SUBJECT: BILL OF QUANTITIES

PROJECT: 2G NATIONAL ROLL-OUT "FTK PROJECT-PHASE II"


Greenfield - 40m TOWER "Light Duty" (250 km/h)
SBC = 144 Kpa w/out Water Table

CODE Excavation Length


(m)
C0C01003 L

Excavation works for Mat Foundation 9.00


soil_VIS
Total Volume of Excavation (cu. m)

Excavation, Backfilling & Compaction Works for Other Civil Length


CODE Works (m)
C0C01001 L

Excavation, backfilling ODU Pad Footing 2.20


& compaction for other
civil works_VIS Total Volume of Excavation (cu. m)

CODE Backfill
C0C01004 Volume Excavated (cu.m)
Length
LESS:
(m)
L
Lean Concrete 8.300
Mat Foundation 8.000
Backfilling work & Three - Pedestal Column 1.000
compaction works for ODU Pad Column Embedded @ Mat Foundation 0.275
tower foundation_VIS ODU Pad Column 0.275
ODU Pad Footing 1.200
Cable Ladder Foundation 1.300
Net Volume of Backfill (cu. m)
tower foundation_VIS

PLUS: 45% Soil Compaction


Total Volume of Backfill (cu. m)

Length
CODE Lean Concrete (1000 psi)
(m)
C0C01005 L
Lean Concrete_VIS Mat Foundation 8.30

Length
CODE Formworks
(m)
C0C01007 L
Mat Foundation 8.000
Three - Pedestal Column 1.000
ODU Pad Column Embedded @ Mat Fndn 0.275
ODU Pad Column 0.275
Form Works_VIS ODU Pad Footing 1.200
ODU Pad Slab & Beam 4.000
Cable Ladder Foundation 1.300
TOTAL AREA (sq.m):

Length
CODE Concreting Works - Class "A" (3000 psi @28days)
(m)
C0C01008 L
Mat Foundation 8.000
Three - Pedestal Column 1.000
Concreting Works for
Tower Foundation_VIS ODU Pad Column Embedded @ Mat Foundation 0.275
Cable Ladder Foundation 1.300
TOTAL VOLUME (cu.m):

Length
CODE Concreting Works - For Other Civil Works
(m)
C0C01009 L
ODU Pad Column 0.275
ODU Pad Beam 3.750
Concreting Works for ODU Pad Footing 1.200
other civil works _VIS
ODU Pad Slab 4.000
Concreting Works for
other civil works _VIS

TOTAL VOLUME (cu.m):

Length
CODE Gravel Bedding
(m)
C2I00004 L
100mm thick gravel 9.800
LESS: TA = A - (V + O)
Supply, level & Three - Pedestal Column 1.000
compaction of 100mm Cable Ladder Foundation 1.300
thick gravel _VIS ODU Pad Column Embedded @ Mat Foundation 0.275
ODU Pad Slab 4.000
TOTAL AREA (sq.m):

Length
CODE Perimeter Fence
(m)
C2I00005 L
Perimeter fence CHB
wall, column & footing Fencing 9.800
works _VIS

Length
CODE Perimeter Fence Barbed wire
(m)
C2I00006 L
Perimeter fence barbed
wire works (SMART Barbed Wire 9.800
Spec.) _VIS

Length
CODE
Imported Backfill (m)
C0C02002 L
Imported Backfill 9.800
Volume of Imported Backfill (cu. m)
Length
LESS:
(m)
L
Three - Pedestal Column 1.000
Supply, level & ODU Pad Column Embedded @ Mat Foundation 0.275
compaction of
imported fill _VIS ODU Pad Column 0.275
Cable Ladder Foundation 1.300
ODU Pad Slab/Beam 4.000
Supply, level &
compaction of
imported fill _VIS

Volume deducted (cu. m)


Net Volume of Imported Backfill (cu. m)
Plus: 45% Soil Compaction
Volume of Imported Backfill (cu. m)

Diameter (mm) & Spacing


CODE Metal Reinforcement Commercial Length
(m) (mm)
C0C01006 Mat Foundation A1
25mm φ @ 6m
Top Bars @ x-axis 0.25
length
25mm φ @ 6m
Bottom Bars @ x-axis 0.25
length

