Вы находитесь на странице: 1из 14

Requirement of Material for the Month up to April - 2017

SR NO ITEM AREA DETAIL UNIT QTY REMARKS

Condidering handing
1 Plain Cement Concrete Balance area of wing B M 15 CU.M 80 over of wing B for pcc
on 1/4/17

2 Bricks North side Retaining wall and South-East corner 9 " Thick Brick work Nos 30000 Area planned
Retaining wall 260 Sq. M.

3 cement North side Retaining wall and South-East corner OPC Bags 100 Area planned
Retaining wall 260 Sq. M.

Pour D and E, As per approved pour plan M 30 CU.M 519


Considering handing
Over of wing B for
4 RCC placing Reinforcement
steel on 16/4 / 2017
Columns up to 2nd basement bottom- Wing A M 50 CU.M 68
Pedestal over pour 1 and 2 - Wing A M 50 CU.M 17
Retaining Wall- Wing A M 50 CU.M 84

8 mm M.T. 7
10 mm M.T. 10
Fixing of wing B Raft, Columns and Retaining Wall 12 mm M.T. 8 Considering handing
5 Reinforcement Steel up to 2nd Basement level and Wing B Raft and 16 mm M.T. 10 Over of wing B for
1st lift provisional quantity for Cutting and placing Reinforcement
Bending 20 mm M.T. 45 steel 16/04/2017
25 mm M.T. 47
TOTAL 127
Requirement of Material for the Month up to May - 2017

SR NO ITEM AREA DETAIL UNIT QTY REMARKS

Condidering handing
1 Plain Cement Concrete Balance area of wing B M 15 CU.M over of wing B for pcc
on 1/4/17

2 Bricks North side Retaining wall and South-East corner 9 " Thick Brick work Nos 25000 Area planned
Retaining wall 260 Sq. M.

North side Retaining wall and South-East corner Area planned


3 cement Retaining wall OPC Bags 100 260 Sq. M.

Pour D and E, As per approved pour plan M 30 CU.M 519


Considering handing
4 RCC Over of wing B for
placing Reinforcement
steel on 25/4 / 2017
Columns up to 2nd basement bottom- Wing A & B M 50 CU.M 75
Pedestal over pour 1 and 2 - Wing B M 50 CU.M 18
Retaining Wall- Wing A & B M 50 CU.M 95
Slab Wing A M30 CU.M 160

8 mm M.T. 7
10 mm M.T. 10
12 mm M.T. 8 Considering handing
Fixing of wing B Raft, Columns and Retaining Wall up
16 mm M.T. 10 Over of wing B for
5 Reinforcement Steel to 2nd Basement level and Wing B Raft and 1st lift placing Reinforcement
provisional quantity for Cutting and Bending 20 mm M.T. 45 steel 25/04/2017
25 mm M.T. 47
TOTAL 127
Requirement of Material for the Month up to June - 2017

SR NO ITEM AREA DETAIL UNIT QTY REMARKS

North side Retaining wall and South-East corner


1 Bricks 9 " Thick Brick work Nos 10000
Retaining wall

North side Retaining wall and South-East corner


2 cement OPC Bags 100
Retaining wall

Wing B Columns Upto B-2 M 50 CU.M 70


Wing B Retaining wall Upto B-2 M 50 CU.M 120
Wing A slab B-2 M30 CU.M 145
Wing A Column slab Junction B-2 M50 CU.M 35
3 RCC
Wing A Columns Upto B2 to B1 M50 CU.M 80
Wing A RW Upto B2 to B1 M50 CU.M 85
Wing B Slab B-2 M30 CU.M 120
Wing B Column Slab Junction B-2 M50 CU.M 31

8 mm M.T. 14
10 mm M.T. 58
A-WING:-B2-1 Column/Retaining Wall,B1-Gr. Column
including Girder Beam & B1 Slab 12 mm M.T. 16
4 Reinforcement Steel 16 mm M.T. 17
B-Wing :- B2 Slab, B2-B1 Column / Retaining Wall & 20 mm M.T. 18
B1 Slab
25 mm M.T. 35
TOTAL 158
Requirement of Material for the Month up to july- 2017

SR NO ITEM AREA DETAIL UNIT QTY REMARKS

1 Bricks South-East corner Retaining wall 9 " Thick Brick work Nos 5000

2 cement South-East corner Retaining wall OPC Bags 50

Wing B Columns upto B1 M 50 CU.M 70


Wing B Retaining wall Upto B1 M 50 CU.M 120
Wing A slab B-1 M30 CU.M 100
Wing A Column slab Junction B-1 M50 CU.M 30
Wing A Columns Upto B1 to GF M50 CU.M 80
3 RCC
Wing A RW Upto B1 to GF M50 CU.M 85
Wing A slab GF M30 CU.M 100
Wing A Column slab Junction G.f. M50 CU.M 30
Wing B Slab B-1 M30 CU.M 85
Wing B Column Slab Junction B-1 M50 CU.M 25

