BILL OF QUANTITY

PROJECT :
CLIENT : IBU FRIDA
LOCATION : DEPOK
DATE :
FURNITURE WORK

NO DESCRIFTION

A PRELIMINARY WORKS
1 Area Protection / fencing for the site
2 Cleaning the site
3 Secure the site during the project
4 Permission license (IMB, etc)
5 Work tools (scafolding, etc)
6 Bouwplank works
7 Workers building during the project
8 Water supply during the project for the worker (drilling well)
9 Water pump, ex shimitsu
10 Electricity supply during the project (electricity tokenor electricity abadoment)
11 Temporary toilet during the project for worker

B GROUND FLOOR (GF) WORKS


1 Excavation for bored pile foundation sz. Ø 20 cm
2 Excavation for foot plat foundation sz. 120 x 120 x 100 cm
3 Excavation for drainage control / earthing fit sz. 100 x 100 x 100 cm
4 Excavation for water infiltration sz. 100 x 100 x 100 cm
5 Excavation for septic tank sz. 200 x 300 x 200 cm
6 Excavation for hanging sloof works
7 Sloof rollag brick set work
8 Bored pile works sz. Ø 20 cm
9 Foot plat works foundation sz. 120 x 120 x 100 cm
10 Drainage control / earthing pit wall work
11 Water infiltration wall works
12 Septic tank wall works
13 Hanging sloof works
14 Covering the ground / making works floor (urug)
15 Concrete platform works
16 Main structure coloumn works
17 Practical structure coloumn works
18 Gypsum works for ceiling
framework hollow steel sz. 4 x 4 cm + gypsum sz. 9 mm
NO DESCRIFTION

19 Shadowline works for ceiling


20 Brick wall works
21 Plaster works for wall
22 Finish coat works for wall
23 Wall painting (interior) ex. Vinilex
24 Wall painting (exterior) ex. Vinilex
25 Ceiling painting ex. Vinilex
26 Screeding floor works
27 Floor tile installation sz. 40 x 40 cm ex. Roman
28 Floor plint installation sz. 40 x 10
29 Concrete stair works
30 Stair step nosing works
31 Steel railing for stair works
steel finish black painting
32 Stair floor tile installation sz. 40 x 40 cm ex. Roman
33 Stair plint tile installation sz. 40 x 10
34 Door and door frame works
include accessories
double plywood 18 mm + veneer 3 mm + melamic coating
sz. 80 x 230 cm
area : study room + powder room + studio A1 + studio A4
35 Double window works
alumunium
sz. 160 x 120 cm
area : study room + studio A1 + studio A4
36 Single window works
alumunium
sz. 80 x 120 cm
area : study room
37 Ventilation window works
alumunium
sz. 80 x 120 cm
area : toilet in studio A1 and studio A4
38 Fixed tempered glass 10 mm (frameless)
area : beside entrance door
39 Tempered glass door 10mm (frameless)
include accessories
area : entrance
40 Fixed non-tempered glass 8 mm (frameless)
area : kitchen set-trought dining table
41 Folding gate fence
alumunium
area : kitchen
NO DESCRIFTION

