Вы находитесь на странице: 1из 4

SAUDI ARAMCO ID/PID FORM REV 1 - 010109 REV 3 COS 06/30/2008

SATIP No. APPROVED DATE DISCIPLINE:


SAUDI ARAMCO TYPICAL INSPECTION PLAN
BUILDING SPRINKLER AND STANDPIPE SYSTEM SATIP- S-050-01 01-Jun-09 Plumbing
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW

Welding Procedures and Welders See See


1.1 See-SATIP-W-011 Welding-On-Plot Piping
Qualifications Remarks Remarks
See See
1.2 Brazing Procedures See SATIP-S-060-08 Copper Piping
Remarks Remarks
RTR & Thermoplastic Installer See See
1.3 See-SATIP-S-070-03 Thermoplastic and RTR Piping
Qualifications Remarks Remarks
2.0 MATERIAL RECEIVING

Sprinkler System Component and Hardware include but


are not necessarily limited to:
Sprinkler System Components and SAIC SAIC
2.1
Hardware Receiving Inspection S-4022 S-4022
H W Sprinklers, Pipe and Tube, Fittings, Hangers and Valves.
Saudi Aramco to be notified on initial delivery of each item
by type or manufacturer

Standpipe System Component and Hardware include but


are not necessarily limited to:
Sprinklers, Pipe and Tube, Fittings, Hangers and Valves,
Standpipe System Components and SAIC SAIC
2.2
Hardware Receiving Inspection S-4022 S-4022
H W Hose Stations and Hose Connections.

Saudi Aramco shall be notified on delivery of each item by


type or manufacturer
See See
2.3 Fire Water/Jockey Pump (If Applicable) See SATIP-G-005-01 Centrifugal Pump
Remarks Remarks
Sprinkler and Standpipe Systems
SAIC SAIC
2.4 Components and Hardware
S-4022 S-4022
W S Contractor QA/QC to perform Weekly Inspection
Handling, Storage and Preservation

3.0 INSTALLATION

See SATIP-L-350-01 Metallic On Plot Piping,


SATIP-S-060-08 Copper Piping, SAES-S-070-03 RTR
and Thermoplastic Piping and SATIP L-350-07 Carbon
SAIC SAIC
3.1 Piping and Tubing Installation
S-4023 S-4023
W W Steel Cement Line as applicable

Saudi Aramco shall be notified on start of this activity for


each Building / Area

Page 1 of 4
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 REV 3 COS 06/30/2008
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
BUILDING SPRINKLER AND STANDPIPE SYSTEM SATIP- S-050-01 01-Jun-09 Plumbing
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW


See SATIP-H-002-06 APCS-113 Epoxy Coating,
SATIP-H-002-02 FBE Coating of Carbon Steel
See See
3.2 Coating and SATIP-H-100-01 Paint Application of Liquid Coating
Remarks Remarks
systems for Industrial Facilities
as applicable

See See
3.3 Cathodic Protection Refer to SATIP-X series as applicable
Remarks Remarks

SAIC SAIC Saudi Aramco shall be notified on start of this activity for
3.4 Sprinkler and Standpipe Installation
S-4062 S-4062
W W each Building / Area

Hangers and supports Installation SAIC SAIC Saudi Aramco shall be notified on start of this activity for
3.5
Inspection S-4061 S-4061
W W each Building / Area

Water flow Alarms & Fire Department SAIC SAIC


3.6
connection Inspection S-4063 S-4063
W W

Location and Spacing Installation SAIC SAIC Saudi Aramco to be notified on start of this activity for
3.7
Inspection S-4024 S-4024
W W each building / area

Saudi Aramco to be notified on start of this activity for


SAIC SAIC
3.8 Valve Installation Inspection
S-4025 S-4025
W W each building and/or room. Also see
SATIP-L-008-01

SAIC SAIC Saudi Aramco to be notified on start of this activity for


3.9 Thrust Block Installation
S-4009 S-4009
W W each area

See SATIP-G-005-01 Centrifugal Pump


See See and SATIP-P-116-06 Fire Water Pump / Motor /
3.10 Fire Water / Jockey Pump
Remarks Remarks Controller
as applicable

Page 2 of 4
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 REV 3 COS 06/30/2008
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
BUILDING SPRINKLER AND STANDPIPE SYSTEM SATIP- S-050-01 01-Jun-09 Plumbing
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW See SATIP-J-100-01 Flow


SATIP-J-200-01 Pressure
See See
3.11 Instrumentation SATIP-J-400-01 Temperature and
Remarks Remarks
SATIP-J-300-01 Liquid Level
as applicable

See See
3.12 Fire Detection and Alarm System See SATIP-B-014-01 Fire Detection / Alarm
Remarks Remarks

Motor Operated Valves and Control See See See SATIP-P-J-700-01 Motor Operated Valves and
3.13
Valves Remarks Remarks Control Valves

Piping See See


3.14 See SATIP-A-004-02 Pressure Testing
Hydrostatic Test Remarks Remarks

Application of Safety Color Coding &


See See See SATIP-H-100-01 paint Application of Liquid Coating
3.15 Stenciling of Equipment/Piping
Remarks Remarks System for Industrial Facilities
Identification

4.0 PRE-COMMISSIONING

NFPA-13
Fig. 8-1 (a) Requirements for Hydrostatic Test of the system shall be
4.1 Sprinkler System Acceptance Test NFPA-13 93
Fig. 8-1 (b)
H H in accordance with SATIP-A-004-002
Forms
NFPA-14
Fig. 8-1 (a) Requirements for Hydrostatic Test of the system shall be
4.2 Standpipe System Acceptance Test NFPA-14 96
Fig. 8-1 (b)
H H in accordance with SATIP-A-004-002
Forms

SAIC SAIC
4.3 Final system Inspection
S-4026 S-4026
H H

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
1 levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3 representative is not present.

4 Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.

5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

Page 3 of 4
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 REV 3 COS 06/30/2008
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
BUILDING SPRINKLER AND STANDPIPE SYSTEM SATIP- S-050-01 01-Jun-09 Plumbing
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW


LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection

Page 4 of 4

Вам также может понравиться