PROJETO BÁSICO DE ENGENHARIA PARA EXECUÇÃO DAS OBRAS REMANECENTES DE DUPLICAÇÃO E RESTAURAÇÃO
COM MELHORAMENTOS DA PISTA EXISTENTE NA RODOVIA BR-101/AL.
Rodovia : BR-101/AL
Trecho : Div. PE/AL – Div. AL/SE
Subtrecho : Entr. AL-220 – Entr. AL-110 (P/ ARAPIRACA)
Segmento : km 139,32 ao km 170,32
Extensão : 31 km
Código SNV : 101BAL0710 – 101BAL0820 – 101BAL0830 – 101BAL0850
Lote :5
VOLUME 2
PROJETO BÁSICO DE EXECUÇÃO DE DRENAGEM E OBRAS DE ARTE CORRENTES
Outubro / 2017
REPÚBLIC A FEDER ATIVA DO BR ASIL
MINISTÉRIO DOS TRANSPORTES
DEPARTAMENTO NACIONAL DE INFRA-ESTRUTURA DE TRANSPORTES
SUPERI NTENDÊNCI A REGI ONAL DO DNIT NO ESTADO DE AL AGO AS
PROJETO BÁSICO DE ENGENHARIA PARA EXECUÇÃO DAS OBRAS REMANECENTES DE DUPLICAÇÃO E RESTAURAÇÃO
COM MELHORAMENTOS DA PISTA EXISTENTE NA RODOVIA BR-101/AL.
Rodovia : BR-101/AL
Trecho : Div. PE/AL – Div. AL/SE
Subtrecho : Entr. AL-220 – Entr. AL-110 (P/ ARAPIRACA)
Segmento : km 139,32 ao km 170,32
Extensão : 31 km
Código SNV : 101BAL0710 – 101BAL0820 – 101BAL0830 – 101BAL0850
Lote :5
VOLUME 2
PROJETO BÁSICO DE EXECUÇÃO DE DRENAGEM E OBRAS DE ARTE CORRENTES
Outubro / 2017
1 ÍNDICE
Volume 2: Projeto de Execução de Drenagem e Obras de Arte Correntes – Projeto BÁSICO de Engenharia para Execução das Obras Remanescentes de Duplicação e Restauração com Contrato: TT-00083/2017-00
Melhoramentos da Pista Existente na Rodovia BR-101/AL
Página 1
RELATÓRIO PROJETO BÁSICO DE ENGENHARIA PARA EXECUÇÃO DAS OBRAS REMANECENTES DE DUPLICAÇÃO E
RESTAURAÇÃO COM MELHORAMENTOS DA PISTA EXISTENTE NA RODOVIA BR-101/AL.
ÍNDICE
1 ÍNDICE .................................................................................................... 1
2 APRESENTAÇÃO...................................................................................... 3
2.1 MAP A DE S ITUAÇÃO ...................................................................... 5
3 QUADRO DE CARACTERISTICAS TÉCNICAS .......................................... 6
4 PROJETO DE DRENAGEM E OBRAS DE ARTE CORRENTES................... 8
5 TERMO DE ENCERRAMENTO..............................................................113
Volume 2: Projeto de Execução de Drenagem e Obras de Arte Correntes – Projeto BÁSICO de Engenharia para Execução das Obras Remanescentes de Duplicação e Restauração com Contrato: TT-00083/2017-00
Melhoramentos da Pista Existente na Rodovia BR-101/AL
Página 2
2 APRESENTAÇÃO
Volume 2: Projeto de Execução de Drenagem e Obras de Arte Correntes – Projeto BÁSICO de Engenharia para Execução das Obras Remanescentes de Duplicação e Restauração com Contrato: TT-00083/2017-00
Melhoramentos da Pista Existente na Rodovia BR-101/AL
Página 3
2 APRESENTAÇÃO
O CONSÓRCIO BR – 101/AL, com sede na Rua Aníbal Torres, 17A – Bairro Rui Palmeiras, Município de São Miguel dos Campos, Estado de Alagoas, atendendo ao disposto no Edital RDC nº 091/2016-00 do
DNIT – Departamento Nacional de Infraestrutura de Transportes para a “Contratação Integrada de Empresa para Elaboração dos Projetos Básico e BÁSICO e Execução das Obras Remanescentes de
Duplicação e Restauração com Melhoramentos da Pista Existente, Incluindo Obras de Arte Especiais, na Rodovia BR-101/AL (Remanescente dos Lotes 04 e 05)” apresenta a RELATÓRIO DO PROJETO
BÁSICO DE DRENAGEM E OBRAS DE ARTE CORRENTES.
_________________________________________
CONSORCIO BR – 101/AL
ROGÉRIO BARROS DE SOUZA
CREA/RJ nº 851.056.688/D
Volume 2: Projeto de Execução de Drenagem e Obras de Arte Correntes – Projeto BÁSICO de Engenharia para Execução das Obras Remanescentes de Duplicação e Restauração com Contrato: TT-00083/2017-00
Melhoramentos da Pista Existente na Rodovia BR-101/AL
Página 4
2.1 MAPA DE SITUAÇÃO
ALAGOAS
RODOVIA: BR-101/AL
TRECHO: Div. PE/AL – Div. AL/SE (PROJETO BÁSICO / EXECUTIVO DE ENGENHARIA)
SUBTRECHO: Entr. AL-220 – Entr. AL-110 (P/ ARAPIRACA)
SEGMENTO: km 139,32 ao km 170,32 (LOTE 5)
EXTENSÃO: 31Km
MAPA DE SITUAÇÃO
Volume 2: Projeto de Execução de Drenagem e Obras de Arte Correntes – Projeto BÁSICO de Engenharia para Execução das Obras Remanescentes de Duplicação e Restauração com Contrato: TT-00083/2017-00
Melhoramentos da Pista Existente na Rodovia BR-101/AL
Página 5
3. QUADRO DE CARACTERISTICAS TÉCNICAS
Volume 2: Projeto de Execução de Drenagem e Obras de Arte Correntes – Projeto BÁSICO de Engenharia para Execução das Obras Remanescentes de Duplicação e Restauração com Contrato: TT-00083/2017-00
Melhoramentos da Pista Existente na Rodovia BR-101/AL
Página 6
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 7
4 PROJETO DE DRENAGEM E OBRAS DE ARTE CORRENTES
Volume 2: Projeto de Execução de Drenagem e Obras de Arte Correntes – Projeto BÁSICO de Engenharia para Execução das Obras Remanescentes de Duplicação e Restauração com Contrato: TT-00083/2017-00
Melhoramentos da Pista Existente na Rodovia BR-101/AL
Página 8
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 9
CONECTAR
COM EXISTENTE
EDA 01
DAR 02
SCC 04 DEB 01
SCC 04 CONECTAR A.S.M.
A.S.M.
L=51,40m COM EXISTENTE MFC 01
L=191,70m
CONECTAR COM
PROJETO DO LOTE 4
EDA 01 EDA 01 EDA 01 EST. 17+0,00 EDA 01 EDA 01
STC 02 CONECTAR EDA 01 CONECTAR CONECTAR
DAR 02 DAR 02 DAR 02 DAR 02 DAR 02
L=93,15m COM EXISTENTE L=18,00m DAR 02 MFC 01 COM EXISTENTE COM EXISTENTE
DES 03 DES 03 DES 03 DES 03 DES 03
DES 03 A.S.M.
A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. MFC 05 MFC 05
A.S.M. A.S.M.
VER NOTA 5 L=14,20m L=14,70m
Página 10
CONECTAR
COM EXISTENTE
EST. 48+15,00
EDA 01 L=13,75m
DAR 02 Prol. LE=2,00m
DEB 01
A.S.M. A.S.U. SCC 04 CONECTAR
EDA 02 VER NOTE 5 A.S.M. CONECTAR
MFC 01 MFC 01 MFC 01 COM EXISTENTE
MFC 05 MFC 05 DAD 02 COM EXISTENTE
L=191,70m L=191,70m L=142,25m
L=11,70m L=11,70m L=2,00m
Página 11
MFC 01
L=63,20m
EST. 105+11,00
L=15,00m
VPC 04 DES 03
DES 03
L=243,20m CONECTAR Executar boca
MFC 05 CONECTAR STC 01 SCC 04 MFC 01 COM EXISTENTE A.S.M. DAD 02
L=99,40m COM EXISTENTE A.S.U. A.S.M. L=17,45m VPC 04 VER NOTA 5
L=11,80m A.S.M.
SZC 02 DES 03
L=6,00m
A.S.D.
Página 12
EST. 104+0,00
L=138,00m CONECTAR
MFC 01
L=63,20m COM EXISTENTE CONECTAR
A.S.M.
EST. 105+11,00 VPC 04 VPC 04 COM EXISTENTE
L=245,30m L=122,80m
DAD 02
L=15,00m A.S.M.
CONECTAR COM CONECTAR
Executar boca DAD EXISTENTE COM EXISTENTE MFC 05 MFC 05
A.S.M. DAD 02 L=29,00m L=40,00m
VER NOTA 5 STC 01 SCC 04 DES 03 STC 01
A.S.M.
