FOR INTERNAL USE ONLY Standard Specification For Road Works

SECTION 1

GENERAL

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 8


FOR INTERNAL USE ONLY Standard Specification For Road Works

SECTION 1 - GENERAL
Page

1.1 GENERAL DESCRIPTION OF THE PROJECT S1-11


1.2 SCOPE OF WORKS S1-11
1.3 NOTES, ABBREVIATIONS AND UNITS OF MEASUREMENT S1-11
1.3.1 Notes S1-11
1.3.2 Abbreviations S1-11
1.3.3 Units of Measurement S1-11
1.4 PROGRAMME OF WORKS S1-12
1.5 LIMITATION OF SITE S1-12
1.6 SUPPLY OF MATERIALS S1-12
1.7 MATERIALS OF MALAYSIAN ORIGIN S1-12
1.8 SETTING OUT S1-13
1.9 DIMENSIONS AND LEVELS S1-13
1.10 PROTECTION OF WORKS S1-13
1.11 DESIGN OF TEMPORARY WORKS BY THE CONTRACTOR S1-13
1.12 CONTRACTOR'S SUPERINTENDENCE S1-14
1.13 INSPECTION AND TESTS S1-14
1.14 COVERING UP OF WORK S1-14
1.15 OFFICE ACCOMMODATION FOR S.O. AND HIS STAFF S1-14
1.16 VEHICLES FOR THE S.O.'S STAFF S1-16
1.17 CONTRACTOR'S OFFICE AND ACCOMODATION S1-16
1.18 MATERIAL TESTING LABORATORY AND STAFF S1-16
1.19 PROVISION FOR SURVEY INSTRUMENTS AND CHAINMEN S1-17
1.20 MAINTENANCE OF EXISTING ROADS AND PROTECTION
OF TRAFFIC S1-17
1.20.1 Maintenance of Existing Roads, Bridges, Culverts, etc. S1-17
1.20.2 Temporary Diversions S1-17
1.20.3 Half-width Construction and Traffic Control S1-18
1.20.4 Temporary Traffic Signs S1-19
1.20.5 Temporary Works S1-19
1.21 LOCATION, TEMPORARY PROTECTION AND TEMPORARY
DIVERSION OF PUBLIC UTILITY INSTALLATIONS AND
OTHER SERVICES S1-19
1.22 WATER AND ELECTRICITY SUPPLY S1-20
1.23 PROJECT SIGNBOARD S1-20
1.24 PHOTOGRAPHIC RECORD OF WORKS S1-20
1.25 AS-BUILT DRAWINGS AND MICROFILMING S1-21
1.26 CLEARING UP OF SITE S1-21
1.27 OPPORTUNITIES FOR OTHER CONTRACTORS S1-21

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 9


FOR INTERNAL USE ONLY Standard Specification For Road Works

Page

APPENDIX 1A GENERAL DESCRIPTION OF PROJECT S1-22

APPENDIX 1B SCOPE OF WORKS S1-23

APPENDIX 1C VEHICLES FOR S.O. AND HIS STAFF S1-24

APPENDIX 1D LIST OF LABORATORY EQUIPMENT

(a) Soil Testing Equipment S1-25


(b) Concrete Testing Equipment S1-27
(c) Flexible Pavement Testing Equipment S1-27

APPENDIX 1E SURVEY EQUIPMENT S1-30

FIGURE 1-1 APERTURE CARD FOR MICROFILM S1-31

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 10


FOR INTERNAL USE ONLY Standard Specification For Road Works

SECTION 1 - GENERAL iv) The terms "Engineer" and


"Superintending Officer" shall be
synonymous.
1.1 GENERAL DESCRIPTION OF
THE PROJECT
1.3.2 Abbreviations
The general description of the project is as
given in Appendix 1A. a) M.S. means Malaysian Standards
published by the Scientific and
1.2 SCOPE OF WORKS Industrial Research Institute of
Malaysia (SIRIM).
The Works covered in this Contract comprise
the provision by the Contractor at his own risk b) B.S. means British Standards
and cost of all materials, tools, plants, labour, published by the British Standard
transport and everything else necessary for the Institution.
construction and completion of the Works as
given in Appendix 1B all to the approval of the c) A.A.S.H.T.O. means The American
S.O. Association of State Highway and
Transportation Officials.
1.3 NOTES, ABBREVIATIONS AND
UNITS OF MEASUREMENT d) A.S.T.M. means The American
Society for Testing and Materials.
1.3.1 Notes
e) M.D.D. means Maximum Dry
i) Any clause in this Specification which Density.
relates to work or materials not included
in the Works shall be deemed not f) O.M.C. means Optimum Moisture
applicable. Content.

ii) Unless stated to the contrary, any g) C.B.R. means California Bearing
dimension of material described means Ratio.
the finished or fully compacted
dimension. h) S.O. means Superintending Officer.

