Вы находитесь на странице: 1из 37

PT PLN (PERSERO)

UPI MALUKU DAN MALUKU UTARA

LAPORAN PENJUALAN TENAGA LISTRIK VERSI PUSAT TOTAL


BULAN : Desember 2014
PEMBUKUAN : PLUS STATUS : Closing
RUPIAH PENJUALAN TENAGA LISTRIK
PEMAKAIAN KWH
BIAYA PEMAKAIAN
TARIF PELANGGAN DAYA KELEBIHAN KVARH
(VA) JUMLAH LWBP WBP BIAYA BEBAN KWH KEL.KVARH TTLB

+ 15.29%

1 2 3 4=5+6 5 6 7 8 9 10 11
S.1 / 220 VA 931 151,572 97,712 97,712 0 0 0 13,778,800 0
S.2 / 450 VA I 2,799 1,259,550 318,949 160,046 0 0 10,743,750 42,820,973 0
II 0 0 0 41,178 0 0 0 10,800,870 0
III 0 0 0 117,725 0 0 0 41,935,320 0
S.2 / 900 VA I 3,878 3,490,200 488,382 152,749 0 0 35,932,845 51,854,980 0
II 0 0 0 85,477 0 0 0 25,219,339 0
III 0 0 0 250,156 0 0 0 90,056,160 0
S.2 / 1.300 VA 1,341 1,743,300 202,815 202,815 0 0 0 143,546,959 0
S.2 / 2.200 VA 783 1,722,600 176,959 176,959 0 0 0 134,827,481 0
S.2 / 3.500 VA s/d 200 923 11,305,000 1,304,144 1,304,144 0 0 11,700 1,173,548,425 0
S.3 / 200 KVA 3 1,485,000 164,418 116,146 48,272 4,464 0 138,587,190 4,129,200
JUMLAH S 10,658 21,157,222 2,753,379 2,705,107 48,272 4,464 46,688,295 1,866,976,497 4,129,200
R.1 / 450 VA I 198,807 89,463,150 15,517,503 5,718,467 0 0 725,107,984 1,375,062,710 0
II 0 0 0 2,770,564 0 0 0 997,176,153 0
III 0 0 0 7,028,472 0 0 0 3,468,569,940 0
R.1 / 900 VA I 165,537 148,983,300 19,080,558 6,670,767 0 0 1,898,366,624 3,319,320,572 0
II 0 0 0 3,555,578 0 0 0 1,582,006,505 0
III 0 0 0 8,854,213 0 0 0 4,381,715,464 0
R.1 / 1.300 VA 39,944 51,927,200 6,700,157 6,700,157 0 0 6,072,402 9,027,790,408 0
R.1 / 2.200 VA 13,156 28,943,200 3,843,800 3,843,800 0 0 8,014,176 5,181,949,981 0
R.2 / 3.500 VA s/d 5.500 2,824 11,074,500 1,242,720 1,242,720 0 0 19,200 1,999,428,927 0
R.3 / 6.600 VA keatas I 534 6,511,400 760,086 760,086 0 0 185,700 1,152,274,099 0
II 0 0 0 0 0 0 0 0 0
JUMLAH R 420,802 336,902,750 47,144,824 47,144,824 0 0 2,637,766,086 32,485,294,759 0
B.1 / 450 VA I 4,367 1,965,150 277,106 164,840 0 0 17,302,817 72,318,849 0
II 0 0 0 112,266 0 0 0 47,151,720 0
B.1 / 900 VA I 8,297 7,467,300 897,307 652,611 0 0 65,722,876 358,057,208 0
II 0 0 0 244,696 0 0 0 113,855,364 0
B.1 / 1.300 VA 3,950 5,135,000 690,133 690,133 0 0 8,745 666,109,251 0
B.1 / 2.200 VA s/d 5.500 5,361 15,987,000 2,079,093 2,079,093 0 0 7,756 2,276,941,380 0
B.2 / 6.600 VA s/d 200 k 2,323 49,454,900 7,451,110 7,451,110 0 0 5,644,991 11,353,176,315 0
II 0 0 0 0 0 0 0 0 0
B.3 / > 200 kVA 24 20,700,000 2,995,130 2,333,730 661,400 7,960 0 3,708,415,016 9,552,657
JUMLAH B 24,322 100,709,350 14,389,879 13,728,479 661,400 7,960 88,687,185 18,596,025,103 9,552,657
I.1 / 450 VA I 0 0 0 0 0 0 0 0 0
II 0 0 0 0 0 0 0 0 0
I.1 / 900 VA I 3 2,700 720 180 0 0 85,050 56,700 0
II 0 0 0 540 0 0 0 218,700 0
I.1 / 1.300 VA 2 2,600 128 128 0 0 0 119,355 0
I.1 / 2.200 VA 1 2,200 227 227 0 0 0 217,920 0
I.1 / 3.500 s/d 14 kVA 19 154,800 18,172 18,172 0 0 0 20,205,776 0
I.2 / > 14 kVA s/d 200 kV 55 3,578,500 606,736 506,002 100,734 -8,589 0 638,704,116 -9,078,573
I.3 / > 200 kVA 5 1,725,000 242,055 208,919 33,136 760 0 288,386,945 906,847
I.4 / 30.000 kVA keatas 0 0 0 0 0 0 0 0 0
JUMLAH I 85 5,465,800 868,038 734,168 133,870 -7,829 85,050 947,909,512 -8,171,726
P.1 / 450 VA 417 187,650 37,235 37,235 0 0 2,652,300 21,590,831 0
P.1 / 900 VA 835 751,500 94,995 94,995 0 0 11,125,350 59,192,888 0
P.1 / 1.300 VA 445 578,500 73,202 73,202 0 0 654,576 76,713,441 0
P.1 / 2.200 VA s/d 5.500 1,000 3,356,100 420,002 420,002 0 0 1,476 451,773,230 0
P.1 / 6.600 VA s/d 200 k 926 23,061,800 3,423,402 3,423,402 0 0 20,664 5,216,305,865 0
II 0 0 0 0 0 0 0 0 0
P.2 / > 200 kVA 11 4,308,000 529,270 465,992 63,278 14,624 0 625,487,856 17,555,215
P.3 561 4,689,370 1,410,918 1,410,918 0 0 0 2,224,134,274 0
JUMLAH P 4,195 36,932,920 5,989,024 5,925,746 63,278 14,624 14,454,366 8,675,198,385 17,555,215
T / > 200 kVA 0 0 0 0 0 0 0 0 0
C /TM > 200 kVA 0 0 0 0 0 0 0 0 0
L 58 632,800 954,791 954,791 0 0 0 1,376,898,551 0
JUMLAH 460,120 501,800,842 72,099,935 71,193,115 906,820 19,219 2,787,680,982 63,948,302,807 23,065,346
JUMLAH

