L équipe du chantier réussie de Descendre le tie back avec sucée et on tout sécurité BBR-2 well (ENF 08)
Lowlights
Highlight
Lowlights
Well MD-SPEC238
- Attente changement top drive. 0.56jour
RIH 18”5/8 Casing to 427m freely without prior wiper trip in NHBHJ-1 well (GWDC 112).
Lowlights
7 meter Time Drilling in MD676 (NDIL F27) in order to sidetrack the well (does not comply with the procedure).
Briefing of May 8th 2016
Lowlights
Fire ignition in Driller’s Cabin in GWDC112 (NHBHJ-1 well) during 26”-16” Inter-phase (work on wellhead).
Well Control operations performed successfully without incident in OMK623IG well (NDIL F21) using Wait and
Weight method.
Lowlights
BOTIL float valve of 18’’5/8 stab in shoe failed in OKS-39 well (TP 216).
The communicated planned mud density (0.86sg), to drill the 6” section in OMK623IG well (NDIL F21), seems to
be lower than it should be as the well was controlled (after well control incident once drilled 3m in new
formation) using 1.04sg.
Briefing of May 10th 2016
Highlights
Oil at surface in GDN1Bis exploratory well (ENF18) during the DST operations (Serie Inf).
Lowlights
Repeating VSP Logging, in ONRS1 well (ENF 51), after having doubts in the interpretations of the first one; this
will lead to avoidable NPT.
Briefing of May 11th 2016
Highlights
Drilled 8”1/2 phase (from 3275m to 3360m) using DSF713M PDC bit SN: E223939 in 8.75 hours time, in OMJ-431
well (NDIL F28), with ROP of 13.32 m/hr WOC.
Briefing of May 12th 2016
Highlights
Delivered the ONI451 well (NDIL F22) after 54.5 days (planed 90 days).
Succeeded to perform coring and recover core in deviated well at 60° in BKHC1 (SPEC 151).
Succeeded to core using 4 sections of inner tubes, and recover the 36 meter core in HRC64 well (ENF 44) – Hassi
Rmel Field-
Lowlights
Repeated Incidents/Accidents in GWDC rigs, especially incidents related to accommodation (cabins and skids).
Fatal Accident happened in GWDC118 (MD 675) during the last storm when the security check point
destroyed; this led to 2 casualties (one died in the hospital).
Briefing of May 13th 2016
Highlights
Ability to sidetrack using Packed Hole BHA in WRAA1 well (TP 169).
Started getting formation after drilling out 28m of cement; and got 90% formation after drilling out 54m of
cement.
Lowlights
The production packer is requested to be set below the 7” landing collar (between the float collar and the shoe)
in HGAS4 well (TP226).
This requires the scrapping in front the landing collar which may lead to some downhole problems (risk of
scraper sticking)
2 Days NPT repairing Bentec TDS (report n°3) in TP160 (EAR-1 well).
Briefing of May 14th 2016
Highlights
Lowlights
The Drilling Line found seriously damaged inside the Drawworks in ENF 10 (HTFN-6 well) during running in hole
the 13”3/8 Casing @ 1528m (133 joints).
Waiting on Baker dies in order to repair Power Tong (no back up in site) in HRS33 well (TP 161).
SLB fisher man failed in the fishing operations in SBBR1 well (ENF 08).
The fishing BHA components left in hole rather than to recover the primary fish (the Top of Fish moved
upper).
Briefing of May 15th 2016
Highlights
The Impreg bit iQ616D SN° 12377081 and the SLB 6"5/8 TSH MK2 FBS Turbine, succeeded to reach an average
ROP of 3.27m/hr in CAMBRIAN RI formation, in RDH1 (SPEC 118) during the 8”1/2 turbo drilling.
Lowlights
Waiting on completion equipment in MD-676 (NDIL F27) and OMP46 (GWDC155) even the fact that the
Production Packers have been set.
Traffic accident during the rig move of NDIL F22 to new platform @ MD-679.
Collision between the Nabors Track loading cabin skid and BJSP Cement unit truck.
No injuries; and the BJSP truck was damaged.
Briefing of May 16th 2016
Highlights
The Impreg bit K505BPX SN° JM0334 succeeded to Drill Out the Landing Collar of 7” WFD liner in 1 hour using
Hal Turbine.
Changed the Traveling Block, whose Inspection Certificate was expired, with certified new one in NDIL F22,
instead of waiting for the certification process.
Succeeded to change the bearings of the Drawworks gear box in 9 hours rather 24 hours in NDIL F28 (OMJ-431)
Lowlights
Razor Back tool is not designed to scrap through Drilled Out accessories such as Landing Collar.
Hard Back Reaming using Kelly during POOH 16'' Drill String in OKS-39 well (TP 216).
Briefing of May 17th 2016
Highlights
6.55 Days saved during drilling 8”1/2 section in RDH1 well (SPEC 118).
Drilled 8”1/2 section from 3278m to TD @ 3620 m in 13.78 days (planned 20.33 days).
Lowlights
Waiting on Mi-Swaco to backload mud HTF24 (NDIL 283); this delayed the cleaning tanks to start moving.