A.S.M. A.S.M. L=41,35m
MFC 01 DPS 07
A.S.M. A.S.M.
EDA 01 EDA 01 EDA 01 EDA 01
EDA 02 EDA 02 EDA 02 DAR 02 EDA 01
EDA 02 DAR 02 DAR 02 DAR 02
EDA 02 DAR 02 DAR 02 DAR 02 DEB 01 MFC 05 MFC 05 DAR 02
VPC 04 EDA 02 DAR 02 DEB 01 DEB 01 DEB 01
EDA 02 DAR 02 A.S.U. A.S.U. A.S.U. A.S.M. L=14,70m L=14,60m DEB 01
CAIXA DAR 02 EDA 02 A.S.U. A.S.M. A.S.M. A.S.M.
DAD 02 L=69,10m EDA 02 A.S.M.
EXTRAVASORA DES 03 A.S.M. DAR 02 A.S.M.
DEB 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 MFC 01 SCC 04
A.S.M. L=2,00m
A.S.M. CONECTAR A.S.M. L=1,50m L=3,40m L=3,00m EDA 01 L=18,60m A.S.M.
COM EXISTENTE A.S.D. A.S.D.
DAR 02
L=4,40m
Página 13
EST. 159+10,00
L=23,00m
EDA 01 EDA 01
EDA 01 EDA 01 EDA 01 MFC 05 MFC 01 EDA 01 CONECTAR EDA 01 VPA 04 EDA 01
DAR 02 DAR 02 EST. 165+5,00
DAR 02 DAR 02 DAR 02 L=89,50m L=157,60m DAR 02 COM EXISTENTE MFC 01 DAD 02 L=315,55m DAD 02
DEB 01 DEB 01
DEB 01 L=2,80m L=3,10m L=4,00m A.S.M. L=7,30m L=10,60m
A.S.M. A.S.M. L=30,50m
A.S.M. DEB 01 DEB 01
A.S.D. A.S.D. A.S.M.
VER NOTA 5
CONECTAR
COM EXISTENTE
Página 14
EST. 189+0,00
Página 15
EST. 239+16,00
EDA 01 EDA 01 EDA 01
STC 01 DAR 02 DAR 02 DAR 02 L=17,20m
L=220,50m A.S.M. STC 01 A.S.M. A.S.M.
EST. 209+6,00 CONECTAR VPC 04 A.S.M.
EDA 01 L=87,55m
MFC 05 COM EXISTENTE EDA 01 L=232,50m VER NOTA 5
L=15,00m DAR 02 VPC 04 DAR 02
L=37,80m CONECTAR
A.S.M. L=240,10m A.S.M.
COM EXISTENTE
Prol. LD=2,00m CONECTAR EDA 01
VER NOTA 5 STC 02 do terreno com degraus DAR 02 DES 03
COM EXISTENTE MFC 03 CONECTAR A.S.U.
DES 03 A.S.M.
L=763,85m COM EXISTENTE
MFC 05
L=37,50m
SCC 04
STC 01
DCD 04 A.S.M.
A.S.M.
L=2,00m VPC 04 EDA 01 EDA 01 EDA 01
MFC 05 SZC 02 DAD 02 DAR 02 DAR 02
CCS 02 L=81,60m DCD 04 DAR 02
L=13,30m DCD 04 L=27,50m A.S.M. EDA 01 A.S.M.
T=110,450m SCC 04 L=7,20m A.S.M. A.S.M.
F=109,250m L=14,40m DPS 07 SCC 04 A.S.M. EDA 02 DAD 02
MFC 01 MFC 05 L=179,60m EDA 01 EDA 01
A.S.M. A.S.M. DAD 06 L=1,50m
L=5,60m L=13,20m DAR 02 DAR 02 DAD 02
CONECTAR VPC 04 L=8,80m DES 03
A.S.D. A.S.M. A.S.M. L=27,50m
COM EXISTENTE L=43,40m STC 02 MFC 03 DEB 04 A.S.M.
VPC 04 A.S.M. A.S.M. A.S.M.
L=42,50m
VPC 04
L=12,80m
Página 16
02 5m
CONECTAR EDA 01 EDA 01 C ,7
DAR 02 DAR 02 ST 328
COM EXISTENTE L =
A.S.M. A.S.M.
CONECTAR
EDA 01 EDA 01 EDA 01 EDA 01 COM EXISTENTE
DAR 02 DAR 02 DAR 02 STC 01 DAR 02 EDA 01 EDA 01
STC 02
A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. DAR 02 DAR 02
MFC 03 L=328,75m
A.S.M. A.S.M.
A.S.M.
Página 17
MFC 01
STC 02 L=20,00m
L=328,75m
MFC 05 MFC 01
L=12,65m L=56,15m
MFC 01
MFC 05
L=8,35m
L=15,25m
EDA 02
MFC 01 DAD 02
L=257,65m L=2,60m
EDA 01
MFC 01
L=188,40m SCC 04 EDA 01
L=228,00m
EDA 01 SCC 04
EDA 01 EST. 307+11,00 A.S.M.
L=17,00m
STC 02 EDA 02
L=192,00m EST. 307+1,00 DAD 02 A.S.M.
L=2,60m VER NOTA 5
EDA 01 L=45,80m
MFC 01 A.S.M.
L=41,15m MFC 01
L=47,05m
EST. 293+10,00
L=16,70m
A.S.M.
VER NOTA 5
Página 18
EST. 334+0,00 MFC 05
L=17,40m
L=15,00m EDA 01
MFC 05 VPA 04 EDA 01
A.S.M. L=11,55m EDA 02 L=196,60m DAD 02
MFC 01
VER NOTA 5 MFC 01 DAR 02 L=13,90m
L=252,80m
L=20,00m L=2,00m
EST. 343+4,00
Página 19
MFC 03 MFC 03
L=4,00m L=4,00m
Página 20
EST. 406+18,00 EST. 415+10,00
EST. 389+0,00
MFC 03 CONECTAR COM L=18,60m L=14,00m
L=667,40m L=26,50m
SCC 04 EDA 01 CCS 14
i=0,004m/m
L=330,30m DAR 02 A.S.U. T= 101,440m
A.S.U. MFC 03 EDA 01 MFC 01 VER NOTA 5
L=9,85m EDA 01 VER NOTA 5 MFC 05 F= 98,300m
VER NOTA 5 L=206,65m DAR 02 L=886,95m
EDA 01 DAR 02 L=14,25m MFC 05
L=11,90m
EDA 01 EDA 01 L=5,60m L=34,25m
EDA 01 DAR 02
DAR 02 L=11,00m
L=13,45m
DAR 02
L=2,90m
EDA 01 EDA 01 SCC 04 SCC 04
EDA 01 DAR 02 DAR 02 L=156,85m L=493,00m MF
EDA 01
DAR 02 L=3,50m L=1,00m L= C 0
EDA 01 DAR 02 28 5
EDA 01 L=4,00m ,45
MFC 03 MFC 05 DAR 02 L=8,80m m
L=76,80m MFC 03 MFC 01
L=667,40m L=10,40m
EDA 01 L=336,50m L=613,40m
EDA 01 CCS 02
DAR 02 EDA 01
DAR 02 T=103,600m
L=8,50m L=10,80m
F=101,800m
EDA 01
Página 21
EST. 440+0,00
L=82,15m
VPC 04
A.S.M. VPC 04
VPC 04 VPC 04
A.S.M.
A.S.M. A.S.M.
MFC 05
L=30,60m SCC 04 STC 01
L=493,00m L=571,70m
VPC 04
MFC 05 L=83,80m
L=42,10m
MFC 05 DCD 04
L=28,45m L=6,80m
STC 01
L=63,00m
VPC 04
04 m DCD 04
C ,00 L=81,20m STC 01
SC 493 VPC 04 L=2,80m L=571,70m
L= SCC 04
L=20,60m
L=363,15m
Página 22
EST. 440+0,00
L=82,15m
VPC 04
A.S.M. VPC 04
VPC 04 VPC 04
A.S.M.
A.S.M. A.S.M.
MFC 05
L=30,60m SCC 04 STC 01
L=493,00m L=571,70m
VPC 04
MFC 05 L=83,80m
L=42,10m
MFC 05 DCD 04
L=28,45m L=6,80m
STC 01
L=63,00m
VPC 04
04 m DCD 04
C ,00 L=81,20m STC 01
SC 493 VPC 04 L=2,80m L=571,70m
L= SCC 04
L=20,60m
L=363,15m
Página 23
TSS 03
L=12,00m
MFC 05
L=20,80m EST. 482+6,00
MFC 05
VPC 04 L=20,25m L=35,80m
L=14,50m
A.S.M.
VP S.M
A.
C .
DPS 07 A.S.M.
A.S.M.
VP S.M
A.
C .
VPC 04 CONECTAR
04
EDA 01
DAD 08
VPC 04 m
L=104,2
CONECTAR DEB 05
CONECTAR COM EXISTENTE A.S.M.
SCC 04 COM EXISTENTE CONECTAR
0
L=4,30m EDA 01 CONECTAR COM EXISTENTE
VPC 04
COM EXISTENTE EDA 01
L=12,00m MFC 05
A.S.D. L=20,90m
SCC 04
SCC 04 m
L=287,8
TSS 03
L=12,00m A.S.M.
