EN MARCHA DE PLANTAS
COMISIONAMIENTO DE PIRQUITAS
Ing. Msc. Oscar Apaza Mendoza
210-BN-100
10301 FC 10801 220-MA-123
OI H 220-MD-123
210-FE-103
II 10801
220-CV-145
210-GZ-104
M LIC 12501
210-CR-108 220-SC-148
PRIMARY 220-BN-125
CRUSHING
AREA 210
210-MA-110
VSD
210-MD-123
VSD M M 220-CV-123
210-CV-106
12701 220-FE-126A/B 12701
II II
210-SC-119
220-CR-129
220-CR-120 220-CR-127
220-CV-123
SECONDARY AND TERTIARY
CRUSHING 220-CV-153
AREA 220
15401 SI FINE ORE STOCKPILE
220-WT-154 AREA 230 HY 165A1@D1
KEY WI 15401
VSD
Ore M
230-FE-165A@D To Jig
Preconcentration
230-CV-166
230-WT-169 310-SA-170
16901 SI
WIC 16901
4.2. SISTEMA DE PRECONCENTRACION
AREA 300 - CONCENTRATING, MILL BUILDING
230-CH-168
To Grinding Bin
330-BN-141
LV-10201 LIC 10201
VSD
SC-100 PP-102A/B COARSE
WT-554 STOCKPILE
FIC 102A1/B1 SA-551 AREA 410
PB-102 WI 55401
DB-108
110A2 FIC
/B2/C2 12401 Agua de
FIC
proceso
SC-117
KEY
PIC 12401 12401
LIC
SC-118 Ore / Slurry
VSD
Ore (Occasional)
12201
LIC
Process Water
330-CV-138
PP-124A/B Recovered Water
PB-124
VSD
LIC 12301 PB-122
VSD PP-122A/B
To Grinding Pumpbox
PB-123 PP-123A/B 310-PB-154
PP-131A/B
PB-131
4.3. SISTEMA DE MOLIENDA Y CLASIFICACION
KEY
GRINDING
AREA 330
Ore / Slurry
Ore (Occasional)
From Trouser Chute Process Water
230-CH-168
Recovered Water
BN-141
M 341-SA-156 341-PA-157
To Rougher
Silver Flotation
FE-142
14201
SE WT-142
FIC 14501 DC 14501
WIC 14201 SP
Agua de
CY-152 proceso
VSD FY 14501
AIC 14501
WC 14202 HCN
Del Oversize
DY 15401 Agua de
a reactivos proceso
14203 DIC
ML-145 LIC 15401
FIC 15401
WC 14203
VSD DIC 15401
FIT 14203
PT
PSI A flotaciòn de plata
PT
nido de D-20
ciclones
VDS carga DT
faja feed
MOLINO DE BOLAS descarga pulpa DIC
16`X 22` LAZO 4
LAZO 1
FT
LT agua
WIC WT cajon descarga
LAZO 3
LAZO 2
LIC VDS
FRIC
agua FT
NOMENCLATURA
WT:trasmisor de peso LT: trasmisor de nivel lazo nro 1: control de carga entrada al molino
WIC: controlador indicador de peso LIC: control indicador de nivel lazo nro 2: control de agua entrada al molino
VDS: variador de velocidad VDS: variador de velocidad lazo nro 3: control de nivel en el cajon de descarga
FT: trasmisor de flujo DT: trasmisor de densidad lazo nro 4: control de densidad de pulpa alimento al nido de ciclones
FRIC: feed ratio indicator controller DIC: controlador indicador de densidad
PSI: indicador tamaño de particula D-20: nido de ciclones(20" diametro c/u)
PT: trasmisor de presion
4.4. SISTEMAS DE FLOTACION PLATA Y ESPESAMIENTO-FILTRADO PLATA
SISTEMA 341 - Silver Flotation
SUBSISTEMA DESCRIPCION
341-C First & Second Silver Cleaner Flotation Cells & Pumping
From Grinding
AREA 341
Overflow Cyclone LIC 166A1/D1/G1
SILVER ROUGHER
FLOTATION LV 166A1/D1/G1
TK-163
LIC 16901
FC-166A@G
SILVER
1st CLEANER
VSD
FLOTATION
PP-169A/B
PB-169 LIC 177B1/E1
LIC 176B1
LV 176B1 LV 177B1/E1
SILVER
2nd CLEANER FC-176A/B