iii) All Standards and Codes of Practice i) B.Q. means Bill of Quantities.
referred to in this Specification shall be
deemed to be the editions current at the
time of Tender. If the Malaysian 1.3.3 Units of Measurement
Standard exists, which the S.O. deems to
be equivalent to the British or other All units of measurement used in this
Standard specified, then the Malaysian Specification and in the Bill of
Standard shall be followed. Quantities shall be in accordance with
the metric system unless otherwise
In the event of any discrepancy between stated.
the provision of this Specification and
the provision within the relevant Where British Imperial units are shown
Standards or Codes of Practice as or stated the following conversions shall
mentioned in this Specification, then the apply :-
provision of this Specification shall take
precedence.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 11


FOR INTERNAL USE ONLY Standard Specification For Road Works

1 inch = 25.40 millimetres Should the Contractor require additional


1 foot = 0.3048 metres land outside the Site for his workyards,
1 lb = 0.4536 kilograms stores, offices, temporary haul roads or
1 gallon = 4.5461 litres any other temporary structures, he shall,
1 lb/sq.in = 6.895 x 10-3 N/sq.mm on his own, purchase or rent any
additional area he may need.

1.4 PROGRAMME OF WORKS Areas or area to be rendered as part of


the Site shall be subject to the S.O.'s
Within thirty (30) days after the receipt approval.
of the Letter of Acceptance of Tender,
the Contractor shall submit to the S.O. 1.6 SUPPLY OF MATERIALS
for his approval a programme showing
the order of work activities and time The Contractor shall place orders for
schedule in which the Contractor specified materials at such times as
proposes to carry out the Works and will enable him to execute the Works in
shall, whenever required by the S.O. or accordance with his approved
the S.O.'s representative, furnish in programme.
writing, particulars of the Contractor's
arrangement for carrying out such works If the Contractor's failure to supply any
and of the construction plants and material causes any interruption or delay
temporary works, if any, which the in the progress of the Works, the
Contractor intends to supply, use or Government may supply any portion
construct as the case may be. The or all of the materials and the cost
submission to and approval by the S.O. borne by the Contractor shall be either
or the S.O.'s representative of such a that as calculated at the current market
programme or the furnishing of such rates or the actual cost to the
particulars shall not relieve the Government at the date of supply,
Contractor of any of his duties or including overheads or any other
responsibilities under the Contract. charges, whichever is the greater.

If at any time it should appear to the Any costs incurred under this Section
S.O. that the actual progress of the shall be deducted from the Contract
Works does not conform to the approved Sum. No claim for loss of profit under
programme referred to herein before, the the conditions of this Contract shall be
Contractor shall submit for approval, a deemed to have arisen. No action taken
revised programme showing the under this Section shall in any way
modifications to the previously affect or modify the right of the
approved programme necessary to Government to claim for damages in the
ensure the completion of the whole event of the Contractor's failure to
Works within the time set for complete the Works by the agreed date.
completion.
1.7 MATERIALS OF MALAYSIAN
ORIGIN
1.5 LIMITATION OF SITE
Materials of Malaysian origin where
The Contractor shall ensure that all his available must be used by the Contractor
plants, materials, temporary workshops, to the exclusion of imported materials
stores and offices are kept within the and this requirement shall be allowed
Site at locations approved by the S.O. for in his tender.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 12


FOR INTERNAL USE ONLY Standard Specification For Road Works

Under no circumstances shall the Before the Works or any part thereof are
Contractor be permitted to use imported commenced, the Contractor shall verify
materials unless he can prove to the the levels of the existing ground surface
satisfaction of the S.O. that the within areas where earthworks are to be
materials are not available locally, or if performed and the locations and bed
available are not of an acceptable levels of water-courses. These may
standard. differ from the locations and levels
shown on the Drawings owing to
changes which could have taken place
1.8 SETTING OUT during the interval between the original
survey and construction.
Before commencing the Works at any
location, the Contractor shall provide The levels and dimensions taken by the
and install precast concrete reference Contractor jointly with the S.O. shall
beacons on both sides of the road form the basis of measurement of the
centre-line at a spacing of 300 metres. relevant work quantities.
The beacons shall be firmly sited at right
angles to the centre-line at a distance
from the centre-line of 15 metres or such 1.10 PROTECTION OF WORKS
other distance as directed by the S.O.
The beacons shall be not less than 75 From the commencement of the Works
mm square in plan and shall project at to the date the Works are taken over by
least 600 mm above the surrounding the Government, the Contractor shall
ground. Each beacon shall be clearly take full responsibility for the care there
marked with its chainage and elevation of together with all temporary works
above datum. and in case any damage, loss or injury
shall happen to the Works or to any part
The Contractor shall take all practicable thereof or to any temporary works from
steps to safeguard the beacons including any cause whatsoever, he shall at his
fencing and concreting-in where own cost repair and make good the
necessary in the opinion of the S.O. and same so that at completion, the Works
shall immediately replace any damaged shall be in good order and condition and
beacons. The Contractor shall give the in conformity in every respect with the
S.O. not less than 24 hours notice of his requirements of the Contract and the
intention to set out or give levels for S.O.'s instructions. The Contractor shall
any part of the Works in order that also be liable for any damage to the
arrangements may be made for Works occasioned by him in the course
checking. of any operations carried out during the
Defects Liability Period.

