Form No:
Ref No:
Checked By Approved By
Item Detail Y N NA
Engr / Foreman Date RE / RTO Date
A EXCAVATION
1 Position with reference to drawing
2 Length, Width and Depth
3 Side Supports / Shoring / Sheet Piling
4 Compacting
B LEAN CONCRETE
1 Level as Per Drawing
2 Surface is free from mud & water
C BACKFILLING
1 Remove timber, rubbish, etc.
2 Honeycomb of substructure
3 Soil Quality
4 Backfilling & Compacting
D ANY OTHER
REMARKS: