Surcharge Embankment Soil This method accelerates the settlements pressing the

method Surcharge Improvement design weight of planned embankments or structures


Method (Accelerated on soft sipil ground.The weight is used the extra fill
Consolidation) method at many times, and other method are surcharge
Vacuum Soil method and pre-loading method etc. Surcharge
Consolidation Improvement method is available at embankment section and pre-
Method (Accelerated loading method is available at structure section. Pre-
Consolidation) loading method is effective against interal flow
Unwatering Soil prevention.
method Improvement
(Accelerated
Consolidation)

Vertical Sand drain Soil This method, locates the sand pillars or cardboards etc.
drain method Improvement to vertical direction on equal space, increases soil
method (Accelerated intensity due to acceleration of consolidation by
Consolidation) reduction of consolidation length in horizontal
Paper drain Soil direction. The method name is decided by vertical
method Improvement drainage materials. Construction method has some
(Accelerated kinds such as sand pillars, the constructed after press
Consolidation) into the ground by vibration, after impavion of
steel/pile or one by waterjets
Sand or Sand Soil It compacts soft soil layer and increases a bearing
Crushed compaction Improvement capacity by compacted sand or crushed stone pile
stone pile method (compaction) which will be located in the ground. Specially , this
compaction Crushed Soil method has some effects to keep stability by shear
pile method stone Improvement resistance of pile materials for sliding failure on ground.
compaction (compaction)
pile method
Soil Lime pile Soil Lime pile method makes pillars by slaked lime in the
solidification method Improvement ground and solidificates the soft soil ground by the dry
Method action and chemically bonds. As a result, it increases
stability and reduce settlement. Deep mixing method of
Deep mixing Soil soil stabilization is to mix the soft soil and solidification
method of Improvement materials such as slaked lime, cemens milk and mortal.
soil This method gets the soil intensity soon and it reduces
stabilization the settlement. But since this method is high
construction cost, it must compare one with other
method .