FC-177A@B 18201 LIC
FLOTATION
To Sulphides
Flotation
VSD
PB-182
LIC 18001 PP-182A/B
VSD
PB-180 To Silver
Concentrate
PP-180A/B Thickener
4.4.3. DIAGRAMA DE CONTROL : ESPESAMIENTO-FILTRADO DE LA PLATA
From
Silver Flotation
From Tin
Concentrate
AREA 342 HV 19801
Thickener
TK-198
TK-192
RAISE/
OIC 19301
LOWER
TH-193
19301 ZE
19901 FIT
LIC 19901
FL-200
TK-199
HV 19901 PP-199A/B
To Water System
KEY: CV-203
Wash Water To Water System
Slurry
Water Process
Occasional Slurry
SILVER CONCENTRATE Ag
BAGGING STATION
4.5. SISTEMAS DE FLOTACION DE SULFUROS –ZINC Y ESPESAMIENTO-FILTRADO DE ZINC
SISTEMA 361 - Zinc Sulphide Flotation
SUBSISTEMA DESCRIPCION
LV 214B1/D1
SULPHIDES ROUGHER
FC-214A@D FLOTATION
Particle Analyser
225C1/F1 LIC
FC-255A@F
CY-226
To Tin Gravity
AIC 242A1 Concentration
PB-233 FC-242A/B
PP-233A/B
Conc. from gravity
LIC 21801
Concentration FIC 25402 25802 FIC To Fine Tails
Sulphides flot. Thickener
FC-254
VSD
25601 PLANT AIR ZINC 2nd/3rd
Manual control water PLANT AIR
FC-258 CLEANER
from PI 21501 LIC 25801
PP-218A/B 25801 AIT FLOTATION
PB-218 LE LE LIC 26101
KEY: 25401
VSD
Wash Water LIME VSD To Zinc
LV -25401 LV-25801
Slurry PB-265 PP-265A/B Concentrate
Water Process 26301 LIC 26501 LIC PB-261 PP-261A/B Thickener
Occasional Slurry
VSD
Plant Air VSD
PB-263 PB-265
PP-263A/B PP-265A/B
DIAGRAMA DE CONTROL : CELDAS COLUMNA
DIAGRAMA DE CONTROL DE LA CELDA COLUMNA
agua de lavado 3
FT
FIC
alimento concentrado
LT2 LT
FT
LAZOS DE CONTROL
FIC 2 4
LIC LT1 1.- lazo de control del bias
LIC 2. lazo de control del hold up
3. lazo de control del agua de lavado
4. lazo de control del nivel de pulpa
aire
cola
1 C. BIAS FIC FT
4.5.2. PLANO P&D: ESPESAMIENTO Y FILTRADO DE ZINC
4.5.3. DIAGRAMA DE CONTROL : ESPESAMIENTO-FILTRADO DEL ZINC
From
Silver Flotation
From Tin
Concentrate
AREA 362 HV 27501
Thickener
TK-275
TK-272
RAISE/
OIC 27301
LOWER
TH-273
27301 ZE
27701 FIT
LIC 27701
FL-200
TK-277
HV 27701 PP-199A/B
To Water System
CV-288
KEY:
Wash Water To Water System WT-290
Slurry
Water Process
Occasional Slurry
4.6. SISTEMA DE GRAVIMETRIA GRUESA ESTAÑO
SISTEMA 371 - Coarse Gravity Tin Recovery
SUBSISTEMA DESCRIPCION
372-C Fine Tin Rougher & Scavening Spirals Banks & Pumping
373-A 1st. Stage Tin Desliming Cyclone Feed Pumping & Cycloning
373-B 2nd. Stage Tin Desliming Cyclone Feed Pumping & Cycloning
373-F Tin Cleaner 1st., 2nd., & 3rd. Flotation Cells & Pumping
374-C Tin Concentrate Filter Press, Feed Pumping & Recovered Water Pumping
From Fine
Concentration Tail
From Regrinding
O/F
manual manual
39601 PI 39701 PI
CY 396 CY 397
PB 399 PP 399A/B To Fine Tail
PP 400A/B Thickener
PB 400
FC-421A/B FC-422A@D
Magnetic 42002 AIC
Material acid
agua PP 425A/B To Fine
agua Tail Thickener
to sulphuric acid PB 423 PB 425
dosage pump PP 423A/B
PB 424
LIME agua
PP 424A/B
To Tin Conc.