Top Bars @ y-axis 25mm φ @ 9m 0.30


length
25mm φ @ 9m
Bottom Bars @ y-axis 0.30
length
25mm φ @ 6m
Bar Chair 1.50
length

Three - Pedestal Column B1


Rebar works_VIS
20mm φ @ 6m
Vertical Bars -
length

12mm φ @ 6m
Lateral Ties 0.15
length

Cable Ladder Foundation C1


12mm φ @ 6m
Vertical Bars -
length

12mm φ @ 6m
Lateral Ties 0.15
length

ODU Pad Slab D1

12mm φ @ 6m
Top Bars 0.20
length
12mm φ @ 6m
Bottom Bars 0.20
length

ODU Pad Column Footing E1

12mm φ @ 6m
Horizontal Bars -
length
ODU Pad Column Embedded @ Mat F1
Foundation

16mm φ @ 6m
Vertical Bars -
length

10mm φ @ 6m
Lateral Ties 0.20
length

ODU Pad Column G1


Rebar works_VIS 16mm φ @ 6m
Vertical Bars -
length

10mm φ @ 6m
Lateral Ties 0.20
length

ODU Pad Beam H1

16mm φ @ 6m
Horizontal Bars -
length

10mm φ @ 6m
Lateral Ties 0.20
length

Tie Wires

Tie Wires

TOTAL WEIGHT (kg):

Prepared by:

ENGR. ANTHONY DACUNO/BSPT CONSTRUCTION CORP.


NAME & SIGNATURE
(JUNIOR ENGINEER)
Code
Input Values
Select from Drop Down List
Results
Total Results
Descriptions/Values
Formula

Width Depth Quantity Volume Remarks


(m) (m) (set) (cu.m)
W D Q V=LxWxDxQ
500 mm allowance on
9.00 1.65 1.000 133.65 both sides
133.65

Width Depth Quantity Volume


Remarks
(m) (m) (pc/s) (cu.m)
W D Q V=LxWxDxQ
500 mm allowance on
2.20 1.20 2.000 11.62 both sides

11.62

Backfill
ed (cu.m) 133.65
Remarks
Width Depth Quantity Volume
(m) (m) (pc/s) (cu.m)
W D Q V=LxWxDxQ 300 mm allowance on
8.300 0.050 1.000 3.44 both sides
8.000 0.600 1.000 38.40 -
1.000 1.000 3.000 3.00 -
0.275 1.000 2.000 0.15 -
0.275 1.000 2.000 0.15 -
1.200 0.200 2.000 0.58 -
0.200 1.000 1.000 0.26 -
87.67
39.45 -
127.12

Width Depth Quantity Volume


Remarks
(m) (m) (set) (cu.m)
W D Q V=LxWxDxQ
8.30 0.05 1.00 3.44 300 mm allowance on
both sides

Width Depth Quantity Perimeter Area


(m) (m) (pc/s) (m) (sq.m)
W D Q P = 2 x (L + W) + 0.20 A=DxQxP
8.000 0.600 1.000 32.20 19.32
1.000 2.000 3.000 4.20 25.20
0.275 2.000 2.000 1.30 5.20
0.275 1.500 2.000 1.30 3.90
1.200 0.200 2.000 5.00 2.00
4.000 0.550 1.000 16.20 8.91
0.200 1.800 1.000 3.20 5.76
70.29

Width Depth Quantity Volume


Remarks
(m) (m) (pc/s) (cu.m)
W D Q V=LxWxDxQ
8.000 0.600 1.00 38.40
Concrete cover; 50mm for
1.000 2.000 3.00 6.00 all members exposed to
weather & 75mm for
0.275 2.000 2.00 0.30 permanently cast on
earth
0.200 1.800 1.00 0.47
45.17

Width Depth Quantity Volume


Remarks
(m) (m) (pc/s) (cu.m)
W D Q V=LxWxDxQ
0.275 1.500 2.00 0.23 Concrete cover; 50mm for
0.200 0.350 4.00 1.05 all members exposed to
weather & 75mm for
1.200 0.200 2.00 0.58 permanently cast on
4.000 0.150 1.00 2.40 earth
4.25

