Montauk

tP
Ell
80

85
Drive n

Ea s

Em
85

Dun th

Elr
ont

th

40
ot
80

ca

75
n
Str
Public

Sou
Montauk Montauk South Forest Street

dic
So

oy

25

on Extensio
70

Eliza

den
ton
85

Pla
40
85
Pamela's

En
School Brewing Motel 60

Dri
85

eet
th
t

85

ce

Ro a
Pla

th
ed Stre
e

beth
New

Do

ve
60 St. Co.

u
115
tre

ane Neptune Beginnings 50 55

So
ce

rs

ce
rt L

75
er Pla
60

70 5
Peter's

et
nue
e

Pla
iS

Eld
45 Motel 40 ay Fish

7
Ave Soul

90
Dr
JSo&uth
P
hw

South Edis
Catch
55

En ace
ce
lph

ive
Erie

90
95

Street
Hig

Terr
Pool, Spa es Street

80
dic
et

80
135
th South Forb
Sou k
So
De

25
50 Cycle & Patio t au
80

ott
John 70

10
on
u

South Fox
0
Montauk Perry B 60
th

60
th

14 75
M

60
Ecker
55

25
u

El

60
5 just
Duryea Junior Montauk
So

55
15 Inc. t
ih

20
75 ee

Essex Street
Str

65
75

50
Cinnabar
u

Sec
sold East by
Ely
Community

85
45
Post Office
Pl

Martell's

15
75 Group Inc. Northeast uth 50

o
Fort Pond
ac

So 65

nd
Stationery My-Mo

10
Church

65
e

135 15 Native Apartments 75

Ho u
Store Montauk

55
75

15
0
Plant

80

70
ue

12
70 0

60
se
55
45
ven Fuels, Etc.

Driv
130
dA 6

Ro a
5 Air & Happy
80

Place

60
ucli
125

60
mp

50
th E
25

50
speed Bowls 55

e wa
80

40

55
Ra

35
Sou

65
25
85 70
Muse @

60
Dewey

20
10
80 So Vintage board shop

65
tthe End Sausages 50

y
u
60 60 Pink

15
h Calypso 70 75

North Su
55
65
85
De
65

65
85
South
lre
White's Drug White's Naturally

Ro
50

itt Place

60
y 60 70
Gary-Lynn

20
Ro 50

70
40

0 95
&Department Liquor Good Foods

ad

75
ad 55 85
90 Apts. 25 50
40 No
Bridgehampton Store & Café 50

65
75 55 Store

I
rth 70 80

South Dew
National Bank 45 Su 70

rfside
55
Saint Therese

80 5
ue
rfs 85
So

South id
Durham

7
eA
ue ace

n
Road Fort Pond
of Lisieux ven

Fara
ut

Etna Pl
80 ve

Ave
60

70
Montauk nu
aA South

50
Lodge

65
75
hD

Avenue
60Motel 55 e

40
Place
Elihu
Etn

day
Church

55
The Gig

Unname
Chase outh

iew
85 80
ew

40
70 80
Shack S

Str
Montauk Montauk

40
Harvest on Nellie's Bank 40 Share Brewing Motel Pamela's 60 85 55 70

eet
itt P

v
et
Deli
60 New 35

Edison Street
Fort Pond St. Co.

Sea
South Dev with…

tre

d
on Place Mainstay Neptune Beginnings
ace 60
nue
Peter's er Pl

Street
iS
45 Montauk Ave Soul
Motel 40 ay Fish
lac

J&P
Kailani

The
Catch w

55
55

30
igh

lph

60
La Garden Erie Pool, Spa 65
Candy Sou
th kH
60
e

So
De
50 Cycle & Patio u

65
Brisa 70
Montauk John nta

10
u
Center 55 Ecker Perry B Mo 60

Plaz
The Lido

th
60

th

45

60
50just

55
10 Marshall &

El
Chamber of 5
Duryea Junior Montauk
60

So

55
15 Inc.

ih
Sons Service Yoga Lila Margret 75

50

65
Cinnabar

65
sold
Commerce Suffolk

a
Lido 45
Post Office Community

Pl
China Town Studio & Martell's

15
lace
70

Group Inc.
Hayes PT

65
60

ac
Fort Pond
orn P Resort75 Station County Stationery 65

10
Church

65
e
Dearb Restaurant Boutique
70

Native
Aimees Sweet Tauk 15 Store Montauk

55

60
South Ronnie's Bliss

65
15
Strawberry 45 National Bank Plant
enu
e 55 70 0
El Vaquero Closet - Red Hook Fuels, Etc.

Driv
Meeting Fields Deli Av 6

South Embassy Street


5 Air & Happy

60
lid
Euc
60

Wave Gansett
ue

60
Lobster Pound speed Bowls 55

e wa
House Lane th
Sou

65
60
en
Muse @
Montauk Wok N Wear Lane Home Waves

10
John's Medical Vintage board shop 50
Av

65
the End Sausages 50

y
60 20
60 Calypso Pink
55

North Sur
Drive-in Corner Roll 65
s 65

60
Citgo Montauk White's Drug White's
in
Naturally

Ro
50
Left Hand
60

60
65

Gary-Lynn

20
6Restaurant
pk50

70
Store

40

65
70 &Department Liquor Good Foods

ad
5 Cynthia Beer & Soda Kelly B. Coffee Apts. 25
Ho
Bridgehampton Store & Café 40
Ramp

65

55 Store
De

75

I
Rauley Montauk National Bank 45
Mo Saint Therese
lph

fside Ave
ue
Memory

So
Seascape nta 5 Pizza Laundromat ue
iS

n
60

u of Lisieux ven
ce
South Emery Street

uth
kH Etna Pla

Ave
60
Puff N Motel/Bar aA

50
tre

Motel igh Village South 60

Surfsidee Pla
5 e Church Etn

55
The Gig
Woodbine 7-Eleven Lan

De
wa Putt
e

Chase outh

iew
t

y nd Shack S
60

40
South Elmwood Avenue

nue
wit
Nellie's 55
Collection Po Harvest on Bank Share

v
in
Driveway Deli 35
Tw

Edison Street
Fort Pond

Sea
tP
65 Mainstay with…

South Edgemere Street


Concerned The Malibu Montauk 40

lac
Kailani

Th
Busy Bodies

30

60
70 La Garden 65
Citizens Candy

e
5 5 Daunt's Exercise Motel Montauk Brisa Center Surfs 55

Plaza
A Wave The Lido
id

45
45
50
ghway 75 of Montauk Wave
10 Marshall & Chamber of e Av

15
hway
80 Studio/Yoga aceYoga enue
tauk Hi Albatross Lila Margret
Inn Sons Service
Montauk Hig

65

65
w Terr Boutique
Lido Commerce Suffolk
Zum

55
ce
M on The Antique Crest II ace China Town Studio &

40
Hayes PT 60
rn Pl Station
West 15 n Vie Restaurant
Resort County
Dearbo
Schneider
Ocea
Aimees Sweet Tauk

45
Lumber South Ronnie's Bliss

Drivewa
National Bank
IGA -
South Eagle Street

Royal Strawberry

60
El Vaquero Closet - Red Hook
10 Meeting Fields

South Embassy Street


Montauk Deli

10
Montauk Company Wave Gansett e

55
Lobster Pound u
Oceanside Atlantic House Lane
John's Medical Montauk Wok N Wear Lane Home Waves 50 en 60
Wavecrest Ocean Sole East Born Born North 20 Av 55
South

Drive-in Roll
45
Street

Corner s

60
Elder

Citgo
Beach
Montauk Sands 10 Motel II Resort Beach Free Free I Restaurant Store
Montauk
ay
Left Hand 50 pk
in
?

65
Cynthia Beer & Soda Kelly B.
10 Surf Coffee
Resort
ew Ho

y
15
Ramp

Inn Montauk 50
Village Dune Motel Mo Rauley

15
riv
Eton Ro

15
60 10 Seascape nta
u
5 Memory PizzaClub Laundromat
60
Apartment

South Emery Street


kH
55 Puff N Motel/Bar Village D

40
Motel igh

Surfside Place
Beach 5 Woodbine 7-Eleven

55
wa Putt

Legend
10 65

15
10 Breakers Plum y Collection Royal South Elmwood Avenue
Motel South Emerson Avenue 15 Sloppy Atlantic Driveway

South Edgemere Street


Concerned The Malibu 40
10 Atlantic Busy Bodies

15
ad

5 Citizens Terrace Motel Surfs

45
50 Tuna 5 Daunt's A Wave Exercise
ide Av

45
hway of Montauk Wave
Montauk Royal

15
Studio/Yoga enue
ntauk Hig Montauk High
way Zum
Albatross Inn rrace
Old Mo The Antique 20 Crest II ew Te

40
20 Ocean Blue West 15 n Vi

15
20 Atlantic Schneider
Ocea

45
Lumber
20

Driveway
Ocean End IGA -
15

South Eagle Street

55
Royal 60
Surf Montauk 10

5 Foot Contours
25 Hotel

10
Montauk Company

55
Apartments
40 20 Oceanside 15 15 Born
Atlantic
15 Motel 20 Wavecrest Ocean Sole East Born North

South
20 45

Street
Elder
15

Beach
ay
20

25 25 20
Montauk Sands 10 Motel II Resort Beach Free Free I 50
15

?
15

40
25

10 Surf
Resort
ew

15
25 15 Village Dune Motel Inn 15

15
riv
Eton Ro

15
10 Club 60
20

Apartment D
25

40
25 20

55
Legend
20

10 65

15
10

Water Bodies
Royal
25 25 South Emerson Avenue 15 Sloppy Atlantic
25 10 Atlantic

15
ad

Terrace

45
20

Tuna
Montauk Royal
20 Ocean Blue 20

15
20 Atlantic
30

20 Ocean End

15

55
Surf 60
5 Foot Contours
25 Hotel 15 15
10 Apartments Motel 20
20 15 20

15
Rivers and Streams

20
25 20

15
15 25

25
25 15 15

20
25 25 20

20
5
25 25 25
Water Bodies
20

20

Wetlands
10
0 20
Rivers and Streams
5

0 Wetlands
Permanent protection

RTH
Permanent protectio

NO
Open Space Open Space

o
o
Montauk’s downtown is centered on a central open space (facing page, top), East
withHampton
many M o n t aStudy
Hamlets uk Downtown Montauk Downtown
pton Hamlets Study Town of East Hampton
one and two story mixed use buildings (above, bottom). Hotels (facing page, middle; RKG Associates Montauk Downtown 0 0.0475 0.095 0.19
Miles 9/14/2016
above, top), many of which are located directly behind the beaches (facing page, bottom), Line Basemap
Feet

mpton Fine Arts and Sciences 0 195 390 780

0 0.0475 0.095 0.19


are an important
RKG Associates part of the summer economy. LK McLean Associates Miles 9/14/2016
Source: Town of East Hampton NY Department of Information Technology; NY State GIS NY.GIS.GOV

Feet
Fine Arts and Sciences 0 195 390 780

LK McLean Associates Hamlet Study


Source: Town - Montauk
of East Hampton | Introduction
NY Department of Information & Existing Conditions
Technology; NY State GIS NY.GIS.GOV 7
East Hampton Hamlets Study

Tu
th
M o n t a u k T r a iRKG
nAssociates

ill
R
Town of East Hampton

oa
d

ue
Aven
Fine Arts and Sciences

ont
Fairm
LK McLean Associates
Station Area
Montauk Downtown
0

Orthophotography
0
0.0225

100 200
0.045

Feet
400
0.09
Miles

Source: Town of East Hampton NY Department of Information Technology; NY State GIS NY.GIS.GOV
o
3/16/201

ue
en
Av
go
in
m
Fla

Flo
rid
a
Ro
ad
Ramp
Tu
th
ill
R oa
d

Montauk Tennis Auditorium

Drive
wa y
ad
Ro
or
Man
Montauk Station

Ramp
Fort Pon
Road d
g Road
Connectin

e
le Driv
Fernda
Fai rm
ont Av
Driveway

p
m
enue

Ra
Fenw
Montauk Manor ic k
Pla
ce

reet
x St
Es se
Navy
Road

d
R oa
vy
Edgeme

Na
Fairv
iew
Aven
ue
re

Edgemere Street

Edge
wor
th Terr
ace

oad
lR
tria
us

Street
Ind
Fort Hill Cemetery

Es sex
Fairla
wn Drive

RTH
NO
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community

8 Town of East Hampton, New York


5

Tuthill
5

130
135

5
Tuthilll
Pond 13
5

Flo
5

rid
a
Ro
40

115
45

ad
50
Montauk

0
Ram

12
Montauk Tennis

p
Drive
5
Station Auditorium

Ramp
y
Nav

wa y

Fenwick Place

75
Pond
Road

Fort
d
Roa

5
5
Connecting

105
5
5 10
5 5 Road

ale
5
Drivew

Fernd
110

0
ay

10
10
110
ad 5

Fairmon
o
Montauk

Avenue
5 R 5
vy

5
5 a
N 5 Manor
10

5
10 5 10 5 5 5

t
5 5

25
5 5 5

re x
5

St sse
35

et
10
5

E
30
5 55

Edgemere
5

15
20
5 5
Unname

5
Street

5 5
5
5

Es
5

rac h
5 1 10
5

Ter wort
5 5 h

se
or t

90
d

e
Navy Road 5 55 w
e

xS
Edg rrace
5

5 5

ge
5

10
5

Te

tre
Ed
5
oad Fort Hill

10

et
a l R
stri
5

5 Montauk’s train station area lies alongside Fort Pond Bay (facing page, top), u
5
and is overlooked by the historic Montauk Manor hotel (above, bottom). The Ind Cemetery
5

5 5 5
train station (facing page, bottom; above, top) is the easternmost end of the

RTH
75
LIRR line. 5
5

NO
5

5 5 75 8
0
Ro trial

75 7

85
790
ad

Hamlet Study - Montauk | Introduction & Existing Conditions


us
Ind

5
5
5

0
10

Sun N' Sound Motel


Montauk Soundview

15
10

15
15 10
15
10

20
15

15

10
10
10
15

g Lot
Parkin
10

10

Soundview Drive

10
20

10

10

20

15
Gosman's Restaurant
Culloden House West
Culloden House East

20
10

Blue Haven Motel

10

20 25
10

25

15
5

15

Forsberg Motel
10

15

West Lake Inn

Uhlein's motel
5 5 Gosman's Clam Bar

Rod & Reel Motel

20
5
10

We
ll sA
ve
nu
5

e Zorba's Inn

Dock Restaurant
Sail Inn

Un
10 na
m
10 ed
St
re
e et
e

Driv
Kirk Avenu

ake
Gaviola's Montauk Market

st L
We
Finest Kind Wines & Liquores 10

Ben & Jerry's Inc Cream

Uihlein's Marina & Boat Rentals

Swallow East

Ann Breyers Cottages

Clam & Chowder House @ Salivars Dock

Jet's Marine Service & Transporting


Dave's Grill

5
mp
Ra
5

Sammy's Restaurant
5

e
5

venu
vacant retail buildings

in go A
Flam
5

East Hampton Hamlets Study Montauk Harbor


o
Kenny's Tipperary Inn

Four Oaks Bakery Montauk Marine Basin

Montauk Marine Basin Town of East Hampton


RKG Associates Feet
Fine Arts and Sciences 0 40 80 160

LK McLean Associates Source: Town of East Hampton NY Department of Information Technology; NY State GIS NY.GIS.GOV 9/14/2016
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community

Montauk Harbor
Linework Base Map with business names

10 Town of East Hampton, New York


5
Saint Therese

side Aven

0
75
ue ace

n
of Lisieux ven Etna Pl

Ave
60

70
aA South

50
60
Church Etn

55
The Gig
outh

iew
Shack S

40
55

ue
v
Edison Street 35

Sea
30

60
65
55

45
50

5 5
Lila Margret

65

65
o& Hayes PT

65
60
que Aimees Sweet Tauk

60
65
Closet - Red Hook

5
Lobster Pound ue 60
Waves 50 en
20 Av 55

5
s

60
Left Hand in
pk

65
Coffee
Ho

5
Surfside Place
Driveway
The Malibu 40
Motel Surfs
id

45
e Av
15

ace enue
w Terr

55
40
15
an Vie

45
Oce
Drivewa

60
10

55
45 50
Surf ay
ew
y
15

50

15
riv

15
Club 60
D

40

55
Legend
65

15
Royal
15 Sloppy Atlantic
Atlantic
15

Terrace

45
Tuna
20
15

55
60
15 15
5 Foot Contours 10

40
15 0
10

10
Water Bodies 15
15 15 t
in g Lo
15 Park
Rivers and Streams Sun N'
Montauk
Soundview
Sound
10 10
Motel 15
Wetlands D riv
e
ke

