Вы находитесь на странице: 1из 7

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGION IV-A
BATANGAS DISTRICT ENGINEERING OFFICE

OFFICE OF THE DISTRICT ENGINEER


BATANGAS CITY

CONSTRUCTION AND REHABILITATION OF


MULTI-PURPOSE BUILDING / STRUCTURE
(COVERED COURT)
BRGY. SAMBAT, BALAYAN, BATANGAS

DESIGNED BY: CHECKED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY:

BENCIO A AGUZAR
HERMINIO C. SIMBOL RODRIGO M. SUMANGA FLORENCIA G. CORDOVA JULIANA D. VERGARA
ENGINEER III / CHIEF, MAINTENANCE SECTION
ARCHITECT ENGINEER CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER Officer - in - Charge
A PERSPECTIVE
NTS
A-1

N
A T AGA
SAMBAT

AL
ELEM.
(COVERED COURT) BRGY.

C
D
SCHOOL SCHOOL
SAMBAT, BALAYAN, BATANGAS

TO
A
RO
N
AYA
BAL
TO

GO
BA
N

LI
BA
OAD
A NR
LAY
/ BA

-
IB AGO
BAL

AN Y
ALA
TUY
BUIL
DIN
G
TO

B
/ G 6.04
GAN TIN
AT A EXIS 2
CA L
TO ROAD
N
LIA 1
1

TO B
13.79 A LAYA
N TOW
34.00 N PRO
PER AD
- 88
4m
2 )
- 17
2
9m
)
RO
9-B
(A
9-A
(A
TY
CI
228 228
L OT LOT 3

4.00

S
26.00

A
4
URT

NG
CO
V E RED
E CO
POS

TA
PRO 12.79

PALICO - BALAYAN - BA
TO BATANGAS CITY
4
5

26.00 2
5.00

(COVERED COURT) BRGY.


SAMBAT, BALAYAN, BATANGAS
34.00

B SITE DEVELOPMENT PLAN C LOCATION MAP


D VICINITY MAP
NTS NTS
A-1 A-1 NTS
A-1

PROJECT NAME/ LOCATION: SHEET CONTENT: DESIGNED BY:


SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
ELEVATION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION AND SITE DEVELOPMENT PLAN HERMINIO C. SIMBOL
REGION IV-A
REHABILITATION OF MULTI-PURPOSE LOCATION MAP ARCHITECT II
BATANGAS I DISTRICT ENGINEERING OFFICE
BUILDING / STRUCTURE VICINITY MAP CHECKED BY: A-1
OFFICE OF THE DISTRICT ENGINEER
(COVERED COURT)
FLORENCIA G. CORDOVA BENCIO A. AGUZAR JULIANA D. VERGARA
BATANGAS CITY
RODRIGO M. SUMANGA 1 6
BRGY. SAMBAT, BALAYAN, BATANGAS CHIEF, PLANNING & DESIGN SECTION ENGINEER III / CHIEF, MAINTENANCE SECTION Officer - in - Charge
DRAWN BY: J.I.M. DIO ENGINEER II OIC - ASSISTANT DISTRICT ENGINEER
1.00 16.70 1.00 1.00 16.70 1.00
8.35 8.35 8.35 8.35

0.87 0.87 0.87 0.87 0.87


2.00

4.34
0.60
1.00 16.70M 1.00

8.00 M.

1.47
6.00
LINE OF ROOF EAVES ABOVE 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
1.00

3.36
0.30
FINISH FLOOR LEVEL
5.85

NATURAL GRADE LINE


B FRONT ELEVATION B REAR ELEVATION
SCALE 1:100 M. SCALE 1:100 M.
A-2 A-2
1.00 6.00 6.00 6.00 6.00 5.85 1.00 G.A. # 26 PREPAINTED
G,I, LONG SPAN
COLOR ROOF

2.00
6.00

MULTI - PURPOSE BUILDING STRUCTURE


BASKETBALL COURT PAVEMENT

0.80 0.80 0.80


2.40
6.00
1.00 1.00 1.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.85
A B O V E

A B O V E 1.00 1.00 W/ STD. TURN BUCKLE

EXISTING BUILDING
F 2 - 6mm x 63mm x 63mm

3.00
29.85 M.