VPC 04 MFC 05
SC 363
0
L=
C ,15
L=539,60m
04 m
EDA 01
VPA 04 m
L=101,1
ST 571
L=
EST. 467+8,00
C ,7
01 0m
L=34,80m
EDA 01
0
DAR 02
L=6,15
A.S.M.
VER NOTA 5
m
EST. 457+19,00
L=102,70m
MFC 0 m
L=539,6
SCC 04 STC 01 STC 01
L=167,30m L=185,50m L=22,60m
A.S.M.
1
A.S.D.
EDA 01
DAD 02
L=15,9
0m
DAD 02
L=21,4
DEB 02
0m
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 24
VPA 04
DES 03 L=158,90m
MFC 05
L=41,00m TSS 03
L=14,00m MFC 05
L=40,60m
EDA 01
DES 03
DAD 02
VPA 04 L=11,50m
L=101,10m
DAD 02 VPC 04
L=21,40m VPA 04 L=360,00m
SCC 04
DES 03 L=237,00m SCC 04
VPC 04 L=287,80m
L=104,20m L=540,00m
DAD 02
L=21,40m
EDA 01
DAD 02 DEB 02
MFC 01 L=15,90m
EDA 01 L=539,60m
DAR 02
L=6,15m
CO
M
EX
IS
T
VP .S.U
EDA 01
CO OM
A
A .
C
04
NE EX
CT IST
AR EN
ET
VP 12
L=
A ,40
04 m
CO OM
C
NE EX
CT IST
VP .S.U
AR EN
A
A .
04
ET
TE
XISTEN
COM E
Página 25
Galeria - PI-3
Cotas (m)
CCS 10-A T=38,263 F=35,516
CCS 10-B T=38,000 F=35,351
CCS 10-C T=37,930 F=35,149
CCS 15-E T=37,919 F=34,782
CCS 06-D T=38,112 F=36,012
PERFIL DA GALERIA VER DESENHO:
DE-PB-DR-2048
DCD 04 DCD 04
36 04
CCS 10-B
00
L=115,30m i=0,005m/m
L=18,80m
L= P C
L=17,00m
0,
VER NOTA 5
DCD 04
V
L=3,60m
CONECTAR MFC 01
COM EXISTENTE L=149,20m
VPA 04
VPC 04 L=144,80m EDA 01
VPC 04 L=51,00m EST. 550+2,00 EDA 01 DAD 02
EST. 541+1,00 L=112,40m MFC 01 L=15,50m
L=325,35m
10-C
L=102,60m L=68,00m EDA 01 CCS
SCC 04
VPC 04 VER NOTA 5 DAR 02
L=540,00m A.S.M. MFC 05
L=114,80m VPC 04 L=1,40m
VER NOTA 5 EDA 01 L=115,05m
EDA 01 A.S.M. DAR 02
SCC 04 CONECTAR
VPA 04 DAR 02 L=7,15m
L=41,15m COM EXISTENTE
A.S.U. EDA 01 L=3,20m
SCC 04
VPA 04 DAR 02
A.S.U. EDA 01
L=12,40m VPA 04 L=3,60m EDA 01 CCS 06-D DAD 02
A.S.U. TSS 03 L=16,20m
CONECTAR MFC 01
L=5,85m L=25,00m
COM EXISTENTE
CONECTAR Est. 109+5,00
EDA 01 MFC 01
COM EXISTENTE SCC 04
L=337,90m
L=27,90m DAD 02 L=18,50m
EDA 01 L=14,70m Esc.=long.
VPA 04
L=102,20m i=0,005m/m
MFC 01 MFC 01 DEB 05 VER NOTA 5
EDA 01 SCC 04
CONECTAR L=206,50m L=36,10m
SCC 04 L=143,00m DAD 08 CCS 15-E
SCC 04 COM EXISTENTE
EDA 01 L=67,30m A.S.U. L=30,00m
DAD 02 EDA 01 EST. 202+4,00
EDA 01 L=1,10m DAR 02
DAD 08 L=3,80m L=36,00m
DEB 05
A.S.M. EST. 108+2,50 i=0,010m/m
VER NOTA 5
L=32,00m
EDA 01
Esc.=long.
DAD 02
i=0,010m/m L=10,80m
VER NOTA 5
Página 26
STC 01 DCD 04
L=30,30m STC 01
STC 01 L=39,30m
L=235,00m
L=115,00m STC 01
VPC 04 STC 01 L=235,00m VPC 04
L=620,95m L=243,45m
L=346,50m DCD 04
L=44,20m STC 01 STC 01
02-F L=137,20m
CCS 68m L=226,75m STC 01
,5
VPC 04 T=44 68m L=226,70m
,5 DAD 02 VPA 04 MFC 01
L=98,70m F=42 DAR 02 L=11,20m L=256,00m L=324,95m STC 02 STC 01
L=2,45m VPC 04 L=288,45m
L=141,80m
,00 L=505,35m
7+10
ES T. 55
DEB 03
VPC 04
,50m
L=21 L=235,15m
10-A 05m
/m MFC 01
CCS i=0,0 NOTA 5 L=130,45m
01
EDA 04 VER
DCD 0m
,0
L=17
VPC 04
L=286,00m
SCC 04 EDA 01
MFC 01
L=537,70m A.S.M. EST. 572+17,00
EDA 01 L=184,65m
CONECTAR COM SCC 04 EDA 01
DAR 02 MFC 05 DAR 02 MFC 01
MFC 05 EXISTENTE L=33,20m L=537,70m A.S.M. EDA 01
L=2,90m L=235,00m L=1,60m A.S.M.
05 L=21,40m A.S.M. CONECTAR COM EST. 584+8,00
MFC ,05m A.S.M. CAIXA EXISTENTE
5
L=11 MFC 05 VER NOTA 5 L=49,00m MFC 01
01 EDA 01 SCC 04
EDA 2 L=28,60m
DAD 08 DAR 02
A.S.M.
A.S.M.
0
DAR 5m DEB 05
A.S.U. A.S.M.
L=7,1 01
VPA 04 MFC 01 VER NOTA 5
EDA 02 L=125,00m EDA 01 L=222,50m A.S.M.
D AD 0m
06-D L=16,2 DAD 08
CCS A.S.M.
03
TSS 0m
,0
L=25 5,00
109+
Est.
,50m
L=18 long.
E s c .= /m
05m
i=0,0 NOTA 5
VER
15-E
CCS
0
+4,0
. 202
EST
,0 0m
L=36
/m
10m
i=0,0 NOTA 5
VE R
2,50
. 108+ 01
EST EDA 2
0
,00m DAD 0m
L=32 long. L=10
,8
E s c .= /m
10m
i=0,0 NOTA 5
VER
Página 27
EST. 599+5,00
STC 01
L=226,70m L=53,10m
STC 01 A.S.U.
L=288,45m VER NOTA 5
STC 01
STC 01
L=140,50m
L=75,40m
DCD 04 EST. 629+10,00
L=8,05m AR E
ECT ENT
L=18,00m CON EXIST
CO M
A.S.M.
STC 01 VER NOTA 5
L=470,00m
VPC 04
L=541,90m
MFC 01 SCC 04
A.S.M. A.S.M.
MFC 05
MFC 05 L=30,40m MFC 03
L=38,45m L=20,25m
TSS 03
L=11,00m
VPC 04 VPC 04
L=31,95m L=464,40m
SCC 04
A.S.M.
DAD 08
DEB 05
A.S.M.
Página 28
EST
. 62
9+1
0,00
L=1
8,00
m
A.S EDA 01 EST. 665+0,00
.M CONECTAR
VER . MFC 01 EDA 01
DAR 02
NOT CONECTAR COM EXISTENTE
A L=210,30m EDA 01 EDA 01 DEB 01 Esc.=long.
5 COM EXISTENTE DAR 02 MFC 03
DAR 02 DAR 02 A.S.M. L=13,00m
DEB 01 L=15,75m
DEB 01 DEB 01 i=0,005m/m
CONECTAR A.S.M.
A.S.M. A.S.M. VER NOTA 5
COM EXISTENTE
EST. 630+0,00
BSCC 2,0x2,0m
L=51,00m EDA 01 MFC 03
MFC DAR 02 EDA 01 SCC 04
EDA 01 L=291,00m MFC 01
L=2 03 A.S.M. DAR 02 L=706,55m MFC 05
0,25 DEB 01 DAR 02 L=642,75m
m DEB 01 EDA 01 L=29,30m
A.S.M. DEB 01
A.S.M. DAR 02
A.S.M. DEB 01
A.S.M.
Página 29
CONECTAR CONECTAR
SCC 04 COM EXISTENTE
EST. 665+0,00 COM EXISTENTE
L=43,20m
MFC 01 MFC 05
Esc.=long. EDA 02 CCS 02 L=113,60m L=88,20m MFC 01
MFC 03 MFC 03 MFC 03 SCC 04
L=13,00m DAR 02 A.S.M. L=706,80m L=283,30m T=104,099m SCC 04 A.S.M.