20
La

15
s t
We
15
Permanent protection 20
Gosman's
10 Restaurant
Open Space

10
10 20
10
15

15
Drive
Soundview

o
25

10
15

20

Culloden

Montauk Downtown
Culloden House East 20
House West Blue
Haven 25
Motel

10
15

15
10

10

10
10 10 Gosman's
0 0.0475 0.095 0.19
10
Miles 9/14/2016 15
Clam Bar

10
Forsberg
Motel

5
Feet 5

10
West 20

5
5 Lake
0 195 390 780 Inn
Uhlein's
Rod &
10 motel
Reel Motel
10 Zorba's
Inn
Source: Town of East Hampton NY Department of Information Technology; NY State GIS NY.GIS.GOV Dock
Restaurant
We
lls Un
15

15 Ave 5 n
10 nue Str ame
ee d
t

10
10 Gaviola's
Montauk Ben & Jerry's
Sail Inn Market Inc Cream
5

10
Swallow
East
Finest
Kind Wines
& Liquores Uihlein's Clam & Chowder
Marina & House @
Boat Rentals Salivars Dock

Dave's
Grill

Ann Breyers
Cottages
Duryea Avenue

Jet's Marine
5
Service &

Lake
Transporting
10

5
5
5

5 Sammy's
Montauk

0
Restaurant
10

ive
e Dr vacant
ak retail
s tL
5 We buildings

Ra
m
p
5

5
Kirk
Mulfo

Ave

RTH
n
rd Av

ue

NO
enue

n ue
Ave Kenny's
ingo
Flam Four Oaks Tipperary
Bakery Inn Montauk
Montauk Harbor’s economy and character are shaped by
Montauk
Marine
Seaplane

Montauk Harbor
Basin Base
its fishing industry (facing page, top) and coastal landscape Drivew
ay

(above, bottom). Its tourism economy is currently poised for 10

significant redevelopment (facing page, middle and bottom) Linework Base Map with business names
5

with Gosman’s Dock up for sale. 10


20
25

15
5

10
5 Hamlet Study - Montauk | Introduction & Existing Conditions 11
5

10

ad
5

d Ro
Seawind
Environmental
Challenges Montauk
Typical Nitrogen Loading to Septic Systems
Sea Level Rise
A n t i c i and
p a t eResilience Montauk
d Sea Level Rise | Montauk

11-13 lb
Nitrogen HIGH TIDE
per Person
Annually
9 lb
Nitrogen Load Mean Higher High Water
Septic Tank Drainfield
at Discharge (MHHW)

Water Table

TODAY

From US EPA via Lombardo Associates 2014

is a Coastal Fish and Wildlife Habitat. This pond is sep- Agriculture and Fisheries: Lake Montauk supports a + 15”
arated from Block Island Sound and from the Atlantic major fishing industry based in the Montauk Dock area.
Ocean by narrow, low-lying sandy land that is susceptible Due to pollution, the southern portion of Lake Montauk
New MHHW
to overwash and even inlet formation in strong coastal and Coons Foot Cove have experienced shellfish closures
Sea Level Rise
Montauk
storms. in recent years. Oyster Pond has also experienced water
pollution issues and shellfish closures.
and Resilience
Groundwater: Montauk, like the western portion of
East Hampton, is underlain by a glacial freshwater aqui- Environmental Challenges 2100: LOW SLR SCENARIO
fer. However, the freshwater aquifer in Montauk is much
shallower and hydraulically separated from the larger Surface and Groundwater Pollution: One of the
aquifer to the west by saltwater. As such, fresh ground-
44’ (3+ ft/yr)
most notable environmental challenges in the hamlet is
water in Montauk is much more susceptible to saltwater
intrusion than the other hamlets. This groundwater is
the impact of surface and groundwater pollution on aq-
uifers and sensitive surface waters. Septic systems with- + 72”
also susceptible to human pollution. Pollution from sep- in the hamlet contribute nitrogen to groundwater that
New MHHW
tic systems, in particular, is an on-going challenge in the makes its way into surface waters, generating harmful
hamlet. algal blooms. Other potential contaminates include lea-
Downtown chate from landfills, pesticides, herbicides, fertilizers, and
Shoreline
Environmentally Erosion
Sensitive Areas: pollution from fuel underground storage tanks4.
2000-2012
Surrounded by water, Montauk is home to impor- Habitat and Open Space Loss: Loss of sensitive
tant beaches, dune habitat, bluffs, and wetlands. Hith- habitatProject
From USACOE 2014 Downtown Montauk Stabilization areas FONSI
and open agricultural land to development 2100: HIGH SLR SCENARIO
er Woods Preserve and Montauk Point State Park each is an on-going challenge in Montauk. About 3% (418
contain continuous blocks of protected forest land that AC) of vacant land in the hamlet is developable. From ClimAID 2014 Supplemental
are home to rare and endangered plant and animal spe-
cies. The ponds, bays and lakes and their surrounding 4
East Hampton Town Water Resources Management
sensitive wetlands are also home to a diverse collection of Plan Final Draft
wildlife and important shellfish habitats.

12 Town of East Hampton, New York


t
Stree
h Ely
Sout

ive
Dr
oy
Elr
uth
So

Fa eet
Str
rad
ay
Street
Edgemere
Unna
med
Street
nu e
Ave
Sec

th Erie
Sou
ndo
Hou
s eR
oa d

Driv
ewa
y
ue
ven
Fort Sou
th E uc
lid A

Pond

Ro
ad
I

Essex Street
way
H ig h
tauk
Mo n

Edison Street
The Pl
ue
South Etna Aven

aza
South Embassy Street
ay
ig hw
ery Street

H
tauk
Mo n
South Em

Surfside Avenue

South Elmwood Avenue


Driveway

South Edgemere Street


Montauk Highway

Legend

Driveway
Montauk
South Elder Stree
South Eagle Street

Water Bodies

Driveway
Rivers and Streams

Downtown
t

South Emerson Avenue Wetlands

Cross-Sections

Linework
Flood HazardBase
ZonesMap with FEMA
Zone Type
floodplains. Velocity Zone and
1% Annual Chance Flood Hazard
100 Regulatory
year flood Floodway
zone shown in light
blue.Special500 year floodplain shown
Floodway
in orange.
Area of Undetermined Flood Hazard
0.2% Annual Chance Flood Hazard

RTH
Future Conditions 1% Annual Chance Flood Hazard

NO
Area with Reduced Risk Due to Levee

East Hampton Hamlets Study


Town of East Hampton
RKG Associates
Fine Arts and Sciences
LK McLean Associates
Montauk Downtown
0

0
Hamlet
0.0225 Study
0.045

100
- Montauk
0.09

200
Miles
| Introduction
9/14/2016
& Existing Conditions
Feet
400

Source: Town of East Hampton NY Department of Information Technology; NY State GIS NY.GIS.GOV
o 13
Cap
tain
K idds
Path
t
in g Lo
Park
Road C

Beach Veh
icle Check
Road

Soundview Drive

Butt
ernu We Un
t Drive lls n
Ave
nu Str ame
e ee d
t

Cran
berry
R oad
Duryea Avenue
Gull Road

Shadbush Road
st
We ke
La e
iv
Ra
mp Dr
Tern Drive
Pinetree Drive

Gannet Drive

Mu lf

We
st
o

Kirk

Lak
rd A

y
Drivewa

eD
Ave
Beachplum Road

ven

rive
nu e
ue

Baybe
rr
Road y

Ea
Unnamed

st
Street

akL
e
Dr
iv
Dury

e
ea A
ven
u e
rt

Blac
k be
Cou

rry D
ri ve H
ad
ingo

Cu
l lo Ro
d
Flam

en
Pl
ac
e

East Fl
amingo
Avenue
eu
en
Av
go

y
in

Drivewa
am

Legend
Fl

M o n t a u k H a r b oReed
Water Bodiesr LittlePond

ad
Ro
nd
Isla
Rivers and Streams

ar
St
Linework
WetlandsBase Map overlaid with

FEMACross-Sections
floodplains. Velocity Zone
and 100
Flood year
Hazard flood zone shown in
Zones
Zone Type
light blue. 500 year floodplain
ad
Ro
d
W

Lake
n
ill

la
s

Is

1% Annual Chance Flood Hazard


Po

shown in orange.
ar
i

St
nt

Montauk
Unnamed
R
oa

Street
Regulatory Floodway
d

d
oa
dR

Special Floodway
o
wo
ern

Area of Undetermined Flood Hazard


hF
rt
No

0.2% Annual Chance Flood Hazard

RTH
Fa
rr
ag
ut
Future Conditions 1% Annual Chance Flood Hazard

NO
Ro
a d
Area with Reduced Risk Due to Levee

y
wa

o
ive
Dr
North

East Hampton Hamlets Study Montauk Harbor


Nort

Green
h Film

wich
ore

14Town ofTown
East Hampton
of East Hampton, New York
Street
North Fer

Roa

0 0.05 0.1 0.2


RKG Associates 9/14/2016
d

rragut
Ro ad Miles
North Fa
ndale Pla

rt
g Cou Feet
Fine Arts and SciencesFl emin
North 0 250 500 1,000
Gle
n
Farring

mo

ce

LK McLean Associates
re
Road

Av

Source: Town of East Hampton NY Department of Information Technology; NY State GIS NY.GIS.GOV
to

en
n

u e
From US EPA via Lombardo Associates 2014

Sea Level Rise


Montauk
Montauk
Sea Level Rise and Resilience
and
S e a Resilience
Level Rise + Storm Surge Impacts | Montauk Shoreline Change | Montauk

44’ (3+ ft/yr)


Fort
Pond

49
Downtown
wy
Shoreline Erosion
auk H
27
Mont 2000-2012
From USACOE 2014 Downtown Montauk Stabilization Project FONSI

Montauk
Sea Level Rise
and
DeerResilience
Management: Increasing populations of white- Resilience, Climate Change and Sea Level Rise:

o
tailed deer in the Town have reached an emergency level Today, areas of Downtown Montauk and the Montauk
according to the East HamptonFort
Deer Management Work- Dock area are at risk from flooding in coastal storms.
ing Group . Over-browsing by deer has begun to shift the
5 Pond

49
0 300 600 1,200 species composition of existing forests, nearly eliminat- As climate changes, rising seas and more frequent and
Feet
ing herbaceous plants and saplings and damaging popu- intense storms will increase the area impacted by coastal

o
wy
uk H
Monta
lations of other wildlife that rely on these plants.
27
flooding. Although the timing and amount of sea level
rise is uncertain, scientific models today provide a range
0 500 1,000 2,000
Light Pollution: Unshielded lights in Montauk’s com- of possible sea level rise scenarios. According to the New
Feet mercial center and other areas create glare. Street lights, York State ClimAID 2014 report, Eastern Long Island can

77
o
particularly
0 300 600
older
1,200
This light contributes
Feet
ones, also contribute light pollution.
to a gradual decline in the dark-
expect between 8” and 30” of sea level rise by 2050 and
between 15” and 72” of sea level rise by 2100. This means

o
ness of the night sky. The town’s Dark Skies Initiative
has resulted in laws that require lights on new0 construc-
500 1,000 2,000

tion with a building permit to77be fully shielded. Current


Feet
that by 2050, for example, high tide will be between 8”
and 30” above the current high tide6.

exempt lighting types include up-lighting for flags, tree Coastal erosion and storm surges will provide additional
up-lighting, and municipal street lighting. impacts in Montauk. As sea level rises, coastal erosion
will likely continue to change the shape of beaches and
coastal wetlands. An example of this on-going change is
Deer4 Management Plan 2013
9
5
the shoreline in Downtown Montauk, which has moved

77
49
Lake
77

Montauk

6
Sea Level Rise projections and information in this re-
Lake High Tide: 1’ Sea Level Rise port were obtained from the NYS DEC’s recommended 2011
Category 3
Montauk High Tide: 3’ Sea Level Rise Storm Surge ClimAID Report and 2014 ClimAID Supplemental. Storm surge
@ 2’ SLR impacts were estimated from the Nature Conservancy Coastal
High Tide: 6’ Sea Level Rise
Resiliency Network Digital Modelling Tools.

High Tide: 1’ Sea Level Rise Hamlet Study - Montauk | Introduction & Existing Conditions 15

Category 3
A A-PC
PC
A3 B B

e
an
PC

tL
PC

r
Fo
B t re
e t

e ll S

et
Elm
Elw

re
PC

St
Str

y
Fa

Fairfie
eet
B

ld Dr
B

et
tre

ive
yS
B B

Fa
A3

et
th

tre
eet

u
So

S
A3

Str

lls
view Avenue

Fa
South Fair

er
Fort Pond

b
Fa

eet
ay

rmont Str
B

ew
B

Se

iv
Dr
c
oad

on
FR

d
p

South Fai
Loo B

Ho

Sou
The
A3

us
e

th
Ro
B

Ferri
ad
y Ro

ad

et
ss
D ebu

in Stre

s Str
B

eet
h Ed
et
B

y
l Stre

a
dera

vew

Sout
h Fe
Sout

Dri
B B
B B
e
ac

PC
Pl
ey

ad
sy Ro
w

Debu
B B
De

South

Sou
B B tree
t
B

Sou
er S

th
Fab

Edis
th

th
Sou

Em
B

on
den

Str
ve

eet
y Dri
B

Ro a
Sou
Elro

e
ce
th dicott Pla

c
Sou South En

Pla
th

d
B

H
d
Egm
So

oa
iot
B

R
u

Ell
th

B A2

ont
A2
Do

B B
South Forest Street

Sou
rs

Montauk Public School RS

ion
Pla
et

th
Dr

A3

ce

son Extens
iv

Eliz
ane t
B
e

B B e rt L tre
e
sS
B

abe
Eld
rbe
Sou
th
B B Fo

th
th
B

x Street
u

Pla
So

South Edi
Sou
B

ce
Montauk

th
B B

Ea s

South Fo
Sou
South Dewey

ton
th Ely
Stre

Pla
et
e
lac

B
ce
tP

B
wit
De
Place

uth
So

mp Monta

Street
uk High
Ra
B So
way

Edgemere
u th
De
B lre
y B
Sh
a d
La
Ro
ad
A B n e
B B

Fa
CB

ra
South

Unnamed Street
Durh

da
am Ro
B

yS
ad
Eli

RS
hu

tre
B

et
Pla

B Ave
nu e
c

B
So rie
RS CB
e

ue
u th E
th Sou

Aven
El Fisher Place
South Devon Place
ih
u
Pl
CB RS

North Surfside
ac
B B e
CB CB PC
et

CB
tre

RS
iS

Perry B Duryea Junior Post Office


h
lp

CB Montauk Community Church


De
th

RS
u
So

CB CB
CB

Driv
CB RS A PC

e wa
et
tre

Ro
iS
CB

y
lph So

ad
De u

Essex Street
th

I
De
wit nue
tP
lac CB Euc
lid A
ve
h Etna
Plac
e

A nd
Lan
e e
Sou
th CB CB CB CB Saint Therese of Lisieux Church Sout

Tw
in Po
ven
ue B B
B CB CB Etn
aA
CB Sou
th
B B RS
CB B
A B
ery Street

lace
rn P
De a
rbo
CB CB

Edison Street

e
th The

nu
Sou e
PC CB P laza nu

e
e

Av
Av
CB
South Em

ew
in
B CB pk

vi
Ho

a
PC CB

Se
CB
Ramp

CB
PC

Surfside Place
Surfside Avenue

South Edgemere Street


RS South Elmwood Avenue
Driveway
RS RS B
CB RS RS RS CB Legend Residential Districts:
South Embassy Street

CB A10, A5, A3, A2,


South Elder Stree

ay Ocean View Terrace


South Eagle Street

uk Highw
Old Monta
PC RS RS Land Use Values A, B: Single-Family
Eton Road

RS A RS RS
CB RS Institutional Land Use MF: Multi-Family
PC

Driveway
South Emerson Avenue
B
t

RS Industrial Land Use


RS RS RS Commercial Districts:
PC RS
Commercial Land Use CB: Central Business
PC PC PC NB: Neighborhood Business
RS Zoning CI: Commercial-Industrial
Commercial RS: Resort
Resort WF: Waterfront
CS: Commercial-Service
Residential

RTH
Parks and Conservation Special Districts:

NO
PC: Park and Conservation

o
East
M o Hampton
n t a u k DHamlets Study
owntow n Zoning and Land Use Montauk Downtown: Zoning and Landuse
Town of East Hampton 0 0.05 0.1 0.2
RKG Associates Miles 9/14/2016
Base zoning shown in solidFine
colors, with land
Arts and Sciences use as a transparent hatch. A limited business overlay allows some commercial use in residential
0 zones.200 400 800
Feet

LK McLean Associates Source: Town of East Hampton NY Department of Information Technology; NY State GIS NY.GIS.GOV

16 Town of East Hampton, New York


44’ inland from 2000 to 2012.7 This equals a rate of nearly
3’ per year, which if continued could create 300’ of shore-
line erosion by 2100. Storm surges from coastal storms
and hurricanes, on top of these higher tide elevations, will
PC
create flood impacts that extend further inland than the
same sized storms today.
ot
gL
r kin
Pa

RS WF Another issue for Downtown Montauk is the low narrow


Ch
ec
k
Ro
ad
strip of sand that separates Fort Pond from the Atlantic
WF
Ocean, an area sometimes referred to by Montauk resi-
l e
WF Ve
h ic

