TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60ºF TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.
1C Nil 0 Nil 0 0 0
2C 16.35 16.119 610 3,835 18.075 17.825 23.68 149 3,686 31.4 88.5 44.6 0.98578 3,634 9.085 3,625 0.12544
3C 6.35 6.121 4,727 29,730 Nil 29,730 31.0 87.8 44.6 0.98613 29,318 73.294 29,244 0.12544
4C 17.94 17.694 78 489 Nil 489 30.6 87.1 44.6 0.98648 482 1.205 481 0.12544
5C Nil 0 Nil 0 0 0
6C 11.24 11.017 2,769 17,418 17.933 17.707 73.01 459 16,959 31.3 88.3 44.6 0.98588 16,720 41.80 16,678 0.12544
7C 3.90 3.675 5,727 36,020 Nil 36,020 30.3 86.5 44.5 0.98680 35,544 88.861 35,455 0.12551
8C 3.78 3.557 5,151 32,398 17.640 17.414 209 1,316 31,082 30.2 86.4 44.6 0.98683 30,672 76.680 30,595 0.12544
SL.P 8.89 8.615 308 1,939 9.200 8.930 298 1,875 64 36.0 96.8 44.6 0.98159 63 0.156 62 0.12544
SL.S 8.87 8.578 306 1,924 11.220 10.933 231 1,451 473 36.0 96.8 44.6 0.98159 464 1.161 463 0.12544
TOTAL
TOTAL 19,675 123,753 835 5,251 118,502 116,897 116,604
REMARKS: 866 56 809 798 796
PRODUCTION LOADING IN TO 2C
Gross Volume :(T.O.V.) 123,753 Oil Volume @ 60 F :(N.S.V.) 116,604 DRAFT FWD 7.70 m AFT
Less Free Water : 5,251 Less OBQ/ROB :
Oil Volume :(G.O.V.) 118,502 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 116,897 Long tons/Metric tons :
Long Tons/Metric Tons : 14,666 14,901 Vessel Experience Factor :
API 60 F : 44.6 Adjusted Volum @ 60 F : Capt. Juanda Pardede
B.S & W. % Vol :. 0.25 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 7-Apr-17
0 0
456 0.12745 463.143
3,677.591 0.12745 3736.519
60.484 0.12745 61.453
0 0
2,097.323 0.12745 2130.929
4,461.155 0.12752 4532.599
3,847.517 0.12745 3909.168
7.845 0.12745 7.971
58.255 0.12745 59.189
14,666 14,901
Staff
Surya Putra Jaya Master Capt. Boy Richard Togas Santos Rep. Capt. Juanda Parde
Water Offtake
PFW PH 0
Note: : PRODUCTION LOADING INTO COT 2C
OIW Average (mg/I) 10 Continue free Gas COT 1 C & 5 C
Regulated Waste
Category Vol (m3) Kg Comments
Biological Waste 0 0
Note :
OYONG OPERATORS DAILY REPORT
Fuel
FSO-MFO FSO-MDO Service Vessel
MDO
Remarks :
Meetings
Incidents
Drills
Type Time Comment
S.T.O.P. Audit program
19-Dec-16
141,460
deg C
deg C
NTO COT 2C
&5C
3674 / 116595
e Vessel
Comment
COT 1C & 5C
arboard side
pt. activity
DSS equipment
rgency machinery
ntainer at laydown
ck
Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT
Mooring/Unmooring :
19.50 : Aht. Tegap jaya port alongside
22. 15 : AHT. Tegap jaya cast off
Bunkering/Debunkering :
20.00 : Commenced transferred fresh water to AHT. Tegap jaya
22.10 : Completed transferred fresh water 20T to AHT. Tegap jaya
ENGINE :
1. Over hauled auxiliary engine no.1
2. Overhauled main air compressor no.2
3. Repaired dryer machine at laundry room
4. Received lube oil system shell
5. Running up A/E No. 2 & 3 :
12.00 - 14.00 : - Transferred materials food stuff
9. EHS AUDIT/INSPECTION
TOTAL
4002
4000
TRANS ROB
0 200.37
0 34.26
ROB `
81
268
ROB
200
POB
38
28-Nov-13
NIL
NIL
NIL
NIL
NIL
FUEL STATUS REPORT
MDO
11
12
13
14
15
16
17
18
19
Date
20
21
22
23
24
25
26
27
28
29
30
FUEL STATUS REPORT
MFO
Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl )
01 203.77 0 0 0 0 203.77
02 203.77 0 0 0 0 203.77
03 203.77 0 0 3.50 0 200.27 Tank Cleaning COT 5C
04 200.27 0 0 0 0 200.27
05 200.27 0 0 0 0 200.27
06 200.27 0 0 0 0 200.27
