SECTION 1
GENERAL
SECTION 1 - GENERAL
Page
Page
ii) Unless stated to the contrary, any g) C.B.R. means California Bearing
dimension of material described means Ratio.
the finished or fully compacted
dimension. h) S.O. means Superintending Officer.
iii) All Standards and Codes of Practice i) B.Q. means Bill of Quantities.
referred to in this Specification shall be
deemed to be the editions current at the
time of Tender. If the Malaysian 1.3.3 Units of Measurement
Standard exists, which the S.O. deems to
be equivalent to the British or other All units of measurement used in this
Standard specified, then the Malaysian Specification and in the Bill of
Standard shall be followed. Quantities shall be in accordance with
the metric system unless otherwise
In the event of any discrepancy between stated.
the provision of this Specification and
the provision within the relevant Where British Imperial units are shown
Standards or Codes of Practice as or stated the following conversions shall
mentioned in this Specification, then the apply :-
provision of this Specification shall take
precedence.
If at any time it should appear to the Any costs incurred under this Section
S.O. that the actual progress of the shall be deducted from the Contract
Works does not conform to the approved Sum. No claim for loss of profit under
programme referred to herein before, the the conditions of this Contract shall be
Contractor shall submit for approval, a deemed to have arisen. No action taken
revised programme showing the under this Section shall in any way
modifications to the previously affect or modify the right of the
approved programme necessary to Government to claim for damages in the
ensure the completion of the whole event of the Contractor's failure to
Works within the time set for complete the Works by the agreed date.
completion.
1.7 MATERIALS OF MALAYSIAN
ORIGIN
1.5 LIMITATION OF SITE
Materials of Malaysian origin where
The Contractor shall ensure that all his available must be used by the Contractor
plants, materials, temporary workshops, to the exclusion of imported materials
stores and offices are kept within the and this requirement shall be allowed
Site at locations approved by the S.O. for in his tender.
Under no circumstances shall the Before the Works or any part thereof are
Contractor be permitted to use imported commenced, the Contractor shall verify
materials unless he can prove to the the levels of the existing ground surface
satisfaction of the S.O. that the within areas where earthworks are to be
materials are not available locally, or if performed and the locations and bed
available are not of an acceptable levels of water-courses. These may
standard. differ from the locations and levels
shown on the Drawings owing to
changes which could have taken place
1.8 SETTING OUT during the interval between the original
survey and construction.
Before commencing the Works at any
location, the Contractor shall provide The levels and dimensions taken by the
and install precast concrete reference Contractor jointly with the S.O. shall
beacons on both sides of the road form the basis of measurement of the
centre-line at a spacing of 300 metres. relevant work quantities.
The beacons shall be firmly sited at right
angles to the centre-line at a distance
from the centre-line of 15 metres or such 1.10 PROTECTION OF WORKS
other distance as directed by the S.O.
The beacons shall be not less than 75 From the commencement of the Works
mm square in plan and shall project at to the date the Works are taken over by
least 600 mm above the surrounding the Government, the Contractor shall
ground. Each beacon shall be clearly take full responsibility for the care there
marked with its chainage and elevation of together with all temporary works
above datum. and in case any damage, loss or injury
shall happen to the Works or to any part
The Contractor shall take all practicable thereof or to any temporary works from
steps to safeguard the beacons including any cause whatsoever, he shall at his
fencing and concreting-in where own cost repair and make good the
necessary in the opinion of the S.O. and same so that at completion, the Works
shall immediately replace any damaged shall be in good order and condition and
beacons. The Contractor shall give the in conformity in every respect with the
S.O. not less than 24 hours notice of his requirements of the Contract and the
intention to set out or give levels for S.O.'s instructions. The Contractor shall
any part of the Works in order that also be liable for any damage to the
arrangements may be made for Works occasioned by him in the course
checking. of any operations carried out during the
Defects Liability Period.
Such submission shall be made at least The Contractor shall provide the
two weeks before the temporary work is necessary attendance whenever required
scheduled to commence. by the S.O. or his representative.
Notwithstanding the approval by the
S.O., the Contractor is solely responsible Notwithstanding any tests which may
for the adequacy and safety of his work have been carried out off the Site, the
and for any necessary modification or S.O. shall be empowered to order
addition whenever found necessary by further tests of any materials or goods to
the S.O. be made on the Site and to reject such
materials or goods should they fail to
pass such tests on Site.
1.12 CONTRACTOR'S
SUPERINTENDENCE When required by the S.O., the
Contractor shall submit a copy of the
The Contractor shall provide all result of any quality control test carried
necessary superintendence during the out by the Contractor on his own during
execution of the Works and as long the progress of the Works.
thereafter as the S.O. may consider
necessary for the proper fulfillment of 1.14 COVERING UP OF WORK
the Contractor's obligations under the
Contract. Before any part of the Works is
permanently covered up, the Contractor
A competent Site Agent, whose shall give due notice to the S.O. for the
appointment shall be approved by the inspection and measurement of
S.O., shall be employed by the dimensions. The S.O. shall attend
Contractor for management on Site. without unreasonable delay for the
The Site Agent shall have the authority purpose of examination and
to receive instructions from the S.O. and measurement unless he considers it
to act on behalf of the Contractor. The unnecessary and advises the Contractor
Site Agent shall be stationed on Site for accordingly.
the whole duration of the Contract and
shall not be replaced without the 1.15 OFFICE ACCOMMODATION FOR
approval of the S.O. S.O. AND HIS STAFF
If the Site Agent needs to be absent from The Contractor shall provide and
Site for more than three (3) consecutive maintain a site office for the use of the
days, he shall give prior notice to the S.O. and his supervisory staff, all in
S.O. who may require the Contractor to accordance with the relevant Drawings
temporarily appoint another Site Agent. inclusive of all furniture and fittings as
shown on the Drawings.