Width Area
Remarks
(m) (sq. m)
W A=LxW
11.800 115.64 -
(V + O)
1.000 3.00 -
0.200 0.26 -
0.275 0.15 -
4.000 16.00 -
96.23

Width Less: Gate Perimeter


Remarks
(m) (m) (m)
W G P = 2 x (L x W) - G

11.800 3 41
-

Width Less: Gate Perimeter


Remarks
(m) (m) (m)
W G P = 2 x (L x W) - G

11.800 3 41
-

Width Depth Volume


Remarks
(m) (m) (cu.m)
W D V=LxWxD
11.800 0.5 57.82 -
57.82
Width Quantity Volume
Remarks
(m) (pc/s) (cu.m)
W Q V=LxWxDxQ
1.000 3.000 1.50 -
0.275 2.000 0.08 -
0.275 2.000 0.08 -
0.200 1.000 0.13 -
4.000 1.000 8.00 -
9.78 -
48.04 -
21.62 -
69.66

Std. Weight Length Unit Weight Net Length No. of Cut Bars
(kg) (m) (kg/m) (m) (pc/s)
A2 A3 A4 = A2/A3 A5 A6

23.12 6.00 3.854 8.500 33.00

23.12 6.00 3.854 8.500 33.00

34.68 9.00 3.854 8.500 28.00

34.68 9.00 3.854 8.500 28.00

23.12 6.00 3.854 1.300 14.00

B2 B3 B4 = B2/B3 B5 B6

14.80 6.00 2.467 3.475 96.00

5.33 6.00 0.889 3.400 45.00

C2 C3 C4 = C2/C3 C5 C6

5.33 6.00 0.889 3.250 10.00

5.33 6.00 0.889 2.400 13.00

D2 D3 D4 = D2/D3 D5 D6

5.33 6.00 0.889 4.150 40.00

5.33 6.00 0.889 4.150 40.00

E2 E3 E4 = E2/E3 E5 E6

5.33 6.00 0.889 1.250 20.00


F2 F3 F4 = F2/F3 F5 F6

9.47 6.00 1.579 2.700 8.00

3.70 6.00 0.617 0.800 28.00

G2 G3 G4 = G2/G3 G5 G6

9.47 6.00 1.579 1.800 8.00

3.70 6.00 0.617 0.800 22.00

H2 H3 H4 = H2/H3 H5 H6

9.47 6.00 1.579 4.275 16.00

3.70 6.00 0.617 0.800 112.00


Remarks

-
-
-
-
-
-
-
Total Weight
Remarks
(kg)
A7 = A4 x A5 x A6

1081.05 -

1081.05 -

917.25 -

917.25 -

70.14 -

B7 = B4 x B5 x B6

822.99 -

Add one to get the


136.02 quantity of lateral ties
in each column
C7 = C4 x C5 x C6

28.89 -

Add one to get the


27.74 quantity of lateral ties
in each column

D7 = D4 x D5 x D6

147.57 -

147.57 -

E7 = E4 x E5 x E6

22.23 -
F7 = F4 x F5 x F6

34.11 -

Add one to get the


13.82 quantity of lateral ties
in each column
G7 = G4 x G5 x G6

22.74 -

Add one to get the


10.86 quantity of lateral ties
in each column

H7 = H4 x H5 x H6

108.00 -

Add one to get the


55.28 quantity of lateral ties
in each column

I = Total Wt. / 2000

2.82 -

5647.39
AD PO Huawei
CODE Description of Works UOM Qty. PO Qty.
C0C01003 Excavation works for soil_VIS cu.m 133.65 134.40
C0C01001 Excavation, backfilling & compaction for other civil works_VIS cu.m 11.62 5.00
C0C01004 Backfilling work & compaction works for tower foundation_VIS cu.m 127.12 91.14
C0C01005 Lean Concrete_VIS cu.m 3.44 3.70
C0C01007 Form Works_VIS m 70.29 76.14
C0C01008 Concreting Works for Tower Foundation_VIS cu.m 45.17 47.90
C0C01009 Concreting Works for other civil works _VIS cu.m 4.25 4.25
C2I00004 Supply, level & compaction of 100mm thick gravel _VIS sq.m 96.23 101.00
C2I00005 Perimeter fence CHB wall, column & footing works _VIS m 41.00 41.00
C2I00006 Perimeter fence barbed wire works (SMART Spec.) _VIS m 41.00 41.00
C0C02002 Supply, level & compaction of imported fill _VIS cu.m 69.66 52.00
C0C01006 Rebar works_VIS kg 5647.39 5631.86

Prepared by:

ENGR. ANTHONY DACUNO/BSPT CONSTRUCTION CORP.