2.75
ANGLE BARS COLUMN
6.00

TOP LEVEL OF PEDESTAL


E A V E S

E A V E S

.86 .30
FINISH FLOOR LEVEL

NATURAL GRADE LINE


R O O F

R O O F

C RIGHT SIDE ELEVATION


SCALE 1:100 M.
A-2
O F

O F

G.A. # 26 PREPAINTED 1.00 5.85 6.00 6.00 6.00 6.00 1.00


G,I, LONG SPAN
L I N E

L I N E
6.00

COLOR ROOF

1.00 2.00 1.00


0.50

2.00
EXISTING POWER
2.00

HOUSE 0.80 0.80 0.80


0.50

2.64
2.40
6.00

6.00
1.00 1.00 1.00
4.00

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

W/ STD. TURN BUCKLE

3.36
0.85 1.00 1.00 1.00
2 - 6mm x 63mm x 63mm

3.00
2.75
ANGLE BARS COLUMN
1.00

TOP LEVEL OF PEDESTAL

.86 .30
LINE OF ROOF EAVES ABOVE UP FINISH FLOOR LEVEL
4.00
VERIFY
A NATURAL GRADE LINE
F L O O R P L A N
A-2 SCALE 1:50 M. C LEFT SIDE ELEVATION
SCALE 1:100 M.
A-2

PROJECT NAME/ LOCATION: SHEET CONTENTS: DESIGNED BY:


SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION AND FLOOR PLAN HERMINIO C. SIMBOL
REGION IV-A
REHABILITATION OF MULTI-PURPOSE FRONT ELEVATION ARCHITECT II
BATANGAS I DISTRICT ENGINEERING OFFICE
BUILDING / STRUCTURE REAR ELEVATION CHECKED BY: A-2
OFFICE OF THE DISTRICT ENGINEER
(COVERED COURT) RIGHT SIDE ELEVATION FLORENCIA G. CORDOVA BENCIO A. AGUZAR JULIANA D. VERGARA
BATANGAS CITY
LEFT SIDE ELEVATION RODRIGO M. SUMANGA 2 6
BRGY. SAMBAT, BALAYAN, BATANGAS CHIEF, PLANNING & DESIGN SECTION ENGINEER III / CHIEF, MAINTENANCE SECTION Officer - in - Charge
DRAWN BY: J.I.M. DIO ENGINEER II OIC - ASSISTANT DISTRICT ENGINEER
SUMMARY OF QUANTITIES

ITEM NO. DESCRIPTION UNIT Qty.

1014 Prepainted Metal Sheet sq.m. 345.80


SPL-1 Steel Works(Column and Trusses) bays 3.00
.80 .60
SPL-2 Parapet Wall sq.m. 243.11
SPL-3 Plumbing Works L.S. ALL
F SPL-4 Electrical Works L.S. ALL

1.20
2.00 SPL-5 Electrical Room(Power House) sq.m. 4.00
3.00

2.10
.40 2.00 SPL-6 Fiberglass Board w/ Flexible Ring set 2.00
SPL-7 Mobilization/Demobilization mo. 3.00
STP-1

.90
C1/F1 SPL-8 Main Scoreboard set 1.00

.50
.90

.90
SPL-9 Project Billboard pcs. 2.00
SPL-10 Construction Safety & Health Program L.S. ALL
C1/F1

F D W

2.00

2.00

3.00
1 1

2.70
2.30
2.30

METAL DOOR W/ 2"x5" CLEAR GLASS ON STEEL


METAL DOOR JAMB AWNING TYPE WINDOW C1/F1
W
1 D
1

.50
1 (SET) 1 (SET)
C1/F1

.15
.15

STP-1

A FRONT ELEVATION B RIGHT SIDE ELEVATION C SCHEDULE OF DOOR & WINDOW D FOUNDATION PLAN
A-2 SCALE 1:50 M. P-1 SCALE 1:50 M.
A-2 SCALE 1:50 M. A-2 SCALE 1:50 M.