12=8+9+10+11
13,778,800
106,300,913
0
0
203,063,324
0
0
143,546,959
134,827,481
1,173,560,125
142,716,390
1,917,793,992
6,565,916,787
0
0
11,181,409,165
0
0
9,033,862,810
5,189,964,157
1,999,448,127
1,152,459,799
0
35,123,060,845
136,773,386
0
537,635,448
0
666,117,996
2,276,949,136
11,358,821,306
0
3,717,967,673
18,694,264,945
0
0
360,450
0
119,355
217,920
20,205,776
629,625,543
289,293,792
0
939,822,836
24,243,131
70,318,238
77,368,017
451,774,706
5,216,326,529
0
643,043,071
2,224,134,274
8,707,207,966
0
0
1,376,898,551
66,759,049,135
PT PLN (PERSERO)
WILAYAH KALIMANTAN BARAT
AREA SINGKAWANG

LAPORAN PENJUALAN TENAGA LISTRIK VERSI PUSAT TOTAL


BULAN : September 2013
PEMBUKUAN : PLUS STATUS : Closing
RUPIAH PENJUALAN TENAGA LISTRIK
PEMAKAIAN KWH
BIAYA PEMAKAIAN
TARIF PELANGGAN DAYA KELEBIHAN KVARH
(VA) JUMLAH LWBP WBP BIAYA BEBAN KWH KEL.KVARH TTLB