42 Steel door
sz. 90 x 230 cm
area : front fence to dining area and right garden to power panel area
43 Folding steel fence
sz. 300 x 150 cm
44 Steel swing - sliding combination fence door
sz. 90 x 150 cm
45 Feder cable installation (from kwh to panel)
46 Lighting cable installation
47 Grounding cable installation (for lightning rod)
48 Network socket installation
49 Switch installation
50 TV antenna cable installation
area : lobby entance 1, study room 1, studio roo A1 1, Studio room A4 1
51 Telephone cable installation
phone device by Owner
area : entrance
52 Downlight lamp
area : 2 in panel and storage room, 2 in lobby entrance, 4 in coridor, 1 in powder room, 2 in canteen, 1 in
1 in studio room toilet, 1 in studio room A4, 1 in studio room A4 toilet, 3 in study room, 2 in stair area
53 Wall garden lamp
area : 1 in parking area, 1 in pedestrian area, 1 In dining area, 1 in righ garden, 1 in panel and storage roo
54 Spot light lamp
area : 1 in parking area, 1 in pedestrian area, 1 In dining area, 1 in righ garden, 1 in panel and storage roo
55 Network socket outlet
ex. Panasonic
area : 2 in parking area, 2 In dining area, 2 in canteen,2 lobby entrance, 2 in powder room, 2 in power pan
2 in storage room, 2 in studio room A1, 2 in studio room toilet,
56 double switch outlet
ex. Panasonic
area : 1 for garden lamp in parking area, pedestrian area, dining area, rihgt garden
1 for spot light lamp in parking area, pedestrian area, dining area, rihgt garden
1 for panel and storage room, 1 for lobby entrance and coridor, 1 for canteen, 1 for studyb room, 1 for sta
57 Single switch outlet
ex. panasonic
area : 1 in power room, 1 in studio room A1, 1 in studio room A1 toilet, 1 in studio room A4, 1 in studio ro
58 TV outlet
ex. Panasonic
area : 1 in lobby entrance, 1 in study room, 1 in studio A1, 1 in studio A4
59 Telephone outlet
ex. Panasonic
area : lobby entrance
60 Electricity panel (PP1) + MCB + TIMER
NO DESCRIFTION

61 Air conditioner power installation


area : 1 in lobby entrance, 1 in study room, 1 in studio A1, 1 in studio A4
62 Refrigrant for air conditioner installation
area : 1 in lobby entrance, 1 in study room, 1 in studio A1, 1 in studio A4
63 Air conditioner 1/2 PK
64 Clean water pipe installation; sz. 1/2"
65 Water disposal pipe installation; 1" 2" 3"
66 Sewerage pipe installation; sz. 4"
67 Hot and cold water pipe installation (for water heater)
Area :in studio room
68 Water heater
69 Toilet ex. Toto
area : studio room toilet
70 Wastafel; only : handyman and standard equipment
area : studio room toilet
71 Jet washer ex. Toto
area : studio room toilet
72 Floor drain; only : handyman and standard equipment
area : studio room toilet
73 Faucet; only : handyman and standard equipment
area : studio room toilet
74 Tissue holder; only : handyman and standard equipment
area : studio room toilet
75 Wall tile installation; sz. 25 x 33.5 cm ex. roman
area : studio room toilet
76 Floor tile installation; sz. 40 x 40 cm ex. Roman
area : studio room toilet
77 Blacksplash tile installation; only : handyman and standard equipment
area : canteen
78 Sliding door work
include accessories
double plywood 18 mm + veneer 3 mm + melamic coating
sz. 80 x 230 cm
area: from studio bedroom to studio toilet
79 Exhause fan installation
ex. Panasonic
area : studio room toilet
80 Screeding floor works
area : parking and pedestrian

C 1 ST FLOOR WORK
NO DESCRIFTION

1 Platform works 1 : 3
2 Mian beam works
3 Beam works
4 Main structure coloumn works
5 Practical structure coloumn works
6 hebel block wall work
7 Plaster works for wall
8 Finish coat works for wall
9 Gypsum works for ceiling
framework hollow steel sz. 4 x 4 cm + gypsum sz. 9 mm
10 Shadowline works for ceiling
11 Wall painting (interior) ex. Vinilex
12 Wall painting (exterior) ex. Vinilex
13 Ceiling painting ex. Vinilex
14 Floor tile installation sz. 40 x 40 cm ex. Roman
15 Floor plint installation sz. 40 x 10
16 Sika and waterproofing works
area : studio toilet
17 Wall tile installation; sz. 25 x 33.5 cm ex. roman
area : studio room toilet
18 Floor tile installation; sz. 40 x 40 cm ex. Roman
area : studio room toilet
19 Concrete stair works
20 Stair step nosing works
21 Steel railing for stair works
steel finish black painting
22 Stair floor tile installation sz. 40 x 40 cm ex. Roman
23 Stair plint tile installation sz. 40 x 10
24 Door and door frame works
include accessories
double plywood 18 mm + veneer 3 mm + melamic coating
sz. 80 x 230 cm
area : study room + powder room + studio A1 + studio A4
25 Double window works
alumunium
sz. 160 x 120 cm
area : study room + studio A1 + studio A4
26 Single window works
alumunium
sz. 80 x 120 cm
area : study room
27 Ventilation window works
alumunium
NO DESCRIFTION