1.9 DIMENSIONS AND LEVELS 1.11 DESIGN OF TEMPORARY


WORKS BY THE CONTRACTOR
All temporary benchmarks, reference
markers and levels as shown on the Unless otherwise provided in the
Drawings shall be checked on the Site Drawings, the Contractor shall submit to
by the Contractor at his own expense the S.O. for his approval, 2 copies of all
and be confirmed by the S.O. working or shop drawings produced by
him including all drawings made by his
approved sub-contractors for all
temporary works.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 13


FOR INTERNAL USE ONLY Standard Specification For Road Works

Such submission shall be made at least The Contractor shall provide the
two weeks before the temporary work is necessary attendance whenever required
scheduled to commence. by the S.O. or his representative.
Notwithstanding the approval by the
S.O., the Contractor is solely responsible Notwithstanding any tests which may
for the adequacy and safety of his work have been carried out off the Site, the
and for any necessary modification or S.O. shall be empowered to order
addition whenever found necessary by further tests of any materials or goods to
the S.O. be made on the Site and to reject such
materials or goods should they fail to
pass such tests on Site.
1.12 CONTRACTOR'S
SUPERINTENDENCE When required by the S.O., the
Contractor shall submit a copy of the
The Contractor shall provide all result of any quality control test carried
necessary superintendence during the out by the Contractor on his own during
execution of the Works and as long the progress of the Works.
thereafter as the S.O. may consider
necessary for the proper fulfillment of 1.14 COVERING UP OF WORK
the Contractor's obligations under the
Contract. Before any part of the Works is
permanently covered up, the Contractor
A competent Site Agent, whose shall give due notice to the S.O. for the
appointment shall be approved by the inspection and measurement of
S.O., shall be employed by the dimensions. The S.O. shall attend
Contractor for management on Site. without unreasonable delay for the
The Site Agent shall have the authority purpose of examination and
to receive instructions from the S.O. and measurement unless he considers it
to act on behalf of the Contractor. The unnecessary and advises the Contractor
Site Agent shall be stationed on Site for accordingly.
the whole duration of the Contract and
shall not be replaced without the 1.15 OFFICE ACCOMMODATION FOR
approval of the S.O. S.O. AND HIS STAFF

If the Site Agent needs to be absent from The Contractor shall provide and
Site for more than three (3) consecutive maintain a site office for the use of the
days, he shall give prior notice to the S.O. and his supervisory staff, all in
S.O. who may require the Contractor to accordance with the relevant Drawings
temporarily appoint another Site Agent. inclusive of all furniture and fittings as
shown on the Drawings.
1.13 INSPECTION AND TESTS
The Contractor is permitted to provide a
The S.O. or his representative may at relocatable site office as an alternative to
any stage of the Works carry out the JKR designed type shown on the
inspection, measurement and tests on Drawings.
any part of the Works to ensure
compliance with the requirements of this
Specification and of the Drawings.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 14


FOR INTERNAL USE ONLY Standard Specification For Road Works

The quality of such a relocatable site Sanitary facilities with disposal to


office shall be of equivalent standard but septic tanks located not nearer than 5 m
not inferior to the JKR designed type from the building shall be provided.
and shall be equipped with similar
furniture and fittings as indicated in the The office shall be illuminated by
JKR designed site office. fluorescent fittings giving a general level
of illumination of at least 2 lumens/
Where a relocatable site office is to be sq.m. Additional lighting in the form of
provided, the Contractor shall submit wall or deck lamps shall be provided
details of the relocatable site office where required by the S.O. Lighting to
together with his tender. Such details toilets and corridors may be by tungsten
should include the name of the filament bulbs.
manufacturer, floor area and layout, list
of furniture and fittings and brochures if Thermostatically controlled air-
available. The Contractor shall also conditioners capable of maintaining a
indicate whether the proposed site office temperature below 23°C in the office
is new or otherwise. shall be provided.

Unless otherwise shown on the The Contractor shall arrange for the
Drawings, the site office is to be sited, installation of a telephone with a
constructed and positioned as approved separate connection to the telephone
by the S.O. exchange for the exclusive use of the
S.O. at all times. The telephone shall
The Contractor shall make proper also be be fitted with 4 extensions unless
arrangements for and pay all charges in not required by the S.O. The Contractor
connection with conservancy. The site shall be responsible for the connection
office shall comply with local building to such exchange and the payment of
by-laws. It shall be erected or provided rental for the telephone services but the
by the Contractor within four (4) weeks Government shall reimburse the
from the date of possession of Site. Contractor for the cost of making calls.