.20

2" X 12"
0.127 FASCIA BOARD

GA. 26 PREPAINTED LONG SPAN


RIB TYPE ON 2" x 6" C PURLINS
@ .15M.O.C
2" x 2" WEB MEMBERS
NGL
GA.24 FLASHING
.30

.30
HORIZONTAL BARS @ 3RD LAYER
ON FILL ON FILL

.90
BARS @ .60M.O.C

.80
BOTH WAYS

.40
FFL
RB
5" thk. CHB
.40

FIREWALL

2.70

.20

.20
2.30
5" thk. CHB ON FILL ON FILL
RB

FIREWALL
.20

.80
RB
.40

G SECTION PLAN
E ROOF FRAMING PLAN F WALL FOOTING PLAN A-2 SCALE 1:50 M.

A-2 SCALE 1:50 M. A-2 SCALE 1:20 M.


@ .15M.O.C

.80

.15
.15 L BOTH WAYS

.20
.20

RB RB
.80

@.15M.O.C

H ROOF BEAM DETAIL I COLUMN DETAIL


A-2 SCALE 1:20 M.
A-2 SCALE 1:20 M.

PROJECT NAME/ LOCATION: SHEET CONTENT: DESIGNED BY:


SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES FRONT ELEVATION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION AND RIGHT SIDE ELEVATION
SCHEDULE OF DOOR & WINDOW
HERMINIO C. SIMBOL
REGION IV-A
REHABILITATION OF MULTI-PURPOSE FOUNDATION PLAN ARCHITECT II
ROOF FRAMING PLAN
BATANGAS I DISTRICT ENGINEERING OFFICE
BUILDING / STRUCTURE WALL FOOTING PLAN CHECKED BY: S-1
OFFICE OF THE DISTRICT ENGINEER
(COVERED COURT) SECTION PLAN FLORENCIA G. CORDOVA BENCIO A. AGUZAR JULIANA D. VERGARA
BATANGAS CITY ROOF BEAM DETAIL
RODRIGO M. SUMANGA 3 6
BRGY. SAMBAT, BALAYAN, BATANGAS COLUMN DETAIL
CHIEF, PLANNING & DESIGN SECTION ENGINEER III / CHIEF, MAINTENANCE SECTION Officer - in - Charge
DRAWN BY: J.I.M. DIO ENGINEER II OIC - ASSISTANT DISTRICT ENGINEER
16.70 1.00

1.00 16.70 1.00 SEE DETAIL G


S-1

2.00

.60
.92 .92 .92 .92 .92 .92 .46
1.00

3.85
DS T-1 0.84 0.84 0.84 2 - 50mm X 50mm X 5mm
DS SEE DETAIL C ANGULAR BARS
SEE DETAIL F S-1 (WEB MEMBERS)

8.00 M.
S-1

7 EQUAL PARTS@
2" x 6" x 15mm C - PURLINS

.86M = 6.00M
SPACED @ 1.00 M.

1.20
5.85

E S I D E S T R U T D E T A I L

3.00
2.75
S-1 SCALE 1:20 M.
TURN BUCKLE

0.30
DS T-1
DS
1.00
B SCHEMATIC TRUSS DIAGRAM
G.A. 26 PRE-PAINTED GUTTER S-1 SCALE 1:100 M.
6.00

2" x 6 C PURLINS .30


SPACED @ 1.00 M.O.C

.30
1
4" THK. x 5" WIDE
STEEL PLATE
DS T-1 2" x 2" 3 16" FULLY WELDEL
DS ANGLE CLEATS
G.A 26 PRE-PAINTED LONG 2 - 6mm x 63mm x 63mm
SPAN G.I ROOF SHEETS ANGLE BARS COLUMN
1.00
29.85

6.00

G.A. 26 PRE-PAINTED GUTTER ON


2 PCS 2"x4" C-PURLINS FASCIA BOARD

DS T-1

.30
DS
F S E C T I O N D E T A I L E D
S-1 SCALE 1:20 M.