sz. 80 x 120 cm
area : toilet in studio A1 and studio A4
28 Lighting cable installation
29 Network socket installation
30 Switch installation
31 TV antenna cable installation
32 Downlight lamp
33 Network socket outlet
ex. Panasonic
34 double switch outlet
ex. Panasonic
35 Single switch outlet
ex. panasonic
36 TV outlet
ex. Panasonic
37 Electricity panel (PP2) + MCB
38 Air conditioner power installation
39 Refrigrant for air conditioner installation
40 Air conditioner 1/2 PK
41 Clean water pipe installation; sz. 1/2"
42 Water disposal pipe installation; 1" 2" 3"
43 Sewerage pipe installation; sz. 4"
44 Hot and cold water pipe installation (for water heater)
Area :in studio room
45 Water heater
46 Toilet ex. Toto
area : studio room toilet
47 Wastafel; only : handyman and standard equipment
area : studio room toilet
48 Jet washer ex. Toto
area : studio room toilet
49 Floor drain; only : handyman and standard equipment
area : studio room toilet
50 Faucet; only : handyman and standard equipment
area : studio room toilet
51 Tissue holder; only : handyman and standard equipment
area : studio room toilet
52 Blacksplash tile installation; only : handyman and standard equipment
area : canteen
53 Sliding door work
include accessories
double plywood 18 mm + veneer 3 mm + melamic coating
sz. 80 x 230 cm
NO DESCRIFTION

area: from studio bedroom to studio toilet


54 Exhause fan installation
ex. Panasonic
area : studio room toilet

D 2 ST FLOOR WORK
1 Platform works
2 Mian beam works
3 Beam works
4 Main structure coloumn works
5 Practical structure coloumn works
6 hebel block wall work
7 Plaster works for wall
8 Finish coat works for wall
9 Gypsum works for ceiling
framework hollow steel sz. 4 x 4 cm + gypsum sz. 9 mm
10 Shadowline works for ceiling
11 Wall painting (interior) ex. Vinilex
12 Wall painting (exterior) ex. Vinilex
13 Ceiling painting ex. Vinilex
14 Floor tile installation sz. 40 x 40 cm ex. Roman
15 Floor plint installation sz. 40 x 10
16 Sika and waterproofing works
area : studio toilet
17 Wall tile installation; sz. 25 x 33.5 cm ex. roman
area : studio room toilet
18 Floor tile installation; sz. 40 x 40 cm ex. Roman
area : studio room toilet
19 Concrete stair works
20 Stair step nosing works
21 Steel railing for stair works
steel finish black painting
22 Stair floor tile installation sz. 40 x 40 cm ex. Roman
23 Stair plint tile installation sz. 40 x 10
24 Door and door frame works
include accessories
double plywood 18 mm + veneer 3 mm + melamic coating
sz. 80 x 230 cm
area : study room + powder room + studio A1 + studio A4
25 Double window works
alumunium
NO DESCRIFTION