+ 15.29%

1 2 3 4=5+6 5 6 7 8 9 10 11
S.1 / 220 VA 0 0 0 0 0 0 0 0 0
S.2 / 450 VA I 55 24,750 1,674 1,042 0 0 170,100 223,129 0
II 0 0 0 281 0 0 0 74,465 0
III 0 0 0 351 0 0 0 126,360 0
S.2 / 900 VA I 102 91,800 6,513 2,405 0 0 884,850 883,921 0
II 0 0 0 1,414 0 0 0 417,130 0
III 0 0 0 2,694 0 0 0 969,840 0
S.2 / 1.300 VA 36 46,800 2,789 2,789 0 0 0 1,973,227 0
S.2 / 2.200 VA 19 41,800 2,816 2,816 0 0 0 2,140,687 0
S.2 / 3.500 VA s/d 200 32 187,500 9,555 9,555 0 0 0 8,599,385 0
S.3 / 200 KVA 0 0 0 0 0 0 0 0 0
JUMLAH S 244 392,650 23,347 23,347 0 0 1,054,950 15,408,144 0
R.1 / 450 VA I 6,036 2,716,200 353,874 142,717 0 0 27,189,360 28,185,489 0
II 0 0 0 85,874 0 0 0 30,914,640 0
III 0 0 0 125,283 0 0 0 62,015,085 0
R.1 / 900 VA I 1,724 1,551,600 162,256 43,720 0 0 24,270,666 19,110,537 0
II 0 0 0 39,828 0 0 0 17,723,460 0
III 0 0 0 78,708 0 0 0 38,960,460 0
R.1 / 1.300 VA 372 483,600 39,401 39,401 0 0 94,287 55,912,866 0
R.1 / 2.200 VA 96 211,200 13,557 13,557 0 0 0 19,247,257 0
R.2 / 3.500 VA s/d 5.500 14 53,700 6,021 6,021 0 0 0 8,621,361 0
R.3 / 6.600 VA keatas I 1 13,200 894 894 0 0 0 1,263,097 0
II 0 0 0 0 0 0 0 0 0

JUMLAH R 8,243 5,029,500 576,003 576,003 0 0 51,554,313 281,954,252 0


B.1 / 450 VA I 56 25,200 2,310 1,258 0 0 359,550 485,261 0
II 0 0 0 1,052 0 0 0 441,840 0
B.1 / 900 VA I 41 36,900 3,502 2,714 0 0 634,410 1,344,563 0
II 0 0 0 788 0 0 0 366,420 0
B.1 / 1.300 VA 29 37,700 5,598 5,598 0 0 0 5,405,148 0
B.1 / 2.200 VA s/d 5.500 61 184,500 21,933 21,933 0 0 8,460 24,123,455 0
B.2 / 6.600 VA s/d 200 k 14 206,600 31,148 31,148 0 0 0 44,024,403 0
II 0 0 0 0 0 0 0 0 0
B.3 / > 200 kVA 0 0 0 0 0 0 0 0 0
JUMLAH B 201 490,900 64,491 64,491 0 0 1,002,420 76,191,090 0
I.1 / 450 VA I 0 0 0 0 0 0 0 0 0
II 0 0 0 0 0 0 0 0 0
I.1 / 900 VA I 0 0 0 0 0 0 0 0 0
II 0 0 0 0 0 0 0 0 0
I.1 / 1.300 VA 0 0 0 0 0 0 0 0 0
I.1 / 2.200 VA 0 0 0 0 0 0 0 0 0
I.1 / 3.500 s/d 14 kVA 0 0 0 0 0 0 0 0 0
I.2 / > 14 kVA s/d 200 kV 0 0 0 0 0 0 0 0 0
I.3 / > 200 kVA 0 0 0 0 0 0 0 0 0
I.4 / 30.000 kVA keatas 0 0 0 0 0 0 0 0 0
JUMLAH I 0 0 0 0 0 0 0 0 0
P.1 / 450 VA 18 8,100 686 686 0 0 136,800 395,636 0
P.1 / 900 VA 16 14,400 2,797 2,797 0 0 296,676 1,755,400 0
P.1 / 1.300 VA 7 9,100 601 601 0 0 0 630,616 0
P.1 / 2.200 VA s/d 5.500 6 13,200 1,652 1,652 0 0 0 1,777,878 0
P.1 / 6.600 VA s/d 200 k 0 0 0 0 0 0 0 0 0
II 0 0 0 0 0 0 0 0 0
P.2 / > 200 kVA 0 0 0 0 0 0 0 0 0
P.3 0 0 0 0 0 0 0 0 0
JUMLAH P 47 44,800 5,736 5,736 0 0 433,476 4,559,530 0
T / > 200 kVA 0 0 0 0 0 0 0 0 0
C /TM > 200 kVA 0 0 0 0 0 0 0 0 0
L 0 0 2,903 2,903 0 0 0 4,623,926 0
JUMLAH 8,735 5,957,850 672,480 672,480 0 0 54,045,159 382,736,942 0