On completion of the Works, the Where a telephone exchange is not


Contractor shall further maintain the site within practical distance, an automatic
office till the end of the Defects Liability mobile telephone such as the ATUR
Period unless otherwise directed by the (Automatic Telephone Using Radio)
S.O. and thereafter remove from the Site service shall be provided.
the site office with all furniture and
fittings which become the property of The Contractor shall keep the offices
the Contractor. accessible at all times and in every way
habitable for working purposes
Where electricity and piped water are throughout the duration of the Contract.
available from public utility authorities, The Contractor shall also provide such
the Contractor shall arrange for the site labour and cleaning materials as are
office to be connected to the electricity required to maintain the site office in a
and water supplies.Otherwise, the thoroughly clean and sanitary condition.
Contractor shall supply the site office
with electric power from generators and
shall provide an adequate supply of
water for washing and potable filtered
water for drinking purposes.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 15


FOR INTERNAL USE ONLY Standard Specification For Road Works

1.16 VEHICLES FOR THE S.O.'S When instructed by the S.O., the
STAFF Contractor shall remove all such
buildings and appurtenant works from
The Contractor shall provide new the Site, clean up the area and restore it
vehicles as listed in the B.Q. and to its original condition.
Appendix 1C for the sole use of the S.O.
and his staff at all times. All necessary The Contractor shall provide adequate
fuel, oil and lubricants, general first aid facilities appropriate to the size
maintenance, comprehensive insurances and composition of his staff and labour
and roadtax shall be provided by the force. The Contractor shall afford the
Contractor together with a licensed and S.O.'s site staff full use of the services
competent driver for every vehicle. and facilities as and when required.
Replacement vehicles shall be provided
when normal vehicles are not available 1.18 MATERIAL TESTING
such as during periods of servicing, LABORATORY AND STAFF
maintenance or repair. The vehicles will
revert to the Contractor at the The Contractor shall provide and
completion of the Contract unless maintain a laboratory at the Site
otherwise stated in the B.Q. throughout the duration of the Contract.
Earthworks and pavement construction
1.17 CONTRACTOR'S OFFICE AND will not be permitted to commence until
ACCOMODATION the laboratory and necessary equipment
have been provided.
The Contractor shall provide and
maintain a suitable office for himself The said laboratory shall be in
and his staff in a position or positions to accordance with the Drawings and shall
be approved by the S.O. be equipped as indicated in Appendix
1D. It shall be maintained in a clean
In addition, the Contractor shall provide and tidy condition to the satisfaction of
and maintain temporary accomodation the S.O. The laboratory shall be
and living facilities, stores, workshops, adequately supplied with water and
etc., including all necessary services for electricity.
water supply, drainage and lighting for
his staff. Before any work can The laboratory shall be used exclusively
commence the Contractor shall submit by the S.O. and his staff. However the
to the S.O. details of the proposed Contractor shall provide helpers to assist
buildings and services and shall obtain the S.O. as and when requested.
the S.O.'s approval together with any
necessary approval in writing from the All laboratory equipment shall become
relevant statutory authority. the property of the Contractor on
completion of the Works.
The Contractor shall be responsible for
all fees and other charges or expenses On completion of the Works, the
incurred in connection with such office building shall be removed from the Site
and housing and shall keep the whole and the Site left in a neat and tidy
area in a clean, tidy and well drained condition.
condition.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 16


FOR INTERNAL USE ONLY Standard Specification For Road Works

1.19 PROVISION FOR SURVEY He shall also be responsible for


INSTRUMENTS AND CHAINMEN maintaining the free flow of traffic on
these sections of existing road.
The Contractor shall provide for the sole
use of the S.O. and his staff all such The Contractor shall arrange for the
instruments, equipment and chainmen as conveyance of materials and plants so as
the S.O. may require to enable him to to cause minimum damage to existing
check the accuracy of the Contractor's roads and installations and minimum
setting out and any measurements taken. inconvenience to the public. He shall
The chainmen shall have knowledge of not deposit any earth, rubbish or
Bahasa Malaysia or English and as far materials upon any road, street,
as possible the same men shall be pavement or footway to cause hindrance
provided throughout the Contract or obstruction of vehicles or pedestrians.
period.
The Contractor shall be responsible for
The instruments and equipment to be any damage caused by any work carried
provided are as listed in Appendix 1E. out by him or by construction traffic to
any existing roads or installations from
The Contractor shall be responsible whatsoever cause arising thereof and
throughout the Contract period for all shall repair, maintain and reinstate the
such instruments, equipment and same to their original condition to the
chainmen and shall ensure that the satisfaction of the S.O. The Contractor
instruments and equipment are at all shall also keep such roads clear of
times in good working condition and slurry, boulders and loose earth which
adjustment. All instruments and may be dropped in the course of
equipment shall remain the property of transportation.
the Contractor on completion of the
Works. Upon failure on the part of the
Contractor to fulfill his obligations
under this Section, the S.O. may take
1.20 MAINTENANCE OF EXISTING whatever action and any means
ROADS AND PROTECTION necessary to satisfy the requirements
OF TRAFFIC and all costs incurred by the S.O. shall
be deducted from any monies due or to
1.20.1 Maintenance of Existing Roads, become due to the Contractor under this
Bridges, Culverts, etc. Contract.