.30

.30
6.00

.30
W/ NUT & WASHERS

.30 .30

.86
DS RB
EXISTING DS
RB

3
8''
THK. X 4'' WIDE STEEL PLATE
RB
CENTER JOINT SUPPORT (FULLY WELDED)

2 - 6mm X 63mm X 63mm


6.00

2 - 5mm X 63mm 63mm BOTTOM & TOP CHORD


WEB MEMBERS

C S E C T I O N D E T A I L E D
SCALE 1:20 M. G S E C T I O N D E T A I L E D
S-1
DS T-1 S-1 SCALE 1:20 M.
DS
1.00

18.85

2 - 50mm X 50mm X 5mm


A R O O F F R A M I N G P L A N
.30

ANGULAR BARS
(WEB MEMBERS)
S-1 SCALE 1:50 M.
.82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82 .82

D C E N T E R S T R U T D E T A I L
S-1 SCALE 1:50 M.

PROJECT NAME/ LOCATION: SHEET CONTENT: DESIGNED BY:


SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES ROOF FRAMING PLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION AND SCHEMATIC TRUSS DIAGRAM HERMINIO C. SIMBOL
SECTION DETAILED
REGION IV-A
REHABILITATION OF MULTI-PURPOSE CENTER STRUT DETAIL
ARCHITECT II
BATANGAS I DISTRICT ENGINEERING OFFICE
BUILDING / STRUCTURE SIDE STRUT DETAIL
CHECKED BY: S-2
OFFICE OF THE DISTRICT ENGINEER
(COVERED COURT)
SECTION DETAIL C/S-1
SECTION DETAIL F/S-1
FLORENCIA G. CORDOVA BENCIO A. AGUZAR JULIANA D. VERGARA
BATANGAS CITY
SECTION DETAIL G/S-1 RODRIGO M. SUMANGA 4 6
BRGY. SAMBAT, BALAYAN, BATANGAS CHIEF, PLANNING & DESIGN SECTION ENGINEER III / CHIEF, MAINTENANCE SECTION Officer - in - Charge
DRAWN BY: J.I.M. DIO ENGINEER II OIC - ASSISTANT DISTRICT ENGINEER
1.00 16.70M 1.00

GENERAL NOTES (ELECTRICAL)

1.00 1. THE ELECTRICAL WORKS SHALL COMPLY IN ACCORDANCE WITH


THESE PLANS AND SPECIFICATIONS. THE APPLICABLE PROVISIONS
OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE (PEC).
THE RULES AND REGULATION OF THE LOCAL ENFORCING AUTHORITY
AND THE REQUIREMENTS OF THE LOCAL POWER COMPANY.
THE ELECTRICAL WORKS SHALL BE UNDER IMMEDIATE SUPERVISION
5.85

OF A DULY REGISTERED ELECTRICAL ENGINEER.

2. THE ELECTRICAL SERVICE POWER IS 1-PHASE , 2-WIRE


230 V AC, 60 Hz.

3. WIRING METHOD SHALL BE AS FOLLOW:


a. FEEDERS AND RISERS - INTERMEDIATE METALLIC CONDUIT
Ckt#4 16 Amp.
CEE b. LIGHTING, POWER RECEPTACLE - POLYVINYL CHLORIDE CONDUIT

4. ALL WIRES SHALL BE COPPER AND THERMOPLASTIC INSULATED TYPE


"THW" UNLESS OTHERWISE INDICATED IN THE PLAN. THE MINIMUM
6.00

SIZE OF THE WIRE FOR POWER AND LIGHTING CIRCUIT HOME RUN SHALL BE

15mm TRADE/NOMINAL SIZE.