HITUNG LF TRAFO
JUMLAH KWH TR 5,564 KVA
COS q 0.8
FAKTOR KEBERSAMAAN 0.45
WAKTU (JAM) 744 31 HARI 11,915,700
ENERGY MAKSIMUM 1,490,195
ENERGY JUAL 631,777 KWH
LF TRAFO 0.424

HITUNG LF TR/ SR
JUMLAH KWH R 5,030 KVA
COS q 0.8
FAKTOR KEBERSAMAAN 0.45
WAKTU (JAM) 744 31 HARI
ENERGY MAKSIMUM 1,347,101 KWH
ENERGY JUAL R 576,003 KWH
LF TR & SR 0.428
JUMLAH

12=8+9+10+11
0 TR
594,054 TR
0 TR
0 TR
3,155,741 TR
0 TR
0 TR
1,973,227 TR
2,140,687 TR
8,599,385 TM
0 TR
16,463,094 JUMLAH S
148,304,574 TR
0 TR
0 TR
100,065,123 TR
0 TR
0 TR
56,007,153 TR
19,247,257 TR
8,621,361 TR
1,263,097 TR
0 TR Daya x0,45xcosx720
333,508,565 JUMLAH R 1,385,124
1,286,651 TR LF TR SR 0.42
0 TR
2,345,393 TR
0 TR
5,405,148 TR
24,131,915 TR
44,024,403 TM
0 TM
0 TM
77,193,510 JUMLAH B
0 TR
0 TR
0 TR
0 TR
0 TR
0 TR
0 TR
0 TM
0 TM
0 TT
0 JUMLAH I
532,436 TR
2,052,076 TR
630,616 TR
1,777,878 TR
0 TR
0 TR
0 TM
0 TM
4,993,006 JUMLAH P
0 TR
0 TM
4,623,926 TR
436,782,101 JUMLAH
LF Cos
No. APJ TM Trafo JTR SR TM Trafo JTR SR
1 TW4 2013 0.88 0.42 0.428 0.428 0.89 0.8 0.7 0.7 3
2 4
DISTRIBUSI 5
6
7
8
0.882 9
TW1 TW2 TW3 TW4 TW4

Penerimaan 935360
Penjualan Total 672,480
Penjualan TT
Penjualan TM -
Kirim ke unit lain
PS GD 0
Periode Perhit 744
TW1

8,760
PANJANG KABEL TEGANGAN MENENGAH 20 kV (meter sirkuit)

CABANG TEMBAGA (Cu)


1.15 0.73 0.52 0.39 0.27 0.19 0.15 0.12 0.10
16 mm2 25 mm2 35 mm2 50 mm2 70 mm2 90 mm2 120 mm2 150 mm2 185 mm2
TW4 - - 20

TW1 TW2 TW3 TW4


Jmlh pnyl 4
ALUMINI
0.08 0.06 0.05 1.91 1.20 0.87 0.64
240 mm2 300 mm2 400 mm2 16 mm2 25 mm2 35 mm2 50 mm2
-
ALUMINIUM (Al)
0.44 0.32 0.25 0.21 0.16 0.13 0.10 0.08
70 mm2 90 mm2 120 mm2 150 mm2 185 mm2 240 mm2 300 mm2 400 mm2 Jumlah
20
-

20
R Total
4
-
-
PANJANG RUTE SALURAN UDARA TEGANGAN MENENGAH 20 kV (meter sirkuit)

CABANG TEMBAGA (Cu)