Delayed the Move operations of NDIL F22 to MD679 due to the late authorization to move the Camp.
Briefing of May 18th 2016
Highlights
Tested the Bridge Plug in pressure and compression with the OEDP string which would be used to set isolation
cement plug, in the same run.
MI-Swaco Mud Company provided CaBr2 in order to mix Brine for completion in HGAS4 well (TP226) even the
well was to be completed by AVA.
Lowlights
Damaged 13”3/8 CSG Centralizer during running the shoe track with ECP in OKS-39 well (TP 216).
After screwing ECP and pup joint, and during RIH, the Casing set at Bell Nipple (Bell Nipple is not well
centralized).
AVA mud company could not provide CaBr2 in order to mix Brine for completion in HGAS4 well (TP226).
Briefing of May 19th 2016
Highlights
Use the Recycled Water from Mud Pit in order to Mix WBM in DBA-1 well (TP 208).
Lowlights
Hal Turbine failed to finish 6” hole section in OMJ-431 well (NDIL F28).
6” PDC bit plugged with junks (increased pressure while started circulation) in HRC64 well (ENF 44).
During RIH scrapping BHA, after drilled out cement and landing collar (7”liner), and once tried to circulate at
top of liner, the pressure increased (string plugged).
After POOH to surface found bit plugged with junks (seem to be from landing collar already drilled out).
Apparently the metal shavings (aluminum junks) are from the drilled out landing collar, and they stayed in
the circulating system.
NDIL F22 Rig ready to spud the well MD-679 but it was delayed due to waiting on permission to move the Main
Camp.
Briefing of May 20th 2016
Highlights
10.25 Days saved to reach the 1st DST point in HGAW-5 well (ENF 50).
Drilled to DST point n°1 @ 3375m after 38.75 days (planned 49 days).
The 6” Impreg bit K505BCTPX SN° JK5837 and the SLB Turbine, succeeded to reach an average ROP of 4.39m/hr
in QUARTZITE DE HAMRA formation (51m), in HGAW-5 (ENF 50) during the 6” turbo drilling (56m).
Good coordination to get the Cement Unit (came from GWDC112) at time for the 13”3/8 CSG cement job in
KEHN-1 well (TP 130).
The Cement Unit was brought from Berkine after the lack of Hal Units.
Lowlights
Found 13”3/8 CSG Centralizers designed for 17”1/2 hole size in OKS 39 well (TP216) where the actual hole size
is 16”.
The information was written on paper and stamped on the centralizers and not printed on the metal.
No final Bump during 4”1/2 Liner Cement job in MD675 well (GWDC 118).
Radioactive Sources are still in site in GWDC155 (OMP46 well) where the rig move is soon, and in NDIL283
(HTF25) where the rig move has already started.
5 Hours Excess time during the Inter-phase (16” - 12”1/4) in GWDC 112 (NHBHJ-1 well).
Clean Mud Tanks prior rig move in invisible time during laying down 5” DP in TP 226 (HGAS4).
Lowlights
Electrical problem.
Sometimes set the casing point shallower than it should be, which probably can lead to losses in the next
section
Sometimes set the casing point deeper than it should be, which probably can to lead losses during drilling,
negative FIT or losses during RIH casing.
Briefing of May 22nd 2016
Highlights
Used the Mobile Bunker for the 1st time in NHGAW1 well (GWDC 133), this allowed to perform perforation
without delay (no wait on explosive or escort).
Delivered the OMP46 well (GWDC 155) after 53.21 days (planed 69.65 days).
Abandon Cement Plug job done by COPS rather than HAL in RDH1 well (SPEC 118) which HAL is assigned (wait
on HAL cement unit)
COPS assisted in providing acid tank in order to pump acid pill in MDZ677 (ENF46) even the fact that this well is
assigned to BJSP.
Perform Drill Out 4”1/2 liner shoe track and Scrapping (with Razor Back) 4”1/2 liner operations in a single run in
MD675 well (GWDC118).
Baker power tong operators refused to continue working (applied STOP WORKING) after the accident of
damaged Sling of single joint clamp in SRAA1 (TP 227).
Lowlights
Accident due to damaged Sling of single joint clamp during POOH 9"5/8 Casing in TP 227 (SRAA1).
Mud Properties in in RDC18 (NDIL 284) should be consulted as the LGS was @ 8.70% in the last DDR whereas it
was 10.80% in previous one; However, it is planned to be <5%
Briefing of May 25th 2016
Lowlights
Missed 7” Casing Point (deeper than it should be) during drilling 8”1/2 section in HGA43 well (ENF49), this led to
spot HI-VIS -HI-DENSITY plug at bottom
Drilled to 3388m, and the 7” liner shoe will be set at 3359m
Tried to set DST Packer without success in OMJ-431 well (NDIL F28).
During RIH 16” BHA inside 18”5/8 Casing, Tagged cement 144m above shoe (equivalent to 22m3 cement inside
18”5/8 CSG) in MD-679 well (NDIL F22).