L=15,75m
i=0,005m/m L=9,30m F=102,400m L=385,40m
VER NOTA 5
EST. 681+11,00
MFC 05 EDA 02 EST. 668+2,00 EDA 01 MFC 01 EDA 01 EDA 01 MFC 03 EDA 01
L=29,30m L=642,75m EDA 01 DAR 02 L=1459,40m MFC 05 DAR 02
MFC 03 L=35,00m MFC 01
L=27,00m MFC 05 L=4,00m L=88,20m L=4,00m
L=729,90m L=362,50m
i=0,010m/m L=21,00m
A.S.U. VER NOTA 5
VER NOTA 5 MFC 05
MFC 05 L=21,00m
L=51,95m
MFC 01
L=31,15m
Página 30
MFC 01
L=12,00m
CONECTAR A.S.D.
COM EXISTENTE MFC 05
MFC 05
EST. 702+0,00 CONECTAR L=21,00m L=21,00m
EDA 01 COM EXISTENTE
L=13,00m EDA 01 EDA 01 EDA 01
DAR 02 EDA 01 DAR 02
Esc.=long. DAR 02 EDA 01 EDA 01 DAR 02 MFC 01
i=0,010m/m DEB 01 DAR 02 EDA 01 EDA 01 DEB 01 DEB 01
DEB 01 EDA 01 DAR 02 DAR 02 A.S.U.
VER NOTA 5 A.S.M. DEB 01 DAR 02 DAR 02 A.S.M.
A.S.M. DAR 02 DEB 01 DEB 01 A.S.M.
A.S.M. DEB 01 DEB 01 DEB 01
A.S.M. A.S.M.
A.S.M. A.S.M. A.S.M.
MFC 03 SCC 04
L=4,40m L=57,75m
EDA 01
EDA 02 MFC 01
L=276,00m
MFC 05 SCC 04 EDA 01
MFC 05 MFC 03
EDA 01 L=29,90m L=246,20m
L=15,83m L=307,10m
DAR 02 MFC 05
L=4,00m L=14,45m
EST. 705+8,00 MFC 01
L=140,75m
L=60,50m
Executar boca
A.S.U.
VER NOTA 5
Página 31
MFC 0
1
L=12,0
0m
A.S.D.
MFC 0
5 MFC 0
L=21,0 5
0m L=21,0
0m EST. 763+9,00 EDA 01
EDA 01 DAR 02
MFC 0 EDA 0 VALETA EDA 01 DAR 02
1 1 A.S.M. EDA 01 L=17,00m DEB 01
A.S.U. DAR 0 EDA 01 EDA 01 DAR 02 DEB 01 A.S.M.
2 EDA 01 DAR 02 SCC 04
DEB 01 DAR 02 EDA 01 DAR 02 DEB 01 A.S.M.
DAR 02 DEB 01 A.S.M. A.S.M.
A.S.M. DEB 01 EDA 01 DAR 02 DEB 01 A.S.M.
EDA 01 DEB 01 A.S.M.
A.S.M. DAR 02 EDA 01 DEB 01 A.S.M.
SCC 04 EDA 01 DAR 02 A.S.M.
A.S.M. DAR 02 EDA 01 SCC 04 DAR 02 A.S.M.
A.S.M. EDA 01 A.S.M.
A.S.M. DAR 02 DAR 02 A.S.M. A.S.M.
A.S.M. A.S.M.
MFC 01 EDA 01
EDA 01
L=20,00m
MFC 05 MFC 05
EDA 01 L=15,65m L=14,00m
MFC 01 EDA 01
L=276,00m MFC 05 MFC 05 MFC 01
L=14,25m L=12,00m L=20,00m
Página 32
MFC 01
L=32,00m
MFC 05 EDA 01
VALETA EDA 01 DAD 02
EDA 01 EDA 01 L=13,45m DAD 02 CONECTAR
EDA 01 EDA 01 EDA 01 A.S.M. EDA 01 EDA 01 L=17,30m
DAR 02 DAR 02 DAR 02 DAR 02 MFC 01 DAR 02 DAR 02 DAR 02 L=15,70m COM EXISTENTE
CONECTAR
DEB 01 DEB 01 DEB 01 DEB 01 L=3,40m MFC 05 DEB 01 SCC 04 DEB 01 DEB 01 MFC 01
COM EXISTENTE
A.S.M. A.S.M. A.S.M. A.S.M. A.S.D. L=15,70m A.S.M. A.S.M. A.S.M. A.S.M. A.S.M.
EDA 01 MFC 03
MFC 01 DAR 02 MFC 03
EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 VPA 04 L=4,00m
L=713,30m L=2,65m L=254,70m DAD 02 L=200,30m MFC 03 EDA 01
MFC 05 EDA 01
L=2,70m L=4,00m DAD 02
L=14,00m DAD 02 PE - EST.=804+2,380
EST. 776+5,00 EDA 01 L=16,20m
L=10,70m PD - EST.=803+6,699
DAD 02 EDA 01
L=31,50m L=14,60m TSS 03 DAD 02
L=15,00m L=12,70m
Executar boca
A.S.M.
VER NOTA 5
Página 33
MFC 01
L=32,00m
EDA 01
DAD 02
L=17,30m
EDA 01
DAR 02
EDA 01 A.S.M.
CONECTAR DAR 02
EDA 01 COM EXISTENTE
MFC 03 A.S.M.
DAD 02
L=4,00m L=16,20m VALETA
MFC 03
A.S.M.
L=639,10m MFC 01
L=590,15m
SCC 04
L=261,60m EDA 02
DAR 02
L=1,50m
MFC 03
L=4,00m
MFC 03
L=4,00m EDA 01
DAD 02
L=14,60m L=16,20m VPA 04
TSS 03 EDA 01 L=208,00m EDA 01
L=15,00m DAD 02 DAD 02 MFC 01
L=12,70m L=12,70m MFC 03
L=260,50m EDA 02 EDA 01
L=639,10m
DAR 02 EST. 816+15,00 DAR 02
EDA 01 SCC 04
L=2,80m EDA 01 L=2,60m
L=35,00m DAR 02 A.S.U.
L=3,40m
CONECTAR A.S.M.
COM EXISTENTE VER NOTA 5
Página 34
EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01
DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02
A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. MFC 01 A.S.M. A.S.M. A.S.M. A.S.M.
A.S.M. A.S.M. A.S.M.
A.S.M.
Executar boca
A.S.U.
VER NOTA 5
Página 35
MFC 05 MFC 05
L=15,20m L=15,20m
MFC 01
EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01
L=6,60m
DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 EDA 01
A.S.D. EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01
A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. DAR 02
DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02
A.S.M. A.S.M.
A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M.
SCC 04 EST. 878+0,00 CCS 06 EST. 885+4,00 SCC 04 EST. 900+7,00 SCC 04
T=113,203m MFC 05 MFC 05 MFC 03
A.S.U. A.S.U. A.S.U.
L=36,20m F=111,100m L=18,00m L=18,55m L=13,80m L=15,40m L=758,40m
MFC 05
L=16,30m
A.S.M. i=0,006m/m Executar boca
VER NOTA 5 VER NOTA 5 A.S.M.
VER NOTA 5
MFC 05
L=13,20m
Página 36
CONECTAR
COM EXISTENTE
MFC 05
L=14,40m EDA 02
DAR 02 EST. 930+10,00
MFC 05 EDA 02 CONECTAR
L=3,00m
EDA 01 L=14,15m L=52,00m SCC 04 DAD 02 COM EXISTENTE
MFC 03 MFC 03 EDA 01
DAR 02 EDA 02 L=72,00m EDA 02 L=2,00m EDA 02
CONECTAR EDA 01 EDA 02 A.S.U. A.S.M. DAR 02 EDA 01
EDA 02 DAR 02 A.S.M. DESAGUAR
A.S.M. COM EXISTENTE DAR 02 DAR 02 EDA 02
A.S.M. A.S.M. EDA 01 DAR 02 DAR 02
DAR 02 A.S.M. VER NOTA 5 SOBRE BUEIRO DAR 02 A.S.M.
A.S.M. A.S.M. EDA 01 L=14,40m
A.S.M. DAR 02 L=11,60m
A.S.M. DAR 02
L=2,40m
MFC 03
L=301,60m
SCC 04 EDA 01
A.S.U. MFC 01 EDA 01 SCC 04
L=14,50m A.S.U. MFC 05 EDA 01
EDA 02 EDA 01 EDA 01 MFC 03
A.S.D. MFC 03 L=28,85m EDA 01
MFC 03 DAR 02 EST. 934+10,00 DAR 02 L=361,50m EDA 01
L=226,60m MFC 01 L=8,05m
L=33,90m L=8,30m DAR 02
L=875,40m
L=14,00m L=7,30m
EDA 02
Esc.=long.