1.15 0.75 0.53 0.38 0.28 0.20 0.17 0.16 0.12
16 mm2 25 mm2 35 mm2 50 mm2 70 mm2 95 mm2 110 mm2 120 mm2 150 mm2
TW4 15
TW1
ALUMINIU
0.10 0.08 0.06 0.05 0.04 1.96 1.18 0.96 0.67 0.44
185 mm2 240 mm2 300 mm2 400 mm2 500 mm2 16 mm2 25 mm2 35 mm2 50 mm2 70 mm2
52
ALUMINIUM (Al)
0.36 0.33 0.29 0.21 1.83 0.14 0.11 0.08 0.07
95 mm2 100 mm2 120 mm2 150 mm2 185 mm2 240 mm2 300 mm2 400 mm2 500 mm2 Jumlah
3 90
-

1,385,550 410,300
R Total R Eq
38 0.43 2,559 48 1.23
- #DIV/0! 2,855 38 1.16
PANJANG JARINGAN TEGANGAN RENDAH (meter sirkuit)

CABANG TEMBAGA (Cu)


2.90 1.86 1.15 0.75 0.53 0.38 0.28
6 mm2 10 mm2 16 mm2 25 mm2 35 mm2 50 mm2 70 mm2
TW4 - - - 996 - - -

- - 3,266 15,916 - - -

(3,266) (14,920) - - -

Jmlh Jrs TW1 TW2 TW3 TW 4


100

4094
3301
740

8135
TEMBAGA (Cu)
0.20 0.17 0.16 0.12 0.10 0.08 0.06 0.05 0.04
95 mm2 110 mm2 120 mm2 150 mm2 185 mm2 240 mm2 300 mm2 400 mm2 500 mm2
- - - - - - - - -

- - - - - - - - -

- - - - - - - - -
ALUMINIUM (Al)
1.96 1.18 0.96 0.67 0.44 0.36 0.33 0.29
16 mm2 25 mm2 35 mm2 50 mm2 70 mm2 95 mm2 100 mm2 120 mm2
- - 5,045 1,375 - - -

- - 1,353,450 3,325,350 1,115,437 1,036,100 - - -

- - (1,353,450) (3,320,305) (1,114,062) (1,036,100) - - -


M (Al)
0.21 1.83 0.14 0.11 0.08 0.07
150 mm2 185 mm2 240 mm2 300 mm2 400 mm2 500 mm2 Jumlah R Tot R Eq
- - - - - - 7,416 6,496 0.88
- - #DIV/0!
- - - - - - 6,849,519

- - - - - - (6,842,103)
PANJANG JARINGAN TEGANGAN RENDAH (meter sirkuit)

CABANG TEMBAGA (Cu) ALUMINIUM (Al)


3.08 1.83 1.15 3.08 1.91
2 x 6 mm2 2 x 10 mm2 2 x 16 mm2 2 x 6 mm2 2 x 10 mm2 2 x 16 mm2
TW4 2,218 0 0 - 21,943 -

1,344,100 15,374,240 2,530,000


(1,344,100) (15,352,297) (2,530,000)

Jmlh Konsumen tw1 TW2


442356 7,552
JUMLAH R Tot R Equi
24,161 74,416 3.08
- - #DIV/0!
19,248,340

(19,224,179) (9,612,090)
(5,767,254)
(3,844,836)


7671 230130
442,356 13270680
-434,804 -19566180
TABEL JUMLAH TRAFO

LFE 0.115 0.19 0.32 0.46 0.55 0.65 0.77 0.93 1.1 1.3 1.95 2.3 2.7 3.3 3.9 4.5
APJ LCU 0.7 1.1 1.75 2.35 2.85 3.25 3.9 4.6 5.5 6.5 10.2 12.1 15 18.1 21 28 Jumlah Equivalent
KVA 25 50 100 160 300 250 315 400 500 630 800 1000 1250 1600 2000 2500 Trafo KVA LFE LCU

TW4 10 43 12 3 - - - - - - - - - - 68 4,080 0.214 1.211


- - #DIV/0! #DIV/0!
758 1,209 520 248 236 101 30 38 5 8 34 2 5 2 #DIV/0!