RS Be
ac
h

B
RS
PC dents as the “breach point.” With sea level rise, this area
s Path

B Un

and a narrow strip of land on the sound side are likely to


nam
ed
Captain Kidd

Str
eet
Wel
ls A
venu
WF
be inundated, potentially creating new inlets to Fort Pond
e
Soundv
iew Dri
ve A
Mulford Avenue

CB WF
and making the eastern end of Montauk functionally an
Ea
s
B B ive WF
tL
ak
e
Dr Dr
iv
ke

island.
e
Buttern CB t La
Kirk Avenue

ut Drive es
W
Gannet Drive

WF
B
B
Duryea Avenue

Cranbe
rry Road

B
B
Ram
p A
Land Use
B

Shadbush Road
Montauk Seaplane Base
Montauk land-use is notable for its large area of unde-
B
veloped land. More than 50% of the landscape is per-
Pinetree Drive

Tern Drive

eway
CB Driv
Gull Road

B B
Montauk Harbor
manently protected open space, beaches, and park land.
WF WF
WF A5
The area that is developed ranges in land use from low
B
A3
B
B
and medium density residential to relatively dense devel-

H
Beachplum Road

ad
Ro
B Unnamed
Street
B RS
opment in the two commercial centers, including sever-
RS
RS
al high rise buildings and Oceanside hotels in Montauk
Bayberry Roa
d
Dury
ea Aven
ue RS Downtown
B A
t
Cour

B
Open Space and Recreation: Protected open
ingo

Blackb
erry Dri
B
Flam

ve
B B
Cu
llo
d en
A5
space the hamlet makes up 62% of the land area—the
B RS RS
largest amount of protected open space of any hamlet in
Pla
ce
Star Island
Aven
ue Lake Montauk Montauk Yacht Club LightMontauk Yacht Club
the Town. These conservation lands are managed by a
Flam ingo
East

mix of public and private-not-for profit organizations.


way
Drive
e u
en

A3
Legend Residential Districts:
Av
go

Montauk is also notable for having the largest protected


in

A10, A5, A3, A2,


m
Fla

PC
A3 WF RS Land Use Values A, B: Single-Family
Institutional Land Use MF: Multi-Family
block of maritime forest in all of Long Island. Important
Industrial Land Use
RS R oa
d Commercial Land Use
Commercial Districts:
CB: Central Business
parks and recreational sites include Montauk Point State
Park, Kirk Park, Camp Hero State Park, Shadmoor State
d
lan
Sta
r Is
A5 NB: Neighborhood Business
Zoning CI: Commercial-Industrial
Commercial RS: Resort Park, Montauk Downs State Park Golf Course, Hither
PC WF: Waterfront
PC
Resort
CS: Commercial-Service Hills State Park and Hither Woods Preserve.

RTH
Residential
Special Districts:

NO
Parks and Conservation
Road

PC: Park and Conservation


Private recreation sites and park lands and beaches in
od
Fernwo

Montauk are home to a range of active and passive rec-


North

A3
A3 A
reational opportunities and an extensive network of
East Hampton Hamlets M o n t aStudy
uk Zoning and Land Use Montauk Harbor: Zoning and Landuse

o
Wil
ls trails. Fort Pond and Lake Montauk provide recreation-
Town of East Hampton
Po
int

al boating and fishing opportunities. These water-based


Ro
ad
A3 0 0.0475 0.095 0.19
A3 RKG Associates No
rth
Miles 9/14/2016
A3 Feet
Base Fine
zoning shown in solid colors, with land use as a transparent hatch. A limited business overlay allows some commercial use in residential zones.
Fa

Arts and Sciences


rra
gu
tR
oa
d
A2 0 195 390 780
A A2
A3 LK McLean Associates
A3
B Source: Town of East Hampton NY Department of Information Technology; NY State GIS NY.GIS.GOV
7
USACOE Downtown Montauk Stabilization Project

Hamlet Study - Montauk | Introduction & Existing Conditions 17


recreational activities are particularly important for the fishing industries and recreation, while Resort zoning
commercial center at Montauk Dock. (CB) Central Business: Core of downtown with along the northern end recognizes an area of existing and (NB) Neighborhood Business: Found infre-
shops, delis, cafes, tourist services. Dimensional re- potential hotels and motels. Waterfront zoning requires quently in Montauk. Dimensional requirements:
Residential Uses, housing types: Montauk residen- quirements: buildings to have a 40 foot setback from the street, and
tial uses range from low to medium density. The ham- as a result, development within this zone does not create • 10,000 sf min lot area
let contains the highest total number of housing units • 3,000 sf min lot area an architectural streetscape. Many of the waterfront facil-
at 4,666. This includes 1422 households (only 30.5% of ities within this zone have large open parking lots or boat • 40% max building coverage on lot
housing units are occupied). The average household size • 50% max building coverage on lot yards on the street, with buildings closer to the water’s
is 2.3. edge. Even Gosman’s dock, a retail and dining develop- • 2 stories max
• 2 stories max ment, has a wide green lawn within this 40 foot setback
East Hampton, like many ocean resort communities, has area. Gosman’s, a commercial anchor of Montauk Har- • 30 ft max height (35 ft for gabled roof height)
a large number of seasonally occupied homes. In Mon- • 30 ft max height (35 ft for gabled roof height) bor, is currently for sale along with fifteen other Montauk
tauk, 63.1% of households are seasonally occupied while Harbor parcels under the same ownership, mostly located • 25 ft front setback (corner lots have 2 fronts)
624 are occupied year-round. Montauk is also notable for • 10 ft front setback (corner lots have 2 fronts) in the north end of Montauk Harbor. Eleven of these par-
having the highest percentage of renter-occupied, year- cels fall within Resort zoning, three fall within Waterfront • 15 ft side setbacks
round homes in the town (26.7% renter occupied and • 10 ft side setbacks zoning, and two fall within Central Business zoning. The
73.3% owner occupied). asking price of $52 million for these properties indicates • 25 ft rear setback
• 25 ft rear setback that the real estate value of this area may risk outpacing
Commercial and Industrial uses: The major com- the economic viability of the fishing industry which has
mercial centers include the Montauk Downtown and traditionally inhabited Montauk Harbor and shaped this
the Montauk Dock Area. Montauk Downtown is one of part of the hamlet’s identity. While zoning limits the size Non-conforming uses: Land use conforms with zon-
the highest-density commercial areas in the town, with Potential impact on town character and rede- of new buildings on individual lots, the number of adja- ing throughout most of downtown Montauk. The parcels
high rise buildings and oceanfront motels alongside one velopment: Zoning throughout downtown Montauk cent lots being sold at once by the same owner all with- on Montauk Highway are zoned Central Business, and
story and two story beach-oriented retail stores and res- encourages development of low-rise (2 story) water- in the Resort zone enable a development of considerable they contain commercial and retail land uses. Toward
taurants. Montauk Dock includes restaurants and shops front-oriented retail, dining, recreation, tourism and hos- size. the waterfront, the south end of downtown Montauk
along with a working waterfront. pitality. Central Business and Resort zones do allow for along South Emerson Avenue is zoned resort and con-
residential apartments within commercial buildings (by sists largely of hotels. The only non-conforming uses in
Zoning special permit), which allows for the possibility of mixed downtown Montauk are on the east end of the waterfront,
use development. The waterfront south of South Emer- (RS) Resort Zone: Motels, Restaurants allowed as where a motel on Oceanview Terrance exists on a parcel
Density and Dimensional Requirements son Ave between South Emery Street and Essex Street is an auxiliary use. Dimensional requirements: zoned as residential.
zoned Resort and consists of beachfront hotels, while the
• Minimum ten foot front yard setback requirements adjacent land to the west is zoned Park and Conservation. • 3,630 sf min lot area (for transient hotel) Montauk Harbor consists of a mix of zones. The work-
in CB zone facilitates building placement close to This adjacent area consists of sand dunes and beach grass- ing waterfront on West Lake Drive is zoned Waterfront
street, rear parking, reduced vehicular traffic speed es, which serves as a natural buffer against storm surges • 15% max building coverage on lot (WF), and land uses there are consistent with zoning,
and good walkability for the development in downtown. The Army Corps of including marina, boatyards, fish processing, ferry ter-
Engineers’ recently installed a sandbag wall in an effort • 2 stories max minal, restaurants, and some retail. Inland, across West
• Same uses permitted in CB zone and NB zone; ma- to fortify the hotels on South Emerson Ave against storm Lake Drive from the working waterfront, the zoning is
jor difference are dimensional requirements with CB surges. However beach erosion has continued, and has • 30 ft max height (35 ft for gabled roof height) Waterfront, with conforming uses such as boat yards, as
zoning allowing for more intense development on brought public attention to the tenuous nature of older well as one parcel that is zoned Central Business, where
smaller lots than NB zone development that was allowed to occur so close to the • 30 ft front setback (corner lots have 2 fronts) there is a retail land use. North of Wells Ave, on both
dynamic and changing shoreline. Since this area is still sides of the West Lake Drive loop, the zoning is Resort,
• Apartments over stores are allowed by special permit zoned Resort, redevelopment along this shifting beach- • 15 ft side setbacks and the parcels which are developed have hotel and motel
in CB & NB zones, available for moderate income front could still potentially occur. land uses. South of Flamingo Ave, West Lake Drive has
families • 15 ft rear setback waterfront and resort zoning along the waterfront, with
In Montauk Harbor, Waterfront zoning is designed to conforming land uses. On the west side, at the intersec-
help maintain a working waterfront which includes both tion with Flamingo Ave is Central Business zoning with a

18 Town of East Hampton, New York


Montauk
10.0% of total). Most of these businesses are concentrated in
(WF) Waterfront Zone: Docks, Restaurants, Boat Downtown Montauk and Montauk Harbor. (See RKG’s Hamlet H o u s i nHousing
g | Montauk
Yards. Dimensional requirements: Business District Plan for more detail).

• 10,000 sf min lot area Economic Characteristics and Issues in the Fo-
cus Area: Montauk CDP Owner Occupied Housing:
• 40% max building coverage on lot
Montauk Harbor, also referred to as the Dock area, is Housing Units: 4,666 Census 2010
Census 2010
• 2 stories max home to the majority of support facilities for the Town’s

• 30 ft max height (35 ft for gabled roof height)


commercial fishing industry. Beyond the working wa-
terfront businesses, the Harbor also includes many
2000-2010: -3%
Census 2010
businesses associated with the Harbor as a tourist des-
• 40 ft front setback (corner lots have 2 fronts) tination. This includes restaurants, shops, motels, and
recreational fishing businesses. Many of the tourist-ori-
25000
26.7% 73.3%
• 10 ft side setbacks ented businesses are located within the 14-acre property Wainscott
currently owned by the Gosman family, which is likely to 20000
• 25 ft rear setback be sold in the near future. Because this area is low-lying Springs
and relatively exposed, flooding and storm impacts are Renter Owner
issues that also impact long-term viability of businesses Northwest Occupied Occupied
15000

hotel land use, which is a non-conforming use since nei-


in this area.
Napeague 379 1043
ther “transient motel” nor “resort” are permitted under Downtown Montauk contains a variety of businesses
Central Business zone. Continuing south along the west typical of a traditional downtown, including supermar- 10000
Montauk
side of West Lake Drive, the parcels are zoned Resort, kets, banks, delis, restaurants, pharmacies, bars, gas,
East Hampton
Montauk CDP
with conforming hotel land uses. stations and laundromats. Additionally, Downtown
Montauk includes many of the largest hotels and resorts
North Seasonal Housing
5000
Business Uses and Hamlet Economy in East Hampton. Downtown businesses alone account Amagansett
for 26% of businesses in East Hampton Town’s unincor- Sag Harbor (part)
A recent inventory by RKG Associates identified, in total porated areas. The accommodations category, includ- East Hampton
308 businesses in 31 industry categories, from resort ho- ing hotels/resorts, account for 42 businesses or 22.3% of 0
Village
1990 2000 2010
tels and services to retail and restaurants. The commer- the total businesses in the hamlet and cover the largest
cial activity in Montauk account for 43% of businesses
in East Hampton Town’s unincorporated areas and 48%
amount of acreage (37.94 acres in the hamlet. The larg-
est facilities include Surf Club, Royal Atlantic, Montauk
63.1% 36.9%
of the total commercial building square footage. These Blue Hotel, and Atlantic Terrace. All of these businesses
businesses are concentrated in Montauk Downtown and have ocean frontage are used by those visiting the beach Households
Montauk Harbor. Other smaller businesses areas are lo- and are therefore doubly susceptible to storms and beach Census 2010
cated in the Fort Pond area along Second House, Shore
and Industrial Roads.
erosion. Food Services & Drinking places are the sec-
ond largest business category (31 businesses), followed
1422 2.3
by Miscellaneous Store Retailers (27 businesses). The 2942 1724
Businesses that serve tourists and second home owners account fourth largest category is Food & Beverage Stores (24 Seasonal Year-Round
for 60% of the total number of businesses in the hamlet. This businesses). One of the most pressing issues for Down-
includes the accommodation industry category, which has the town Montauk is how to expand local affordable housing # Households Avg Household
highest number of businesses (74) and occupies the most land for workers in these service industries. Another key is- Total Size
area (56.1% of total building floor area), followed by Food Ser- sue is how to minimize damage to Downtown businesses
vices & Drinking Places (53 businesses, 12.9% of total build- from rising seas and more frequent and severe storms. Data from the US Census Bureau as collected in the Community Housing Opportunity
ing floor area), and Food & Beverage Stores (31 businesses or Fund Implementation Plan 2014

Hamlet Study - Montauk | Introduction & Existing Conditions 19


Market Orientation

• Primary destination for tourists looking for beach


experience

• Largest concentration of accommodations

• Restaurant and entertainment establishments

• Seasonal businesses are challenged to find affordable


housing for seasonal workforce

• Large and growing second home market

• Local businesses largely cater to seasonal population


but important to year-round population as well

The beachy informality of waterfront streets is prized by both residents and visitors, but in busier times conflicts between pedestri-
ans and vehicles lead to dangerous conditions.

Buildout Analysis Montauk Highway through the Montauk downtown has


one lane of travel in each direction, with a center median
Residential: According to a 2011 residential buildout and left turn lanes at key intersections in certain areas.
performed by the Planning Department8, the town as a On-street parking occurs on the roadway shoulder in the
whole could see a 13% increase in the total number of business district, i.e. between South Elder and South Es-
housing units. This assumes future development con- sex Streets. The posted speed limit is 30 MPH.
sistent with current zoning. In Montauk, this residential
buildout is estimated to be 623 housing units. This is County Road 49 consists of one travel lane in each di-
down from an estimate of 1,020 in 2005. rection, with shoulders. Posted speed limits are 30 MPH
from Carl Fisher Plaza to just north of Lion’s Field and in
Transportation (hamlet overview the harbor area, and 40 MPH elsewhere.
with focus on commercial centers)
County Road 77 also consists of one travel lane in each
Roadways: Montauk is served from the east and west direction, with shoulders. Posted speed limits are 30
by Montauk Highway (NY Route 27). The primary route MPH in the harbor area, and 45 MPH elsewhere.
connecting the downtown area to the LIRR station and
the harbor area is County Road 49 (Flamingo Avenue). The estimated average daily traffic (ADT) volume on
East of the downtown area, County Road 77 (West Lake Montauk Highway west of downtown, in the segment
Drive) extends from Montauk Highway north to the har- paralleled by Old Montauk Highway was calculated to
bor area, crossing County Road 49 adjacent to the harbor. be 12,000 vehicles, based on the latest available NYSDOT
The Montauk Station, terminus of the Long Island Rail Road, count data taken in August of 2015. East of downtown,
played a key role in the history of the Hamlet, and provides Crosswalks and generous sidewalks help make the downtown while a count taken in August of 2011 equated to an es-
extraordinary opportunities for a summer community that is pedestrian-friendly, but lack of connectivity to the beach and
8
2014 Community Housing Opportunity Fund Imple- timated ADT of 7,900 vehicles, the actual daily count re-
more sustainable and less dependent on the automobile. other areas limits their usefulness. mentation Plan corded on a Saturday was 14,800 vehicles, or 87% higher