DAR 02
L=2,00m i=0,005m/m
VER NOTA 5
Página 37
EST. 13+0,00 (R.L-PE)
BLS-03
T=116,362m
F=114,400m
MFC 03
L=301,60m
SCC 03
EDA 01 SCC 04 EST. 12+0,00 L=92,60m MFC 01
EDA 01 MFC 01
L=441,80m EST. 5+0,00 (R.L-PD) (P.B.) L=154,30m
EDA 01 L=269,85m
SCC 04 MFC 01 (R.L-PD) (P.A)
MFC 03 EDA 01 i=0
EDA 01 L=875,40m EST. 12+0,00 (R.L-PD) ,010
L=361,50m DAR 02
L=360,50m EST. 9+0,00 (R.L-PD) m/m
BLS-13
L=7,30m BLS-12 T=117,024m
T=117,156m F=114,572m
F=115,156m
SCC 03 L=60,00m L=60,00m
L=18,70m i=0,010m/m i=0,010m/m
L=60,00m EST. 976+12,00
i=0,010m/m EST. 15+0,00 (R.L-PD) EST. 18+0,00 (R.L-PD)
L=23,70m BLS-14 BLS-15
T=117,083m T=117,167m
A.S.M. F=114,644m F=114,797m
VER NOTA 5
Página 38
EST. 28+0,00 (R.L-PE)
BLS-08
L=60,00m T=117,146m
i=0,010m/m F=115,306m
MFC 01 MFC 01
EDA 01 DSS 04 SCC 04
L=215,25m L=180,80m
DAR 02 L=103,40m L=534,60
DSS 04 m
L=3,70m
L=215,25m DSS 04 EDA 02
L=180,80m DAR 02
L=4,05m
MFC 01
MFC 05 SCC 04 L=251,75m
L=431,95m L=722,00m
A.S.D.
EST. 989+14,00
EST. 28+0,00 (R.L-PD) MFC 01
L=50,00m BLS-18 L=97,75m MFC 05 SCC 04 EDA 01
1 L=23,00m
C0 m T=117,583m L=722,00m
MF 54,30 i=0,010m/m EST. 35+0,00 L=92,00m CONECTAR MFC 01
3 L=1 L=60,00m i=0,010m/m
F=115,583m
(R.L-PD) (P.A.)
COM EXISTENTE L=186,50m MFC 03
C0
SC 2,60m i=0,010m/m VER NOTA 5 MFC 05 L=62,70m EDA 02
L=9 CONECTAR L=20,00m DAR 02
L=30,00m EST. 22+0,00 (R.L-PD) L=30,00m COM EXISTENTE L=2,0m
EST. 26+0,00 (R.L-PD)
i=0,010m/m BLS-16 i=0,010m/m
PV-02 MFC 05
T=117,278m
0m T=117,590m L=53,00m
0,0 /m F=115,278m
L=6 010m D)
F=115,548m
,
i=0 .L-P EST. 20+0,00 (R.L-PD)
, 00 (R PV-02
8+0
T. 1 T=117,237m EST. 25+0,00 (R.L-PD)
ES -15 7m F=114,948m
0m S ,16 BLS-17
0,0 /m B L
17
L=6 010m T=1 14,79
7m T=117,362m
,
i=0 D) F=1
F=115,372m
L-P
(R.
,00
5+0
T. 1
ES -14 3m
LS ,08
B 17 4m
T=1 14,64
F=1
5
TA
R NO
VE
Página 39
MFC 03
m SCC 04
L=103,40 CONECTAR
L=11,15m MFC 01 MFC 01 DSS 04 MFC 01 EDA 01 EDA 01 EDA 01
SCC 04 MFC 01 COM EXISTENTE MFC 05 DSS 04 CONECTAR EDA 01 EDA 01 EDA 01
DSS 04 L=18,70m L=168,30m L=168,30m DAR 02 DAR 02 DAR 02
DSS 04 L=534,60m EDA 02 A.S.U. L=27,30m L=143,50m COM EXISTENTE DAR 02 DAR 02 DAR 02
m DAR 02 L=22,95m DEB 01 DEB 01 DEB 01
L=103,40 DEB 01 DEB 01 DEB 01
EDA 02 L=2,00m A.S.M. A.S.M. A.S.M. A.S.M. A.S.M.
A.S.M.
DAR 02
L=4,05m
A.S.U.
VER NOTA 5
Página 40
EDA 01
DAR 02
EDA 01
DEB 01
DAR 02
A.S.M.
DEB 01
EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01
EDA 01 A.S.M.
DAR 02 EDA 01 EDA 01 EDA 01 EDA 01 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02
DAR 02
DEB 01 DAR 02 DAR 02 DAR 02 DAR 02 MFC 01 DEB 01 DEB 01 DEB 01 DEB 01 DEB 01 DEB 01 MFC 01 DEB 01 DEB 01 DEB 01
DEB 01
A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. L=10,50m A.S.M. A.S.M. A.S.M.
A.S.M.
Executar boca
A.S.M.
VER NOTA 5
Página 41
MFC 01
L=8,65m
Página 42
CONECTAR MFC 01
MFC 01 SCC 04 MFC 05
COM EXISTENTE L=6,90m
A.S.M. L=9,00m L=13,90m
A.S.D. EDA 02
EDA 01 EDA 01 EDA 01 EDA 01 EDA 02 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 01 EDA 02 EDA 02 DAR 02 EDA 02 EDA 02
DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DAR 02 DEB 01 DAR 02 DAR 02
DEB 01 DEB 01 DEB 01 DEB 01 DEB 01 DEB 01 DEB 01 DEB 01 DEB 01 DEB 01 DEB 01 DEB 01 DEB 01 DEB 01 DEB 01 DEB 01 DEB 01 A.S.M. DEB 01 DEB 01
A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M. A.S.M.
MFC 01
A.S.M.
CONECTAR SCC 04
EST. 1135+0,00 EST. 1143+12,00 MFC 05 A.S.M.
SCC 04 SCC 04 COM EXISTENTE
A.S.M. A.S.M. L=7,90m
L=64,00m L=13,50m SCC 04 MFC 05
A.S.M. A.S.U. L=58,00m L=13,60m
VER NOTA 5 VER NOTA 5
Página 43
MFC 01
L=5,20m
A.S.D.
EDA
02 MFC 05 MFC 05
D AR
02 L=5,95m L=9,00m
DEB EDA 01
01 EDA EDA 01
A.S.M 02 CONECTAR EDA 01 DAD 02
. DAR EDA EDA 01 DAR 02
02 02 COM EXISTENTE VALETA EDA 01 EDA 01 DAR 02 DEB 01
D EB DAR EDA 01 DAR 02 DEB 01
01 02 EDA 02 A.S.M. DAR 02 DAR 02 DEB 01 DES 03 A.S.M.
MFC A.S.M DEB EDA 01 DAR 02 DEB 01 A.S.M.
01 01 DAR 02 EDA 02 EDA 01 DEB 01 DEB 01 A.S.M.
. A.S.M EDA 01 DAR 02 DEB 01 A.S.M.
A.S.M DAR 02 EDA 02 DAR 02 A.S.M.
. . DEB 01 DAR 02 DEB 01 A.S.M.
DAR 02 DEB 01 A.S.M.
A.S.M. DEB 01 DEB 01 A.S.M.
A.S.M. MFC 01 DEB 01 A.S.M. SCC 04
A.S.M. MFC 01 A.S.M.
L=8,05m A.S.M.
MFC 01 A.S.M.
L=9,60m
MFC 05
EDA 01 SCC 04 L=339,65m
EDA 01 MFC 01 EDA 01
EDA 01 L=301,25m MFC 01
L=189,65m DAD 02
SCC 04 L=4,50m L=190,95m
MFC 05 MFC 05 CONECTAR
EST. 1161+10,00 MFC 01 EDA 01 A.S.M.
L=14,60m L=17,80m COM EXISTENTE
EDA 01 EDA 01 L=473,80m
L=29,00m
A.S.M.
VER NOTA 5
Página 44
CONECTAR
PE - EST. = 1198+6,455
COM EXISTENTE
TSS 03 PD - EST. = 1197+6,487
L=21,00m
EST. 1209+0,00
EDA 01 SCC 04 MFC 05 MFC 01 SCC 04 EDA 01
MFC 03 EDA 01 EDA 01
L=301,25m L=339,65m L=28,00m L=21,00m A.S.M.
L=4,00m EDA 01
MFC 01 MFC 05
EDA 01 MFC 01 MFC 05 DAD 02 DAR 02 MFC 05 MFC 01
EDA 01 L=216,15m i=0,005m/m L=17,00m
DAD 02 L=190,95m L=246,10m L=11,30m L=1,40m L=16,10m L=697,35m
DAD 02 VER NOTA 5
L=4,50m
VPA 04 EDA 01 TSS 03 L=14,80m CONECTAR
DAD 02 COM EXISTENTE VPA 04
L=178,55m L=20,00m DES 03
L=15,35m L=210,75m
TSS 03
DES 03 L=20,00m
Página 45
CONECTAR
COM EXISTENTE
EST. 1234+15,00
EDA 01 EDA 01 EDA 01 EDA 01 EDA 01
L=32,50m
DAR 02 DAR 02 DAR 02 DAR 02 DAR 02
DEB 01 DEB 01 DEB 01 DEB 01 DEB 01
Executar bocas
A.S.M. A.S.M. A.S.M. A.S.M. A.S.M.
A.S.M.
SCC 04 MFC 01
A.S.M. A.S.M.