(748) (1,166) (508) (245) (236) (101) (30) (38) (5) (8) (34) (2) (5) - (2) -

5 25 95 70 10 70 3 -4 0 -12 -3

(753) (1,191) (603) (315) (246) (171) (33) (34) (5) (8) (22) (2) (2)
.
APJ : Wil. Maluku & Malut TW II
Penerimaan *) kWh 935,360
Penjualan total *) kWh 672,480 TM Trafo TR SR
Penjualan di sisi TT *) kWh
Penjualan di sisi TM *) kWh - -
Penjualan di sisi TR kWh 672,480 Faktor Beban (LF) 0.88 0.42 0.43 0.43 -
Faktor Susut (LLF) 0.81 0.25 0.26 0.26
KWh Kirim ke Unit Lain kWh - Faktor Kerja (FK/Cos j) 0.89 0.80 0.70 0.70
Pemakaian Sendiri GD kWh - Tahan Penghantar ( R ) Ohm/km 0.43 0.88 3.08
Faktor Koreksi (FK) 0,2 - 1,4 1.00 1.00 2.00
Susut total kWh 262,880 Periode perhitungan Jam 744 744 744 744
Susut I 2 R kWh 33,323
Susut non I 2 R kWh 229,557
Susut total % 28.10
Susut I 2 R % 3.56
Susut non I 2 R % 24.54

TM Trafo JTR SR
Input kWh 935,360 935,357 911,744 903,357
Jml Peny/Trafo/Jur/Kons * ) bh 4 68 100 7,552
Panjang JTM/KVA Trafo/JTR/SR * ) kms 0 4,080 7 24
Panjang/KVA trafo rata-rata kms 0 60 0.07 0.003
Node per Peny/Jurusan 17 2
Rugi besi 0.21
Rugi tembaga 1.21
Iek per Peny/Trafo/Jur/Kons kVA 239 55 31 0.54
Rugi beban puncak per Peny/Trafo/Jur/Kons kW 0.00 1.84 0.44 0.000235
Susut I 2 R kWh 3 23,612 8,387 1,320
Susut I 2 R vs input % 0.00 2.52 0.92 0.146
Susut I 2 R vs input total % 0.00 2.52 0.90 0.141
REALISASI SUSUT TW II2015 VS TW I 2015
Wilayah Maluku & Maluku Utara

0.00% 3
JTM 0.97% 2,171,850

2.52% 23,612
GARDU 0.79% 1,783,919

SUSUT TEKNIK*)
0.90% 8,387
JTR 2.85% 6,416,603
3.56% 33,323
6.19% 13,906,874
0.14% 1,320
DISTRIBUSI SR 1.57% 3,534,503

28.10% 262,880
11.30% 25,412,180
0.09% 806
INTERNAL 0.02% 40,410

SUSUT NON TEKNIK

24.54% 229,557
5.12% 11,505,306 24.46% 228,754
TW II 2015 EKSTERNAL 5.10% 11,465,038
TW I 2015
28.10%
PT.PLN (PERSER0)
DISTRIBUSI JAWA BARAT DAN BANTEN
SUSUT TEKNIS & NON TEKNIS
Wilayah Maluku & Malut

TW 1 2014
SUSUT kWh SUSUT
NO CABANG kWh Siap
kWh Siap Salur kWh PSSD kWh Kirim kWh JUAL
Jual Total JTM Trafo JTR SR Jml. Teknis Non Teknis Total JTM Trafo
1 2 3 4 5=(3-4) 6 7 8 9 10=(6+7+8+9) 11=(5-10) 12 13 14
AREA Ambon 120,394,876 - 120,394,876 -
1 AREA Ternate 61,180,111 - 61,180,111 -
AREA Tual 21,822,984 - 21,822,984
4 WILYAH M2U 221,750,667 1,301,710 221,750,667 -
5
6

9
10

11
12

13
14

15

DISTRIBUSI.JABAR
SUSUT (%)
Keterangan
Jml. Non
JTR SR
Tek Tek
15 16 17 18 19
ALOKASI ANGGARAN PENURUNAN LOSSES
A. Program Penurunan Susut Teknik :

No. INISIATIF ALOKASI ANGGARAN (M) PROGRAM RENCANA KERJA

1 Penambahan Penyulang. Pembangunan penyulang baru.


Pemindahan beban penyulang lama ke
penyulang baru.
Pemberatan Penyulang.
2
Pemilihan penyulang TM yang overload.
Penggantian konduktor TM dengan
penampang yang lebih besar.
Perbaikan tegangan ujung TM Pemilihan penyulang TM yang tegangan
3
ujungnya drop.

