Вы находитесь на странице: 1из 3

Dear Sir/ Madam,

I am sending my resume for appropriate post.


I have 14 years 6 month experience in Erection & Commissioning, Operation & Maintenance and Planning of
4X250 MW Power plant.

Currently Working with Hydro Operation International, Switzerland as Maintenance Manager for Mt. Coffee
Project.

Worked with Mainstream Energy Solutions Limited, Nigeria 760 + 600 MW power plant as Maintenance
Manager. From Dec 2014 to Sep 2016.

Worked with Nam Theun 2 power company, Laos (Electricity De France major share holder) from Oct 2009 to
Dec 2014
Involved in erection and commissioning of 4X250 MW + 2X35 MW Nam Theun 2 Power Company.

Involved in O&M, erection and commissioning of 4X250 MW Karcham Wangto Hydro Power Plant of JAI
PRAKASH Group (Annual Turnover Rs 7000 crores) from Aug 03 to Oct 09.

Project Manager for CMMS (Computerized Maintenance Management System) and active member of ISO14001
certification of Nam Theun 2 Power Company.

Implementation of Maintenance Plan, Maintenance Sheets & Procedures for Power Plant.

Outage Manager for Minor / Major Overhaul of Hydro power generating units.

Lubrication Level II certificate holder from Noria USA.

Preparation of Technical requirement, Scope of works, Owners requirement for various new & improvement
projects related to Hydro Power Plant.

I have completed one week training program on Advanced Welding Technology and Non Destructive Test
conducted by Welding Research Institute, Bharat Heavy Electricals Limited, Tiruchirapalli.

Two month complete runner weld repairing and Robotic HVOF coating (in technical collaboration with Techno lab)
work at HEAVY ENGINEERING WORKSHOP, REWA, M.P. All these activities were held under my supervision

Regards,

MANVENDRA MISHRA

Maintenance Manager

Mt. Coffee Hydro Power Plant

Hydro Operation International, Lausanne, Switzerland

Mobile No.-+231775505680
Skype id- manavjhpl@hotmail.com

1. Joining Time required -1 month or less.


2. Passport No – Z3985136
3. Have LMV DRIVING LICENCE – Yes
RESUME
MANVENDRA MISHRA
S/O Sri Krishna Nand MISHRA
H No. 178,Shuklana Tola,
Parsadepur,Raebareli,U.P.
PIN-229129
Mo. - +231775505680
Email: manavjhpl@gmail.com, mmishracar@gmail.com
Linkedin Profile- https://www.linkedin.com/in/mishramanvendra/

SUMMARY
Maintenance Manager with 14 years 6 month experience in Erection & Commissioning, Operation &
Maintenance & Planning of Power plant from 2nd August. 2003 till date.

EXPERIENCE
 Currently Working with Hydro Operation International, Switzerland as Maintenance Manager for Mt. Coffee
Hydro Power Project.
 Worked with Mainstream Energy Solutions Limited, Nigeria 760 + 600 MW power plant as Maintenance
Manager. From Dec 2014 to Sep 2016.
 Involved in erection and commissioning of 4X250 MW + 2X35 MW Nam Theun 2 Power Company.
 Involved in erection and commissioning of 4X250 MW Karcham Wangto Power Plant of JAI PRAKASH
Group w.e.f Aug 07 to Oct 09.
 Four year in Operation & Maintenance of 330 MW Power Plant of JAIPRAKASH group awarded Gold shield
for 2007-2008 by ministry of power.
 Implementation and operation of Computerized Maintenance Management System for Power Plant.
 Implementation of Maintenance Plan, Maintenance Sheets & Procedures for Power Plant.
 Outage Manager for Minor / Major Overhaul of Generating Units.
 Preparation of Technical requirement, Scope of works, Owners requirement for various new & improvement
projects related to Hydro Power Plant.

