INFORMATION PLAN FOR NETWORK & GENERATION EQUIPMENT Annex-A

General Instructions: The following Guidelines may please be followed for completion of all templates
1. The soft form of this proforma is avaialble for download at the link "http://bit.ly/2kyVryu" under title "Annex-A Grid Stations"
2. All information must be in accordance with NPCC Standard Nomenclature and given format.
3. Terminologies/ nomenclature for data/ information may be used as given in this document.
4. Number of records may be added / provided as per actual number of CBs, Lines, Transformers and Generation Units etc.
5. Provide the photocopy of name plate data of each transformer along with winding connection diagram
6. Provide factory testing report of the transformer in which open circuit and short circuit tests are given with their test results.

A. Grid Station Information

Name of Grid Station

COD (DD/MM/YYYY)

Total No of Transformers

Total No of Auxilliary
Transformers.

Total No of Circuit Breakers.

Total Auxiliary Consumption


(kWh)
INFORMATION PLAN FOR NETWORK & GENERATION EQUIPMENTS
C-1. Transmission Lines (500/220/132 kV)
Measurement
Type Line # 1 Line # 2 Line # 3 Line # 4 Line # 5 Line # 6
Unit
Line From (Station Name) -
Line To ( Station Name) -
Circuit Number -
Voltage Level KV
Conductor Type -
Current Carrying Capacity Amps
No of Bundles -
Measured Used CT Ratio -
Nominal Current Amps
Length of Line Kilometers
Surge Impedance Loading (SIL) MW
Number of Towers -

Value -

Positive Sequence
Line Resistance Explained in (1) -
(1) = Possible
expression units are : %
B(MVA) if value expressed in % at B
at B(MVA) Base, ohm, -
miliohm. Base
(2) = Possible
expression units are the Value -
same as for LNRES data
if it is a classical line it Line Reactance Explained in (2) -
is a series reactance,
they are : ohm, mohm,
B(MVA) if value expressed in % at B
MVAR, milihenry (mH), -
ampere (A) Base
(3) = Possible
expression units are: Value -
%/km at a B (MVA) base,
micro S/kM, nanofarad Line Susceptance Explained in (3) -
(nF)/kM, MVAR/kM
B(MVA) if value expressed in % at B
-
Base

Value -

Zero Sequence Line Resistance Explained in (4) -


(4) = Possible
expression units are : % B(MVA) if value expressed in % at B
at B(MVA) Base, ohm, -
miliohm.
Base
(5) = Possible
expression units are the Value -
same as for LNRES data
if it is a classical line it Line Reactance Explained in (5) -
is a series reactance,
they are : ohm, mohm,
MVAR, milihenry (mH), B(MVA) if value expressed in % at B
-
ampere (A) Base
(6) = Possible
expression units are: Value -
%/km at a B (MVA) base,
micro S/kM, nanofarad
(nF)/kM, MVAR/kM Line Susceptance Explained in (6) -

B(MVA) if value expressed in % at B


-
Base
INFORMATION PLAN FOR NETWORK & GENERATION EQUIPMENTS
D-1. All Transformers Data
Type Transfo#1 Transfo#2 Transfo#3 Transfo#4 Transfo#5 Transfo#6 Transfo#7 Transfo#8 Transfo#9 Transfo#10
Transformer ID/Make/Year
Standard/Class
Rated Power Respect to
Cooling Methods
Rated MVA(3-Phase)
Primary Voltage Level

Secondary Voltage Level

Vector Group

No. of Taps

Rated Max. Current


Respect to Cooling Method

UCC % (Short Circuit impedence in terms


of %age on 100 MVA base and base voltage
with respect to Max,Nominal and Min.
Voltage Tap Position)

Unomfix (Nominal fix


voltage at low voltage side)

Ucc Base (MVA)

No load Excitation current


respect to %age rating current

No load Current (3 Phase)


Total Iron losses/core losses/no load
losses 3Phase
(From open circuit test)
Total Copper Losses/Winding Losses/Load
Losses 3 Phase (From Short Circuit Test)