Memindahkan suplai terdekat antara


GI/Pembangkit dengan beban penyulang.
Penyeimbangan beban TM Mengukur beban antar fase pada seksi
4
tertentu penyulang.
Memindahkan beban pada fasa yang berat
ke fasa yang ringan.
Penggantian konector press Menentukan konector yang kendor atau
materialnya jelek dengan infra red.
5

Penggantian konector press.


6 Pemasangan gardu sisipan
7 Penyeimbangan beban trafo
8 Normalisasi beban trafo maks 60
%.
9 Desain gardu yang efisien
10 Penambahan Jurusan TR
11 Penyeimbangan beban JTR
12 Pemberatan/Penggantian JTR
13 Perbaikan tegangan ujung JTR
14 Penggantian konector press TR
15 Normalisasi panjang SR
16 Normalisasi penampang SR
Penggantian kWh meter tua
17 (diatas 15 tahun)
18 Penggantian CT pengukuran
Upgrade Meter Mekanik ke APP Terpadu
Upgrade kWh ME AMR (APP
terpadu) untuk CT pelanggan
19 41,5 kVA - 197 kVA & 16,5 kVA-
33 kVA.
Pasang kWh Meter Exim antar Pasang kWh meter exim percabangan
Area & percabangan penyulang. pada penyulang yang terpilih.
20
Pasang kWh Meter Exim antar
Area & percabangan penyulang.
20
Pasang kWh meter extim di perbatasan
Area.

Update MDI ke MTDm@x dan


21 pemasangan MTDm@x.

B. Program Penurunan Susut Non-Teknik :

No. INISIATIF ALOKASI ANGGARAN (M) PROGRAM RENCANA KERJA

Pelaksanaan Revass :
1 Rekonsilisasi Komersial &
Pembenahan data pelanggan

2 Pembenahan Manajemen Cater.

TUL : Proses dari menyala sampai


3 menjadi rekening.

TUL : Waktu pelanggan diputus


4 (sisa kWh agar ditagihkan)

TUL : Evaluasi sambungan


5 sementara/pesta dll.

6 PJU ilegal.
Intensif pelaksanaan P2TL oleh
7 OS.
ALOKASI ANGGARAN PENURUNAN LOSSES SEMESTER 2
A. Program Penurunan Susut Teknik :

No. INISIATIF ALOKASI ANGGARAN PROGRAM RENCANA KERJA PREDIKSI SAVING kWh YANG
(RP) DIPEROLEH (KWH)
JTM
Pembangunan penyulang baru.
1 Menaikan teg Penyulang.
33,643,071,668.00 7,501,848
Pemindahan beban penyulang lama ke
penyulang baru.

2 Menaikan teg Penyulang di GI


1,739,487
Pemberatan Penyulang.
Pemilihan penyulang TM yang overload.

3 Penggantian konduktor TM dengan


penampang yang lebih besar.
Perbaikan tegangan ujung TM Pemilihan penyulang TM yang tegangan
ujungnya drop.

4 Memindahkan suplai terdekat antara


GI/Pembangkit dengan beban penyulang.
Penyeimbangan beban TM Mengukur beban antar fase pada seksi
tertentu penyulang.

5
Memindahkan beban pada fasa yang berat
ke fasa yang ringan.

GD danJTR

Penggantian konector press Menentukan konector yang kendor atau


materialnya jelek dengan infra red.
6 80,000,000 Penggantian konector press. 521,600
7 Menaikkan teg di rak tr 400v -
8 Penyeimbangan beban trafo -
9 Normalisasi beban trafo maks 60 %. 7,040,000,000 Pemasangan 88 gardu sisipan 1,584,000
10 Desain gardu yang efisien
11 Penambahan Jurusan TR
12 Penyeimbangan beban JTR
13 Pemberatan/Penggantian JTR
14 Perbaikan tegangan ujung JTR
15 Penggantian konector press TR
16 Normalisasi panjang SR
17 Normalisasi penampang SR
18 Penggantian kWh meter tua (diatas 15 tahun)
19 Rewiring APP