Found one joint 3”1/2 DP Washed Out during RIH SLB FLEX Trip Assembly in GINE1BisZ1 well (TP217);
RIH SLB FLEX Trip Assembly to 790m.
Pressure Test Assembly to 5000 psi -Negative-, Got leaks on drill string (wash out)
Briefing of May 26th 2016
Highlights
Oil at surface in NHGAW1 exploratory well (GWDC 133) with 26.98m3/hr flow rate during the DST operations
(Cambrian).
Found Soft cement plug (Sidetrack cement plug) after more than 50hr in SBBR1 well (ENF 08);
Tried to tag cement plug with slick BHA 3 times without success (Soft Cement)
Slow speed in RIH 13”3/8 Casing (average of 4 joints/ hour) in ENF 46 (MDZ-677).
Briefing of June 01st 2016
Lowlights
The Top drive in ENF46-MDZ677 was not centered properly before start drilling which generates important NPT
in terms of:
Unnecessary 7” tie back in two wells NHGAW1-GWDC133 and ONRS1-ENF51 which led to approximately 16
days NPT in both wells and additional cost (additional 7” casing column + cement plugs..).
The reason behind that was: SH-DP couldn’t provide the adequate tubing head.
Briefing of June 07th 2016
Highlights
Lowlights
The 18’’5/8 casing could not reach section TD in F27-OMK843 at two attempts.
Pulled out the casing –found 2 centralizer lost in hole
RIH with 26’’ packed hole BHA for wiper trip and work intervals.
Try again to run casing without success (tag at the same depth). POOH casing for second time.
The BJSP cement unit fold down while cementing the 13”3/8 casing in ENF47-MDZ672.
Waiting for 2 hours to change the cement unit.
Briefing of June 12th 2016
Highlights
Frequent Waitings on Cement Units, casing Power Tongs and Crews in different rigs.
Sometimes the Power Tongs arrive to the rig without Crew (lack of Personnel).
Excessive Surface Losses due to overflow in Shale Shakers in HGAW-6 well (SPEC 118).
Briefing of July 01st 2016
Highlights
Drilled 8”1/2 phase (from 3208m to 3328m) using DSF713M PDC bit SN: E223969 in 9.5 hours time, in HTF-25
well (NDIL 283), with ROP of 19.73m/hr WOC (HTF Bit Record).
Lowlights
The Excessive Surface Losses, due to overflow in Shale Shakers, persist in HGAW-6 well (SPEC 118).
Briefing of July 02nd 2016
Highlights
POOH 16” Drill String freely in front CENOMANIAN, TURONIAN and SENONIAN SALIFERE formations in HGAW-6
well (SPEC 118).
Usually the POOH is with overpull and backreaming in front those formations.
Lowlights
Wear on Stabilizers (Near BIT: 15"13/16, 1st IBS: 15"12/16, 2nd IBS: 15"13/16) after POOH 16” BHA to change
bit (low ROP) in HGAW-6 well (SPEC 118).
Briefing of July 03rd 2016
Lowlights
Several Repairs on Stand Pipe where changed stand pipe seal (hammer union seal) during Drilling 12”1/4
Section in NDIL F27 (OMK-843 well).
5.75 hours daily NPT due to only this repair without counting the other mud system repairs.
Briefing of July 08th 2016
Highlights
Succeeded to core using 6 sections of inner tubes, and recover the 54 meter core in OKS-39 well (TP 216).
Lowlights
6.28 days NPT Waiting on 7” Casing Cutter (completion phase) in BKHC1 well (SPEC 151) even there were other
alternatives to cut the casing but SH/DP refused.
Repaired Bits by Aldim (bits originally from other companies) are not preferment as they should be.
Those bits have type code ends by: -A2 and the serial number ends by: /1
16” bit type: TFF913S-A2 serial N°: 221455/1 has been run in HGAW-6 well (SPEC 118) without success (did
not reach Casing Point with bad ROP).
Briefing of July 11th 2016
Highlights
Drilled out the 7” liner shoe track with equipment and Drilled the 6” section (44m) in total time of 15 hours in
OMO761 (GWDC155).
Succeeded to reach ROP of 9.69 m/hr during Coring 6” section (47m) in OKS-35 (TP184).
Drilled out the 7” liner Landing Collar in 30 min in MD-679 well (NDIL F22) using impreg bit with turbine.
Used SLB Turbine (1.68 rev/l) with 6” Impreg bit type K505 BCTPX, SN°: JM0366
Drilled 8”1/2 section to coring point (100m) within 8.25 hrs with ROP of 16.37 m/hr WOC in EAR1 well (TP160)
Lowlights
Waiting on WFD DDV (Downhole Deployment Valve) Operator during night due to Escort in MDZ672 UBD well
(ENF47) during RIH 7” tie back with circulation sub and DDV.
Missing ENF Equipment in ENF18 (GRB1 well) in order to spud the well: downhole equipment (Drill Collars &
Stabilizers), 18”5/8 handling equipment (elevators & IPN) and 20”3/4 BOP.
Briefing of July 23rd 2016
Highlights
Lowlights
Waiting on NPS cement product to cure cellar losses (communication at cellar) in ONI-453 (NDIL F27).