NAME & SIGNATURE
(JUNIOR ENGINEER)
BSPT PO Actual Field
Qty. Qty.
159.01 148.11
5.00 5.00
105.84 101.51
3.70 3.44
78.64 79.05
47.90 46.51
4.25 4.25
104.00 101.00
41.00 41.00
41.00 41.00
64.62 56.32
6649.32 6530.77
Length of Cables
CODE Remarks
(m)
C2I00063
Supply & install underground
power cables:- 2-50mm2 THHN Power Cables
& 1-14mm2, in 40mm Ø PVC
Pipe._VIS

Service entrance to Below 2.0 -


embedment

Below embedment to ACPDB 3.0 -

Allowance 3.0 For sag of cables


Total Length 8.0

Length of Cables
CODE Remarks
(m)
C2I00074

Supply & install underground


power cables(perimeter light):-
2-3.5mm2 THHN & 1-3.5mm2, Perimeter Light
in 10mm Ø PVC Pipe, concrete
encased._VIS

External Light 1 to External Light 29.0 -


2
External Light 2 to Service 4.0 -
Entrance
Service Entrance to ACPDB 4.0 -
Allowance 5.0 For sag of cables
Total Length 42.0

Length of Cables
CODE Remarks
(m)
C2I00086
Supply & install 50mm2
insulated copper wire. (color Insulated Copper Wire
green)_VIS
ACPDB to Test Pit 6.5 -
Test Pit to Earth Bar (Below) 12.5 -
Earth Bar (Below) to Earth Bar 17.0 -
(Mid Ht.)
Earth Bar (Mid Ht.) to Earth Bar 17.0 -
(Top)
Tower Leg to Lightning Arrester 42.0 -
Allowance 5.0 For sag of cables
Total Length 100.0
Length of Cables
CODE Remarks
(m)
C2I00088
Supply & install 50mm2 bare
copper wire. (underground Bare Copper Wire
ring)_VIS
External Light 2 (Below) to 4.0 -
Service Entrance
Service Entrance to ODU Pad 26.5 -
(Perimeter)
ODU Pad to Test Pit 1.5 -
Perimeter of Tower Leg 21.0 -
Fence Earthing Connection Point
(1) to Perimeter of Tower Leg 7.0 -
Cable Connection

Fence Earthing Connection Point


(2) to Perimeter of Tower Leg 7.0 -
Cable Connection

Fence Earthing Connection Point


(3) to ODU Pad Cable 4.0 -
Connection

Fence Earthing Connection Point


(4) to ODU Pad Cable 4.0 -
Connection
Allowance 5.0 For sag of cables
Total Length 80.0

Prepared by:

ENGR. ANTHONY DACUNO/BSPT CONSTRUCTION CORP.


NAME & SIGNATURE
(JUNIOR ENGINEER)
CODE Description of Works UOM AD PO Qty.

Supply & install underground power cables:- 2-50mm2 THHN & 1-


C2I00063 m 8.00
14mm2, in 40mm Ø PVC Pipe._VIS
Supply & install underground power cables(perimeter light):- 2-
C2I00074 3.5mm2 THHN & 1-3.5mm2, in 10mm Ø PVC Pipe, concrete m 42.00
encased._VIS

C2I00086 Supply & install 50mm2 insulated copper wire. (color green)_VIS m 100.00

C2I00088 Supply & install 50mm2 bare copper wire. (underground ring)_VIS m 80.00

Prepared by:

ENGR. ANTHONY DACUNO/BSPT CONSTRUCTION CORP.


NAME & SIGNATURE
(JUNIOR ENGINEER)
Huawei PO Qty. BSPT PO Qty. Actual Field Qty.