The Contractor shall maintain all 1.20.2 Temporary Diversions


sections of existing roads and all
bridges, drains and culverts included Temporary diversions shall be
therein within the Site to the constructed wherever the Site is
conditions at the time of possession intersected by existing roads, footpaths,
of Site for the full duration of the cycle tracks, access to properties, etc.
Contract. Such maintenance shall
include routine activities such as Such diversion ways shall be of a
grass cutting, clearing of drains, standard of construction at least
patching of potholes, etc. equivalent to that of the original road,
path, track or access.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 17


FOR INTERNAL USE ONLY Standard Specification For Road Works

They shall be constructed in advance If the Contractor fails to maintain


of the closure of the existing ways and/or reinstate these temporary
and regularly maintained, for as long diversion ways to the satisfaction of
as required, in a satisfactory the S.O., the S.O. shall have the right
condition. On completion of the to carry out these works himself and
work, the original ways shall be all costs incurred shall be deducted
reinstated to their original condition from the Contract Sum.
to the approval of the S.O. At least
fourteen (14) days notice in writing Where, in the opinion of the S.O., a
of any proposed temporary detour is not feasible, construction
diversions of traffic shall be given to on existing public roads shall be
the S.O. for his approval. undertaken only over half of the full
width of the roadway at any time.
Where access roads are to be The lengths of such half-width
permanently closed by the construction shall be kept as short as
construction of the Works, as shown is practicable.
on the Drawings, diversion ways
shall not be required. Such For all temporary diversions, the
closures shall not be effected until Contractor shall provide, install and
any specified alternative access has maintain adequate temporary
been provided and only with the construction signs in accordance
written approval of the S.O. with Sub-Section 1.20.4.

The Contractor shall maintain 1.20.3 Half-width Construction and Traffic


reasonable access to all properties Control
adjoining the Works where such
access exists during construction, Where half-width construction is
and shall ensure that all the necessary, work on culverts shall be
necessary fences, planking and completed and the embankment
gangways are adequately lit to the adjacent to them must be reinstated
satisfaction of the S.O. so that at least half the full width
shall be available for use by the
Where the Contractor proposes to public at all times.
use existing local streets as
temporary diversion ways, he shall In the event of the operation of
give at least fourteen (14) days single-way traffic becoming
notice in writing of his proposal to necessary and when approved by the
the S.O. for his approval. The S.O. on any particular length of the
Contractor shall maintain and/or Works or on the Works or on the
reinstate these temporary diversion approaches to the Works, the
ways to their original condition Contractor shall maintain through
throughout the entire duration of the traffic routes by providing a width of
temporary diversion, all to the at least 3 metres for single-way
satisfaction of the S.O. traffic. He shall also provide
approved electrically operated
signals for traffic control on each of
the affected lengths and any
additional traffic signs as may
be directed.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 18


FOR INTERNAL USE ONLY Standard Specification For Road Works

The electrical signal lights shall be Construction and excavation shall be


automatic in operation, but the sign posted and, during periods of
S.O. may, at any time, require them darkness, shall be lit to the approval
to be hand operated by a competent of the S.O.
operator.
Temporary traffic signals shall
The Contractor shall make suitable comply with the requirements of the
arrangements for emergency ARAHAN TEKNIK (JALAN)
servicing of the electrically operated 2C/85 published by Cawangan
traffic signals to be available at all Jalan, Ibu Pejabat JKR, Kuala
times. Manually operated "Stop/Go" Lumpur and shall be reflectorised
signs shall only be used with the and kept clean and legible at all
prior approval of the S.O.; and shall, times.
if so approved, be of the size, colour
and type as shown on the Drawings The Contractor shall position, cover
and complying with the requirements or remove these signs as may be
of the ARAHAN TEKNIK(JALAN) directed by the S.O.
2C/85 (Manual on Traffic Control
Devices for Temporary Signs and 1.20.5 Temporary Works
Work Zones Control), published by
Cawangan Jalan, Ibu Pejabat JKR, The Contractor shall provide,
Kuala Lumpur. maintain and remove on completion
of the Works all temporary works
At least fourteen (14) days notice in including diversion ways, tracks,
writing of any proposed single-way staging, bridging, etc., and shall
traffic system shall be given to the make them safe and suitable in every
S.O. for his approval before such a respect for carrying all plants and
system can be implemented. materials and for all purposes related
to the Works.
1.20.4 Temporary Traffic Signs
1.21 LOCATION, TEMPORARY
The Contractor shall at all times take PROTECTION AND
full and sufficient precautions to TEMPORARY DIVERSION OF
ensure the safety of all traffic PUBLIC UTILITY
through and around the Work Site INSTALLATIONS AND OTHER
and of traffic that is diverted owing SERVICES
to the Works.
The Contractor shall be responsible for
To this end the Contractor shall erect locating the positions of all public utility
and maintain on the Site and at installations, including water mains,
prescribed points on the approaches overhead and underground cables, pipes,
to the Site, all traffic signs, signals sewers and drains and all service
and warning lights necessary for the connections to buildings, and where
direction and control of traffic. The necessary, shall adopt such methods of
sizes of all such signs and the excavation as may be required by the
lettering and wording thereon shall appropriate authorities or owners to
be as shown on the Drawings and ensure that no damage is caused to
approved by the S.O. before erection. them.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 19