07 200.27 0 0 0 0 200.27
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
LOG SHEET DOMESTIC & SANITARY WASTE WATER
Average/
Day 4,970 4,973 4,966 1,161 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER
1 BOY RICHARD TOGAS Master Wheel House Alley way EXIT emergency light unlit Informed to E/E Negative 1
2 IYYANG C/O Main deck Assisted transfer materials and food stuff Done Positive 1
3 ANDI AHMAD UNIT 2/O Main deck Checked oxygen content in COT 5C and 1C Done Positive 1
4 INDRA 3/O Pump Room Wilden pump not working properly Informed to C/O Negative 1
6 ACO AKBAR 2/E Engine Room Overhauled main compressore no.2 Done Positive 1
7 RATNO SITUMORANG 3/E Engine Room Overhauled turbo charge no.1 auxiliary engine Done Positive 1
16 NUR ALI MTM Engine Room Assisted overhauled main compressore no.2 Done Positive 1
18 UMAR SAID MTM Engine Room House keeping at 2nd floor engine room Done Positive 1
20 HASAN C/Cook Provision store Prepared food store to received food stuff Done Positive 1
21 ROHIM 2ND/Cook Main deck Assisted transferred materials food stuff Done Positive 1
22 RANGGUN JAWI STWD Provision store Prepared food store to received food stuff Done Positive 1
23 BOBBY MANGONTO STWD Provision store Prepared food store to received food stuff Done Positive 1
TOTAL 24
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE
EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 UNIT
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. FIX TANK CLEANING MACHINE IN COT
7. I.G.S FAN 2 SETS
8. PNEUMATIC DRIVEN FAN 4 SETS HEATING & INNERTING COT 1 C & 5 C
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 RESULT O² : 6%
COT 5C 13/Mar/17 RESULT TEMPERATURE : 45°C
COT 1 C
3 Tank Pressure Released 14/Mar/17
4 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 14/Mar/17
2ND STAGE ( 8 MTRS ) 14/Mar/17
1ST STAGE ( 12 MTRS ) 14/Mar/17
1ST STAGE ( 16 MTRS ) 14/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 15/Mar/17
2ND STAGE ( 8 MTRS ) 15/Mar/17
1ST STAGE ( 12 MTRS ) 15/Mar/17
1ST STAGE ( 16 MTRS ) 15/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING
12
10
10
40
OUTH AREA
11
11
61
22
22
22
22
22
22
193
MAINING SLUDGE IN TAN
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE
EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 PCS
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. MACHINE TANK CLEANING IN USE
7. FIX BLOWER FAN IG 2 SET
8. PORTABLE AIR DRIVE FAN 4 SET HEATING & INNERTING COT 1 C & 5 C : 9 HRS
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 1 1 RESULT O² : 6%
COT 5C 13/Mar/17 1 1 RESULT TEMPERATURE : 45°C
COT 5 C
3 Tank Pressure Released 21/Mar/17
4 BUTTERWORTHING COT 5C ( COP NO. 2 ) 21/Mar/17
1ST STAGE ( 4 MTRS ) 21/Mar/17
2ND STAGE ( 8 MTRS ) 21/Mar/17
1ST STAGE ( 12 MTRS ) 21/Mar/17
1ST STAGE ( 16 MTRS ) 21/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 22/Mar/17
2ND STAGE ( 8 MTRS ) 22/Mar/17
1ST STAGE ( 12 MTRS ) 22/Mar/17
1ST STAGE ( 16 MTRS ) 22/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
6 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 23/Mar/17
2ND STAGE ( 8 MTRS ) 23/Mar/17
1ST STAGE ( 12 MTRS ) 23/Mar/17
1ST STAGE ( 16 MTRS ) 23/Mar/17
NOTE : 27TH MARCH 2017 COMPLETED I.G.S FAN AND CONTINUED GAS FREE BY PNEUMATIC AIR DRIVEN FAN
TTL HRS
24
10
10
10
46
UTH
5
8
59
8
4
%
21
0
8
5
%
21
15
15
97