sz. 160 x 120 cm


area : study room + studio A1 + studio A4
26 Single window works
alumunium
sz. 80 x 120 cm
area : study room
27 Ventilation window works
alumunium
sz. 80 x 120 cm
area : toilet in studio A1 and studio A4
28 Lighting cable installation
29 Network socket installation
30 Switch installation
31 TV antenna cable installation
32 Downlight lamp
33 Network socket outlet
ex. Panasonic
34 double switch outlet
ex. Panasonic
35 Single switch outlet
ex. panasonic
36 TV outlet
ex. Panasonic
37 Electricity panel (PP2) + MCB
38 Air conditioner power installation
39 Refrigrant for air conditioner installation
40 Air conditioner 1/2 PK
41 Clean water pipe installation; sz. 1/2"
42 Water disposal pipe installation; 1" 2" 3"
43 Sewerage pipe installation; sz. 4"
44 Hot and cold water pipe installation (for water heater)
Area :in studio room
45 Water heater
46 Toilet ex. Toto
area : studio room toilet
47 Wastafel; only : handyman and standard equipment
area : studio room toilet
48 Jet washer ex. Toto
area : studio room toilet
49 Floor drain; only : handyman and standard equipment
area : studio room toilet
50 Faucet; only : handyman and standard equipment
area : studio room toilet
NO DESCRIFTION

51 Tissue holder; only : handyman and standard equipment


area : studio room toilet
52 Blacksplash tile installation; only : handyman and standard equipment
area : canteen
53 Sliding door work
include accessories
double plywood 18 mm + veneer 3 mm + melamic coating
sz. 80 x 230 cm
area: from studio bedroom to studio toilet
54 Exhause fan installation
ex. Panasonic
area : studio room toilet

D 3 ST FLOOR WORK
1 Platform works
2 Mian beam works
3 Beam works
4 Main structure coloumn works
5 Practical structure coloumn works
6 hebel block wall work
7 Plaster works for wall
8 Finish coat works for wall
9 Gypsum works for ceiling
framework hollow steel sz. 4 x 4 cm + gypsum sz. 9 mm
10 Shadowline works for ceiling
11 Wall painting (interior) ex. Vinilex
12 Wall painting (exterior) ex. Vinilex
13 Ceiling painting ex. Vinilex
14 Floor tile installation sz. 40 x 40 cm ex. Roman
15 Floor plint installation sz. 40 x 10
16 Sika and waterproofing works
area : studio toilet
17 Door and door frame works
include accessories
double plywood 18 mm + veneer 3 mm + melamic coating
sz. 80 x 230 cm
area : laundry area
18 Door and door frame works
include accessories
plkat SPHC
sz. 90 x 130 cm
NO DESCRIFTION

area : shaf
19 Fixed Tempered glass 10mm (frameless)
sz. 190 x 120 cm
area : roofn lounge
20 Fixed tempered glass 10 mm (frameless)
sz. 220 x 120 cm
area : roofn lounge
21 Lighting cable installation
22 Network socket installation
23 Switch installation
24 Downlight lamp
27 Network socket outlet
ex. Panasonic
28 double switch outlet
ex. Panasonic
29 Single switch outlet
ex. panasonic
30 Electricity panel (PP2) + MCB
31 Air conditioner power installation
32 Refrigrant for air conditioner installation
33 Air conditioner 1/2 PK
34 Clean water pipe installation; sz. 1/2"
35 Water disposal pipe installation; 1" 2" 3"
36 Floor drain; only : handyman and standard equipment
area : laundry area

D ROOF WORKS
1 Platform works
2 Concrete ring balk works
3 Sika works for floor (2 time)
4 Screeding floor works
5 Waterproofing works for floor
6 Top shaf concrete roof
7 Clean water pipe installation; sz. 1/2"
8 water disposal pipe installation sz. 1" 2" 3"
9 Roof drain works
10 Water tank
ex. Penguin 1000 lt
11 Network socket installation
12 Network socket outlet
NO DESCRIFTION

13 Booster pump (from water tank)


14 Water tank holder
ex. Steel
FURNITURE WORK

UNIT VOL. UNIT PRINCE TOTAL PRINCE

pagar pengaman m2 44 22,297 981,084


pembersihan ls 130.2 3,000 390,600
BY OWNER
BY OWNER
sewa scafolding ls 1 -
pengukuran ls 1 -
bedeng dan gudang ls 1 -
air kerja ls 1 -
BY OWNER
listrik kerja unit 1 -
toilet sementara ls 1 -

SUB TOTAL A 1,371,684

pek. Galian titik 30 86,700 2,601,000


pek. Galian m3 30 86,700 2,621,808
pek. Galian m3 1 86,700 86,700
pek. Galian m3 2 86,700 173,400
pek. Galian m3 12 86,700 1,040,400
pek. Galian m3 6 86,700 561,816
pas. Bata m2 79 124,300 9,758,793
beton bored pile m3 3 940,600 2,539,620
beton pondasi plat m3 11 3,109,400 34,203,400
bak kontrol m2 4 119,200 476,800
resapan m2 12 400,500 4,806,000
septik tank m2 20 789,700 15,794,000
balok beton m3 8 3,828,800 30,063,738
urugan m3 6 1,038,400 6,033,104
plat lantai m3 9 1,602,300 13,715,688
kolom beton utama m3 3 3,057,100 9,629,865
kolom praktis m3 1 3,057,100 2,384,538
plafon gypsum m2 71 172,200 12,283,026
UNIT VOL. UNIT PRINCE TOTAL PRINCE

Shadowline m1 131 40,000 5,242,000


pas. Bata m2 326 125,874 41,024,908
plester m2 652 57,600 37,545,984
aci m2 652 24,100 15,709,344
cat dalam m2 652 45,500 29,658,720
cat luar m2 630 45,500 28,665,000
cat plafon m2 71 45,500 3,245,515
screeding lantai m2 78 45,200 3,534,459
keramik lantai m3 64 242,154 15,430,064
plint keramik m1 37 60,594 2,241,961
tangga beton m3 2 5,684,100 8,810,355
step nising m1 25 110,000 2,772,000
railing tangga m1 7 1,000,000 7,000,000

trap tangga m2 14 376,100 5,114,960


plint tangga m1 11 55,200 585,120
pintu kayu unit 4 -

jendela dobel unit 3 1,300,000 3,900,000

jendela tunggal unit 2 650,000 1,300,000

jendela pentilasi unit 2 340,000 680,000

kaca mati m2 5 465,000 2,250,600

pintu kaca unit 2 465,000 930,000

kaca mati m2 6 386,000 2,485,840

polding gate unit 1 4,200,000 4,200,000


UNIT VOL. UNIT PRINCE TOTAL PRINCE

pintu besi unit 2 1,650,000 3,300,000

pintu besi lipat unit 1 1,530,000 1,530,000

pintu besi unit 2 1,250,000 2,500,000

m1 10 22,000 220,000
ttk 28 50,000 1,400,000
ttk 3 150,000 450,000
ttk 20 99,000 1,980,000
ttk 15 102,000 1,530,000
ttk 4 75,000 300,000

ttk 1 75,000 75,000

bh 20 140,000 2,800,000
der room, 2 in canteen, 1 in studio room A1,
udy room, 2 in stair area
bh 4 135,000 540,000
n, 1 in panel and storage room
bh 4 70,200 280,800
n, 1 in panel and storage room
bh 20 102,000 2,040,000

powder room, 2 in power panel,

bh 7 26,500 185,500

1 for studyb room, 1 for stair area


bh 5 18,500 92,500

tudio room A4, 1 in studio room A4 toilet


bh 4 55,500 222,000

bh 1 39,000 39,000

set 1 1,260,000 1,260,000


UNIT VOL. UNIT PRINCE TOTAL PRINCE

ttk 4 53,000 212,000

ttk 4 60,000 240,000

BY OWNER
ttk 8 13,500 108,000
ttk 7 51,000 357,000
ttk 2 86,000 172,000
ttk 2 175,000 350,000

