CHECKLIST FOR STRUCTURAL WORK (PRE-POUR)


Location:

Inspection Items: Drawing Ref:

Date of Notification: Time of Notification:

Anticipated Inspection Date: Anticipated Inspection Time:

Actual Inspection Date (RE / RTO): Time: To:

Re-Inspection Date: Time: To:

Checked By Approved By
Item Detail Y N NA
Engr / Foreman Date RE / RTO Date
A FORMWORK
1 Location, size and orientation is correct
2 Formwork, is clean and oiled
3 Ties, supports, struts are properly installed
4 Opening / penetration
B REINFORCEMENT
1 Rebars are clean, and free of oil
Location, spacing are correct and secured with
2
wire
3 Rebar sizes are correct
4 Lapping and anchorage correct
5 Stirrups spacing correct
6 Trimmer bars sufficient
7 Cover to re-bar sufficient
C CONCRETE SPECIFICATION
1 Concrete grade is correct
2 Concrete is clean
Checked by
D M / E CLEARANCE Date
NSC
Cast in ducts / conduits are installed correctly
1
and installed.
2 Underground services installed and inspected
3 Box up are installed correctly
4 Casting level & location is correct

REMARKS:

Checked & Confirmed By: Checked By: Checked By: Approved By:
Nominated Sub Contractor Main Contractor (M&E) Main Contractor Site Engineer RE / RTO

Name / Signature / Date Name / Signature / Date Name / Signature / Date Name / Signature / Date
Project Title:

Form No:

Ref No:

CHECKLIST FOR STRUCTURAL WORK (PRE-POUR)


Location:

Inspection Items: Drawing Ref:

Date of Notification: Time of Notification:

Anticipated Inspection Date: Anticipated Inspection Time:

Actual Inspection Date (RE / RTO): Time: To:

Re-Inspection Date: Time: To:

REMARKS:

Checked & Confirmed By: Checked By: Checked By: Approved By:
Nominated Sub Contractor Main Contractor (M&E) Main Contractor Site Engineer RE / RTO

Name / Signature / Date Name / Signature / Date Name / Signature / Date Name / Signature / Date