Total Iron losses/core losses/no load


losses 1Phase (From open circuit test)

Total Copper Losses/Winding Losses/Load


Losses 1 Phase (From Short Circuit Test)

Losses Base
Table of current & Voltage
respect to Tap Positions
Nominal Tap Position
Minimum Tap Position
Maximum Tap Position
Type of Tap Changer
%age Tap Changer

Per unit Step size of each tap changer

No of Taps
Nominal Current (AMPS)
Measured Used CT (A)
INFORMATION PLAN FOR NETWORK & GENERATION EQUIPMENTS
D-2. Transformers (3 Winding Transformer Data, Pi Model)
Measurement
Type Transfo#1 Transfo#2 Transfo#3 Transfo#4 Transfo#5 Transfo#6 Transfo#7 Transfo#8 Transfo#9 Transfor#10
Unit
Value -
1-2 Winding
B(MVA) -
Reactance
U base (kV) -
Value -
1-3 Winding
B(MVA) -
Reactance
U base (kV) -
Value -
2-3 Winding
B(MVA) -
Reactance
U base (kV) -
D-3. Short Circuit Data
Winding Contact Type -
Grounding Resistance -
Primary Grounding Reactance -
Grounding Type -
No. of Transformer -
Winding Contact Type -
Grounding Resistance -
Secondary Grounding Reactance -
Grounding Type -
No. of Transformer -
Winding Contact Type -
Grounding Resistance -
Tertiary Grounding Reactance -
Grounding Type -
No. of Transformer -

D-4. Tap Operation at LTC Side


Nominal Voltage (KV) -

Nominal Tap No -

Minimal Tap No -

Voltage of Minimum Tap -

Number of Taps over/under Nominal Voltage -

Step Size (%) Over Nominal Voltage -

Step Size (%) Under Nominal Voltage -


INFORMATION PLAN FOR NETWORK & GENERATION EQUIPMENTS
D-5. Transformers (2 Winding Transformer Data, Pi Model)
Measurement
Type Transfo#1 Transfo#2 Transfo#3 Transfo#4 Transfo#5 Transfo#6 Transfo#7 Transfo#8 Transfo#9 Transfor#10
Unit
VALUE -
Series Resistance B(MVA) -
U base (kV) -
Value -
Series Reactance B(MVA) -
U base (kV) -
Value -
Shunt Mag.
B(MVA) -
Conductance
U base (kV) -
Value -
Shunt Mag.
B(MVA) -
Suseptance
U base (kV) -
Nominal Voltage (kV) -
D-6. Short Circuit Data
Primary Winding Contact Type -
Primary Grounding Resistance -
LTC SIDE Primary Grounding Reactance -
Primary Grounding Type -
No. of Transformers -
Secondary Winding Contact Type -
Secondary Grounding Resistance -
FIXED SIDE Secondary Grounding Reactance -
Secondary Grounding Type -
No. of Transformers -
D-7. Tap Position at LTC Side (H.T Side)
Nominal Tap No -

Minimal Tap No -

Voltage at Minimum Tap -

Number of Taps over Nominal Voltage -

Step Size (%) Over nominal Voltage -

Number of Taps under Nominal Voltage -

Step Size (%) Under Nominal Voltage -


INFORMATION PLAN FOR NETWORK & GENERATION EQUIPMENTS
E-1. All Circuit Breakers.
Type Measurement Unit CB#1 CB#2 CB#3 CB#4 CB#5 CB#6 CB#7 CB#8 CB#9 CB#10

Block ID -

Voltage Level kV

Open
Nomral Status
Close

Rating (Amps)
Asymmetrical Faults
Short Circuit Analysis
Rating (Amps)
Symmetrical Faults

Rated Impulse Standing Voltage -

Rated Normal Current -

F-1. All Shunt Reactors


Type Measurement Unit SR#1 SR#2 SR#3 SR#4 SR#5 SR#6 SR#7 SR#8 SR#9 SR#10

Shunt Reactor ID -

Shunt Reactor Type -

MVAR Nominal -