20 Penggantian CT pengukuran

Upgrade kWh ME AMR (APP terpadu) untuk CT pelanggan 41,5 kVA - 197 462,000,000 Upgrade Meter Mekanik ke APP Terpadu 74,250
kVA & 16,5 kVA-33 kVA.
21
Pasang kWh Meter Exim antar Area & percabangan penyulang. Pasang kWh meter exim percabangan
pada penyulang yang terpilih.
450,000,000
22 Pasang kWh meter extim di perbatasan 250,000
Area.
Update MDI ke MTDm@x dan pemasangan MTDm@x. 1,240,000,000 Target 1240
B. Program B. Program Penurunan Susut non Teknik :

No.
1 INISIATIF ALOKASI ANGGARAN PROGRAM RENCANA KWH PREDIKSI SAVING kWh YANG
DIPEROLEH
2 Pengecekan untuk LPB > 3 Bln Tdk Beli Token (Bm@X Online) Pengecekan P2TL LPB Tidak Beli Token > 400,200
291,406,599
3 Pengecekan untuk DLPD Pasca bayar (KWH nol ) 3Bln dan KWH NOL 1,120,900
4 Pemakaian Kurang dari 60 Jam Nyala - Pemeriksaan Reguler Pegawai 49,000
5 Pemakaian turun 50% dari Pemakaian Rata2 - Pemeriksaan Reguler Pegawai 12,000

6 Migrasi Pelanggan EX Tanggerang 24,000


- Pengecekan bersama vendor B-max
Pemeriksaan P2TL dan Perbaikan
7 P2TL > 41,5-197 kVA 293,355,145 Komunikasi AMR 1,788,000
8 PP P2TL rutin 5,579,350,002 Vendor PT.Lisna dan PT. Agung 15,000,000
9 Penyelesaian P2TL yang belum jadi SPH - Penyelesaian Reguler Pegawai 1,402,245
10 Pengecekan Ratio CT/PT faktor kali meter pelanggan (>197.000 KVA) TM - Penyelesaian Reguler Pegawai 200,000
11 APP HILANG/RUSAK/BURAM/TUA 60,000
12 Penggantian Meter tua 1 Phasa > 20 Th 52,950,240 Kontrak Penggantian Meter oleh Vendor 1,250,000
13 Penggantian Meter 3 fasa (APP terpadu pengukuran langsung) 1,065,000
14 Penggantian Meter Elektromekanik ke ME APP terpadu daya sd 197 KVA Penggantian APP Terpadu 915,000
15 PJU - Reguler pegawai 37,500
PEMBAGIAN SUSUT TEKNIS DAN NON TEKNIS

TM

TRAFO

#REF!

#VALUE!
TEKNIS TR

SUSUT SR

#REF!

#REF!

INTERNAL
NON TEKNIS

#VALUE!
EXTERNAL

40,927,841
N NON TEKNIS

#VALUE! #REF!

#VALUE! #REF!

#VALUE! #REF!

#VALUE! #REF!

0.01%
86,129
4.49%
40,841,712
Gangguan Jaringan Distribusi
Penghantar TM Overload
Penghantar TM Terlalu Panjang
Tengangan Ujung TM (Drop
Sambungan/Konektor/ Jointing Longgar
Beban JTM Tidak Seimbang

Trafo Distribusi Overload


Beban Trafo Tidak Seimbang
Terminasi/Konektor Longgar
Pemasangan kWh meter di Gardu Distribusi

Jurusan JTR Overload


Sambungan/Konektor Longgar

Beban JTR Tidak Seimbang

Tengangan Ujung JTR Drop

JTR Terlalu panjang

SR Seri lebih satu sambungan

Luas Penampang SR Tidak Standar

kWh meter usia tua/rusak/tidak akurat

Setting CT tidak sesuai

CT Jenuh

Rewiring APP

Pasang kWh Meter Exim antar Area & percabangan penyulang.

Perubahan Pelaporan

Pembacaan meter tdk akurat


PJU ILEGAL

0.16%
PEMAKAIAN ILEGAL

8.94%
APP RUSAK/HILANG

0.26%

Вам также может понравиться