MFC 05
L=17,30m
Página 46
EST. 1290+12,00
L=32,00m
EDA 01
Executar boca DAR 02
A.S.U. L=9,90m
EDA 01 EDA 01 VER NOTA 5
EDA 01 MFC 01 MFC 05 DSS 04
DAR 02 DAR 02 MFC 03
MFC 01 DAR 02 SCC 04 L=400,95m L=88,20m L=400,95m
DEB 01 DEB 01 MFC 01 EDA 01 L=110,10m
A.S.M. L=12,50m L=29,80m
A.S.M. A.S.M. A.S.M. DAR 02
L=5,30m
SCC 04
L=60,60m EDA 01
SCC 04 MFC 01 EDA 0
MFC 01 A.S.M. L=720,10m EDA 01 DAR 02 MFC 03
MFC 05 EDA 01 EDA 01
L=20,00m L=2,20m L=252,75m EDA 01 MFC 05 CCS 02 EDA 01
L=18,50m SCC 04 DAR 02 EDA 01 L=28,20m DAR 02
T=134,440m EDA 01 EDA 01
L=109,00m L=8,80m L=7,20m
F=133,240m
SCC 04 MFC 03
MFC 05 EDA 02 L=288,65m L=646,55m
L=17,30m DAR 02
L=2,00m
Página 47
EDA 01
MFC 05 DAR 02
L=40,90m DSS 04
L=9,25m L=126,50m
EDA 01 EST. 1324+14,00
MFC 05 MFC 05 DAR 02 CONECTAR
EDA 01 CONECTAR
L=27,05m L=27,05m L=10,05m COM EXISTENTE MFC 01 DSS 04 CONECTAR
DAR 02 COM EXISTENTE L=26,00m
SCC 04 DSS 04 EDA 01 L=98,25m L=98,25m COM EXISTENTE
L=9,90m EDA 01 MFC 01
CONECTAR L=288,65m L=204,20m DAR 02
MFC 05 DSS 04 COM EXISTENTE
DAR 02 L=204,20m A.S.M. EDA 01
L=10,05m
L=88,20m L=400,95m L=10,15m MFC 03 DSS 04 VER NOTA 5 DAR 02
L=648,10m L=608,20m L=7,95m
MFC 03
L=126,50m
MFC 01
SCC 04 EDA 01 MFC 03
EDA 01 EDA 01 EDA 01 L=957,30m
EDA 01 L=70,70m DAR 02 L=214,70m EDA 01
EDA 01 MFC 01 DAR 02 EDA 01 DAR 02 DAR 02
EDA 01 EDA 01 MFC 03 A.S.D. L=2,20m DAR 02
DAR 02 A.S.U. MFC 05 DAR 02 L=6,85m DAR 02 MFC 01 A.S.M. L=2,20m MFC 05
DAR 02 MFC 01 A.S.M. CONECTAR L=646,55m L=8,35m
L=7,20m L=88,30m A.S.M. A.S.M. L=28,35m
MFC 03 L=6,90m L=92,00m MFC 05
CONECTAR COM EXISTENTE
L=646,55m L=11,55m EDA 01
COM EXISTENTE EDA 01 CONECTAR SCC 04
EDA 01 SCC 04
MFC 01 MFC 05 DAR 02 COM EXISTENTE L=59,75m
MFC 01 CONECTAR DAR 02 A.S.M.
A.S.M. EST. 1304+4,00 L=15,95m L=7,05m
L=91,50m COM EXISTENTE L=7,05m
A.S.D.
L=32,00m
A.S.U.
VER NOTA 5
Página 48
COM EXISTENTE
MFC 01
A.S.M.
MFC 01
SCC 04 A.S.M.
A.S.M.
EDA 01
DAR 02
L=3,20m
Página 49
EST. 1369+0,00 CONECTAR
EST. 1391+18,00
COM EXISTENTE
L=20,00m
L=18,00m
DES 03
A.S.M.
A.S.M.
MFC 01 VER NOTA 5
VER NOTA 5
A.S.M.
MFC 05
L=3,90m
A.S.D.
Página 50
DES 03 EDA 01
DAD 02 VPA 04
L=8,80m EDA 01
L=241,10m PE - EST. = 1414+4,111 DES 03
EDA 01 DAD 02 EDA 02
PD - EST. = 1413+2,454 MFC 01
DAD 02 L=27,35m DAD 02
MFC 01 EDA 01 L=55,20m
L=11,70m DAD 02 L=27,30m
L=364,40m VPA 04
L=12,25m EDA 01 L=275,50m
DAD 02 EDA 01
L=8,90m DAD 02
L=18,20m
MFC 01
L=299,35m MFC 01
MFC 01 L=104,40m
L=321,15m
EDA 01 EDA 01
SCC 04
L=367,90m
EDA 02
DES 03 DAR 02
SCC 04 L=1,20m
EDA 01 MFC 05 L=462,80m
DAD 02 L=356,70m
L=15,10m VPA 04
EDA 01
L=167,15m EDA 01
EDA 01 DAR 02 EDA 01
DAR 02
DAD 02 L=1,40m DAD 02 VPA 04 MFC 03 L=1,30m
L=13,25m L=13,40m L=195,50m EDA 01
L=308,85m MFC 01
DAD 02
L=355,40m
TSS 03 L=13,05m
L=32,50m
Página 51
CONECTAR
EST. 1436+16,00 COM EXISTENTE
MFC 05 MFC 05
L=19,30m MFC 01
L=19,00m
L=37,60m MFC 01 MFC 05 L=12,45m
DSS 04 L=355,70m L=89,40m A.S.D.
A.S.U. MFC 01 MFC 01
L=20,00m L=355,70m
VER NOTA 5 A.S.U.
MFC 01
MFC L=20,00m EDA 01 EDA 01 EDA 01
0
EDA L=10 1
01 4,40m
SCC 04 EDA 02
MFC 05 MFC 05 L=712,60m MFC 05 MFC 01 DAD 02
L=18,50m L=18,50m L=88,20m L=419,85m L=1,50m
Página 52
EDA 01
DAR 02 EDA 02
CONECTAR
L=8,75m DAD 02
COM EXISTENTE
L=2,00m
DEB 01 CONECTAR
DESAGUAR
COM EXISTENTE
MFC 01 EDA 01 SOBRE BUEIRO
CONECTAR EDA 01 DSS 04
MFC 01 DAD 02 L=669,60m DAR 02 MFC 03
COM EXISTENTE DAR 02 L=669,60m
A.S.U. A.S.U. L=4,00m L=319,15m
L=7,60m
Página 53
EDA 01 EDA 01 MFC 05
DAR 02 DAR 02 CCS 03 L=21,80m
L=9,00m L=5,70m T=146,090m
F=145,000m
EDA 02 MFC 05
MFC 05 MFC 05 MFC 01 DSS 04 DSS 04 MFC 03 EDA 01
DAD 02 L=41,50m DAR 02
L=15,40m L=15,20m L=200,50m L=200,50m L=320,70m L=339,05m
L=2,00m L=1,60m
EDA 01
MFC 01 EDA 01
MFC 05 MFC 05
EDA 01 L=85,00m DAR 02
MFC 05 L=35,25m L=35,10m
DAR 02 L=1,40m
MFC 05 SCC 04 MFC 01 EDA 01 MFC 03 L=18,50m
EDA 01 EDA 01 L=4,40m
L=76,00m L=915,60m L=708,90m DAR 02 L=340,50m
L=8,50m EDA 01
MFC 05
L=18,50m
Página 54
L=27,90m
A.S.M.