BY OWNER
set 2 1,850,000 3,700,000

set 2 393,000 786,000

set 2 302,000 604,000

set 4 303,750 1,215,000

keran bh 2 250,875 501,750

bh 2 87,500 175,000

m2 44 199,700 8,866,680

m2 8 230,000 1,741,560

m1 7 459,000 3,075,300

pintu kayu dorong unit 2 -

unit 2 145,000 290,000

m2 45 45,200 2,014,112

SUB TOTAL B 416,253,727


UNIT VOL. UNIT PRINCE TOTAL PRINCE

pas. Bata m3 9 119,200 1,025,120


beton bored pile m3 5 940,600 4,665,376
beton pondasi plat m3 0 3,109,400 1,057,196
kolom beton utama m3 3 3,057,100 9,244,670
kolom praktis m3 1 896,200 546,682
m2 250 139,600 34,865,100
plester m2 500 57,600 28,771,200
aci m2 500 24,100 12,037,950
plafon gypsum m2 72 146,700 10,562,400

Shadowline m1 142 40,000 5,680,000


cat dalam m2 370 45,500 16,835,000
cat luar m2 130 45,500 5,892,250
cat plafon m2 72 17,825 1,283,400
keramik lantai m3 56 230,000 12,926,000
plint keramik m1 72 60,594 4,362,734
tangga beton m2 18 79,000 1,422,000

m2 100 199,700 19,989,970

m2 15 230,000 3,450,000

tangga beton m3 2 5,684,100 8,810,355


step nising m1 25 110,000 2,772,000
railing tangga m1 7 1,000,000 7,000,000

trap tangga m2 14 376,100 5,114,960


plint tangga m1 11 55,200 585,120
pintu kayu unit 4 -

jendela dobel unit 4 1,300,000 5,200,000

jendela tunggal unit 3 650,000 1,950,000

jendela pentilasi unit 4 340,000 1,360,000


UNIT VOL. UNIT PRINCE TOTAL PRINCE

ttk 19 50,000 950,000


ttk 11 150,000 1,650,000
ttk 11 102,000 1,122,000
ttk 4 75,000 300,000
bh 19 140,000 2,660,000
bh 12 102,000 1,224,000

bh 3 26,500 79,500

bh 9 18,500 166,500

bh 4 55,500 222,000

set 1 1,260,000 1,260,000


ttk 4 53,000 212,000
ttk 4 120,000 480,000
BY OWNER
ttk 9 13,500 121,500
ttk 5 51,000 255,000
ttk 4 86,000 344,000
ttk 4 175,000 700,000

BY OWNER
set 4 1,850,000 7,400,000

set 4 393,000 1,572,000

set 4 302,000 1,208,000

set 4 303,750 1,215,000

keran bh 4 250,875 1,003,500

bh 4 87,500 350,000

m1 2 459,000 1,009,800

pintu kayu dorong unit 4 650,000 2,600,000


UNIT VOL. UNIT PRINCE TOTAL PRINCE

unit 4 145,000 580,000

SUB TOTAL C 236,094,284

pas. Bata m3 9 119,200 1,025,120


beton bored pile m3 5 940,600 4,665,376
beton pondasi plat m3 0 3,109,400 1,057,196
kolom beton utama m3 3 3,057,100 9,244,670
kolom praktis m3 1 3,057,100 1,864,831
m2 250 139,600 34,865,100
plester m2 500 57,600 28,771,200
aci m2 500 24,100 12,037,950
plafon gypsum m2 72 172,200 12,398,400

Shadowline m1 142 13,163 1,869,075


cat dalam m2 370 45,500 16,835,000
cat luar m2 130 45,500 5,892,250
cat plafon m2 72 20,400 1,468,800
keramik lantai m3 56 242,154 13,609,064
plint keramik m1 72 60,594 4,362,734
tangga beton m2 18 79,000 1,422,000