20 Town of East Hampton, New York


than on an “average” day. (The 2015 count west of down- • Encouraging the use of short cuts In season, three additional eastbound trains are provid- Wastewater: Wastewater in Montauk is managed
town did not include a weekend.) ed on Friday afternoon/evening, and one additional west- through individual septic systems. The vast majority of
• Widening and straightening roads bound train is provided on Monday mornings. these individual septic systems provide only secondary
Data from two count locations on County Road 49, ob- treatment of effluent: nitrogen and phosphorous are not
tained in July 2014, indicates an estimated ADT of 9,400 Pedestrians: Sidewalks exist in the downtown area The LIRR recently proposed to add three additional trains removed and therefore enter the groundwater. 10 Old and
at Edin Street, while the actual Saturday count was 15,800, along both sides of Montauk Highway. The 45-mile in each direction year round, but one of the eastbound ineffective septic systems combined with a less than 100’
more than double the estimated ADT. Similarly, north of long Paumanok Path, which runs from the Southampton trains would be eliminated on Fridays due to conflicts distance between wells and septic systems in many loca-
the LIRR station area, the estimated ADT was 6,900; the Town line to Montauk Point, follows the old Montauk with current enhanced Friday summer service. The LIRR tions, creating on-going groundwater and surface water
actual Saturday count was 13,100, nearly double the esti- Parkway Right of Way, except at Fort Pond, where it hugs continues to review the proposed schedule in an effort to pollution concerns. The Lombardo Wastewater Report
mated ADT. the Pond’s southern shore. better accommodate work hours, and will also investigate has recommended the following wastewater improve-
using the existing Bridgehampton siding to enhance ser- ments in Montauk:
On County Road 77, just north of Montauk Highway, Bicyclists: Montauk Highway is a designated bike route vice, by allowing trains to pass. Any enhanced services
the July 2015 estimated ADT and Saturday traffic vol- (NY Bike Route 27). West of the downtown area the would start in late 2018, after the LIRR meets the Federal • Upgrades recommended for existing septic systems
umes were 4,400, and 7,400 (a 70% increase over ADT), roadway’s shoulders are designated as bike lanes. mandate for installing Positive Train Control system-wide. to achieve advanced tertiary treatment in problem
respectively. PTC affects the schedule because equipment that would be areas
Transit: Montauk is served by Suffolk County Transit’s needed to provide the new commuter service is first need-
Because the rural and scenic character of the area is high- Route 10C, which connects the East Hampton LIRR Sta- ed to replace that removed from circulation during instal- • Neighborhood wastewater system recommended
ly valued, there is a reluctance in East Hampton for solv- tion with Montauk. Service consists of five eastbound and lation. When the LIRR’s current signal and interlocking for densely developed areas: Montauk Center, The
ing traffic problems by: four westbound bus routes per weekday. In the summer, project is complete in Spring 2018, it will expand the exist- Docks, Ditch Plains, Camp Hero
a connection is provided in Montauk to the S94 Shuttle to ing westbound “single seat” service from Speonk eastward,
• Adding lanes on existing roads the Montauk Point Lighthouse. The LIRR’s Montauk train to originate in Southampton. Schools and other public facilities:
station on the railroad’s Montauk Branch is located north
• Constructing bypass roads to congested routes of downtown, approximately a mile north of Montauk Taxis: Taxi activity is particularly prevalent in the down- East Hampton High School accepts students from Mon-
Highway. Weekday off-season (October through May) town area on summer weekends. Customers are dropped tauk on a tuition basis. School Taxes, which make up
• Installing traffic signals service is currently 6 eastbound and 5 westbound trains, off and picked up throughout downtown on demand. the majority of property taxes within each school dis-
with one additional eastbound train on Friday evenings. Late night activity at bars and clubs results in pedestri- trict, support the Montauk public schools. School taxes
ans randomly hailing cabs and jaywalking across streets in Montauk are the second highest in Town. Townwide,
to board them. A similar disorganized pattern of pas- school taxes as a percentage of median real estate value is
senger pick-ups occurs at the LIRR station, as numerous 1.1%, the lowest on Long Island except for Shelter Island.
cabs pick up customers at scattered locations within the However, because of the large difference in tax rates be-
station parking lot. tween the school districts, the Town has pursued a strate-
gy of encouraging senior housing and single room rental
Infrastructure and public facilities apartments as well as concentrating new development in
the East Hampton hamlet where the high school is locat-
Public water supply: 9 Fresh groundwater sepa- ed.11
rated from the mainland aquifer of East Hampton by
saltwater. Freshwater found in shallow upper glacial
aquifer. Groundwater limited—four foot high ground-
water contour rather than five to ten foot contour to the 10
East Hampton Town Wide Wastewater Management
west. Groundwater is vulnerable to contamination from Plan 2015 - Lombardo Associates, Inc.
human land uses as well as salt water intrusion. Suffolk 11
2014 Community Housing Opportunity Fund Imple-
county Water Authority installed a water main and boost- mentation Plan
er station to supply Montauk with water from mainland
East Hampton
The intersection of Flamingo Avenue and West Lake Drive is one of several in Montauk where a roundabout could help ease traffic
flow and create safer conditions for vehicles and pedestrians.
9
Comprehensive Plan – Montauk Report

Hamlet Study - Montauk | Introduction & Existing Conditions 21


22 Town of East Hampton, New York
Charrette Process

Overview
The Montauk Hamlet Study public participation process centered on an in-
tensive, four-day charrette. The purpose of the charrette was to facilitate a dis-
cussion of issues and concerns in each hamlet, to provide an opportunity for
shared fact-finding and analysis, and to generate and present physical plan-
ning ideas specific to the hamlet and the two commercial centers—Montauk
Downtown and Montauk Harbor. The four day charrette consisted of work-
shops, focus groups, and tours that were open and advertised to the general
public, including businesses, year round residents, second home owners and
other stakeholders. These events provided the opportunity for local citizens to
work together with town staff and the consulting team to develop creative and
detailed recommendations for each hamlet.

Charrette Process
The Montauk Charrette took place Wednesday, Thursday, Friday and Saturday Walking tours of Downtown Montauk and Montauk Dock allowed stakeholders to
September 14-17th, 2016. Public workshops were held in the Gymnasium point out key issues and opportunities to the consulting team.
of the Montauk Playhouse Community Center, 240 Edgemere Street. Public
events included a pubic walking tour, a public listening workshop, two public Next, the group walked to the north and east along S. Emerson Ave, discuss-
visioning workshops, and a public forum presenting the results of the public ing the motel area and, in particular, opinions about the importance of these
visioning workshops. motel businesses for the tourist economy and their vulnerability to rising seas
and a retreating coastline. The Downtown portion of the tour ended at the
Public Walking Tour: The first charrette event was a public walking tour of beach access off of S. Emerson and S. Edison, where the group discussed the
Montauk Downtown and Montauk Harbor, which provided an opportunity U.S. Army Corps of Engineers Dune stabilization and re-nourishment project.
for community members to introduce the consultant team to the important Sand-filled geotextile tubes installed as part of this effort had been damaged
locations and issues in the hamlet. The walking tour took place Wednesday, by a coastal storm just prior to the charrette. Finally, the group returned to the
September 14th at 10:30 a.m. beginning at the gazebo on the green in Montauk Montauk Green by way of S. Edison. On the return walk, the group stopped
Downtown. at crosswalks on Montauk Highway at South Edison and South Essex Street,
which several members of the groups wanted to point out as particularly un-
After an introductory discussion, the group began by walking northwest to safe and inefficient crosswalks. The South Edison Crosswalk , for example, is
South Eerie Street and the Lions Field Park. Here, the discussion focused on viewed as unsafe by pedestrians—the south ramp of the crosswalk is in a “blind
public infrastructure and the possibility of using this area for affordable hous- spot” for oncoming traffic on Montauk Highway, with views often blocked by
ing. Next, the group walked down South Euclid Ave past the Harvest Restau- vegetation and nearby on-street parked vehicles. Another member of the tour
rant and made its way south and west past the IGA to the Kirk Park Beach pointed out the problem of frequent potholes and puddling along the roads
parking lot. In route, the group stopped briefly at the newly built commercial north of the Montauk Green.
property for sale at 669 Montauk Highway. At the Kirk Park parking lot, con-
versation ranged from parking issues and public infrastructure and pedestrian After completing the Downtown Portion of the walk, the group relocated by
crosswalks. The crosswalk on Montauk Highway at the IGA was mentioned car to Montauk Harbor for the second half of the walking tour. The group
by several members as being misplaced, causing traffic congestion. Walk par- gathered at the parking lot off of West Lake Drive at the Gosman’s Property.
ticipants felt it would be better located further to the east. After reviewing maps of the area prepared by the consultants, the group began

Hamlet Study - Montauk | Charrette Process & Results 23


by walking south through Gosman’s to the Town Road Pier. Here, the group
discussed the continuing value of Montauk Harbor as a working waterfront,
and the relationship between this role and the tourist economy of the area.
Next the group walked along the edge of the harbor, discussing potential pe-
destrian infrastructure improvements. Many walk participants felt that creat-
ing a continuous boardwalk along the harbor would add greatly to the sense of
place and ability to use the harbor for passive recreation.

Next, the group continued to walk south along west lake drive toward the
Westlake Marina. The group stopped to discuss the wide intersection at West
Lake Drive and Flamingo Ave. While most group participants indicated that
this intersection was not necessarily unsafe, there was a general feeling that the
wide expanse of pavement here was inefficient and disappointing aesthetically
as a gateway to Montauk Harbor. Finally, the group returned by way of the
sound side of West Lake Drive. Here, the group discussed development possi-
bilities for the large hill between Wells Ave and West Lake Drive. This area is
the highest ground in the Montauk Harbor and is also relatively undeveloped,
currently used as an informal scrapyard.

Public Listening Workshop: Wednesday, September 14th, 6:30 p.m.


Simple three-dimensional models allowed participants to explore options for the fu-
The next charrette event, a public listening workshop, took place later that ture of the Gosman’s properties and neighboring areas of Montauk Dock.
day, Wednesday September 14th, at 6:30 p.m. In this event, the consultant
team presented an overview of existing conditions. Then, the assembled par- coastal resilience, hamlet economy, and transportation.
ticipants broke into small groups to run through a list of questions, facilitated
by members of the consulting team. The facilitated discussion was intended to For each focus area, facilitators presented key concepts and maps and intro-
identify top issues and opportunities within the hamlet as a whole and within duced exercises developed to gather public feedback. Facilitators presented
the two commercial centers. Questions were provided to facilitators to fo- this feedback and additional ideas generated in small groups. The workshop
cus the group discussion on hamlet strengths and weaknesses more broadly concluded with general discussion and conclusions.
and also within three specific topic areas: economy, recreation, connectivity.
Strengths were circled on the maps with green markers. Weaknesses were not- Public Visioning Workshop-Montauk Dock: Friday, September 16th ,
ed on maps with red markers. Additional comments on economy, recreation, 6:30 p.m.
connectivity were noted on maps with markers and sticky notes.
Another public visioning workshop took place the following day, Friday, Sep-
At the end of the charrette, groups presented a summary of key issues and tember 16th at 6:30 p.m.—this time focusing on the Montauk Dock area. For
opportunities, followed by a larger group discussion. this workshop the consulting team first presented an overview of existing con-
ditions, issues and opportunities. Next, participants broke into small groups
Public Visioning Workshop-Montauk Downtown: Thursday, Septem- for a physical modeling exercise exploring planning and design alternatives for
ber 15th, 6:30 p.m. Montauk Harbor. Each group was provided with a large map of the Montauk
Harbor area with foam models of existing buildings affixed to the map. The
The next charrette event, a public vision workshop for the Montauk Down- groups were also provided with foam building blocks for new buildings.
town area, took place the following day, Thursday, September 15th, 6:30 p.m.
This workshop began with the consulting team presenting a brief overview Groups were encouraged to develop a vision for the Montauk Harbor area that
Participants circulated through stations to hear about and comment on issues such of the issues and opportunities identified at the Wednesday workshop. Next, included areas for new development, pedestrian and automobile infrastruc-
as sea level rise and coastal resilience (top), and voted on their priorities for future participants circulated through stations to review draft plans and work with ture, new open space and conservation areas, and coastal resilience measures.
action (bottom). consultants to explore additional alternatives within five focus areas: housing, At the end of the workshop, groups presented the results of their work. The

24 Town of East Hampton, New York


workshop concluded with a facilitated discussion to identify shared elements
and common master-planning concepts to be explored in more detail.

Based on a suggestion from participants, a separate breakout group assembled


at the same time to discuss issues related to the working waterfront and the
harbor. This group identified several important concerns, among them:

• Water quality in the harbor is threatened by polluted runoff, septic sys-


tems and illegal dumping from some of the boats that visit the harbor each
summer. Eel grass beds, shellfish and finfish are all affected.

• Montauk is the #1 fishing port in New York, landing $17 million worth of
fish, but two docks where they currently unload are for sale. If these are
lost the fishing boats will follow.

• The fishing industry supports year-round jobs and families that represent
the lifeblood of Montauk - but may not be able to survive without a con-
certed effort to keep fishing viable and maintain housing and services that
fishermen can afford.

• The harbor can continue to serve multiple economic roles - commercial


fishing, charters, marinas and tourism - but needs a master plan to explore Interactive mapping exercises allowed participants to show where they thought different responses to sea-level-rise would be most appropriate.
opportunities such as a continuous waterfront walk, shared parking and
beautification.

Open Gallery and Listening Workshop: Saturday, September 17th ,


9:00 am

The final charrette event, which took place Saturday, September 17th at 9:00
a.m., was an open gallery and listening workshop. In this event, the consult-
ing team presented an overview of the issues and opportunities and general
recommendations and planning concepts for the overall hamlet, revised plan-
ning and design alternatives for downtown Montauk, and common elements
among the model vision for Montauk Harbor.

Participants circulated among stations with various design alternatives, filled


out comment sheets and “voted” for their favorite ideas. Facilitators present-
ed the reactions to and preferences for various alternatives. The open gallery

Hamlet Study - Montauk | Charrette Process & Results 25


concluded with a general discussion and conclusions.

Charrette Results
Key Problems and Opportunities
Discussion in the Public Listening Workshop, Site tour, and Visioning Work-
shops generally revolved around some key themes: traffic and parking; the
scope, scale and type of needed commercial development; architectural and
aesthetic preferences for new development; pedestrian and bicycle infrastruc-
ture; watershed and coastal ecological health; climate change and coastal resil-
ience. Input on transportation issues was received from a variety of sources,
including Town Police Chief Sarlo, attendees of the charrette, post-charrette
comments, and the Citizens Advisory Committee’s Transportation subcom-
mittee. Below is a summary of the key problems and opportunities raised dur-
ing listening and visioning workshops for Montauk Downtown and Montauk
Harbor. Problems and opportunities are also broken out for a third focus area
that emerged during the charrette: the land adjacent to the LIRR train station.

Montauk Downtown
Traffic and Parking: Issues include seasonal traffic problems in Montauk
Highway and lack of parking in the downtown core. Participants stressed op-
portunities for encouraging seasonal alternative transportation, while provid-
ing traffic infrastructure that works for the year-round residents. Alternative
transportation ideas included creating a central bus service in Montauk, as well
as supporting rail and marine transportation through the Hamptons. Efforts
to improve automobile and alternative transportation infrastructure should
maintain Montauk’s rural character. Below are some of key suggestions from
the public input process:

• The 5-legged intersection of Montauk Highway and South Elmwood Av-


enue/South Emery Street experiences traffic congestion and allows too
many motorist turning movements, causing safety concerns. Consider
making both streets one-way for one block each, in directions away from
Montauk Highway.

• Remove parking spaces near those intersections where motorists’ sight


distance is obstructed by parked cars.

• The Montauk Highway/Old Montauk Highway/Second House Road in-


tersection consists of multiple two-lane connecting roadways. Consider a
Visioning workshop physical model, Proposal A. roundabout to improve safety, and to “calm traffic” for eastbound motor-
(White model buildings represent new structures.) ists on Montauk Highway who are entering the developed downtown area.

26 Town of East Hampton, New York


• Improve street lighting in areas of high pedestrian activity south of Mon-
tauk Highway.

• Improve one-way signing to prevent wrong-way movements on South El-


der Street (adjacent to the IGA store).

• Institute one-way counter-clockwise traffic flow at the Carl Fisher Plaza


traffic circle.

• Improve signage directing motorists to Town parking lots.

• Consider making South Elmwood Avenue one-way eastbound and South


Emerson Avenue one-way westbound in the area between South Emery
Street and South Essex Street.

New Development: Many workshops participants supported the evolution


of Montauk into a “green/eco resort” economy, building on tourism associat-
ed with conservation areas and resort infrastructure incorporating innovative
resilience strategies. Toward this end, new development should generally be
centered on higher ground. There was an interest in infill and second story
mixed use in the downtown core—particularly second story worker housing
and more affordable units. Concern was raised by participants about any new
development in the first two ocean-side blocks because of sea level rise and
flooding. Participants suggested that development greater than two stories
should be located at higher elevations near the train station.

Affordable Housing: In addition to second story residential in the down-


town core, there was an interest expressed in affordable housing at Camp Hero
and near the Transfer Station. An interest exists for both affordable temporary,
seasonal housing and permanent housing. Temporary housing could include
ideas such as Tiny House development in low-lying future flood plain areas,
which could easily be relocated as sea-level rise makes such areas untenable.
These options should generally work toward improving the ability for “ordi-
nary” families and businesses to exist in the hamlet. This includes acknowl-
edging families that are not part of the resort economy.