FROM 374-TK-446
Thickener PB 439
PP 439 A/B
4.8.3. PLANO P&D: ESPESAMIENTO-FILTRADO DE ESTAÑO
4.8.4. DIAGRAMA DE CONTROL : ESPESAMIENTO Y FILTRADO DE ESTAÑO
From
Tin Flotation
From Silver
Concentrate
AREA 374
Thickener
AIT 44601
TO 372-PB-439
TK-446
RAISE/
HV 45002/3 SA-447 OIC 44801
LOWER
TH-448
HV 45004 44801 ZE
EMERGENCY DE 45001
From Zinc POOL
Concentrate VSR
Thickener HV 45401
HV 45001
PP 450A/B
45401 FIT
45401 LIC
FL-200
TK-454
HV 45402
PP-454A/B
To Water System
KEY: CV-362
Wash Water To Water System
Slurry
Water Process
Occasional Slurry
TIN CONCENTRATE Ag
BAGGING STATION
4.9. SISTEMAS DE LOS REACTIVOS DE FLOTACION
SISTEMA 380 - Reagents Mixing & Distribution
SUBSISTEMA DESCRIPCION
BOMBA DOSIFICADORA
AIT AIT
pH
pH
AREA DE
PROCESO
TANQUE DE AGITACION AREA DE
PREPARACION CELDA DE FLOTACION
DE REACTIVOS
PESOMETRO
310-WT-142
STROKE
WIC 14201
BOMBA DOSIFICADORA
FC WC 14202
AREA DE
PREPARACION
DE REACTIVOS 14203 WC
TANQUE DE AGITACION DIC 14203
14203 FI
Tails from
coarse scavenger LIME
tin spirals
TK-539
TK-541
SA-542
TH-543
To water System
DE 54501
VSR
To tailings
Dam
HV 54101 HV 54102
PP-543A/B
DIAGRAMA DE CONTROL: ESPESADOR DE RELAVES
NIVEL PULPA
EJE RASTRA
ESPESADOR
RASTRA
trasmisor de densidad
DT bomba DESCARGA PULPA
controlador DIC
VDS variador
4.11. SISTEMAS DE LAS LINEAS DE AGUA -AIRE-ENERGIA
AREA 600 - PLANT SITE UTILITIES & GENERAL SERVICES
623-C Ore Storage & Handling Plant & Instrument Air Distribution
623-D Preconcentrating, Primary Grinding & Classification Plant & Inst. Air Distribution
TIEMPO /
ERO TAG CLASIFICACION DESCRIPCION dìas 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 2
CHEQUEO MECANICO
SISTEMA 330 - Primary Grinding & Classification
BALL MILL
CN 140 CRANE
MAINTENANCE 4 HORAS X
FE 142 FEEDER BALL MILL FEED 4 HORAS X
WT 142 SCALE PRECONCENTRATION 2 HORAS X
ML 145 MILL BALL 10 HORAS X
CY 152 CYCLOPAC BALL MILL CYCLOPAC 2 HORAS X
BALL MILL CYCLONE
PP 154A PUMP (slurry)
FEED 2 HORAS X
BALL MILL CYCLONE
PP 154B PUMP (slurry)
FEED 2 HORAS X
PP 151 SUMP PUMP GRINDING AREA 2 HORAS X
CHEQUEO ELÉCTRICO
SISTEMA 330 - Primary Grinding & Classification
NE BALL MILL MAINTENANCE 3 HORAS X
ER BALL MILL FEED 4 HORAS X
E PRECONCENTRATION 3 HORAS X
10
BALL
HORAS X
P (slurry) BALL MILL CYCLONE FEED 3 HORAS X
P (slurry) BALL MILL CYCLONE FEED 3 HORAS X
P PUMP GRINDING AREA 2 HORAS X
1.5. ESPECIALIDAD ELECTRICA : FLOTACION DE PLATA
118
5.1.1. HOJA DE CONTROL DE LAS PRUEBAS DE PRESURIZADO DEL PIPING
FASE DE COMISIONAMIENTO
1. CRONOGRAMA DE COMISIONAMIENTO: PRUEBAS CON AGUA
1.1. MOLIENDA Y CLASIFICACION : CONTROLES MECANICOS
PROGRAMACION MECANICA : PRUEBAS CON AGUA
Chequeo Mecanico Prueba en Vacio P. Agua P
Fluid TIEMPO /
o NUMERO TAG CLASIFICACION DESCRIPCION dìas 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
TIEMPO /
NUMERO TAG CLASIFICACION DESCRIPCION dìas 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
SISTEMA 341 - Silver Flotation
AG 163 AGITATOR SILVER FLOT. COND. TANK
TK 163 TANK SILVER FLOT. COND.