8 mm M.T. 18
10 mm M.T. 40
A-WING:-B1 Slab Beam,Columns & RW B1 to GF, GF 12 mm M.T. 6
slab Beam. 16 mm M.T. 25
4 Reinforcement Steel B-Wing :- Columns & RW B2 to B1,B1 Slab
Beam,Columns & RW B1 to GF. 20 mm M.T. 34
25 mm M.T. 55
TOTAL 178
Dia
Sr.no. Description Total
8 10 12 16 20 25
Balance Raft Wing B
1 5.000 15.000 5.000 5.000 5.000 25.000 60.000
Basement 1 Slab wing A
2 B2 Beam wing B 4.000 1.700 0.013 0.500 0.700 5.046 11.959
3 B2 Slab wing B 1.800 8.400 0.600 0.500 0.500 0.500 12.300
4 Columns B2 -B1 Wing A & B 4.648 4.000 - 4.500 5.000 13.736 31.884
5 R.W. B2-B1 Wing A & B 2.500 2.722 1.500 2.500 4.500 14.226 27.948
6 B1 Slab 3.600 16.800 1.200 1.000 1.000 1.000 24.600
9 B1 Beam Including Girder 2.000 3.500 0.026 0.990 2.569 12.910 21.995
10 Columns B1 - G.floor. Wing A 1.900 1.246 - 2.400 3.112 2.315 10.974
11 R.W. B1 - G.floor Wing A 1.700 1.853 1.000 1.400 2.500 8.000 16.453
Total 22.148 40.221 4.339 13.790 19.881 57.733 218.112

Dia of Steel
Sr.no Description
8 10 12 16 20 25 Total
1 Wing A Beam 4.000 1.700 0.013 0.500 0.700 5.046 11.959
Description
2 Wing A Slab 1.800 8.400 0.600 0.500 0.500 0.500 12.300
3 Wing B Beam 4.000 1.700 0.013 0.500 0.700 5.046 11.959 Wing B Beam
4 Wing B Slab 1.800 8.400 0.600 0.500 0.500 0.500 12.300 Wing B Slab
5 Wing B Columns B3-B2 2.810 1.853 - 1.618 2.166 1.609 10.056 Wing A B1 Beam
6 Wing B Retaining wall 1.856 2.038 1.254 1.030 1.883 6.120 14.181 Wing A B1 Slab
7 Wing A Columns B2 -B1 1.631 1.619 - 0.927 0.957 7.016 12.150 Column Wing B
8 Wing A Retaining wall 1.240 1.361 0.710 1.199 2.191 7.113 13.813 Retaining wall
Total 19.136 27.071 3.190 6.774 9.597 32.950 98.717 Total
Less balance 11.117 19.963 11.989 14.033 12.8 15.648 85.550 Balance
Net Required 8.02 7.11 -8.80 -7.26 -3.20 17.30 13.167 Required
Grand Requirement 10 10 5 5 10 20 60 Net Req
July month
Dia of Steel
Description Description
8 10 12 16 20 25 32 Total
Wing B Columns B2 to B1 1.631 1.619 0.000 0.825 0.851 6.238 11.164 ADD for Wing A slab
Wing B RW 1.075 1.151 0.000 0.533 0.001 7.113 9.873 ADD for Wing A Beam
Wing A B1 Slab 1.800 8.400 0.600 0.500 0.500 0.500 12.300 Wing B RW b2 to b1
Wing A B1 Beam 1.521 1.111 0.025 0.226 3.431 3.455 9.768 Wing B B1 Slab
Wing B B1 Slab 1.800 8.400 0.600 0.500 0.500 0.500 12.300 Wing B B1 Beam
Wing B B1 Beam 1.521 1.111 0.025 0.226 3.431 3.455 9.768 Wing A Column B1 to G
Wing A Column B1 to GF 2.891 1.887 0.000 2.555 3.423 2.546 13.302 Wing A RW B1 to GF
Wing A RW B1 to GF 0.000 1.853 1.385 0.735 5.489 4.372 13.833
Wing B Column B1 to GF 2.485 2.450 0.000 1.133 1.170 8.321 15.559 Good length Balance
Wing B RW B1 to GF 0.000 1.853 1.385 0.735 5.489 4.372 13.833
Wing A GF Beam 1.521 1.111 0.025 0.226 3.431 3.455 9.768
Wing A GF Slab 1.800 8.400 0.600 0.500 0.500 0.500 12.300
Wing B GF Beam 1.521 1.111 0.025 0.226 3.431 3.455 9.768
Wing B GF Slab 1.800 8.400 0.600 0.500 0.500 0.500 12.300
Column GF to 1st Floor. 4.970 4.900 0.000 2.266 2.340 16.642 31.118
Rw. GF to 1st floor. 0.000 0.000 2.000 0.000 5.500 0.000 7.500
1st Floor Slab 7.600 18.500 1.213 1.500 1.700 6.046 36.559
Column 1st to 2nd floor. 4.970 4.900 0.000 2.266 2.340 16.642 31.118
Rw. GF to 1st to 2nd floor. 0.000 0.000 2.000 0.000 5.500 0.000 7.500
2nf floor slab 7.600 18.500 1.213 1.500 1.700 6.046 36.559
Girder 0.000 3.666 19.768 0.000 0.000 35.482 103.874 162.790
Total 54.504 109.320 43.463 32.949 71.228 154.639 478.978
Less Balance 8.856 8.6 10.677 0 14.726 14.167 57.026
45.648 100.720 32.786 32.949 56.502 140.472 421.952
Net Req 46 100 35 35 60 145 105 526