FOR INTERNAL USE ONLY Standard Specification For Road Works

The Contractor shall make good, at his 1.22 WATER AND ELECTRICITY
own expense, any damage caused by him SUPPLY
to the existing services to the approval of
and in accordance with the instruction of The Contractor shall provide at his own
the appropriate authority or owner risk and cost all water, lighting and
concerned, and shall keep the Government electric power where required for use in
indemnified at all times from all claims, the Works and shall pay all costs, fees
costs and expenses which may arise on and charges and comply with all safety
account of any damage (whether regulations and statutes in connection
permanent, temporary or recurring) to the therewith.
said services.
The Contractor shall also provide and
All such installations which are maintain temporary water storage
encountered in the course of the Works together with any distribution piping
shall be adequately supported, slung-up, which may be necessary.
strutted or otherwise protected from injury
to the satisfaction of the respective
authority. 1.23 PROJECT SIGNBOARD

The temporary diversion or relocation of The Contractor shall provide, erect and
any service within or outside the Works to maintain signboards at locations to be
permit the construction of the Works shall decided by the S.O. and pay all charges
be the responsibility of the Contractor. in connection with this, including
Where a service is required to be obtaining permission, licences and fees,
interrupted or relocated the Contractor etc. Each sign board shall comply with
shall inform and obtain the approval of the the design and specification as shown on
S.O. who shall notify the appropriate the Drawings. On completion of the
authority or owner of the required removal project, the Contractor shall dismantle
and/or relocation. and clear away the signboards as
directed by the S.O.
Temporary diversion shall mean works
involved in the diversion of services that 1.24 PHOTOGRAPHIC RECORD OF
will be reinstated to their original position WORKS
and condition on completion of the works
in the affected areas. In planning his work The Contractor shall provide a camera
for the diversion or relocation of services, of reasonable quality for the purpose of
the Contractor shall make reasonable taking record photographs and slides of
allowance for the time necessary to obtain the Works as and when directed by the
the S.O.'s approval for the work and for the S.O. The Contractor shall bear the costs
appropriate authorities or owners to of providing the film, development of
authorise the work, obtain the necessary film, printing two (2) copies of each
materials and carry out the work. exposure in 3R size and documenting
the photographs in suitable albums.
The Contractor shall not be entitled to any
extension of time due to his failure to The negatives of the photographs shall
allow for a reasonble period of time be the property of the Government and
necessary for obtaining approval and no prints from these negatives may be
completing the work. supplied to any person or persons except
with the approval of the S.O.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 20


FOR INTERNAL USE ONLY Standard Specification For Road Works

A suitably typed caption shall be affixed On completion of the Works, the


to the reverse side of each photograph Contractor shall remove all rubbish,
describing the subject and the time at debris and surplus materials from the
which it was taken. One copy of each Site and leave the whole Site in a neat
photograph shall be signed by the and tidy condition to the satisfaction of
Contractor and the S.O. the S.O.

1.25 AS-BUILT DRAWINGS AND 1.27 OPPORTUNITIES FOR OTHER


MICROFILMING CONTRACTORS

Drawings for recording as-built The Contractor shall, when required by


construction details of the Works shall the S.O., afford all reasonable
be prepared by the Contractor and shall opportunity to any other Contractors
be certified by the S.O. or his employed by the Government and their
representative. The originals, in good workmen and to the workmen of the
quality transparencies, and two (2) Government and of any other duly
printed copies of all as-built drawings constituted authorities who may be
shall be supplied by the Contractor to employed in the execution on or near
the S.O. progressively as sections of the the Site of any work not included in the
Works become completed. All drawings Contract.
shall be completed within one month
after the completion of the respective
section.

As-built drawings shall be A1 size (838


mm x 584 mm) unless otherwise
approved by the S.O.

The Contractor shall also microfilm the


as-built drawings using 35.0 mm film
with the aperture card format as shown
in Figure 1-1 and submit the same to the
S.O.