Pedestrian and Recreational Infrastructure: In walking tours as well


as visioning and listening workshops, the need for improved sidewalks, light-
ing and crosswalks downtown were raised. This includes improving and re-
locating crosswalks and street parking to prevent blind spots that endanger
pedestrians. A broader opportunity exists to link together existing sidewalks
and multiuse paths into a comprehensive greenway that links all of Montauk.
Below are key suggestions from the public input process:

• Improve approaching motorists’ visibility of pedestrians at existing cross- Visioning workshop physical model, Proposal B.
walk locations on Montauk Highway. Investigate the use of in-pavement (White model buildings represent new structures.)

Hamlet Study - Montauk | Charrette Process & Results 27


• Implement designated taxi-stands in the downtown area, to improve safe-
ty for motorists and pedestrians.

Ecological Health: Participants recognized the impacts of septic systems


on groundwater and surface waters as an on-going issue for the hamlet. This
includes improving the conditions contributing to shellfish closures in Lake
Montauk and Oyster Pond. Opportunities described in the recent Lombardo
wastewater plan were seen as beneficial to the town.

Climate Change and Coastal Resilience: Sea Level Rise and other
impacts of Climate Change were recognized as one of the most important is-
sues for the future of the hamlet. Participants expressed an interest in finding
consensus on sea-level rise assumptions, using good data and finding issues
where all could agree. Support existed for a multi-faceted approach to resil-
ience strategies, including managed retreat and relocation of commercial and
residential density as well as nourishment and strategies to protect critical in-
frastructure from rising seas.

Montauk Harbor
Visioning workshop physical model, Proposal C. Traffic and Parking: While traffic isn’t as major of an issue for the Montauk
(White model buildings represent new structures.) Harbor area, the workshop participants suggested that the wide intersection
at West Lake Drive and Flamingo Ave could be improved to provide a more
rational turning pattern and more welcoming gateway, aesthetically, to the
lights or other warning devices. Improve street lighting at those locations. Montauk Harbor area. Participants proposed constructing a roundabout at
Participants mentioned that existing street lighting has a tendency to this wide intersection of County Roads 49 and 77.
“blind” drivers approaching crosswalks and therefore ultimately making
it harder, rather than easier, to see pedestrians at night. New Development: A central theme of the workshop was a desire to keep/
enhance the area’s working waterfront and fishing village character. Rede-
• Move the crosswalk at the Carl Fisher Plaza east intersection to the east velopment should not drive out existing commercial fishing. This includes
side of the intersection, where more pedestrians are crossing. maintaining the pack out houses that are vital to commercial fishing. Beyond
maintaining the working waterfront, participants pointed out opportunities
• Where feasible, construct sidewalks south of Montauk Highway, in areas for a supermarket, expanded retail, and the potential for affordable housing.
of significant pedestrian activity.
Affordable Housing: Affordable housing, particularly through mixed use
Bicyclists: Below are key suggestions: approaches, was supported for the Montauk Harbor area.

• Add bike racks in convenient places. Pedestrian and Recreational Infrastructure: Many participants sug-
gested that the existing boardwalks through the waterfront areas could be
• Create a separate, shared-use pedestrian/bike path along the general align- better linked together to provide easier public access to the waterfront. This
ment of the existing Paumanok Trail, beginning at Second House Road could include creating multi-use spaces that fishermen could use for work and
and extending easterly through the downtown area, to the point where the tourists could also use. Other recreational opportunities mentioned include
trail meets Montauk Highway. From that point, bike lanes can be estab- an interpretive program for visitors including ecology, history, and informa-
lished on Montauk Highway. tion about the fishing industry. Others suggested the area could benefit from
a movie theater or pop-up drive in.
Transit:

28 Town of East Hampton, New York


Legend Bicyclists: Participants emphasized the need to add more bike racks in con-
Issues and Opportunities: Montauk

5
Rail Road Permanent protection
venient places. Another suggestion was to create separate bike lanes on Coun-
25

5
20
30

5 5
40

40 35 EHTaxParcels Open Space

ty Road 49, from the harbor area to the south.


40 35
45
30

25
45 45

5
5 Foot Contours Potential Inundation After 1 Foot of Sea Level Rise

50

20
25 20
15
25 15
15 15
20 15 15
Water Bodies Potential Inundation After 3 Feet of Sea Level Rise
20

10
15 10

5
50
10 20

40

45
10

25
15

15
20

50
45

20
15
30 25
20

Ecological Health: One of the key issues expressed in the workshops was

10
25 20
Wetlands Potential Inundation After 6 Feet of Sea Level Rise

15
20 25

20
30

30
20

50
20

10
35
20

45

10

5
40
25 15 20

5
20
15

10

20
5

30
25 15

10
5

25
10

5
20 5

20
20 25 5

20
20

10
5 10

10
5

15

5
20 5

maintaining a vital fishing fleet in the harbor. This necessitates maintaining

30
5
7
20 25

35
45

10
40 5

10
55 5

50

15
5

15
65 5 35 5

10
25 5 30

5
30 50

10

10
60
5

45
5 30

40
10

30
5

40
10 5

15
40 5

the ecological health of fishing areas in the hamlet and providing infrastruc-

30
35 35 5 5

The area near the LIRR


10 25

15
10 5 5

5
30 5 25 25 20 20
5
Montauk 25

35
30

5
20
5 25 20

5
5 15 10

15
5
30 50 5 5

30

25
Seaplane 5

5
30
5

5
35

20
10
Base

station could become


55

ture for the fishing fleet that can adapt to rising seas. Water quality in the har-
5

15
40 5

5
5
15 5 15

35

5
60 5
60 5 10

5
5
5 10

5
5

60
60 10 5 10

15
5

5
15
40 5

5
5

5
15

10
55

55
60

5
60

35
65 5 15 5

5
20

10
70

5
65
5

65
more of a transit hub.

20
10

5
5

50
70
15

5
60 20

75

55

5
75
5 5

70

10
65

5
bor is threatened by polluted runoff, poorly-functioning septic systems, and
5

65
45

5
25 15 10 5 20 Montauk

55
Airport

5
55 10 5 5

15
10

Higher ground here could

5
20

5
15 15

5
60 65

5
55 25 15 15

5
25
illegal dumping of sewage from boats moored in the harbor.
5

10
5 5

20

10
20
5

10

10
75 5

80
65
accommodate mixed-use

75

50
25

55
55

60

10
5

35
80 85 5

10
80
85

70

5
5
5

5
70
Big

10
75
5

5
Montauk Harbor’s working
70

10
buildings and transit-oriented

15
5 5
Reed

10
15 75
65 5

5
5
5 5

85
5
Pond

5
90 90 5 5
85 95 Montauk

waterfront is critical to Climate Change and Coastal Resilience: The low-lying Montauk
5
80 Montauk

5
development.
60 60

40
25
Yacht
35

5
5 5
Yacht Club

5
55 5

85
5

85
5 Club 5 5

5
5

10

5
55 Light 5
10

75
70

55
70

5
90 5 5

5
5

5
5

5
the area’s character and

5
15
60

65
90 10 5

75
70 5

5
5 5 15

Harbor area is one of the most susceptible areas in the hamlet to rising seas.
80 80
Little
85 15
65

20 15

5
40
Reed Pond
tourist appeal. This area
80 85

5
80 90 5

11
11
95

10
100

5
35
0
0
105

75

5
105

15
30

Opportunities exist for raising buildings and pier infrastructure as part of re-

85

20
10

5
80 5

35
10 40

115
35

is increasingly vulnerable
45

30
5

15
As sea levels rise, low-lying
30

65
120

5
110
45 100 5

70
5
50 0 35

11
12 20

10
95
45

110

5
100

development. New development could also take advantage of presently lightly

12
125

0
10

10
5

to coastal flooding and

0
10

land between Fort Pond and


65

5
5

95

45
13 5
115 10

14
5

40
12
30

13
5 150 125
115

0
55

5
140
70

85

65
0
120 75

inundation from rising seas.


12
70

the Atlantic is increasingly used higher ground between Wells Ave and West Lake Drive.
75

90 60
70

11

70
35
0

130
55

65
60
65 85

135
5

110

125
120 Suffolk

100
75

95
vulnerable to inundation in

40

90
45

60
25

50
35
12
County

100
0 125

110
45
12 20

125
80

110
80

5
5

10
5

5
10
115

13

75
5

coastal storms.
Transit Center Area

115

85
95 12

70
125

0 0 45
120 10

70
105 13

65
120
Higher ground near downtown is lightly
5 85
13
5

100 12 70
10

105
90

95

105

12
105 90 80 5

40
14

95
13 70
95

80
0
0
115

10
110

5 70 75

75
95

105

125

80

developed. Commercial uses displaced


13 135 70 60

90
120

55
90 0 45

120
95 55
0

95 95 0
12

45
35

95
10
90

5
10
95

85
12

100

70
95

40
110
70

30

95
85

11
95

90
100

80

10

95
5

by rising seas could gradually shift to this

5
10

0
5
35

General:

60

65
80

12
125 90
5
12

55
0 60
40

12 5 40

115
13 85
80 35 105

55
120

Seasonally heavy traffic


135
130

area.
135
0

45
0 120 110
13

11

100
130

20

0
35

11
95
90
95 12

105
20
0
Lake
on Montauk Highway
13 50

35
70
5 10
13

120 5

35

11
0

Montauk
5

12

0
130

45

25

115
90

35
135 25

60

10
1
5

105

0
Tuthilll
Rt. 27 creates mobility

13
60 Improving the train station and creating a well-designed multi-modal transit

85

0
105

30
80

14

0
0

70
85
10

65
65
Pond 13
5 90

Infill and second story residential


65
65
75 140 5
90

120
40 100 13
55
5

85

issues Downtown
90

105
65

80

hub at the terminus of the Long Island Railroad was another opportunity area
75 85 95
85

140

25
65 70

development Downtown could provide


40

135
50
60
115

25
70
45

80
50

Montauk
65
0

70
12

65

Montauk Tennis
65

100
140
40

90
85
45
highlighted in the charrette. Key suggestions included the following:
5

65
5

Auditorium

affordable workforce housing


Station 70
5

60
75

35 40
55

50 35

95
65

14
11
5

55

Montauk 35
5

5
5

5
5

0
5
and provide areas for commercial uses
115 10

15
60

5 65 10
10 65 6 0 Downs
110

6
100

5
50

10
5 5 55 5
5

Golf Club 10 13
50

50 5
12
60

15
65

65

35

10
35
10

65

110 40

to relocate from lower-lying areas.

85
5

5
75

15
35

35
40
Montauk

Transit:

10
35 35 30

15
5

15

0
5

5 115
5 Manor
55
10

5
30

10 75 5
5 5 5 100 12 120
40

10
50

Opportunities exist for connecting and


5 5
45

80 110
25

5 5 5 5 45
35

80
40

40
10

5 10
30

75

40

5 55
80

5 25 10
15

30
20

5 5

improving sidewalks, crosswalks, and


5
5

40
0
5

70
5 5
5
55

5
5

65 5
5

5 10 10
5

5 5 15
75

5
85
90

75
70

• Improving LIRR service to Montauk, particularly in the summer season,


5 5 5 55 80

20
street lighting.
5
5

80

20 5 5 Fort Hill 75
5

50

10
10
5

45

45

10
5

20
50

15
Cemetery
10

10 70
5

55 Montauk 60 25
80

60
85
5

60
5
80

30
45

Downs 75

10
5

5 5 5
55

to reduce traffic congestion on Montauk Highway and other downtown


State Park
75

5
65
5
5

65

5 5 80
75 8
5

5
5
60

0 50
15

50
50
75

50
5 5 75 60
5
85

20

70 75 60
60

25
30

65

roadways.
25
65

45
45
5 85 50

25
80 50
65

10 40
5

55 65

10
5

55
65
70

8 5 65 45
50

25
90 5
55

60

75
65

20
20

75
70 65 85

60
80

60

5
65

65 55
65
70

75

50
30 60 10

70
80
70

15
15

20
70

80
60
60

85 55 60
15

Stepping
75

55
20

45
60 60
70

85
• Create a multi-modal Transportation Hub to facilitate motorist, taxi, pe-

25
55

20
95
Fort Stones 90
60

50

85
20
10

125
80

105
5

120
Pond 65
Pond
65

120 80

100

35
15
65

15
80 0

95
15
25

80
60

65
9

20
120 125
20

destrian, bike and bus access to the train station. Create a designated taxi
75

20
60
100

130 70 85
30

55

40
60
80

55
25

75

90

85

45
35

105 60
10

90
80

12

90
20
75

5 90 30 50
45 85 80

8
90

10
55

90
80

20
35
5

115

stand at the train station.


60

120 30
20

50
40

5 20
95

75

12

15
65
5

50

120 75 70 90 20 90
80

45
20
0
80

14 85
40

25

20
145 10
Montauk 30 80
30

5
30

20
25
75

30
10
15

Public
10

7 20
80 5
0

35
0
14

60
10
30

70

School 70
10
60

65
80

135 65

55
130 85 10

10
55

30
10
80

140

45
25

75
80
75

20 40 15 10 35 60
35
135
55
25

60
85

• Institute a frequent, reliable circulator bus service, linking the station,


Montauk 35 30
70

30 30 50
30

15

135
90

75

65
50 75 30
85

85

125 25
35

45
25

5
40

110
75

85 50
75

10

100 10 55
25

75 90
80

80
85 20 85
20

15 60
60

55
95

90
25

downtown area including parking lots, the harbor area, and beaches.
80
30
25

70

85
70

25

55
55
45

25

75

30
80 55

55
75

55 5
25

6
30 25
85

70
20

60
55

60
75

5
55

60
80 75 10 65
25
60

30 55

55
55
40

60 70
25

30
25

60

10
30 5
25

5
60 65 75
45

60
50

70 25 10
55

70

55
60

85

25
20

45
60

25

75
30
80

70 55
85

15

Perry B 15

70
45 40 80
55
75
50

40 25 10
60

Roadways:
45
Duryea Junior

65
5
Montauk
60

80 50 45
85 5 50
20

75 6 65 60 55 70
75

25

60 5 Post Office Community 80 85 55


25
75

75
60
50

60
15

30
40

15

25

65 70
Church
75

15

70

60
60 60 90 5

65
30

25
80

70
Saint Therese

45
75

50

45
35
75

60 40
10

80
75 75 of Lisieux 40
25

65
65 10
5

40 Church 45 30
75

75 70
60

90

50

10
50

20
45

30
50

55
35

1
0 85

45
55 6
35

85
20
65

10

25

40
20
50

50

35
30 45 25

• Reconfigure the intersections along County Road 49 in the vicinity of the

40
40

55
35

40
40
20
35

25
5

65
60

10

10
40

15

40
55

20

40 65 20 30 45
45

5
10

40 5

45

30
25
45
65

60 20
5

60

40
65

20
5 50 45

20
70

55
65

20 20 5
15

10 65 65

Lake Montauk has


70

10 50

station to optimize safe traffic and pedestrian circulation, including the


60

10 55 10 40
65
10

60

60
15

10
20

45
50

15 60 60
10
10
50

30

60
10

20 20 25
40

20 20 15 20
25 25 20 Ditch 60 45

55

50
20 25 15 55

45
15

15
15

15

50
20 20 40
55

45

15 20

experienced on-
20
60

45

50
70

4 Existing structures on the

50
Plains

20
50

60
5
15

65
40

65
15

20
55 65

o
15 75 70
60

possibility of one or two roundabouts.


10

15
15

5 45
55

55 40 5

60
15 5
10

45
0 70 15 10

55
10

65
40

15
10

40
40
40

going pollution issues


60
10

10

first two ocean-side blocks

35
15

10 15 50
5

55

20
70
10

45
25 20
60
60 60

20
55
15 15

55

50
10

3530

45
65 65 65 30

25
15

contributing to Shellfish

20
60 50

25
are increasingly vulnerable to
15

15

30
40

65 30
0 0.125 0.25 0.5 15

15

20
30

Miles
10

30
20
15

Closures.
60
55

flooding and storm damage.

40
35
Feet 25

10
15

15
40

35

50
0 500 1,000 2,000

20
30
25
10

15

40

40
0

35
55
35 10

45
5
30

30 40 35 0 50
35

Hamlet Study - Montauk | Charrette Process & Results 29


• Consider a new right turn lane for southbound County Road 49 motorists taxi unloading and loading activities separate from through traffic flow on
turning onto Industrial Road County Road 49.

Pedestrians:
Reaction and Take-Aways
• Provide sidewalks along County Road 49 from the station to downtown.
informing next steps
Bicyclists:
Issues and opportunities raised during the workshops were distilled by con-
• Add bike racks at the station. sultants into a list of guiding principles that were voted on as part of the open
gallery. Below are the guiding principles that received ten or more votes:
• Create bike lanes along County Road 49 from the station to downtown.
Montauk Downtown Guiding Principles:
Taxis:
• Move forward with wastewater plan. Include planning for overall water
• A taxi stand is needed near the Surf Lodge to improve safety, by keeping quality not just wastewater

• Evolve toward a “green” resort economy

• Address Seasonal/affordable housing – provide opportunity for “ordinary”


families and businesses

• Acknowledge families that are not part of the resort economy

• Find consensus on sea-level rise assumptions

• Use good data & listen to the science

• Plan for coming generations

• Apply a multi-faceted approach to resilience (managed retreat, relocation,


nourishment, etc.)

