Академический Документы
Профессиональный Документы
Культура Документы
Project Phorphiry
Sub Project Indodrill Pad - Candrian Boxcut
Location project Candrian Title
Drawing Reference BSI-DEC-DWG-CS-040A : Decline Exploration Project Indodrill DE150 PAD
dia A B C D
No Member Name Bar Mark Bar Qty Shape
(mm)
mm mm mm mm
Underground
x y Dept 300 50 *cover concrete
PAD
Thickenin
Pad g
1 6000 4000 200 D10 10 63 400 342 100 283
dir. X -Perimete
r rebar
Thickenin
Pad g
2 6000 4000 200 D10 10 43 400 342 100 283
dir. Y -Perimete
r rebar
Pad Slab
3 6000 4000 150 D10 10 82 180 184 200
dir. Y spacer
Thickenin
Pad g-
4 6000 4000 200 D10 10 43 400 184 200
dir. Y Middle
rebar
Plint -
Middle
5 300 Middle 150 D10 10 12 400 60 500
Plit
Foot
BAR BENDING SCHEDULE & QUANTITY
Project Phorphiry
Sub Project Indodrill Pad - Candrian Boxcut
Location project Candrian Title
Drawing Reference BSI-DEC-DWG-CS-040A : Decline Exploration Project Indodrill DE150 PAD
dia A B C D
No Member Name Bar Mark Bar Qty Shape
(mm)
mm mm mm mm
Perimete
Long
r-
6 bar - 6000 4000 2 D10 10 4 5,900
Thinckeni
dir X
ng
Perimete
Long
r-
7 bar - 6000 4000 2 D10 10 8 3,874
Thinckeni
dir Y
ng
Long
Middle -
8 bar - 400 3 D10 10 12 400
Plint Foot
dir Y
E Length of Total
Total Length UoM / Weight
Each Bar Weight
(mm) 12 m Kg/m
mm (mm) (Kg)
E Length of Total
Total Length UoM / Weight
Each Bar Weight
(mm) 12 m Kg/m
mm (mm) (Kg)
NA NA NA NA NA
E Length of Total
Total Length UoM / Weight
Each Bar Weight
(mm) 12 m Kg/m
mm (mm) (Kg)
D16 0 0.00
D25 0 0.00
#M8-150 5400x2100mm 7lbr 447
PURCHASE REQUEST FORM
Requested By: Roni Fauzi PRF No: PR.1609250001 Received PR date:
Estimate/Quote
No. Part # Item Description Qty UOM Currency Price (per/unit)
(by S/C)
Add Silo 3 x 200 T
1 Deformed Bar D10, 12m per Length 24 Lgh
2 Deformed Bar D19, 12m per Length 40 Lgh
3 Deformed Bar D32, 12m per Length 100 Lgh
4 Wiremesh #M8 - 150 Size 5,4m x 2,4 m 20 Sheets
5 HD-M24-B1-600-120 Anchor Bolt 48 Units
Note:
Anchor bolt material shall be Hot deep Galvanized
C/W with 2 nut + 1 washer + 1 lock washer
Holding downbolt material shall be grade 4.6
Material Certificate Required
Wire mesh Material shall be comply to SNI-07-0663-1989 (Yield Strength of 500 MPa)
Material Certificate Required
Rebar Material shall be comply to SNI-07-2052-2002 '(Round Bar, Yield Strength of 240 MPa)
(Deformed Bar, Yield Strength of 400 MPa)
Rebar shall be delivered to Site in Straight Condition
Material Certificate Required
TOTAL
Approved by, Important Instructions:-
Requested by, Acknowledged by, Checked by cost control Project / Plant Manager All requests must be sent to the Supply Ch
typed and emailed to all.supplychain@bs
End user should endeavour to check to en
Requests for spare parts must include Mo
Any quotation information, & photograph
All requests must include the allocation o
All requests must include an X in a “Reque
Roni Fauzi Arya Perdana
Received PR date: Budgeted :
-
Important Instructions:-
All requests must be sent to the Supply Chain department. Forms may be either handwritten or
typed and emailed to all.supplychain@bsibatu.com
End user should endeavour to check to ensure sufficient budget exists for a request
Requests for spare parts must include Model/Type, and OEM Part #
Any quotation information, & photographs of samples should be included with form.
All requests must include the allocation of a cost code or Project #
All requests must include an X in a “Requesting Department” box