1.26 CLEARING UP OF SITE

The Contractor shall make every effort


to keep the Site in a reasonably clean
and tidy condition for the duration of the
Works. He shall, in addition, from time
to time on the completion of any area of
the Works or where directed by the S.O.,
remove rubbish, surplus materials, or
any other construction debris from such
areas as may be attributable to his work
under this Contract and generally leave
them in a satisfatory condition, to the
approval of the S.O.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 21


FOR INTERNAL USE ONLY Standard Specification For Road Works

APPENDIX 1A

GENERAL DESCRIPTION OF PROJECT

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 22


FOR INTERNAL USE ONLY Standard Specification For Road Works

APPENDIX 1B

SCOPE OF WORKS

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 23


FOR INTERNAL USE ONLY Standard Specification For Road Works

APPENDIX 1C

VEHICLES FOR S.O. AND HIS STAFF

All vehicles shall be NEW and of the types listed below :-

Type A - 2000 c.c. four-door, air-conditioned saloon car;

Type B - 1600 c.c. five-door, air-conditioned estate car;

Type C - 1500 c.c. four-door, air-conditioned Proton Saga;

Type D - 2000 c.c. four-wheel-drive, air-conditioned Trooper or equivalent with hard top;

Type E - 2250 c.c. four-wheel-drive, air-conditioned long-wheel- base Land Rover or


equivalent with hard top.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 24


FOR INTERNAL USE ONLY Standard Specification For Road Works

APPENDIX 1D

LIST OF LABORATORY EQUIPMENT

The Contractor shall provide and maintain the following testing laboratory equipment which shall
become the property of the Contractor at the end of the Contract :-

No.

(a) Soil Testing Equipment

(1) Moisture content tins - 76 mm x 25 mm with lids. 25

(2) Electric balance of 1 kg capacity, accurate to 0.1 g with a tare correction of


not less than 100 g. 1

(3) Electric forced draught oven, capacity of 0.08 cu.m. 1

(4) Atterberg limit machine calibrated with a grooving device as specified in B.S. 1377. 1

(5) Glass plates - 457 mm x 609 mm x 6 mm. 2

(6) Linear shrinkage moulds - 254 mm. 5

(7) Spatulas - 152 mm. 2

(8) 203 mm diameter B.S. sieves - 75 mm, 63 mm, 50 mm, 37.5 mm,
28 mm, 25 mm, 20 mm, 14 mm, 12.5 mm, 10 mm, 9.5 mm, 6.3 mm,
5 mm, 4.75 mm, 3.35 mm, 2.36 mm, 2 mm, 1.18 mm, 600 um,
425 um, 300 um, 212 um, 150 um, 75 um. Lid and pan together with
vibrating machine. 1 of each

(9) 203 mm diameter B.S. sieves - 75 um, 425 um. 2 of each

(10) Wash sieves - 75 um. 2

(11) Sample splitter - 50 mm. 2

(12) Sample splitter - 12 mm. 2

(13) Balance of 10 kg capacity, accurate to 1 g. 1

(14) Standard compaction hammer, electric motor operated, as specified in B.S. 1377. 1

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 25


FOR INTERNAL USE ONLY Standard Specification For Road Works

No.

(15) Standard compaction mould as specified in B.S. 1377. 1

(16) Compaction mould extruder as specified in B.S. 1377. 1

(17) Steel scoop. 1

(18) Rubber mallet. 1

(19) Measuring flasks - 1000 c.c. 2

(20) Vernier calipers - 152 mm. 1

(21) Steel rule - 305 mm. 1

(22) Compression machine suitable for laboratory and field C.B.R.'s with all
fittings necessary for field and laboratory operation as specified in B.S. 1377. 1

(23) C.B.R. moulds fitted with collars and base plates for compaction and soaking
and tripods for small measurement fitted with dial gauges having 0.01 mm
divisions and 25 mm travel as specified in B.S. 1377. 10

(24) 2.26 kg surcharge weights - ring type. 6

(25) 2.26 kg surcharge weights - horseshoe type. 9

(26) Complete field density kit, sand replacement type suitable for volume
measurement of 0.005 cu.m to an accuracy of not less than 0.0001
cu.m as specified in B.S. 1377. 2

(27) Hand auger suitable for boring to depths of 3 m and supplied with 100 mm
diameter heads suitable for boring in cohesive and cohesionless soils. 1

(28) Crowbar, pick and spade. 1 of each

(29) Drying pans - 406 mm x 406 mm x 76 mm. 6

(30) British Standard 1377 - "Methods of Test for Soils for Civil Engineering
Purposes", latest edition. 1

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 26


FOR INTERNAL USE ONLY Standard Specification For Road Works

(b) Concrete Testing Equipment

No.

