Summary of Cost of School Buildings Project
Plinth area of 5,400 Sq.ft and the 48 Rooms(15'x20'), 12 Room in one Flat and total of
1 Class Room Block (from Class 1-12) 4story building . The building will be RC building
overall area of 21,600 Sq.ft
86,400,000.00 with a brick infill
Plinth Area of 3,000 Sq.ft and overall 12 Rooms (20'x26'), 6 Rooms in One flat and its two
2 Primary Section (PG)
area of 9360 sq.ft 37,440,000.00 story RC building with brick infill
Plinth area of 2000 Sq.ft and overall The ground floor will be covered by Library and the
3 Library and Lab Block
area of 4000 Sq.ft 16,000,000.00 first floor will be covered by Lab
7 Indoor Game hall Plinth area of 4000 Sq.ft This will be a steel structure in single story with
14,000,000.00 shell structure.
Sub Total 194,940,000.00
Contingency 10% 19,494,000.00
Net Total 214,434,000.00