m2 100 199,700 19,989,970

m2 15 230,000 3,450,000

tangga beton m3 2 950,600 1,473,430


step nising m1 25 110,000 2,772,000
railing tangga m1 7 1,000,000 7,000,000

trap tangga m2 14 230,000 3,128,000


plint tangga m1 11 55,200 585,120
pintu kayu unit 4 -

jendela dobel unit 4 1,300,000 5,200,000


UNIT VOL. UNIT PRINCE TOTAL PRINCE

jendela tunggal unit 3 650,000 1,950,000

jendela pentilasi unit 4 340,000 1,360,000

ttk 19 50,000 950,000


ttk 11 150,000 1,650,000
ttk 11 102,000 1,122,000
ttk 4 75,000 300,000
bh 19 140,000 2,660,000
bh 12 102,000 1,224,000

bh 3 26,500 79,500

bh 9 18,500 166,500

bh 4 55,500 222,000

set 1 1,260,000 1,260,000


ttk 4 53,000 212,000
ttk 4 120,000 480,000
BY OWNER
ttk 9 13,500 121,500
ttk 5 51,000 255,000
ttk 4 86,000 344,000
ttk 4 175,000 700,000

BY OWNER
set 4 1,850,000 7,400,000

set 4 393,000 1,572,000

set 4 302,000 1,208,000

set 4 303,750 1,215,000

keran bh 4 250,875 1,003,500


UNIT VOL. UNIT PRINCE TOTAL PRINCE

bh 4 87,500 350,000

m1 2 459,000 1,009,800

pintu kayu dorong unit 4 -

unit 4 145,000 580,000

SUB TOTAL D 224,382,087

pas. Bata m3 9 119,200 1,025,120


beton bored pile m3 5 940,600 4,665,376
beton pondasi plat m3 0 3,109,400 1,057,196
kolom beton utama m3 3 3,057,100 9,244,670
kolom praktis m3 1 896,200 546,682
m2 171 139,600 23,801,800
plester m2 341 57,600 19,641,600
aci m2 341 24,100 8,218,100
plafon gypsum m2 72 146,700 10,562,400

Shadowline m1 142 40,000 5,680,000


cat dalam m2 212 45,500 9,623,250
cat luar m2 130 45,500 5,892,250
cat plafon m2 72 17,825 1,283,400
keramik lantai m3 72 242,154 17,435,100
plint keramik m1 68 60,594 4,120,360
tangga beton m2 25 79,000 1,975,000

pintu kayu unit 1 -

unit 1 1,300,000 1,300,000


UNIT VOL. UNIT PRINCE TOTAL PRINCE

pintu kaca unit 6 650,000 3,900,000

kaca mati m2 1 340,000 340,000

ttk 10 50,000 500,000


ttk 10 150,000 1,500,000
ttk 5 102,000 510,000
bh 10 140,000 1,400,000
bh 10 102,000 1,020,000

bh 2 26,500 53,000

bh 1 18,500 18,500

set 1 55,500 55,500


ttk 1 53,000 53,000
ttk 1 120,000 120,000
BY OWNER
ttk 4 13,500 54,000
ttk 6 51,000 306,000
set 2 86,000 172,000

SUB TOTAL E 136,074,305

pas. Bata m3 9 119,200 1,025,120


beton bored pile m3 3 3,828,800 10,682,352
beton pondasi plat m2 82 79,000 6,478,000
kolom beton utama m2 72 79,000 5,688,000
kolom praktis m2 72 79,000 5,688,000
ls 1 789,700 789,700
plester ttk 2 13,500 27,000
aci ttk 6 51,000 306,000
plafon gypsum bh 6 183,000 1,098,000
Shadowline set 2 1,990,000 3,980,000

cat dalam ttk 1 150,000 150,000


cat luar ttk 1 102,000 102,000
UNIT VOL. UNIT PRINCE TOTAL PRINCE

cat plafon bh 1 849,000 849,000


keramik lantai ls 1 1,660,000 1,660,000
plint keramik

SUB TOTAL F 38,523,172


GRAND TOTAL A+B+C+D+E+F 1,052,699,259
GRAND TOTAL + 10% 1,157,969,185
DI BULATKAN 1,158,000,000