5. ALL OUTLET BOXES SHALL BE GALVANIZED GAUGE NO. 16 DEEP TYPE


WITH FACTORY KNOCKOUTS.
SW1 (WEATHER-PROOF, Ckt#6 16 Amp. 6. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND APPROVED TYPE
FLUSHED MOUNTED) 2 CEE
FOR THE PARTICULAR LOCATION AND PURPOSE OF USAGE.

7. GROUNDING SYSTEM SHALL BE PROVIDED TO ALL LIGHTING AND POWER


CIRCUIT AS PER PHILIPPINE ELECTRICAL CODE REQUIREMENTS.
29.85 M.

6.00

8. MOUNTING HEIGHT OF WIRING DEVICES SHALL BE AS FOLLOW:

a. LIGHT SWITCH - 1.20 m. ABOVE FINISH FLOOR


1
SW2 (WEATHER-PROOF,
FLUSHED MOUNTED) b. CONVENIENCE OUTLET - 0.30 m. ABOVE FINISH FLOOR
Ckt#3 16 Amp.
c. PANEL BOARD - 1.50 m. ABOVE FINISH FLOOR
CEE

SERVICE ENTRANCE
SINGLE PHASE 2 WIRE
6.00

ELECTRICAL LEGEND TYPE "F" CONDUIT

250W METAL HALLIDE HIGH BAY MCB 80AT


LUMINAIRE
1.00 2.00 16 AMP. 2P + E, CEE LIGHTING OUTLET LIGHTING OUTLET
OUTLET (LEFT WING)
1 20AT 20AT 2 (RIGHT WING)

0.50 CEE OUTLET


3 30AT 30AT 4
CEE OUTLET
PANEL BOARD
(LEFT LOWER WING) (LEFT UPPER WING)

S1 LO-Ckt#1 INCANDESCENT BULB CEE OUTLET CEE OUTLET


2.00

Ckt#5 16 Amp. (RIGHT LOWER WING)


5 30AT 30AT 6 (RIGHT UPPER WING)
CEE S1 SINGLE POLE SWITCH
SPARE 7 8 SPARE
0.50

WEATHER-PROOF,
SW FLUSHED MOUNTED
SWITCH
6.00

UNDERGROUND OR UNDER
FLOOR CONDUIT
CONCEALED OR EMBEDDED
CONDUIT RUN
1.00

A LIGHTING OUTLET LAYOUT


E-1 SCALE 1:100 M.

PROJECT NAME/ LOCATION: SHEET CONTENT: DESIGNED BY:


SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
PLUMBING LAYOUT PLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION AND CATCH BASIN
GINA B. GUINTO
REGION IV-A
REHABILITATION OF MULTI-PURPOSE ISOMETRIC VIEW ENGINEER II
BATANGAS I DISTRICT ENGINEERING OFFICE
BUILDING / STRUCTURE LEGEND CHECKED BY: E-1
OFFICE OF THE DISTRICT ENGINEER
(COVERED COURT) GENERAL NOTES FLORENCIA G. CORDOVA BENCIO A. AGUZAR JULIANA D. VERGARA
BATANGAS CITY SUMMARY AND QUANTITIES RODRIGO M. SUMANGA 5 6
BRGY. SAMBAT, BALAYAN, BATANGAS CHIEF, PLANNING & DESIGN SECTION ENGINEER III / CHIEF, MAINTENANCE SECTION Officer - in - Charge
DRAWN BY: J.I.M. DIO ENGINEER II OIC - ASSISTANT DISTRICT ENGINEER
16.70M

TO STREET
DRAINAGE

CB

CB
5.85

CB

CB
6.00

MULTI - PURPOSE BUILDING STRUCTURE


BASKETBALL COURT PAVEMENT
CB

CB
29.85 M.

6.00

CB

CB

C ISOMETRIC VIEW
6.00

P-1 SCALE 1:100 M.