6.00 6.00 8.00

30.00 30.00 42.00

51.00 95.00 100.00

37.00 70.00 80.00


Diameter & Commercial Length Standard Weight Length
Bar Size Designation
(mm) (kg) (m)
#8 8mm φ @ 6m length 2.37 6.00
#10 10mm φ @ 6m length 3.70 6.00
#12 12mm φ @ 6m length 5.33 6.00
#13 13mm φ @ 6m length 6.25 6.00
#16 16mm φ @ 6m length 9.47 6.00
#20 20mm φ @ 6m length 14.80 6.00
#25 25mm φ @ 6m length 23.12 6.00
#28 28mm φ @ 6m length 29.00 6.00
#30 30mm φ @ 6m length 33.29 6.00
#32 32mm φ @ 6m length 37.88 6.00
#36 36mm φ @ 6m length 47.95 6.00
#8 8mm φ @ 7.5m length 2.96 7.50
#10 10mm φ @ 7.5m length 4.62 7.50
#12 12mm φ @ 7.5m length 6.66 7.50
#13 13mm φ @7.5m length 7.83 7.50
#16 16mm φ @ 7.5m length 11.84 7.50
#20 20mm φ @ 7.5m length 18.50 7.50
#25 25mm φ @ 7.5m length 28.90 7.50
#28 28mm φ @ 7.5m length 36.25 7.50
#30 30mm φ @ 7.5m length 41.62 7.50
#32 32mm φ @7.5m length 47.35 7.50
#36 36mm φ @ 7.5m length 59.93 7.50
#8 8mm φ @ 9m length 3.56 9.00
#10 10mm φ @ 9m length 5.54 9.00
#12 12mm φ @ 9m length 7.99 9.00
#13 13mm φ @ 9m length 9.38 9.00
#16 16mm φ @ 9m length 14.21 9.00
#20 20mm φ @ 9m length 22.19 9.00
#25 25mm φ @ 9m length 34.68 9.00
#28 28mm φ @ 9m length 43.50 9.00
#30 30mm φ @ 9m length 49.94 9.00
#32 32mm φ @ 9m length 56.82 9.00
#36 36mm φ @ 9m length 71.92 9.00
#8 8mm φ @ 10.5m length 4.15 10.50
#10 10mm φ @ 10.5m length 6.47 10.50
#12 12mm φ @ 10.5m length 9.32 10.50
#13 13mm φ @ 10.5m length 10.94 10.50
#16 16mm φ @ 10.5m length 16.58 10.50
#20 20mm φ @ 10.5m length 25.69 10.50
#25 25mm φ @ 10.5m length 40.46 10.50
#28 28mm φ @ 10.5m length 50.75 10.50
#30 30mm φ @ 10.5m length 58.26 10.50
#32 32mm φ @ 10.5m length 66.29 10.50
#36 36mm φ @ 10.5m length 83.91 10.50
#8 8mm φ @ 12m length 4.74 12.00
#10 10mm φ @ 12m length 7.39 12.00
#12 12mm φ @ 12m length 10.66 12.00
#13 13mm φ @ 12m length 12.50 12.00
#16 16mm φ @ 12m length 18.95 12.00
#20 20mm φ @ 12m length 29.59 12.00
#25 25mm φ @12m length 46.24 12.00
#28 28mm φ @ 12m length 58.00 12.00
#30 30mm φ @ 12m length 66.59 12.00
#32 32mm φ @ 12m length 75.76 12.00
#36 36mm φ @ 12m length 95.89 12.00
#8 8mm φ @ 13.5m length 5.33 13.50
#10 10mm φ @ 13.5m length 8.32 13.50
#12 12mm φ @ 13.5m length 11.99 13.50
#13 13mm φ @ 13.5m length 14.07 13.50
#16 16mm φ @ 13.5m length 21.32 13.50
#20 20mm φ @ 13.5m length 33.29 13.50
#25 25mm φ @ 13.5m length 52.02 13.50
#28 28mm φ @ 13.5m length 65.25 13.50
#30 30mm φ @ 13.5m length 74.91 13.50
#32 32mm φ @ 13.5m length 86.23 13.50
#36 36mm φ @13.5m length 107.88 13.50

Prepared by:

ENGR. ANTHONY DACUNO/BSPT CONSTRUCTION CORP.


NAME & SIGNATURE
(JUNIOR ENGINEER)