Montauk Harbor Guiding Principles


• Keep/enhance fishing village character, creating an integrated community
supporting everyone

• Don’t let redevelopment drive out fishing

• Maintain pack houses (no commercial fishing without it)

• Support hamlet vision including: maintaining a vital fishing fleet; pro-


Participants helped to list guiding principles and then voted for their priorities (top viding affordable housing and retail services to support the year-round
and right). A sketch developed by the consulting team illustrated a framework plan population; maintaining and enhancing open space; and adopting new
for future action: including accommodation, adaptation and evolution. technologies in support of these goals.

30 Town of East Hampton, New York


Hamlet Master Plan

Overall Goal of the ago, a condition which could have a profound effect on courage alternative transportation systems including the Objective 6: Provide opportunities to meet sea-
East Hampton Hamlet Plan the hamlet of Montauk where approximately 64% of East LIRR, the pilot summer bus shuttle bus service, shared sonal employee housing needs.
Hampton’s hotels are located1. Several older hotels have ride and taxi services, the Suffolk County Bus Service,
The Town of East Hampton Comprehensive Plan is the been converted to employee housing in the downtown the Hampton Jitney, walking, biking and other modes of The shortage of employee housing has acute impacts on
foundation and the basis for the Montauk Hamlet Plan. area and the need for continued investment and upgrades travel. Montauk business owners, homeowners, tourists and
Within the context of the Comprehensive Plan, the specif- to businesses and resort facilities must be anticipated. employees themselves. Lack of affordable employee hous-
ic goal of this Plan is to provide the Town of East Hampton Montauk’s recent popularity as a “Hampton’s Hotspot” Objective 4: Enhance and improve walkability ing makes it difficult for business owners to hire qualified
with inspired, achievable, cohesive plans which signifi- is also changing its character and real estate values have and pedestrian safety employees who are often forced to pay for expensive em-
cantly improve the aesthetics, functionality and vitality soared. These conditions provide both opportunities and ployee housing or hire fewer employees. Some seasonal
of the business areas which provide goods and services challenges to improve downtown Montauk and its unique The existing pattern of development, featuring a central employees live in unsafe conditions and work several jobs
for year round residents and support for a major town character. plaza, small lots, wide roadways and service alleys, pro- to pay for substandard housing. Private homes are used
industry. The three Montauk Hamlet master plans—for motes a desirable, walkable downtown environment. But for employee housing affecting the residential neighbor-
the Downtown, Montauk Station, and Montauk Areas ar- Objective 2: Enhance the business area’s unique the downtown needs improved sidewalks, lighting and hoods. Increasing numbers of employees are commuting
eas—depict an aspirational vision for the hamlet; they are aesthetic qualities harmonious with its beach crosswalks to enhance safety and pedestrian mobility. from up west, contributing to heavy traffic congestion.
not specific blueprints, but overall guides depicting how resort and “Fisher Tudor” character. Plans to coordinate pedestrian enhancements with vehic-
potential growth and change can be managed to compli- ular circulation improvements, including some one-way Objective 7: Implement community wastewater
ment rather than detract from the rural and small town The aesthetic qualities and architectural style of down- street designations have been developed for the Town, and stormwater runoff improvements.
character of the Town. town Montauk are unique and eclectic. The dense grid but reaching a consensus has been difficult to devel-
pattern of development was established in the 1920’s and op. Improvements should be integrated with an overall Wastewater management and stormwater runoff im-
General Objectives to Meet Issues of a few Tudor Revival Style buildings, pink sidewalks and streetscape plan. provements in downtown Montauk are essential not only
Concern additional Carl Fisher design features remain prominent. for the viability of the business district but for the fun-
But the overall character today represents a variety of Objective 5: Encourage mixed use development damental health of the economy based on the relatively
A series of general objectives have been de- styles, including beach chic, with no one dominant ar- accommodating year round affordable workforce pristine condition of the environment. Shallow depth to
veloped to address the specific issues raised during the chitectural style. Redevelopment and new development housing groundwater conditions, flooding, small lot size and an-
public workshops, charrettes and planning process. Each could threaten this delicate mix of styles and unique char- tiquated septic systems have caused wastewater contam-
objective is followed by a brief discussion of the specific acter. The need for affordable and workforce housing has reached ination pollution of ground and surface waters. Septic
issue of concern. critical levels in the Town, and in Montauk, the shortag- systems and cesspools are considered inadequate if they
Objective 3: Reduce traffic congestion and es have caused young families to relocate to Springs and need to be pumped more than a few times a year, and, it
Downtown Montauk improve vehicular circulation and parking other areas. The extreme disparity between median house has been reported that some business owners pump their
price and median income in East Hampton has caused septic systems almost daily during the summer season.
Objective 1: Maintain, improve and revitalize Seasonally heavy traffic on Montauk Highway Rte. 27 emergency services volunteers, senior citizens, public According to the Lombardo Associates Comprehensive
downtown Montauk’s remarkable and charming creates mobility problems in downtown Montauk. Man- employees and other year-round residents to be priced Wastewater Plan prepared for the Town, the septic sys-
business district, without harming its special aging seasonal traffic congestion and parking is especial- out of the market. There are a scattering of second story tems on up to 90 percent of the properties in the down-
character. ly challenging because downtown Montauk is an ocean apartments in the downtown area, which contributes to a town area need improvement, but 73 percent of those
beach destination as well as a business area. Devoting vibrant mixed use business area, but without some type of sites lack the space for the installation of an upgraded
Situated directly on the Atlantic Ocean, downtown Mon- too much land to parking lots and road infrastructure improved sanitary waste treatment, environmental con- system. Accordingly, the Lombardo Associates study rec-
tauk has a truly unique character. It is a seasonal resort and would negatively impact Montauk’s rural character and ditions and small lot sizes prevent most new second story ommended advanced, centralized wastewater treatment
year round community where restaurants, retail stores, of- walkability. Traffic flow and parking solutions should en- affordable housing developments. The critical demand for downtown Montauk. Abatement of non-point source
fices, community facilities, motels and ocean beaches are for seasonal employee housing should not overshadow pollution, which has contributed to impaired surface wa-
all contained within walking distance. A majority of East 1
RKG Associates, Inc. 2017 Hamlet Business District Plan Town the need to provide year round affordable housing in the ter conditions, harmful algal blooms and shellfish clo-
Hampton Town’s hotels were built more than 50 years of East Hampton downtown and other areas of Montauk. sures, is also essential.

Hamlet Study - Montauk | Planning & Design Recommendations 31


Objective 8: Increase resiliency and reduce risks Objective 3: Improve traffic circulation and park-
from projected flooding, storms, sea level rise. ing Resilience Strategy Alternatives | Montauk
The risks from coastal flooding, erosion, and sea level
rise are among the most important issues for downtown
Montauk. As climate changes, rising seas and more fre-
Traffic is not as major an issue as it is for downtown Mon-
tauk, but enhancements could help improve functionality
and aesthetics while also reducing driver confusion and
Sea Level Rise
and Resilience Montauk
quent and intense storms will increase the area impacted pavement. Existing parking lots also detract from visual
by coastal flooding. The erosional forces are occurring in quality of the area and ingress and egress causes vehicular
real time and will continue to change the shape of beach- backups at times. Reorganized and shared parking con-
es and landforms. A multi-faceted approach for resil- figurations are needed to improve efficiencies, aesthetics
ience strategies, based on sound science is essential for and functionality.
planning for the future.
Objective 4: Improve pedestrian and bicycle PROPERTY EVENTUALLY LOST
connectivity DUE TO STORM DAMAGE,
RISING HIGH TIDE, OR SHORELINE EROSION
Montauk Harbor Inadequate bike and pedestrian paths discourage walking
and bicycling to the area and through the area. Part of the
BEACH NOURISHMENT ONLY
Objective 1-Support the needs of the commer- attraction and “feel” of the area is derived from the ability
cial and recreational fishing industries to walk around within the working waterfront. For this
reason, completing the missing segments of the existing
With $17 million of annual fish landings, Montauk Har- shore side boardwalk has been a priority for several dec-
bor is the number one fishing port in New York State. De- ades.
clining fish stocks and increased regulations threaten the
viability of the industry nationwide. While the Town has Objective 5: Develop seasonal worker and year
limited or no influence over these major issues, concerted round affordable housing in a fashion which
efforts to support the industry at the local level are need- enhances the maritime character
ed. Affordable housing for fishermen, packing and load- PROPERTY AND BUILDINGS RAISED
ing facilities, docks and other infrastructure are critical. The shortage of affordable year round housing is a seri- TO SAFER ELEVATION WITH ON-GOING
ous problem for fishermen and all the employees in the BEACH NOURISHMENT
Objective 2: Reinforce and enhance the pictur-
esque historic and maritime character of the
Harbor area. With housing prices outstripping incomes
of employees, many workers are being forced to live else-
PROPERTY RAISING + BEACH NOURISHMENT
area as a fishing village and tourist destination, where, reducing the connection these individuals to the
without displacing the fishing industry. community. Seasonal employee housing is also lacking,
and seasonal workers often live in illegal and unhealthy
More than any other location in East Hampton, the Har- conditions. A few motels in the area have been informally
bor area is characterized as a working fishing village. The converted to housing, but the living conditions are gen-
nautical character has also made the dock area an attrac- erally overcrowded and unsafe. Permanent solutions are
tive tourist destination. Improvements are needed, but needed and affordable housing developments should rein-
preserving the area as working waterfront, is essential. force and support the fishing village character of the area.
Preventing displacement of the water dependent uses is PROPERTY PROTECTED AS
critical for the continuation of the fishing industry. The Objective 6: Implement community wastewa- OPEN SPACE BEFORE SHORELINE
harbor can continue to serve multiple economic roles – ter and stormwater runoff solutions to improve RETREAT AND BUSINESSES/RESIDENCES
commercial fishing, charters, marinas and tourism - but water quality and habitat RELOCATED INLAND
needs a master plan to maintain the emphasis on fishing RELOCATING TO HIGHER GROUND
and explore beautification opportunities appropriate to Wastewater management and stormwater runoff im-
the Harbor, rather than a Disneyland idealized version. provements are essential for the health of Montauk Har-

32 Town of East Hampton, New York


bor, the fishing industry and the business district as a Objective 3: Improve bicycle and pedestrian
whole. Boat waste, stormwater runoff, onsite cesspools connectivity
and septic systems have been identified as significant
pollution sources to Lake Montauk, which has experi- The Station is a car-dominated area, physically isolated
enced shellfish closures, bathing beach closures, and oth- from both the Downtown and Harbor areas. The Station
er water quality impairments. A wastewater collection could benefit from pedestrian and bicycle infrastructure
system for the dock properties with transmission to the connecting to the key business area destinations.
proposed Montauk Fire Department wastewater treat-
ment site, as recommended in the Lombardo Associates Objective 4: Improve area to serve as a mul-
Comprehensive Wastewater Plan and the Water Quality ti-modal transportation hub
Improvement Plan is needed. Similarly, implementation
of multiple stormwater abatement projects identified in As the last stop on the Long Island Rail Road, across the
several Town studies is essential. street from the Montauk Fire Station and the Montauk
Playhouse Community Center, the area has unique op-
Objective 7: Increase resiliency and reduce risks portunities for improved organization as a Multimodal
from projected flooding, storms, sea level rise. Transit Center for rail, bus, car, taxi, bike, pedestrian and
community services. Opportunities may also be availa-
The Montauk dock area is highly susceptible to rising ble to provide workforce housing and a small commercial
seas levels, coastal flooding, and storms. Due to its im- area to support train visitors and the local neighborhood.
portance, the dock area has been identified as part of the
Town’s Critical Facilities. A long term strategic approach Objective 5: Improve the visual quality to reflect
is needed to protect the infrastructure and buildings. the historic character of the area

The historic Montauk Manor and Playhouse are visible


from the Station, but otherwise the area lacks cohesive,
Montauk Station welcoming, attractive features and improvements.

Objective 1: Improve traffic circulation and park- Objective 6: Improve the function of the transit
ing area without competing with Montauk’s main
business areas
The Train Station area is traversed by a tangle of uncoor-
dinated streets and improvements. Cars, buses and taxis Downtown Montauk and Montauk Harbor are the two
crowd the train station lot at arrival and departure times main business areas and should continue to provide for
and lack of a designated turnaround causes circulation the needs of year round residents, second homeowners
problems. and tourists. But, improving the functioning of the Train
Station will help support the economy and desirability
Objective 2: Increase resiliency and reduce risks of the existing business areas. Creating a well-organized
from projected flooding storms, sea level rise- transportation hub will improve access to Montauk and
reduce undesirable traffic and congestion.
The Station area is highly susceptible to rising seas levels,
coastal flooding, and storms. Due to its importance, the
area has been identified as part of the Town’s Critical Fa-
cilities. A long term strategic approach is needed to pro-
tect the infrastructure and buildings.

Hamlet Study - Montauk | Planning & Design Recommendations 33


Legend
Relocate
Conceptual Framework: Montauk

5
25 Rail Road Permanent protection

5
20
30

5 5
40

40 35 EHTaxParcels Open Space

EvolvePotential Inundation After 1 Foot of Sea Level Rise


40 35
45
30

25
45 45

5
5 Foot Contours

50

20
25 20
15
25 15
15 15
20 15 15
Water Bodies Potential Inundation After 3 Feet of Sea Level Rise
20

10
15 10

5
50
10 20

40

45
10

25
15

15
20

Overall Conceptual Framework

50
Respond & Adapt
45

20
15
30 25
20

10
25 20
Wetlands Potential Inundation After 6 Feet of Sea Level Rise

15
20 25

20
30

30
20

45 0
20

10
35
20

10

5
40
25 15 20

5
20
15

10

20
5

30
25 15

10
5

25
10

5
20 5

20
20 25 5

20
20

10
5 10

10
5

15

5
20 5

30
5
20 25

35
45

10
40 5

10
55 5

50

15
5

Infill & Accommodate

15
65 5 35 5

10
25 5 30

5
30 50

10

10
60
5

45
5 30

40
10

30
5

40
10 5

15
40 5

The diagrams on this and following pages illustrate a conceptual frame-

30
35 35 5 5
10 25

15
10 5 5

5
30 5 25 25 20 20
5
Montauk 25

35
30

5
20
Destination
5 25 20

5
5 15 10

15
5
30 50 5 5

30

25
Seaplane 5

5
30
5

5
35

20
10
Base

work for Montauk Downtown, Montauk Harbor, and the Transit Center.
55 5

15
40 5

5
5
15 5 15

35

5
60

Points
5
60 5 10

5
5
5 10

5
5

60
60 10 5 10

15
5

5
15
40 5

5
5

5
15

10
55

55
60

5
60

35
65 5 15 5

5
20

10
70

5
65
5

65

20
10

5
5

50
70
15

5
60 20

75

55

5
75
5 5

70

10
65

They show how many of the hamlet’s concerns can be addressed through

5
5

65
45

5
25 15 10 5 20 Montauk

55
Airport

5
55 10 5 5

15
10

5
20

5
15

Bike/Pedestrian Route
15

5
60 65

5
55 25 15 15

a comprehensive approach to access, parking, roadway improvements,

5
25
5

10
5 5

20

10
20
5

10

10
75 5

80
65

75

50
25

55
55

60

10
5

35
80 85 5

10
80
85

70

5
5
5

5
70
Big
pedestrian networks, building location, and open space acquisition. This

10
75
5

5
70

10

15
5 5
Reed

10
15 75
65 5

5
5

5 5

85
5
Pond

5
90 90 5 5
85 95 Montauk 5
80 Montauk

5
conceptual framework also includes a phased strategy to build community
60 60

40
25
Yacht
35

5
5 5
Yacht Club

5
55 5

85
5

85
5 Club 5 5

5
5

10

5
55 Light 5
10

75
70

55
70

5
90 5 5

5
5

5
5

5
5

5
15
60

65
90 10 5

75
70 5

5
5

resilience to coastal flooding and changing shorelines. Over the coming


5 15
80 80
Little
85 15
65

20 15

5
40
80 85 Reed Pond

5
80 90 5

11
11
95

10
100

5
35
0
0
105

75

5
105

15
30

decades, this phased strategy would move existing residential and commer-
85

20
10

5
80 5

35
10 40

115
35

45

30
5

15
30

65
120

5
110
45 5

e
100

70
5
50 11 0 35
12 20

10
95

Av
45

110

5
100

12
cial uses and infrastructure out of low/shorefront areas and replaces these
125

0
10

10
5

0
10
65

95

45
13 5
115 10

14
5

40
12
30

go

13
5 150 125
115

0
55

5
140
70

85

65
0
120 75

12
uses with naturalized buffer areas to mitigate storm damage to property
70
75

60
min
90
70

11

70
35
0

130
55

65
60
65 85

135
5
110

125
120 Suffolk

100
75

95
0

40

90
45

60
25

50
35
12
County

and provide space to accommodate a changing shoreline.