PLUMBING LEGEND: GENERAL NOTES (PLUMBING)

CB - CATCH BASIN 1. GRADES OF HORIZONTAL PIPINGS


CB

CB

EXISTING DS - DOWNSPOUT RUN ALL HORIZONTAL PIPING IN PERFECT ALIGNMENT AND AT A FORM GRADE NOT LESS THAN TWO
POWER
HOUSE SD - STORM DRAINAGE PERCENT (2%)

2. CHANGE IN DIRECTION

WYES, LONG SWEEP QUARTER BEND, SIXTH - EIGHT OR SIXTEENTH BEND. WHEN THE CHANGE OF
6.00

FLOW IS FROM HORIZONTAL TO VERTICAL A SINGLE 81 BEND COMBINATION MAYBE USED ON VERTICAL
STACK AND SHORT QUARTER BENDS MAYBE USED ON WASTE LINE, TEE AND CROSSES MAYBE USED
IN BENT PIPES.
0.60
0.10 .40 0.10 3. PROHIBITED FITTINGS
NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL SOIL AND WASTE LINES, THE

0.10
DRILLINGS AND TAPPING OF HOUSE DRAIN, WASTE OR VENT PIPES OF SADDLE HUB AND BEND PROHIBITED.

0.10
CB

CB

VAR.
4. PIPE CLEAN - OUTS

0.40
0.60
UP CLEAN - OUTS ARE REQUIRED UNDER FOLLOWING CONDITIONS:
a) EVERY CHANGE OF HORIZONTAL DIRECTION EXCEEDING TWENTY TWO AND ONE HALF (22 21)

0.10
b) ONE AND ONE-HALF METERS (1.50m.) INSIDE THE PROPERTY LINES BEFORE THE HOUSE DRAINAGE
0.10

CONNECTION.
PLAN SECTION c) EVERY FIFTEEN METERS (15.00m) IN HORIZONTAL RUN OF PIPES
d) AT THE END OF ANY HORIZONTAL PIPE LINES.

5. THE DIGESTION CHAMBER OF SEPTIC VAULT MUST BE WATERPROOFED.


A PLUMBING LAYOUT PLAN B C A T C H B A S I N
P-1 SCALE 1:100 M. P-1 SCALE 1:100 M. 6. NOT LESS THAN 0.30 METER OF AIR SPACE MUST BE LEFT BETWEEN THE TOP OF THE SEWAGE AND THE
UNDER PART OF VAULT ROOF SLAB.

7. NO SEPTIC VAULT SHALL BE CONSTRUCTED UNDER THE BUILDING.

8. ALL PLUMBING WORKS SHALL BE UNDER THE SUPERVISION OF A LICENSED MASTER PLUMBING AND
LICENSED PLUMBING CONTRACTOR.

PROJECT NAME/ LOCATION: SHEET CONTENT: DESIGNED BY:


SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


PLUMBING LAYOUT PLAN HERMINIO C. SIMBOL
CONSTRUCTION AND
CATCH BASIN ARCHITECT II
REGION IV-A
REHABILITATION OF MULTI-PURPOSE
ISOMETRIC VIEW
BATANGAS I DISTRICT ENGINEERING OFFICE
BUILDING / STRUCTURE CHECKED BY: P-1
OFFICE OF THE DISTRICT ENGINEER PLUMBING LEGEND FLORENCIA G. CORDOVA BENCIO A. AGUZAR JULIANA D. VERGARA
(COVERED COURT)
BATANGAS CITY GENERAL NOTES RODRIGO M. SUMANGA 6 6
BRGY. SAMBAT, BALAYAN, BATANGAS CHIEF, PLANNING & DESIGN SECTION ENGINEER III / CHIEF, MAINTENANCE SECTION Officer - in - Charge
DRAWN BY: J.I.M. DIO ENGINEER II OIC - ASSISTANT DISTRICT ENGINEER

Вам также может понравиться