JOB PROFILE
Working as Maintenance Manager with Hydro Operation International (Sep 2016 till present) 88 MW Power
Plant
 Management of ongoing Erection & commissioning activities for 22MW X 4 Francis turbines.
 Preparation of O&M Organization, procedures and maintenance strategies.
 Maintaining high availability and reliability of Power Plant and assets.
 Managing O&M team at the plant. Preparation & Management of training calendar for entire work force.
 Planning & managing equipment / plant outages.
 Procuring goods and services from external specialist suppliers.
 Managing, supervising and monitoring contractors on site
 Managing the Operation & Maintenance department’s budget.
 Strategic & day to day maintenance management, supervising, planning & co-ordination to ensure safety,
compliance and maximum plant availability.
 Preparation of various reports such as Weekly, Monthly & Annual O&M Report for top management & others.
 Efficient management of work force & periodic performance evaluation of team.
Worked as Maintenance Manager with Mainstream Energy Solutions Limited (Jan 2015 to Sep 2016) 760 MW
Power Plant
 Management of ongoing Erection & commissioning activities for 120MW X 3 turbines.
 Preparation of O&M Organization, Maintenance procedures and maintenance strategies.
 Implementation of Preventive Maintenance & Computerized Maintenance Management system.
 Maintaining high availability and reliability of Power Plant and assets.
 Managing O&M team at the plant. Preparation & Management of training calendar for entire work force.
 Planning & managing equipment / plant outages
 Procuring goods and services from external specialist suppliers.
 Preparation of Technical requirement, Scope of works, Owners requirement for various new & improvement
projects related to Hydro Power Plant.
 Managing compliance with contracts essential to the operation and maintenance of the plant.
 Managing, supervising and monitoring contractors on site
 Managing the Operation & Maintenance department’s budget.
 Developing the site’s maintenance cover arrangements
 Strategic & day to day maintenance management, supervising, planning & co-ordination to ensure safety,
compliance and maximum plant availability.
 Actively participating in site Safety & Engineering Forums.
 Preparation of various reports such as Weekly, Monthly & Annual O&M Report for top management & others.
 Efficient management of work force & periodic performance evaluation of team.
Nam Theun 2 Power Company, Laos (Electricity De France) 1080 MW Power Plant (Oct 2009 to Dec 2014)
Senior Engineer Maintenance & Planning Section Manager
 Involved in erection and commissioning of 4X250 MW Nam Theun 2 Power Company of Electricity De France
Group, France (One of the world’s biggest group in Power Generation).
 Daily T&C activity planning and monitoring of Nam Theun 2 Power Company.
 Preparing daily report of erection, commissioning and operational events as specified in the work instructions.
 Erection of 4X250MW Francis Turbine + 2X37.5MW Pelton Turbine (Andritz make)
 Follow up Erection and maintenance of Dam Hydraulic Gates (Radial and Flap).
 Preparation of punch list & Warranty Defect Notification for various equipments of Power House, Dam site,
Substation and Regulating Dam.
 Implementation and In charge of Preventive & Corrective maintenance planning for Overall project.
 Preparation of Preventive Maintenance Master Plan including all the maintenance activities for each & every
equipments of Power House, Dam site, Substation and Regulating Dam.
 Preparation of the 7 years maintenance rolling program of NT2 and yearly planned outages program.
 Preparation of 25 Years Typical maintenance Plan of Overall Project.
 In charge of the preparation of the yearly maintenance planning and follows it up during the year, in respect of the
PPAs, with the maintenance sections and operation department.
 In charge of the preparation and monitoring of the maintenance indicators for Preventive Maintenance / Corrective
Maintenance.
 Implementation and application of Computerized Maintenance Management System (CMMS) for Maintenance
activities.
 Planning and Co-ordination with various Contractors for shutdown maintenance work.
 In charge of the management of the monthly / weekly planning for the maintenance department (resources /
activities).
 Preparation of various reports.
 Supervision of maintenance activities during outage.
 Fault & Trip analysis.
Jai Prakash Power Ventures Limited
Karcham Wangtoo Hydro Electric Project 4X250 MW (Aug 07 to Oct 09.)
Electromechanical Engineer (Site Installation)
 Involved in erection and commissioning of 4X250 MW Karcham Wangtoo Power Plant of JAI PRAKASH Group.
 Timely and safe execution of erection & commissioning activities as per given erection schedule.
 Looking after safety of man and material at site.
 Safe handling, lifting and proper storage of site material.
 Preparation of daily work record, problem faced, important and pending activities.
 Planning for man power requirement as per given erection and commissioning schedule.
 Preparing daily report of erection, commissioning and operational events as specified in the work instructions.
 Adopting the erection and commissioning procedure as given in supplier’s technical manual.
 Erection of 4X250MW Francis Turbine (Andritz make)
 Erection of 4 X 277.8 Mva Synchronous Generator (Siemens make)
 Erection of 275 ton, 210 ton, 180 ton E.O.T. crane. (Unique make)
BASPA II 3X100 MW (Aug 03 Aug 07)
Assistant Engineer Mechanical
 Overall maintenance of Power Plant including Generator, Turbine and auxiliaries.
TECHNICAL QUALIFICATION
MECHANICAL ENGINEERING Diploma Feroze Gandhi Institute of Engineering Technology
FINAL YEAR 2003 First division (76.9%)
SOFTWARE EXPOSURE
MS OFFICE, AUTO CAD2000, MS PROJECT, ERP, I planning, CMMS (GP Mate & Maars man), Crystal Report.
PERSONAL INFORMATION

Date of birth : 23rdaugust 1983


Physical status : Weight: 74kg, height: 178cms
Martial status : Married
Linguistic ability : Hindi, English, Thai, Lao, French
Passport No. : Z3985136

Вам также может понравиться