2. Feasibility Study
How the feasibility factors impact on the new system
Constraints and Risk
3. System Analysis
Description of Finding
Summary of found Details
4. Hardware Requirement
Minimum Requirement
Resource Requirement
5. Software Requirement
Functional Requirements
Nonfunctional Requirements
Budget
Timeline
6. System Design
Data Flow Diagrams
Context diagram
Level 0 diagram
Level 1 diagram
Use Case Diagram
Class Diagram
Introduction
Company overview
The muthu shoo palace was found by Mr. suranga yapa. The shop is in
Buttala town. it is a small shoe palace. It was started by 2013. There have
shoes, bags, umbrellas and Other Things. The shop works two employees.
The employees are working under Mr. Suranga yapa. There are open
seven days a week. Poya days are closed and This shop is open from 8.00
am to 8.00 pm. Mr. Suranga is doing financial activities. employees are
helping to Customers.
How it works
*accuracy.
*Efficiency.
*economic feasibility
Because a computerized system to our new system, can be removed
unused file and maintaining cost. All details stored in to our database.
*operational feasibility
Operational feasibility is a measure of how well a proposed system solves
the problem. Once you identify the scope of the existing staff, will be
recruiting new employees or to the new training.
*technical feasibility
The company will decide whether that technical knowledge to handle of
this project. Company existing and new technological requirements of the
hardware, software assessment, it must be decided whether complete
new system requirements
*financial feasibility
The new system will be installed and continue estimate the financing
costs.
*schedule feasibility
time management, budget, income tax, deadlines such as the planned of
the incident.
*organizational feasibility
Our first strategic business requirement to determine the availability of
this system.
*Social feasibility
Social feasibility is all about making sure that the project fits with the
business goals and its social environment.
*Legal feasibility
Determines whether the proposed system conflicts with the legal
requirements. Therefore, the computerized system should not conflict
with the legal requirements.
We found this information from the owner of muthu shoo palace Mr.
surnga yapa. We were using it to open ended questions. We use the below
questions.
*history of company.
Minimum Requirement
* POS machine
* Barcode reader
* Computer
* Internet connection router
* Telephone-land line
Software Requirement
Functional Requirements
*registered employers.
*usability
the system is user friendly and online help to find out correct product will
support multiple languages.
*availability
our system are open seven days a week. Poya days are closed. Every day
is open from 8.00 am to 8.00 pm and 24 hours working our website.
*Efficiency Requirement
Even if the system fails, the system will be recovered back within an hour
or less.
*accuracy
our system will be provided 100% access reliability.
Budget
Monitor Rs.5000.00
Processor Rs.16000.00
Random Access Memory Rs.3000.00
Mother board Rs.14000.00
Hard Disk Rs.10000.00
Video Card Rs.4000.00
UPS Rs.7000.00
Keyboard and Mouse Devices Rs.1000.00
Router Rs.1500.00
Printer Rs.10000.00
POS Rs.20000.00
Software Rs.40000.00
Software update Rs.15000.00
Total = Rs. 146,500.00
Timeline
1st week
2nd week
3rd week
4th week
5st week
Research
System Analysis
Troubleshooting
Drawing
Diagram
Handing Over
the Project