1. Scope
This procedure covers the painting requirements for external surface of carbon steel
parts of Pressure Vessel, Piping, tank, etc for
........................................................................................... project.
3. Execution of Works
4. Inspection
4.1 After completion of finished coat, thickness or dry film shall be checked by
thickness gauge.
4.2 After completion of finished coat, appearance of painting be visually checked.
4.3 The acceptance criteria of dry film thickness as follow :
4.3.1 Number of measurements and minimum thickness.
4.3.2 The average of five spot measurements for each such 10 square meters
are shall not be less than specified thickness. No single spot
measurement in any 10 square meters area shall be less than 80% of the
specified thickness the five spot measurements shall be made for each 10
square meters of area as follow :
a) For structure not exceeding 28 square meters in area, each 10 square
meters area shall be measured.
b) For structures not exceeding 93 square meters in area, three of 10
square meters area shall be randomly selected and measured.
c) For structures exceeding 93 square meters, the first 93 square meters
shall be measured as stated in section (b) and for each additional 93
square meters of area or increment there of, one of 10 square meters
area shall be randomly selected and measured.