Project Title : PERLAKSANAAN PROJEK LEBUH RAYA PAN BORNEO

Menaiktaraf Jalan Tawau - Semporna (Tawau - Sandakan) Kepada Jalan D


Sabah (Pakej 1, Fasa 2)

Job Activities :
Location :
Date :

HAZARD IDENTIFICATION
No.
Activities / Process Potential Hazard Potential Effect

1 Excavation Ground Opening Person falling from height

2 Excavation Water / Rain Soil Erosion

3 Soil Excavation / Cutting Exposed Slope / Earth Collapse of slope / earth on to


person

This HIRAC is Created By :-


Name Company Position
AYA PAN BORNEO SABAH.
ndakan) Kepada Jalan Dua Hala, Tawau,
Fasa 2)

RISK ASSESSMENT RISK CONTROL


L S R Control / Recommendation

2 1 2 a.) Barricade of exposed opening


b.) Provide proper ladder

4 1 4 - silt trap
- proper discharge route

4 1 4 - build / maintain slope gradient below


30 degree or safe angle

- person in charge must monitor


excavation activities.

Approved By
Signature

Name :

Position :