VER NOTA 5
MFC 05 MFC 01
MFC 05 MFC 05
L=88,20m L=185,80m
L=35,25m L=35,10m
CONECTAR COM
BUEIRO EXISTENTE
Página 55
TUBO
DECLIVIDADE
(m/m)
COMPRIMENTO
(m)
TUBO
DECLIVIDADE
(m/m)
COMPRIMENTO
(m)
PROJETO DA GALERIA
Página 56
TUBO
DECLIVIDADE
(m/m)
COMPRIMENTO
(m)
TUBO
DECLIVIDADE
(m/m)
COMPRIMENTO
(m)
PROJETO DA GALERIA
Página 57
GREIDE PROJETADO
Página 58
BUEIRO Est.189+0,00 BUEIRO Est.665+0,00
125 125 115 115
Est. 664+7,60
CANTEIRO CENTRAL BOCA
120 120 110 T=102,675 110
GREIDE PROJETADO F=101,325
PISTA DIREITA
RETORNO
115 115 105 105
BUEIRO Est.200+0,00
120 120
BUEIRO Est.681+11,00
115 115 110 110
GREIDE PROJETADO RETORNO GREIDE PROJETADO GREIDE PROJETADO
GREIDE PROJETADO
ILHA PISTA ESQUERDA PISTA DIREITA
110 110 105 105
Est. 200+0,00
105 Est. 198+11,45 105 100 Est. 681+11,00 Est. 681+11,00 100
BOCA L= 33,00m Est. 200+4,45 CCS 02
Est. 681+11,00
T=109,975 i=0,005m/m BOCA CANTEIRO CENTRAL L= 35,00m
BOCA
100 F=108,650 T=109,810 100 95 T=104,099 i=0,010m/m 95
T=103,125
F=108,485 F=102,400
F=101,775
90 90 90 90
*VER PLANTA DE-PE-DR-2006 *VER PLANTA DE-PE-DR-2020
80 80
*VER PLANTA DE-PE-DR-2012
Página 59
BUEIRO Est.885+4,00 BUEIRO Est.1027+11,00
120 120 130 130
GREIDE PROJETADO GREIDE PROJETADO
PISTA ESQUERDA PISTA DIREITA
115 115 125 GREIDE PROJETADO GREIDE PROJETADO 125
PISTA ESQUERDA PISTA DIREITA
110 Est. 885+4,00 110 120 120
Est. 885+4,00
CCS 06 L= 13,00m Est. 1027+11,00
105 CANTEIRO CENTRAL i=0,006m/m 105 115 115
Est. 1027+11,00
T=113,203 CCS 06 L= 18,00m
F=111,100 Est. 885+4,00 CANTEIRO CENTRAL i=0,005m/m
100 BOCA 100 115 110
T=119,390
T=112,077 F=117,287 Est. 1027+11,00
F=110,725 BOCA
95 95 105 105
*VER PLANTA DE-PE-DR-2026 *VER PLANTA DE-PE-DR-2030 T=118,353
F=117,203
Est. 1209+0,00
110 Est. 934+10,00 110 125 125
Est. 934+16,00 L= 28,00m
BOCA Est. 1209+0,00
L= 14,00m i=0,005m/m
T=113,020 CCS 02
105 i=0,005m/m 105 120 120
F=111,670 CANTEIRO CENTRAL
T=130,692
F=128,727
100 100 119 119
*VER PLANTA DE-PE-DR-2027 *VER PLANTA DE-PE-DR-2035
BUEIRO Est.989+14,00
125 125
GREIDE PROJETADO GREIDE PROJETADO
PISTA ESQUERDA PISTA DIREITA
120 120
Página 60
GREIDE PROJETADO
Página 61
MEIOS-FIOS DE CONCRETO (I)
MFC01
MFC02
MFC03 MFC04
PLANTA
EDA 01 EDA 02
C C'
CORTE CC'
Página 63
DAR - 01 MEIA CANA DE CONCRETO DAR - 02 CANAL RETANGULAR EM CONCRETO SIMPLES
CORTE LONGITUDINAL CORTE LONGITUDINAL
Página 64
DISSIPADORES DE ENERGIA (II)
- DEB
PLANTA
B'
CORTE AA'
c
A A'
CORTE BB'
L
B
Página 65
SARJETAS DE CANTEIRO CENTRAL DE CONCRETO SARJETAS TRIANGULARES DE CONCRETO (I) SARJETAS TRAPEZOIDAIS DE CONCRETO
SCC01 STC01
SZC01
SCC03
STC03 SZC02
SCC02
STC02
SCC04
STC04
SZG02
TABELA 1A TABELA 1B
VPC 03 VPC 04
TABELA 2A TABELA 2B
VPA01 VPA02
VPA03
VPA04
TABELA 3A TABELA 3B
TABELA 4B
TABELA 4A
UND
DPS 01 DPS 02 DPS 03 DPS 04 DPS 05 DPS 06 DPS 07 DPS 08
DPR 01 DPR 02
DPR 03
UND
DPR 01 DPR 02 DPR 03 DPR 04 DPR 05
DPR 04 DPR 05
PLANTA
A A'
PLANTA
B B'
Página 70
DRENOS SUBSUPERFICIAIS E DETALHES COMPLEMENTARES
b c k b c k a b c k
d d
k
k
g
g
h
f
L
a
e
p
p
n
k
k
M m M
L
142
165
205
2,076 0,288 0,314 0,068 0,059 202 9,99 2,520 12,346 1,713 1,865
115
85 21 96 2,36 0,424 181 37 0,403 0,250
20
20
20
20
20
27
27
66
50
30
37
20
90
30
15
10
10
5
88 22 99 2,41 0,424 2,078 0,288 0,314 0,068 0,060 188 39 210 10,19 2,523 12,362 1,716 1,867 0,404 0,255
92 23 104 2,47 0,425 2,081 0,289 0,314 0,068 0,062 196 40 219 10,47 2,527 12,381 1,718 1,870 0,404 0,262
98 24 110 2,56 0,425 2,084 0,289 0,315 0,068 0,064 208 43 232 10,84 2,531 12,403 1,721 1,873 0,405 0,271
104 26 117 2,67 0,426 2,088 0,290 0,315 0,068 0,067 222 46 248 10,36 2,536 12,427 1,725 1,877 0,406 0,284
113 28 127 2,84 0,427 2,092 0,290 0,316 0,068 0,071 240 49 269 12,07 2,542 12,455 1,728 1,881 0,407 0,302
con cimento brita 1
BUEIRO SIMPLES TUBULAR = 60 formas
con cimento brita 1
Esc. BUEIRO SIMPLES TUBULAR = 120 formas creto saco areia brita 2 madeira
Esc. creto saco areia brita 2 madeira
m2 m3 m3 m3
m2 m3 m3 m3 a b c d e f g h k m n p L M m3 50kg m3
a b c d e f g h k m n p L M m3 50kg m3
25 200 40 220 12,61 3,638 17,825 2,474 2,692 0,582 0,315
110 130 4,17 0,932 4,567 0,634 0,690 0,149 0,104
110 25 4,568 0,634 0,690 0,149 0,104 201 40 221 12,64 3,639 17,830 2,474 2,693 0,582 0,316
130 4,18 0,932
25 4,570 0,634 0,690 0,149 0,105 203 41 223 12,71 3,642 17,844 2,476 2,695 0,583 0,318
112 132 4,20 0,933
207 41 228 12,84 3,646 17,866 2,479 2,698 0,583 0,321
114 26 135 4,24 0,933 4,573 0,635 0,691 0,149 0,106
163
180
2,484 2,703 0,584 0,326
230
213 43 234 13,03 3,653 17,898
125
40
25
28
28
60
30
38
10
4,577 0,635 0,691 0,149 0,107
155
23
23
88
20
30
33
10
10
121 221 44 243 13,30 3,661 17,937 2,489 2,709 0,586 0,332
28 143 4,38 0,935 4,583 0,636 0,692 0,150 0,110
231 46 254 13,67 3,671 17,986 2,496 2,716 0,587 0,342
127 29 150 4,49 0,937 4,589 0,637 0,693 0,150 0,112
244 49 269 14,16 3,682 18,042 2,504 2,725 0,589 0,354
134 31 159 4,65 0,938 4,597 0,638 0,694 0,150 0,116
261 52 287 14,85 3,695 18,105 2,513 2,734 0,591 0,371
144 33 170 4,85 0,940 4,605 0,639 0,695 0,150 0,121
5,14 283 57 311 15,79 3,709 18,176 2,522 2,745 0,593 0,395
156 35 184 0,942 4,615 0,640 0,697 0,151 0,129
con cimento brita 1
con cimento brita 1 Esc. BUEIRO SIMPLES TUBULAR = 150 formas creto saco areia brita 2 madeira
Esc. BUEIRO SIMPLES TUBULAR = 80 formas creto saco areia brita 2 madeira
a b c d e f g h k m n p L M
m2 m3 50kg m3 m3 m3 m3
m2 m3 m3 m3
a b c d e f g h k m n p L M m3 50kg m3
45 260 31,784 4,411 4,800 1,038 0,510
240 20,39 6,487
140 30 160 6,83 1,619 7,932 1,101 1,198 0,259 0,171 241 45 31,791 4,412 4,801 1,038 0,511
261 20,43 6,488
141 30 161 6,85 1,619 7,934 1,101 1,198 0,259 0,171 46 264 31,810 4,414 4,804 1,039 0,513
244 20,53 6,492
142 30 162 6,88 1,620 7,937 1,101 1,199 0,259 0,172 248 47 20,71 6,499 31,843 4,419 4,809 1.040 0,518
269
31 7,942 1,102 1,199 0,259 0,174
260
166 6,95 1,621
194
145
320
255 48 277 20,98 6,508 31,888 4,425 4,816 1,041 0,524
29
29
75
30
30
39
50
10
120
145
25
35
30
35
25
10
50 287 21,35
154 33 177 7,20 1,624 7,960 1,105 1,202 0,260 0,180 277 52 300 21,86 6,534 32,015 4,443 4,835 1,045 0,547
162 35 185 7,39 1,627 7,971 1,106 1,204 0,260 0,185 293 55 22,56 6,550 32,096 4,454 4,847 1,048 0,564
317
171 37 195 7,66 1,630 7,985 1,108 1,206 0,261 0,191
313 59 339 23,51 6,569 32,188 4,467 4,861 1,051 0,588
183 39 209 8,02 1,633 8,000 1,110 1,208 0,261 0,201 339 64 368 24,84 6,590 32,290 4,481 4,876 1,054 0,621
198 42 226 8,52 1,636 8,017 1,113 1,211 0,262 0,213
Página 72
BUEIRO DUPLO TUBULAR DE CONCRETO - BOCAS NORMAIS E ESCONSAS
VISTA FRONTAL
k
VISTA LATERAL
b c k a
d d
g
g
a
L
L
f
h
e
e
n p
n p
k
k
M m L M
180
163
180
120
25
230
255 32 277 8,65 1,972 9,663 1,341 1,459 0,316 0,216 362 43 383 15,64 4,463 21,870 3,035 3,303 0,714 0,391
20
20
40
60
