MONTAJE DE TUBING PARA ACOMPAÑAMIENTO DE VAPOR Y/O TRACEADO DE VAPOR

R S/.x100 CURVA "S" progreso (%)


100% 1.8
Indicadores de Desempeño Acumulado
1.8
1.7
IDC/IDP IDP = VA 1.7
95%
1.6
VP 1.6
90% 1.5 1.5
IDC = VA
Avance Hasta la 1.4 1.4
85% CR
Fecha 92.15% 1.3 Lim. Sup 1.3
80% 1.2 1.2
1.1 1.1
75% 1.0 1.0
70% 0.9 0.9
0.8 0.8
65% 0.7 0.7
60% 0.6 0.6
0.5 0.5
55% 0.4 0.4
0.3 0.3
50%
IDC Acumulado IDP Acumulado
45%

40% 80% Variaciones de Acumulado


80%
70% Progreso & Costos en (%) 70%
35%
60% VC%= VA-CR 60%
30% 50% VP%= VA-VP VA 50%
40% VP 40%
25%
30% 30%
20% 20% 20%
10% 10%
15% 0% 0%
Tiempo del plazo Original
Recorrido 10% -10% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 -10%
-20% -20%
5% -30% -30%
-40% -40%
0%
-50% -50%
-60% -60%
-70% -70%
Início
-80% -80%
Valor Planeado - VP Valor Agregado - VA Costo Real -CR Estimado para completar Final
01/04/2009 30/06/2009
VP% Acumulado VP% Acumulado

VALOR / PERÍODO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 19 20
Fechas De Reporte 15/04/2009 30/04/2009 16/05/2009 31/05/2009 15/06/2009 30/06/2009

% do Prazo Original 0.17% 0.33% 0.50% 0.67% 0.83% 100.00%

Valor Planeado - VP 15.50 31.00 63.65 96.30 175.00 208.99

Valor Agregado - VA 12 31 76 120 164 209


Costo Real -CR 14 31 72 113 153 193

INDICADORES DE PROGRESO Y COSTOS


PROGRESO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
No Período 0.77 1.23 1.36 1.36 0.57 1.31
IDP Acumulado 0.77 1.00 1.19 1.25 0.94 1.00
COSTO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
No Período 0.86 1.12 1.08 1.08 1.12 1.12
IDC Acumulado 0.86 1.00 1.05 1.06 1.08 1.09
Limites superiores a 1,2 e inferiores a 0,8 para Limites entre 0,9 e 1,1 para casos de costos Limites dentro dos padrones,
Legenda
progreso y cosotos. La corretiva deve ser iniciada. Mantener en observacion, la preventiva provable. sin necesidad de acciones imediatas

17/02/2018