100

0 125

110
45
Fla

12 20

125
80

110
80

5
5

10
5

5
10
115

13

75
5

115

85
95 12

70
125

0 0 45
120 10

70
105 13

65
120
5 85
13
5

100 12 70
10

105
90

95

105
12

105 90 80 5

40
14

95
13 70
95

80
0
0
115

10
110

5 70 75

75
95

105

125

80
13 135 70 60

90
The diagram to the left illustrates a framework of improved bicycle and pe-
120

55
90 0 45

120
95 55
0

95 95 00
12

45
35

95
90

5
10
95

85
12

100

70
95

40
110
70

30

95
85

11
95

90
100

80

10

95
5

5
10

0
5
35

60

65
80

12

125 90
5

destrian routes that link Montauk Downtown, Harbor, and Transit Center
12

55
0 60
40

12 5 115 40 85
80 13 35 105

55
120
135
130
135
0

45
0 120 110
13

11
100
130

20

0
35

11
95
90

and connect these destination points to other areas of East Hampton. The
95 12

105
20
13 0 50
Lake

35
70
5 10
13

120 5

35

11
0

Montauk
5

12

0
130

45

25

115
90

35
135 5

60
12

10
5

105

0
Tuthilll

13
framework also groups strategies for Montauk Downtown, Harbor, and
60

85

0
105

30
80

14

0
0

70
85

10

65
65
Pond 13
5 90
65
65

75 140 5
90

120
40 100 13
55
5

90 85

105
65

80

Transit center into four categories: relocate; evolve; respond & adapt; infill
75 85 95
85

140

25
65 70
40

135
50
60
115

25
70
45

80
50

Montauk
65
0

70
12

65

Montauk Tennis
65

100
140
40

90
85
45
& accommodate. Below is a description of these categories:
5

65
5

Station Auditorium 70
5

Drive
60
75

35 40
55

50 35

95
65

14
11
5

55

Montauk 35
5

5
5

5
5

0
5
115 10

15
60

5 65 10
10 65 6 0 Downs
110
100

5
50

10
5 5 55 5
5

Golf Club 10 13
50

50 5
12
60

15
65

65

35

10
35
10

65

110 40

85
5

5
75

15
35
35

40

Relocate: Teal areas in the diagram are those where this master plan rec-
Montauk

10
35 35 30

15
5

15

0
ke
5

5 115
5 Manor
55
10

5
30

10 75 5
5 5 5 100 12 120
40

10
50

5
5 5
45

80 110

West La
25

5 5 5 5 45
35

80
40

40
10

ommends relocating infrastructure and businesses within the lowest and


5 10
30

75

40

5 55
80

5 25 10
15

30
20

5 5
5
5

40
0
5

70
5 5
5
55

5
5

65 5
5

5 10 10
5

5 5 15
75

5
85
90

75

most vulnerable areas to higher ground. This include relocating a power


70

5 5 5 55 80

20
5
5

80

20 5 5 Fort Hill 75
5

50

10
10
5

45

45

10
5

20
50

15
Cemetery
10

10 70
5

55 Montauk 60 25
80

60
85
5

60
5
80

30
45

Downs 75

10
5

5 5 5
55

substation off of Industrial Road to higher ground at the Montauk Transfer


State Park
75

5
65
5
5

65

5 5 80
75 8
5

5
5
60

0 50
15

50
50
75

50
5
5

5 75 60
85

20

70 75 60
60

25
30

Station. It also includes relocating existing businesses and services from


25 65
65

45
45
5 85 50

25
80 50
65

10 40
5

55 65

10
5

55
65
70

85 5 65 45
50

25
55

90
60

75
65

20
20

75
70 65 85

the low lying area between Fort Pond and the Ocean and using this area for

60
80

60

5
65

65 55
65
70

75

50
30 60 10

70
80
70

15
15

20
70

80
60
60

85 55 60
15

Stepping
75

55
20
h Edgemere St

45
60 60

additional surface parking and recreational open space. Such relocations


70

85
25
55

20
95
Fort Stones 90
60

50

85
20
10

125
80

105
5

120
Pond 65
Pond
65

120 80

100

35
15
65

15
80 0

95
15
25

80
60

65
9

20

120 125

would likely need to be implemented through acquisition of property by


20
75

20
60
100

130 70 85
30

55

40
60
80

55
25

75

90

85

45
35

105 60
10

90
80

12

90
20
75

5 90 30 50
45 85 80
90

10
55

90
80

20
35
5

the Town as open space.


115
60

120 30
20

50
40

5 20
95

75

12
15
65
5

50

120 75 70 90 20 90
80

45
20
0
80

14 85
40

25

20
Essex St

145 10
Montauk 30 80
30

5
30

20
25
75

30
10
15

Public
10

7 20
80 5
0

35
0
14

60
10
30

70

School 70
10
60

65
80

135 65

55
85
10

130
10
55

30
10
80

140

45
25

75
80
75

20 40 15 10 35 60
So u t

35
135
55

Respond & Adapt: Areas in yellow represent additional low-lying and


25

60
85

Montauk 35 30
70

30 30 50
30

15

135
90

75

65
50 75 30
85

85

125 25
35

45
25
40

110
75

85 50
75

10

100 10 55
25

75 90
80

80
85 20 85
20

15 60
60

55
95

90
25

shorefront areas at risk for flooding and storm damage. In these areas, we
80
30
25

70

85
70

Monta
25

55
55
45

25

75

uk Highway

30
80 55

55
75

55 5
25

6
30 25
85

70
20

60
55

60
75

5
55

60
80 75 10 65
25
60

30 55

55
55
40

propose techniques that build resilience through changes to infrastructure


60 70
25

30
25

60

10
30 5
25
5
60 65 75
45

60
50

70 25 10
55

70

55
60

85

25
20

45
60

25

75
30
80

70 55
85

15

Perry B 15

70
45 40 80
55
75
50

40 25 10
60

45
Duryea Junior

65
5
Montauk
60

80

like raising buildings and infrastructure, shoreline armoring, and mar-


85 50 45 5 50
20

75 6 65 60 55 70
75

25

60 5 Post Office Community 80 85 55


25
75

75
60
50

60
15

30
40

15

25

65 70
Church
75

15

70

60
60 60 90 5

65
30

25
80

70
Saint Therese

45
75

50

45
35
75

60 40

ket-based relocation strategies that incentivize existing property owners


10

80
75 75 of Lisieux 40
25

65
65 10
5

40 Church 45 30
75

75 70
60

90

50

10
50

20
45

30
50

55
35

0 85

45
55 6
35

85
20
65

10

25

40
20
50

50

35
45

and developers to gradually shift vulnerable uses to higher ground.


30 25

40
40

55
35

40
40
20
35

25
5

65
60

10

10
40

15

40
55

20

40 65 20 30 45
45

Infill
5
10

40 5

45

30
25
45
65

60 20
5

60

40
65

20
5 50 45

20
70

55
65

20 20 5
15

10 65 65
70

10 50
60

10 55 10 40
65
10

60

60
15

10
20

45
50

15 60
60
10
10
50

30
60
10

20 20 25
40

20 20 15 20
25 25 20 Ditch 60 45
55

50
20 25 15 45 55
15

15
15

15

50
20 20 40
55

45

20 15 20
60

45

50
70

50
Plains

20
50

60
5
15

65
40

Infill & Accommodate: Areas in pink are areas that could accommo-
65
15

20
55
65

o
15 75 70
60
10

15
15

5 45
55

55 40 5

60
15 5
10

45
0 70 15 10

55
10

65
40

15
10

40
40
60 40
10

10

35
15

10 15 50
5

55

20
70
10

45
25 20
60
60 60

date uses relocated from lower areas as these lands are acquired by the town

20
55
15 15

55

50
10

3530

45
65 65 65 30

25
15

20
60 50

25
15

15

30
40

65 30
0 0.125 0.25 0.5 15

15

20
30

Miles

or as open space is created through the sale and sustainable redevelopment


10

30
20
15

60

55

40
35
Feet 25

10
15

15
40

35

50
0 500 1,000 2,000

20
30
25
10

15
40

40
0

of private property.
35
55
35 10

45
5
30

30 40 35 0 50
35

34 Town of East Hampton, New York


My-Mo 50

50

60
20 Apartments 55 65
East by Street
h Ely

Concept Diagram, Phase 1: Montauk Downtown


Northeast
Sout

25

55
55
50

Mixed Use Infill


ive
50

60
Dr
oy

50
Elr

Montauk Highw

50
th

50 Oceanside
u
So

45
Beach

50
Resort

50
15
Relocated Resort Use

55
50 55
50

45
40

60
5

35

Fa eet
55

Str
rad
30
Affordable Housing

ay
Fort Pond 40
25
Lodge Montauk
50 Motel

Street
45

40

Edgemere

20
Unna
Montauk

Bike Route
Motel Pamela's

med
Montauk New
45

40
Brewing Beginnings

Street
St.
Co. Neptune
Peter's 40
Catch Motel
25
ue J&P 60
ven
Sec

Pool, Spa
E rie A
45 th & Patio 20
Sou
o

Soul

55
nd

Cycle

10
Ho u

15

Street Improvements

60
se R

John 55 10
40 Ecker
oad

5 Inc.
15
just
40

Perry B

55
P
Cinnabar sold
Duryea Junior 50 55
Group Inc.
20
Post Office Montauk

15
5

Green Space
Fort Pond

10
Native Montauk Community
15 Fuels,
Church
35

Plant
5 Martell's Etc.

Driv
Stationery
30 15 0
15 Montauk Store

e wa
BuddahBerry Market Deli 55
Happy
Frozen

y
Air & Bowls
Yogurt Café 15 speed

Parking
Muse ue

P
ven
Fort
board shop
@ the id A

P
End th Eucl
Sou Calypso Montauk Printing
Vintage

Pond & Office Pink


Supplies Naturally 35
25

Good Foods

25
10

Ro

20
Gary-Lynn & Café
20

White's Drug White's

ad
Apts. Sausages
&Department Liquor
40

One-way Traffic

I
35

Store Store

Essex Street
Bridgehampton 50
15

National Bank Montauk


Dazies wa y
igh
kH
tau
15 Mo n

Downtown Master Plan:


Saint Therese

P The Gig of Lisieux

50
Shagwong Shack
Chase Tavern Herb's Church
Bank Montauk

Phase 1
Harvest on Nellie's Market
Deli Share
Fort Pond with…

Edison Street
Kailani Montauk
Mainstay Garden

The Pl
Candy La Brisa Center

e
South Etna Avenu

aza
The Lido

The first proposed improvements to


10 Suffolk
Marshall & Montauk County
Sons Service Chamber of National Bank
Lido Station Commerce
Resort Yoga Lila

downtown would relocate existing


Martha Studio & Sweet Tauk -

South Embassy Street


Green Real Boutique Aimees Red Hook Margret
Bliss Estate Closet Lobster Pound Hayes PT
Strawberry El Vaquero
Fields
Meeting Montauk Gansett

uses in the low, flood-prone area be-


Ronnie's Liquors
House Lane Deli Lane China Town
John's Medical & Wines Wave Home Restaurant Waves

P
Drive-in Wok N Wear
ay Montauk John Keeshan 20
Restaurant ighw Roll
ery Street

H Corner
tauk Real Estate

tween Fort Pond and the Ocean. This


Citgo
10 Mon Store Kelly B.
Left Hand
Coffee
South Em

P
Pizza Montauk

land would be acquired by the town


Cynthia Village Beer & Bird on
5 5 Rauley Soda
Memory the Roof
Motel/Bar Montauk
5 Puff N Laundromat Surfside Avenue
Putt

and protected as open space, or re-


7-Eleven
South Elmwood Avenue
Woodbine
Collection Driveway

configured for additional surface


The Malibu

e Infill
5 Motel
5 Busy Bodies
5 Daunt's A Wave Exercise

15
Zum

South Edgemere Street


Inn Studio/Yoga

parking for visitors to downtown.


Wave 10 Albatross
Schneider 10 West
Crest II

15
Montauk Highway Montauk Concerned
The Antique 15
Oceanside Citizens
Beach Lumber of Montauk 10
IGA -

Displaced uses would be absorbed


Resort Company

Driveway
Montauk
Royal
South Elder Stree

P
Atlantic

d Resort Use
South Eagle Street

Born Born North

15
Ocean Sole East
Free Free I
Beach

as infill within the downtown core.


Wavecrest Resort

10
10
Montauk Sands ? Motel II Inn

Driveway
10

Village Dune Motel Surf

15
Club

15
10

Apartment

10
10

Wastewater improvements would also


10
t

10
10

e Housing South Emerson Avenue


Sloppy
Royal
Atlantic

allow for existing one-story build-


10 Tuna
15
15

15
Royal 25

15
Montauk Atlantic
20

ings downtown to be reconfigured as

15
20 Blue Hotel
20 Ocean 20
Ocean End Surf Motel
20 Apartments 20

Legend
25

15 25 15
15 20

15
15
15

20 25

two story buildings with second sto-


15

e
25

20

25 15
20
25

25
15

25
25 5 Foot Contours
20

ry apartments. This infill would be


25 20

20 Water Bodies

provements
15

10
5 Rivers and Streams directed to areas around Carl Fisher
Wetlands
circle currently used for surface park-
Permanent protection
ing and other low-density nursery
5

ace
Open Space
uses. Parking would be expanded in
0

lower-lying areas outside of this core


within easy walking distance. This

o
combined with improved crosswalks

RTH
and sidewalks would make the center

NO
of downtown into a more pedestri-
an-oriented, walkable area.

Hamlet Study - Montauk | Planning & Design Recommendations 35


My-Mo 50

50

60
20 Apartments 55 65
East by Street
h Ely

Concept Diagram, Phase 2: Montauk Downtown


Northeast
Sout

25

55
55
50

Mixed Use Infill


ive

50

60
Dr
oy

50
Elr

Montauk Highway

50
th

50
Oceanside
u
So

45
Beach

50
Resort

50
15
Relocated Resort Use

55
50 55
50

45
40

60
5

35

Fa eet
55

Str
rad
30
Affordable Housing

ay
Fort Pond 40
25
Lodge Montauk
50 Motel

Street
45

40

Edgemere

20
Unna
Montauk

Bike Route
Motel Pamela's

med
Montauk New
45

40
Brewing Beginnings

Street
St. 25
Co. Neptune
Peter's 40 2
Catch Motel
25
ue J&P 60
ven
Sec

Pool, Spa
E rie A
45 th & Patio
Sou 20
o

Soul

55
nd

Cycle

10
Ho u

15

Street Improvements

60
se R

John 55 10
40 Ecker
oad

5 Inc.
15
just
40

Perry B

55
P
Cinnabar sold
Duryea Junior 50 55
Group Inc.
20
Post Office Montauk

15
5

Green Space
Fort Pond

10
Native Montauk Community
15 Fuels,
Church
35

Plant
5 Martell's Etc.

Driv
Stationery
30 15 0
15 Montauk Store

e wa
BuddahBerry Market Deli 55
Happy
Frozen

y
Air & Bowls
Yogurt Café 15 speed

Parking
Muse ue

P
ven
Fort
board shop
@ the id A

P
End th Eucl
Sou Calypso Montauk Printing
Vintage

Pond & Office Pink


Supplies Naturally 35
25

Good Foods

25
10

Ro

20
Gary-Lynn & Café
20

White's Drug White's

ad
Apts. Sausages
&Department Liquor
40

I
35

One-way Traffic
Store Store

Essex Street
Bridgehampton 50
15

National Bank Montauk


Dazies wa y
igh
kH
tau
15 Mo n

Saint Therese

P The Gig of Lisieux

50
Shagwong Shack
Church

Downtown Master Plan:


Chase Tavern Herb's
Bank Montauk
Harvest on Nellie's Market
Deli Share
Fort Pond with…

Edison Street
Kailani

Phase 2
Montauk
Mainstay Garden

The Pl
Candy La Brisa Center

e
South Etna Avenu

aza
The Lido Suffolk
10
Marshall & Montauk County
Sons Service Chamber of National Bank
Lido Station Commerce
Resort Yoga Lila

The second phase of Downtown im-


Martha Studio & Sweet Tauk -

South Embassy Street


Green Real Boutique Aimees Red Hook Margret
Bliss Estate Closet Lobster Pound Hayes PT
Strawberry El Vaquero
Fields
Meeting Montauk Gansett

provements would incentivize the re-


Ronnie's Liquors
House Lane Deli Lane China Town
John's Medical & Wines Wave Home Restaurant Waves

P
Drive-in Wok N Wear
Montauk
Restaurant Hig hway Roll John Keeshan 20
ery Street

Corner
Citgo tauk Real Estate

location of hotel and resort uses from


10 Mon Store Kelly B.
Left Hand
Coffee
South Em

P
Pizza Montauk

the ocean-side inland and improve the


Cynthia Village Beer & Bird on
5 5 Rauley Soda
Memory the Roof
Motel/Bar Montauk
5 Puff N Laundromat Surfside Avenue
Putt

resilience of these businesses to storms.