25
23
23
35
30
30
30
33
15
10
10
265 33 287 8,90 1,981 9,704 1,347 1,466 0,317 0,222 375 44 397 16,10 4,494 22,019 3,056 3,325 0,719 0,403
277 35 300 9,24 1,991 9,755 1,354 1,473 0,319 0,231 393 46 416 16,74 4,531 22,200 3,081 3,353 0,725 0,418
293 37 317 9,71 2,003 9,813 1,362 1,482 0,320 0,243 415 49 439 17,59 4,573 22,410 3,110 3,384 0,732 0,440
313 39 339 10,34 2,016 9,879 1,371 1,492 0,323 0,259 444 52 470 18,76 4,622 22,647 3,143 3,420 0,740 0,469
339 42 368 11,22 2,031 9,953 1,381 1,503 0,325 0,281 481 57 509 20,39 4,676 22,911 3,180 3,460 0,748 0,510
205
260
194
142
30
320
309 37 330 12,06 3,065 15,019 2,084 2,268 0,490 0,301 436 48 458 24,76 7,980 39,102 5,426 5,905 1,277 0,619
20
22
22
24
24
50
30
32
80
30
30
30
34
50
10
10
320 39 342 12,41 3,080 15,093 2,095 2,279 0,493 0,310 452 50 474 25,41 8,032 39,359 5,462 5,944 1,285 0,635
335 40 358 12,89 3,099 15,184 2,107 2,293 0,496 0,322 473 52 497 26,29 8,096 39,669 5,505 5,991 1,295 0,657
354 43 378 13,54 3,120 15,289 2,122 2,309 0,499 0,339 501 55 525 27,49 8,169 40,029 5,555 6,045 1,307 0,687
379 46 405 14,43 3,145 15,408 2,138 2,327 0,503 0,361 535 59 561 29,13 8,253 40,438 5,612 6,107 1,320 0,728
410 49 348 15,66 3,171 15,540 2,157 2,347 0,507 0,391 580 64 608 31,41 8,345 40,891 5,675 6,175 1,335 0,785
Página 73
BUEIRO TRIPLO TUBULAR DE CONCRETO - BOCAS NORMAIS E ESCONSAS
PLANTA ESCONSO
PLANTA NORMAL
b c k b c k
k
k
VISTA LATERAL VISTA FRONTAL
a
b c k
d d
g
a
a
L
L
f
h
e
e
n p
n p
k
k
M m L M
260
165
205
320
142
194
30
50
436 37 458 14,12 3,860 18,915 2,625 2,857 0,618 0,353 617 48 639 26,87 9,902 48,521 6,734 7,328 1,584 0,672
20
22
22
24
24
50
30
32
80
30
30
34
10
10
452 39 474 14,62 3,888 19,049 2,644 2,877 0,622 0,366 640 50 662 27,79 9,996 48,981 6,797 7,397 1,599 0,695
473 40 497 15,31 3,921 19,211 2,666 2,901 0,627 0,383 670 52 693 29,04 10,110 49,537 6,875 7,481 1,618 0,726
501 43 525 16,23 3,959 19,400 2,692 2,930 0,633 0,406 708 55 732 30,74 10,242 50,183 6,964 7,579 1,639 0,768
535 46 561 17,50 4,003 19,613 2,722 2,962 0,640 0,437 757 59 783 33,06 10,391 50,916 7,066 7,689 1,663 0,827
580 49 608 19,24 4,051 19,850 2,755 2,998 0,648 0,481 820 64 849 36,29 10,557 51,729 7,179 7,812 1,689 0,907
con cimento brita 1 madeira
Esc.
BUEIRO TRIPLO TUBULAR = 120 formas creto saco
areia
m3 brita 2 m3 m3
m2 m3 50kg
a b c d e f g h k m n p L M m3
480 40 500 16,66 5,497 26,934 3,738 4,068 0,879 0,416
482 40 502 16,72 5,503 26,963 3,742 4,072 0,880 0,418
487 41 508 16,90 5,521 27,052 3,754 4,085 0,883 0,422
497 41 518 17,21 5,551 27,198 3,774 4,107 0,888 0,430
180
230
163
40
23
23
30
33
10
Página 74
VISTA LATERAL
Página 75
0,09 0,10 0,10 0,10 0,12 0,12 0,14 0,18 0,18 0,19 0,24 0,24 0,24 0,30 0,31 0,29 0,33 0,36 0,33 0,39 0,43
MEDIDAS UNID. SIMPLES DUPLO TRIPLO SIMPLES DUPLO TRIPLO SIMPLES DUPLO TRIPLO SIMPLES DUPLO TRIPLO SIMPLES DUPLO TRIPLO SIMPLES DUPLO TRIPLO SIMPLES DUPLO TRIPLO
0,09 0,13 0,13 0,10 0,15 0,15 0,15 0,23 0,23 0,20 0,26 0,27 0,25 0,32 0,33 0,29 0,36 0,38 0,34 0,41 0,44
MEDIDAS UNID. SIMPLES DUPLO TRIPLO SIMPLES DUPLO TRIPLO SIMPLES DUPLO TRIPLO SIMPLES DUPLO TRIPLO SIMPLES DUPLO TRIPLO SIMPLES DUPLO TRIPLO SIMPLES DUPLO TRIPLO
Página 76
COBRIMENTO SUPORTE PARA APOIO DA ARMADURA
SUPERIOR NAS LAJES
Kg/m PESO (Kg) Kg/m PESO (Kg) Kg/m PESO (Kg) Kg/m PESO (Kg) Kg/m PESO (Kg) Kg/m PESO (Kg) Kg/m PESO (Kg)
TOTAL 126Kg TOTAL 98Kg TOTAL 111Kg TOTAL 146Kg TOTAL 158Kg TOTAL 186Kg TOTAL 212Kg
B
PLANTA
TABELA DE ARMADURA
A A'
CORTE
B'
CORTE BB'
CORTE AA'
CORTE AA'
CORTE BB'
NOTAS:
2- CONCRETO fck > 15 MPa;
3- COBRIMENTO DAS ARMADURAS 2,5 cm;
Página 81
CORTE TRANSVERSAL DEGRAUS DA ESCADA DE ACESSO
NOTAS:
2- CONCRETO fck > 15 MPa;
Página 82
NOTAS:
Página 83
ESPESSURA ALTURA DE ATERRO PESO
DA CHAPA
(Kg/m)
REVESTIDA COM EPOXI (mm)
Página 84
MEIOS-FIOS DE CONCRETO (II)
MFC05
MFC06
MFC07 MFC08
PLANTA
CORTE CC'
D'
c
C C'
CORTE DD'
c
L
D
PEDRA
TIPO C L ARGAMASSADA
Página 86
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 87
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 88
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 89
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 90
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 91
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 92
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 93
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 94
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 95
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 96
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 97
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 98
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 99
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 100
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 101
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 102
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 103
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 104
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 105
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 106
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 107
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 108
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 109
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 110
DEPARTAMENTO NACIONAL DE INFRAESTRUTURA DE TRANSPORTES
Página 111
DUAS CABECEIRAS COMPLETAS PARA BUEIROS NORMAIS VISTA EM
PLANTA
BUEIROS
1,50 x 1,50 m 2,00 x 2,00 m 2,50 x 2,50 m 3,00 x 3,00 m
B
B
B
A
Página 113
5 TERMO DE ENCERRAMENTO
Volume 2: Projeto de Execução de Drenagem e Obras de Arte Correntes – Projeto BÁSICO de Engenharia para Execução das Obras Remanescentes de Duplicação e Restauração com Contrato: TT-00083/2017-00
Melhoramentos da Pista Existente na Rodovia BR-101/AL
Página 114
5 TERMO DE ENCERRAMENTO
O CONSÓRCIO BR – 101/AL, apresenta o VOLUME 2 : PROJETO DE EXECUÇÃO DE DRENAGEM E OBRAS DE ARTE CORRENTES em atendimento ao Edital RDC nº 091/2016-00 - DNIT,
para a “Contratação Integrada de Empresa para Elaboração dos Projetos Básico e BÁSICO e Execução das Obras Remanescentes de Duplicação e Restauração com Melhoramentos da
Pista Existente, Incluindo Obras de Arte Especiais, na Rodovia BR-101/AL (Remanescente dos Lotes 04 e 05)”. Este volume contém 115 (cento e quinze) páginas numeradas
sequencialmente de 01 a 115.
____________________________________
CONSORCIO BR – 101/AL
ROGÉRIO BARROS DE SOUZA
CREA/RJ nº 851.056.688/D
Volume 2: Projeto de Execução de Drenagem e Obras de Arte Correntes – Projeto BÁSICO de Engenharia para Execução das Obras Remanescentes de Duplicação e Restauração com Contrato: TT-00083/2017-00
Melhoramentos da Pista Existente na Rodovia BR-101/AL
Página 115