FC 166A FLOTATION CELL SILVER ROUGHER/SCAV. No. 1
TIEMPO /
NUMERO TAG CLASIFICACION DESCRIPCION dìas 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
SILVER CONCENTRATE
2 AG 199 AGITATOR
HOLDING TANK
TIEMPO /
IFICACION DESCRIPCION dìas 1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293
TIEMPO /
UMERO TAG CLASIFICACION DESCRIPCION dìas 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 2
TIEMPO /
UMERO TAG CLASIFICACION DESCRIPCION dìas 1 2 3 4 5 6 7 8 9 1011121314151617181920212223242526272
SISTEMA 341 - Silver Flotation
SIC 169A1 341-PP-169A Variador de Velocidad de Bomba 1
SIC 169B1 341-PP-169B Variador de Velocidad de Bomba 1
SIC 180A4 341-PP-180A Variador de Velocidad de Bomba 1
SIC 180B4 341-PP-180B Variador de Velocidad de Bomba 1
SIC 182A4 341-PP-182A Variador de Velocidad de Bomba 1
SIC 182B4 341-PP-182B Variador de Velocidad de Bomba 1
LIC 166A1 341-FC-166A Nivel de Celdas Flotación - Banco Rougher 1
LIC 166D1 341-FC-166D Nivel de Celdas Flotación - Banco Rougher 1
LIC 166G1 341-FC-166G Nivel de Celdas Flotación - Banco Rougher 1
Nivel de Pulpa en Cajón Concentrado
341-PB-169 1
LIC 16901 Rougher
LIC 176B1 341-FC-176B Nivel de Celdas Flotación - 2da Cleaner 1
LIC 177B1 341-FC-177B Nivel de Celdas Flotación - 1er Cleaner 1
LIC 177E1 341-FC-177E Nivel de Celdas Flotación - 1er Cleaner 1
Nivel de Pulpa en Cajón Concentrado 2da
341-PB-180 1
LIC 18001 Cleaner
Nivel de Pulpa en Cajón Concentrado 1ra
341-PB-182 1
LIC 18201 Cleaner
FLOTATION
TPH 214
% 79
PRECONCENTRATION
Jig’s Mass Recovery
(51 %)
TPH 58
% 21
TPH 104
TPH 104
% 38
% 38
TPH 58
% 21
TPH 6
% 3
1.4. BALANCE DE MASA AREA DE FLOTACION DE SULFUROS Y ZINC
2. PANTALLAS FUNCIONALES DE LA PLANTA
2.1. AREA DE CHANCADO
2.2. AREA DE PRECONCENTRACION Y MOLIENDA
2.3. AREA DE FLOTACION DE PLATA Y ZINC
2.4. AREA DE FILTRADO Y ESPESAMIENTO (PLATA)
3. ARRANQUE DE UNA PLANTA : LINEAS DE SUMINISTROS
3.1. LINEA ELECTRICA : BALANCE DE CARGAS PARA EL ARRANQUE DE LA PLANTA
3.2. LINEA ELECTRICA: CARGAS CRITICAS DE LA PLANTA
3.3. LINEA ELECTRICA : CARGAS A LIBERAR – ARRANQUE DEL MOLINO
3.4. CARGA ELECTRICA PARA EL ARRANQUE DEL MOLINO-PROCEDIMIENTO