12.2 17 4.5 -4.7 3.5 -0.55 31.95

0 1.833 9.884 0 0 17.741 51.937


0 3.666 19.768 0 0 35.482 103.874
Dia of Steel
Description
8 10 12 16 20 25 Total
Wing B B1 Slab 1.800 8.400 0.600 0.500 0.500 0.500 12.300
Wing B B1 Beam 1.521 1.111 0.025 0.226 3.431 3.455 9.768
Wing A Column B1 to GF 2.891 1.887 0.000 2.555 3.423 2.546 13.302
Wing A RW B1 to GF 0.000 1.853 1.385 0.735 5.489 4.372 13.833
Wing B Column B1 to GF 2.485 2.450 0.000 1.133 1.170 8.321 15.559
Wing B RW B1 to GF 0.000 1.853 1.385 0.735 5.489 4.372 13.833
Wing A GF Beam 1.521 1.111 0.025 0.226 3.431 3.455 9.768
Wing A GF Slab 1.800 8.400 0.600 0.500 0.500 0.500 12.300
Wing B GF Beam 1.521 1.111 0.025 0.226 3.431 3.455 9.768
Wing B GF Slab 1.800 8.400 0.600 0.500 0.500 0.500 12.300
Column GF to 1st Floor. 4.970 4.900 0.000 2.266 2.340 16.642 31.118
Rw. GF to 1st floor. 0.000 0.000 2.000 0.000 5.500 0.000 7.500
Total 20.308 41.473 6.644 9.600 35.204 48.117 161.347

Dia of Steel
8 10 12 16 20 25
North side RW 0.000 2.237 0.000 0.000 4.158 8.242 0.000 14.637
GR.floor Beam 1.035 0.437 0.046 0.374 2.084 1.881 0.000 5.857
GR.floor Slab 0.475 7.014 2.069 1.430 0.199 - 11.186

Total Require 1.510 9.688 2.115 1.804 6.441 10.123 0.000 31.680
Cut bend 0.000 0.000 0.000 0.000 4.158 8.242 0.000 12.400
1.510 9.688 2.115 1.804 2.283 1.881 0.000 19.280
Balance 7.000 16.500 2.500 6.000 6.500 7.000 45.500
Net Required -5.490 -6.813 -0.385 -4.196 -4.217 -5.119 0.000 -26.220
Dia of Steel
8 10 12 16 20 25 Total
4.000 1.700 0.013 0.500 0.700 5.046 11.959
1.800 8.400 0.600 0.500 0.500 0.500 12.300
4.000 1.700 0.013 0.500 0.700 5.046 11.959
1.800 8.400 0.600 0.500 0.500 0.500 12.300
1.631 1.619 - 0.927 0.957 7.016 12.150
2.479 2.722 1.419 2.398 4.382 14.226 27.626
15.710 24.541 2.645 5.325 7.739 32.334 88.294
2.37 0.4 6.4 6.19 10.35 6.46 32.17
13.34 24.14 -3.76 -0.87 -2.61 25.87
15 25 5 5 5 25 80
Dia of Steel
8 10 12 16 20 25 Total
1.800 8.400 0.600 0.500 0.500 0.500 12.300
1.521 1.111 0.025 0.226 3.431 3.455 9.768
1.075 1.151 0.000 0.533 0.001 7.113 9.873
1.800 8.400 0.600 0.500 0.500 0.500 12.300
1.521 1.111 0.025 0.226 3.431 3.455 9.768
2.891 1.887 0.000 2.555 3.423 2.546 13.302
0.000 1.853 1.385 0.735 5.489 4.372 13.833
10.607 23.911 2.635 5.273 16.776 21.941 81.143
22 17 3 0 5 20 67
6.911 11.776 1.941
0 10 5 15 20 15 65

2.485 2.450 0.000 1.133 1.170 8.321


4.97 4.90 - 2.27 2.34 16.64

3.60 16.80 1.20 1.00 1.00 1.00

4.000 1.700 0.013 0.500 0.700 5.046


7.60 18.50 1.21 1.50 1.70 6.05
Beam Ground
Floor 1.380 0.582 0.061 0.499 2.779 2.508 7.809
25% Beam
Ground Floor 0.345 0.146 0.015 0.125 0.695 0.627 1.952
Require 1.035 0.437 0.046 0.374 2.084 1.881 5.857
Slab Ground 0.633 9.352 2.759 1.906 0.265 - 14.915
Floor
25% Slab Ground Floor 0.158 2.338 0.690 0.477 0.066 - 3.729
0.47 7.01 2.07 1.43 0.20 - 11.186

Вам также может понравиться