(1) 152 mm x 152 mm x 152 mm standard concrete test cube steel moulds
as specified in B.S. 1881. 6

(2) Slump cones with tamping rods as specified in B.S. 1881. 2

(3) Compacting factor apparatus as specified in B.S. 1881. 1

(4) Tank for curing of concrete specimens to accomodate 50 Nos. x 152 mm


cubes in layers not more than 50 mm deep. 1

(c) Flexible Pavement Testing Equipment

(1) Metal tray, 0.6 m square or similar suitable for measuring spray rates of
bituminous materials and spread rates of cover aggregate for surface dressing. 4

(2) Metal thickness gauge (or set of slotted sleeves) as specified in M.S. 30 for
determination of aggregate flakiness index. 1

Additional items required for asphaltic concrete and/or bituminous Macadam :-

(3) Balance of 2 kg capacity, accurate to 0.1 g suitable for weighing samples


suspended in liquid. 1

(4) Steel moulds for Marshall test specimens (100 mm diameter) with base,
extension collar, extraction collar and extraction plate as specified in B.S. 598. 6

(5) Extractor for removing Marshall test specimens from moulds without distortion
or shock as specified in B.S. 598. 1

(6) Compaction hammer and automatic compactor for Marshall test specimens as
specified in B.S. 598. 1 of each

(7) Compaction pedestal and mould holder for Marshall test as specified
in B.S. 598. 1 of each

(8) Thermostatically controlled hot plate. 1

(9) Thermometers for use in laboratory and in asphaltic mixes for Marshall test as
specified in B.S. 598. 2 of each

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 27


FOR INTERNAL USE ONLY Standard Specification For Road Works

No.

(10) Rubber and heat resistant gloves. 2 pairs of each

(11) Filter papers - 100 mm diameter. As needed

(12) Containers for heating aggregates and bituminous materials. As needed

(13) Pavement coring machine of the thin-walled diamond bit type for
obtaining 100 mm diameter samples of bituminous surfacings. 1

(14) 100 mm diameter thin-walled diamond bits for use with pavement
coring machine. As needed

(15) Tools for cutting and trimming pavement cores. As needed

(15) Metal bottles of suitable capacity for bitumen extraction by direct


determination as specified in B.S. 598. As needed

(16) Machine to rotate the bottles about their longitudinal axes at a speed of
between 10 rev/min to 30 rev/min as specified in B.S. 598. 1

(18) Volumetric flasks of suitable capacity. As needed

(19) Centrifuge capable of developing an acceleration of 25,000 m/sq.


second as specified in B.S. 598. 1

(20) Filtration apparatus for extraction of bitumen by direct determination as


specified in B.S. 598. 1

(21) Recovery apparatus for extraction of bitumen by direct determination


as specified in B.S. 598.

(22) Pressure filter of appropriate size, air pump and funnel for extraction
of bitumen by direct determination as specified in B.S. 598. 1 of each

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 28


FOR INTERNAL USE ONLY Standard Specification For Road Works

No.
Further items required for asphaltic concrete :-

(23) Wire basket of 6.5 mm or smaller mesh with wire hanger as specified in
M.S. 30, for determination of specific gravity and water absorption
of aggregates. 1

(24) Airtight container of similar capacity as wire basket above. 1

(25) Gas jar - 1.5 litre. 1

(26) Pyconometer - 1 litre. 1

(27) Warm air blower. 1

(28) Mechanical mixer of 2 kg capacity, for preparation of asphaltic concrete mixtures. 1

(29) Thermostatically controlled water bath for Marshall test specimens as


specified in B.S. 598. 1

(30) Steel Marshall testing head as specified in B.S. 598. 1

(30) Compression testing machine with proving ring, capable of applying loads of
up to at least 22 kN at a constant rate of strain of 50 mm + 3 mm per minute
and recording the maximum load achieved as specified in B.S. 598. 1

(31) Dial gauge and mounting assembly for measuring Marshall test flows of up to
10 mm with accuracy of + 0.1 mm as specified in B.S. 598. 1

Testing which is specifically required in the Contract and any test defined in quoted British
Standard Specifications which are required to ensure compliance with the Contract but cannot be
done in the Site testing laboratory shall be carried out at approved laboratories off the Site. These
tests shall be carried out as directed by the S.O. The cost incurred by the Contractor shall be
deemed to have been included in the tendered rates.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 29


FOR INTERNAL USE ONLY Standard Specification For Road Works

APPENDIX 1E

SURVEY EQUIPMENT

The Contractor shall provide and maintain the following instruments and equipment for the
purpose of measurements and setting out. These shall become the property of the Contractor at the
end of the Contract :-

1 No. Theodolite of direct read out accurate to 1 second.

2 No. Automatic levels - Wild NA2 or Koni 007 or equivalent.

2 No. Levelling staves - 5 m aluminium.

1 No. 50 m x 5 mm steel measuring band divided throughout and numbered at 5 m intervals.


Divided over first 30 m at 1 m intervals. Divided over first 5 m at 50 mm intervals.

1 No. Repair set for the same.

2 No. 30 m steel box tapes, white face.

2 No. 30 m fibreglass box tapes.

10 No. 2.5 m ranging rods.

2 No. 1 m spirit level, steel or aluminium.

2 No. Survey umbrellas.

Templates, straightedges, canvas bags, pegs, hammers, parangs, etc.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 30


FOR INTERNAL USE ONLY Standard Specification For Road Works

Figure 1.1

APPERTURE CARD FOR MICROFILM

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 31