7-Eleven
South Elmwood Avenue
Woodbine
Collection Driveway

Existing resort zoning is restrictive


The Malibu

l
5 Motel
5 Busy Bodies
5 Daunt's A Wave Exercise

15
Zum

South Edgemere Street


10 Albatross Inn Studio/Yoga

enough that little or no development


Wave
Schneider 10 West
Crest II

15
Montauk Highway Montauk Concerned
The Antique 15
Oceanside Citizens
Beach Lumber of Montauk 10
IGA -

has occurred on the ocean-front in


Resort Company

Driveway
Montauk
Royal
South Elder Stree

P
Atlantic

ort Use
South Eagle Street

Born Born North

15
Ocean Sole East
Free Free I
Beach

recent decades. We propose allowing


Wavecrest Resort
10
10
Montauk Sands ? Motel II Inn

Driveway
10

Village Dune Motel Surf

15
Club

15
10

Apartment
10

10

potential resort/hotel developers to


10
t

10
10

using South Emerson Avenue


Sloppy
Royal
Atlantic

purchase and transfer development


10 Tuna
15
15

15
Royal 25

15
Montauk Atlantic
20

rights (hotel or condo units) from


15
20 Blue Hotel
20 Ocean 20
Ocean End Surf Motel
20 Apartments 20

Legend
25

15 25 15
15 20

15
15
15

20 25

ocean-side property owners to the sec-


15
25

20

25 15
20
25

25
15

25
25 5 Foot Contours
20

ond row of resort uses, shown in red on


25 20

20 Water Bodies

ments
15

10
5 Rivers and Streams the diagram to the left. This Transfer
Wetlands
of Development Rights would be con-
Permanent protection
tingent upon incorporating resilience
5

Open Space
strategies into new hotel designs, such
0

as floodable first floor parking with


breakaway walls. Ocean-front parcels

o
and the adjacent right of way, in turn,

RTH
would be protected from development

NO
and renaturalized through dune grass
planting and sand fencing.

36 Town of East Hampton, New York


My-Mo 50

50

60
20 Apartments 55 65
East by Street
h Ely

Concept Diagram, Phase 3: Montauk Downtown


Northeast
Sout

25

55
55
50

Mixed Use Infill


ive
50

60
Dr
oy

50
Elr

Montauk Highw

50
th

50 Oceanside
u
So

45
Beach

50
Resort

50
15
Relocated Resort Use

55
50 55
50

45
40

60
5

35

Fa eet
55

Str
rad
30
Affordable Housing

ay
Fort Pond 40
25
Lodge Montauk
50 Motel

Street
45

40

Edgemere

20
Unna
Montauk

Bike Route
Motel Pamela's

med
Montauk New
45

40
Brewing Beginnings

Street
St.
Co. Neptune
Peter's 40
Catch Motel
25
ue J&P 60
ven
Sec

Pool, Spa
E rie A
45 th & Patio 20
Sou
o

Soul

55
nd

Cycle

10
Ho u

15

Street Improvements

60
se R

John 55 10
40 Ecker
oad

5 Inc.
15
just
40

Perry B

55
P
Cinnabar sold
Duryea Junior 50 55
Group Inc.
20
Post Office Montauk

15
5

Green Space
Fort Pond

10
Native Montauk Community
15 Fuels,
Church
35

Plant
5 Martell's Etc.

Driv
Stationery
30 15 0
15 Montauk Store

e wa
BuddahBerry Market Deli 55
Happy
Frozen

y
Air & Bowls
Yogurt Café 15 speed

Parking
Muse ue

P
ven
Fort
board shop
@ the id A

P
End th Eucl
Sou Calypso Montauk Printing
Vintage

Pond & Office Pink


Supplies Naturally 35
25

Good Foods

25
10

Ro

20
Gary-Lynn & Café
20

White's Drug White's

ad
Apts. Sausages
&Department Liquor
40

I
One-way Traffic
35

Store Store

Essex Street
Bridgehampton 50
15

National Bank Montauk


Dazies wa y
igh
kH
tau
15 Mo n

Saint Therese

P The Gig of Lisieux

50
Shagwong Shack
Chase Tavern Herb's Church
Bank Montauk
Harvest on Nellie's Market
Deli Share
Fort Pond with…

Edison Street
Kailani Montauk
Mainstay Garden

The Pl
Candy La Brisa Center

Downtown Master Plan:


e
South Etna Avenu

aza
The Lido Suffolk
10
Marshall & Montauk County
Sons Service Chamber of National Bank
Lido Station Commerce
Resort Yoga Lila

Phase 3
Martha Studio & Sweet Tauk -

South Embassy Street


Green Real Boutique Aimees Red Hook Margret
Bliss Estate Closet Lobster Pound Hayes PT
Strawberry El Vaquero
Fields
Meeting Montauk Gansett
Ronnie's Liquors
House Lane Deli Lane China Town
John's Medical & Wines Wave Home Restaurant Waves

P
Drive-in Wok N Wear
ay Montauk John Keeshan 20
Restaurant ighw Roll
ery Street

H Corner
tauk Real Estate

As sea level continues to rise, additional


Citgo
10 Mon Store Kelly B.
Left Hand
Coffee
South Em

P
Pizza Montauk

resort and mixed uses would be relocated


Cynthia Village Beer & Bird on
5 5 Rauley Soda
Memory the Roof
Motel/Bar Montauk
5 Puff N Laundromat Surfside Avenue
Putt

upland to form a new resort/mixed use


7-Eleven
South Elmwood Avenue
Woodbine
Collection Driveway

corridor along Essex Street. The develop-


The Malibu

e Infill
5 Motel
5 Busy Bodies
5 Daunt's A Wave Exercise

15
Zum

South Edgemere Street


Inn Studio/Yoga

ment of this new corridor would gradually


Wave 10 Albatross
Schneider 10 West
Crest II

15
Montauk Highway Montauk Concerned
The Antique 15
Oceanside Citizens
Beach Lumber of Montauk 10
IGA -

shift the center of downtown toward the


Resort Company

Driveway
Montauk
Royal
South Elder Stree

P
Atlantic

d Resort Use
South Eagle Street

Born Born North

15
Ocean Sole East
Free Free I
Beach

intersection of Essex and Montauk High-


Wavecrest Resort

10
10
Montauk Sands ? Motel II Inn

Driveway
10

Village Dune Motel Surf

15
Club

15
10

Apartment

10
10

way--higher ground. This phase also in-


10
t

10
10

e Housing South Emerson Avenue


Sloppy
Royal
Atlantic

cludes elevating Montauk Highway in the


10 Tuna
15
15

15
Royal 25

15
Montauk Atlantic
20

low area between Fort Pond and the ocean.

15
20 Blue Hotel

“Feeder Beach”
20 Ocean 20
Ocean End Surf Motel
20 Apartments 20

Legend
25

15 25 15
15 20

15
15
15

20 25

Nourishment Area We also propose incorporating alternative


15

e
25

20

25 15
20
25

25
15

25
25 5 Foot Contours
20

beach nourishment practices. For example,


25 20

20 Water Bodies

provements
15

10
5 Rivers and Streams a "Feeder Beach," where nourishment sand
Wetlands
could be deposited on the "updrift" side of
Permanent protection
the main beaches for downtown and al-
5

ace
Open Space
lowed to distribute using natural currents.
0

This has the potential to allow for cost sav-


ings in construction hours and to minimize

o
disturbance to the naturalized dune area

RTH
as the town faces more frequent and costly

NO
beach nourishment.

Hamlet Study - Montauk | Planning & Design Recommendations 37


Recommended Master Plan, Phase 1: Montauk Downtown

Existing One Story Building Converted to


Two Story Building with Residential Above Improved parking Improved crosswalks Grocery uses relocated
on interior alleys
Proposed Infill Buildings with push-button from breach zone to
lighting and bumpouts higher ground
One-way Traffic Flow

Shared parking lot in flood prone area


adjacent to existing tennis courts.

Essex St
New Traffic Circle
St
rie
S. E Downtown Master Plan:
Phase 1 (Illustrative)
Service Station reoriented for
parking and vehicle-oriented uses
This illustrative master plan provides
behind, storefront facing street. one vision of how Phase 1 improve-
ments could shape the landscape of
ve
clid A Downtown Montauk. The configu-
S. Eu
ration of buildings and infrastruc-
Existing uses in “breach zone” ture would emerge, over time, as the
relocated to infill sites uphill.
combined result of individual devel-
opment projects guided by the Town.
If desirable, design guidelines or a
form-based-code could provide ad-
.
S. Emery St

Mixed uses relocated ditional control over the architectur-


a y from breach zone al character of individual buildings
ighw

S. Essex St
uk H and landscapes.
nta
Mo

S. Edgemere St.
S. Elmwood Ave

S. Edison St
S. Embassy St.

This is not intended to be a growth


plan, but rather a strategy for relo-
New affordable housing cating existing density from more
units vulnerable areas of Downtown Mon-
S. Emerson Ave tauk and allowing property owners
to build to density already allowed
under zoning in areas less-suscep-
tible to storm damage. Infill and
Improved/expanded sidewalks
second-story additions do have the
and drainage within common. potential to increase the amount of
Expanded parking area off of Montauk Highway more affordable housing downtown.
reduces traffic entering the downtown. Expanded shared-parking This phase also proposes specific lo-

RTH
area located behind existing cations for affordable housing devel-
Infill creates a pedestrian-oriented

NO
businesses
node out of existing parking areas. opment: for example, the corner of
South Etna and South Edison.

38 Town of East Hampton, New York


Existing Conditions: Montauk Downtown

Hamlet Study - Montauk | Planning & Design Recommendations 39


Safer crosswalks utilizing bumpouts and
Phase 1 - Uses Relocated: Montauk Downtown push-button lights to increase visibility. Second story residential provides
more affordable housing options.

Shared parking lot in flood prone area


adjacent to existing tennis courts. New traffic circle with
pedestrian crosswalks.

Mixed uses relocated


from breach zone.

Service Station reoriented for


parking and vehicle-oriented uses
behind, storefront facing street.

Existing uses in “breach zone”


relocated to infill sites uphill.

New affordable
housing units

Expanded parking within easy


walking distance of downtown.

Existing One Story Building Converted to


Two Story Building with Residential Above
Expanded parking area off of
Montauk Highway reduces traffic
entering the downtown. Proposed Infill Buildings

40 Town of East Hampton, New York


Phase 2 - Hotels Raised & Relocated: Montauk Downtown
Additional mixed uses relocated
from low-lying areas shift the center
of downtown uphill to Essex Street
and Montauk Highway.

Additional low-lying areas


protected as Open Space and
existing uses relocated uphill.

Prospective hotel developers purchase


ocean-side block and concentrate allowed
density on second block from ocean. See
Transfer of Development Rights diagrams.

Existing first ocean-side block


renaturalized with dune fencing and
plantings. Dunes provide a buffer
between ocean and downtown for
storm surges.

Hamlet Study - Montauk | Planning & Design Recommendations 41


Phase 3 - Resort Uses Shift to Essex: Montauk Downtown
Hotel uses relocated from ocean-front
uphill to Essex Street and Montauk
Highway.

42 Town of East Hampton, New York


Transfer of Development Rights - Typical Block - Existing Conditions
A B

A
This diagram depicts an imaginary hotel block that is
based on the typical lot dimensions and typical building
sizes found along the Montauk oceanfront. In this im-
aginary block, as in reality, few if any existing developed
properties meet the 15% building coverage maximum,
C the 84,000 square foot minimum lot size or the 6 or 12
units per acre maximum depending on unit type. This is
because the hotels along the ocean were built at a time
when different zoning requirements were in force. For
example, building coverage in this imaginary block is as
follows:

Owner A: These parcels under common ownership have


a total area of 65,000 square feet. 28% of this total area is
occupied by the building footprint.

Owner B: 28% of this 20,000 square foot lot is occupied


by the building footprint.

Owner C: 28% of this 75,000 square foot lot is occupied


by the building footprint.

Based on building coverage alone, none of these motels


can expand. In this imaginary existing block, the hotels
contain 40 units per acre, meaning a combined 165 units
within parcels A, B, and C.

Hamlet Study - Montauk | Planning & Design Recommendations 43


Transfer of Development Rights - Typical Block - Future, No Action
A+B

A+B

C If Owners A and B were to combine their properties for


redevelopment, the 15% maximum lot coverage would
restrict the new seaside hotel to a footprint approximate-
ly 50% smaller than existing buildings. Given that there
is a two floor maximum hotel height, this footprint could
accommodate approximately 56 hotel rooms each having
450 square feet. Applying the current zoning maximum
density requirements would further reduce the potential
number of motel units to 23 units.

All these requirements have tended to prevent property


from being redeveloped in the two blocks near the ocean
and have protected this area from higher density develop-
ment. However, the existing hotels in the most seaward
row are currently susceptible to damage from coastal
storms. They also take up the space that might otherwise
be occupied by natural dunes, which would provide shel-
ter for downtown. As sea levels continue to rise, the risk
of damage to these buildings will likely increase. Beach
nourishment costs by the town will also likely increase as
the rate of coastal erosion increases.

44 Town of East Hampton, New York


Transfer of Development Rights -Typical Block - Future, Transfer of Development Rights
A+B

C+R.O.W.

A+B

A Transfer of Development Rights approach could al-


low existing hotel owners to profitably redevelop their
property, while also allowing the first row of hotels in
Montauk to be returned to an area of natural dune-build-
ing. In this approach, a developer interested in building in
C+R.O.W. the second row of hotels could increase the allowable density by
purchasing property on the first row (for example, from Owner C).
The developer could then count the area from parcel C as well as the
abandoned right of way toward the lot size used to calculate the build-
ing potential and gain unimpeded seaside views and direct beach access
over newly built dunes.

In exchange for this Transfer of Development Rights, the developer could be re-
quired to incorporate aesthetic and resilience strategies into their new hotel, such as
tastefully designed, floodable first floor parking. Parking under new buildings could
be tastefully masked from the street and garden spaces using a combination of existing
site topography, porches, and architectural/vegetative screenings.

In this illustration, the new seaside motel could accommodate 75 motel rooms and complies
with the maximum building lot coverage, unit size, parking, height and layout design zoning re-
quirements through a TDR exchange. However, without advanced sewage treatment, Suffolk Coun-
ty Health Department standards would restrict new development on the combined acreage to 8 motel
or 5 resort type units. Provided advanced sewage treatment were provided, current zoning would limit
the hotel to 54 motel units. This is based on a lot area of 195,000 sf, including the abandoned right-of-way
(lot area/3630).

Hamlet Study - Montauk | Planning & Design Recommendations 45


5
I s s u e s a n d O p p o r t u n i t i e s : fM
o ro M
n toanutka uHka rHbaorrb o r
5

0
10

Sun N' Sound Motel

Jetty causes severe beach erosion.


Montauk Soundview

15
10

15
15 10
15
10

20
15

West Lake Dr loop segment passes


10 15

10
10
15

gL ot
Parkin
undeveloped lots, and is built 10

upon a rock revetment which 10

Soundview Drive
encourages beach erosion.

10
20

10

10

20
Small undeveloped parcels

15
zoned Resort are unlikely to be Culloden House West
Gosman's Restaurant

developed individually due to lot


Culloden House East

coverage requirements.

20
10

Blue Haven Motel

10
Numerous hotels form a
significant part of Montauk
20 25
10

25

15
5

15

Harbor’s landscape and economy. Forsberg Motel


10

15

Undeveloped parcel lies partly West Lake Inn

within the 500 year flood zone.


Uhlein's motel
5 5 Gosman's Clam Bar

Rod & Reel Motel

Much of Montauk Harbor is low- 20

The diverse cluster of buildings at


5
10

lying and vulnerable to rising seas. We


ll sA
ve Gosman’s dock caters to tourism,
nu
5

e Zorba's Inn

5
retail, and dining, with its parking
Sail Inn
5

Dock Restaurant
consolidated across the street.
Un
Oversized intersection 10

10
na
m
ed
St
is difficult and e
re
et
ue

Driv
ake
Gaviola's Montauk Market
Kirk Aven

dangerous for both We


st L

cars and pedestrians.


Finest Kind Wines & Liquores 10

Ben & Jerry's Inc Cream

Uihlein's Marina & Boat Rentals

Swallow East

Ann Breyers Cottages

Clam & Chowder House @ Salivars Dock

Jet's Marine Service & Transporting


Dave's Grill

A boardwalk offers a pleasant walk


5
along much of the waterfront, but
segments of it are incomplete.
mp
Ra
5

Sammy's Restaurant
5

ue
40’ setbacks for WF zoning Montauk Harbor’s working
5

Aven
vacant retail buildings

Flam
ingo
Lake Montauk experiences encourage parking lots by the street waterfront is an important part of
5
on-going pollution issues instead of buildings, which causes the hamlet’s culture and economy,
contributing to shellfish open paved areas to dominate this but needs certain infrastructure and
closures. area’s character. services like a fish processing facility.

East Hampton Hamlets Study Montauk Harbor


o
Kenny's Tipperary Inn

Four Oaks Bakery

Вам также может понравиться