1.13 INSPECTION AND TESTS
The Contractor is permitted to provide a
The S.O. or his representative may at relocatable site office as an alternative to
any stage of the Works carry out the JKR designed type shown on the
inspection, measurement and tests on Drawings.
any part of the Works to ensure
compliance with the requirements of this
Specification and of the Drawings.
Unless otherwise shown on the The Contractor shall arrange for the
Drawings, the site office is to be sited, installation of a telephone with a
constructed and positioned as approved separate connection to the telephone
by the S.O. exchange for the exclusive use of the
S.O. at all times. The telephone shall
The Contractor shall make proper also be be fitted with 4 extensions unless
arrangements for and pay all charges in not required by the S.O. The Contractor
connection with conservancy. The site shall be responsible for the connection
office shall comply with local building to such exchange and the payment of
by-laws. It shall be erected or provided rental for the telephone services but the
by the Contractor within four (4) weeks Government shall reimburse the
from the date of possession of Site. Contractor for the cost of making calls.
1.16 VEHICLES FOR THE S.O.'S When instructed by the S.O., the
STAFF Contractor shall remove all such
buildings and appurtenant works from
The Contractor shall provide new the Site, clean up the area and restore it
vehicles as listed in the B.Q. and to its original condition.
Appendix 1C for the sole use of the S.O.
and his staff at all times. All necessary The Contractor shall provide adequate
fuel, oil and lubricants, general first aid facilities appropriate to the size
maintenance, comprehensive insurances and composition of his staff and labour
and roadtax shall be provided by the force. The Contractor shall afford the
Contractor together with a licensed and S.O.'s site staff full use of the services
competent driver for every vehicle. and facilities as and when required.
Replacement vehicles shall be provided
when normal vehicles are not available 1.18 MATERIAL TESTING
such as during periods of servicing, LABORATORY AND STAFF
maintenance or repair. The vehicles will
revert to the Contractor at the The Contractor shall provide and
completion of the Contract unless maintain a laboratory at the Site
otherwise stated in the B.Q. throughout the duration of the Contract.
Earthworks and pavement construction
1.17 CONTRACTOR'S OFFICE AND will not be permitted to commence until
ACCOMODATION the laboratory and necessary equipment
have been provided.
The Contractor shall provide and
maintain a suitable office for himself The said laboratory shall be in
and his staff in a position or positions to accordance with the Drawings and shall
be approved by the S.O. be equipped as indicated in Appendix
1D. It shall be maintained in a clean
In addition, the Contractor shall provide and tidy condition to the satisfaction of
and maintain temporary accomodation the S.O. The laboratory shall be
and living facilities, stores, workshops, adequately supplied with water and
etc., including all necessary services for electricity.
water supply, drainage and lighting for
his staff. Before any work can The laboratory shall be used exclusively
commence the Contractor shall submit by the S.O. and his staff. However the
to the S.O. details of the proposed Contractor shall provide helpers to assist
buildings and services and shall obtain the S.O. as and when requested.
the S.O.'s approval together with any
necessary approval in writing from the All laboratory equipment shall become
relevant statutory authority. the property of the Contractor on
completion of the Works.
The Contractor shall be responsible for
all fees and other charges or expenses On completion of the Works, the
incurred in connection with such office building shall be removed from the Site
and housing and shall keep the whole and the Site left in a neat and tidy
area in a clean, tidy and well drained condition.
condition.
The Contractor shall make good, at his 1.22 WATER AND ELECTRICITY
own expense, any damage caused by him SUPPLY
to the existing services to the approval of
and in accordance with the instruction of The Contractor shall provide at his own
the appropriate authority or owner risk and cost all water, lighting and
concerned, and shall keep the Government electric power where required for use in
indemnified at all times from all claims, the Works and shall pay all costs, fees
costs and expenses which may arise on and charges and comply with all safety
account of any damage (whether regulations and statutes in connection
permanent, temporary or recurring) to the therewith.
said services.
The Contractor shall also provide and
All such installations which are maintain temporary water storage
encountered in the course of the Works together with any distribution piping
shall be adequately supported, slung-up, which may be necessary.
strutted or otherwise protected from injury
to the satisfaction of the respective
authority. 1.23 PROJECT SIGNBOARD
The temporary diversion or relocation of The Contractor shall provide, erect and
any service within or outside the Works to maintain signboards at locations to be
permit the construction of the Works shall decided by the S.O. and pay all charges
be the responsibility of the Contractor. in connection with this, including
Where a service is required to be obtaining permission, licences and fees,
interrupted or relocated the Contractor etc. Each sign board shall comply with
shall inform and obtain the approval of the the design and specification as shown on
S.O. who shall notify the appropriate the Drawings. On completion of the
authority or owner of the required removal project, the Contractor shall dismantle
and/or relocation. and clear away the signboards as
directed by the S.O.
Temporary diversion shall mean works
involved in the diversion of services that 1.24 PHOTOGRAPHIC RECORD OF
will be reinstated to their original position WORKS
and condition on completion of the works
in the affected areas. In planning his work The Contractor shall provide a camera
for the diversion or relocation of services, of reasonable quality for the purpose of
the Contractor shall make reasonable taking record photographs and slides of
allowance for the time necessary to obtain the Works as and when directed by the
the S.O.'s approval for the work and for the S.O. The Contractor shall bear the costs
appropriate authorities or owners to of providing the film, development of
authorise the work, obtain the necessary film, printing two (2) copies of each
materials and carry out the work. exposure in 3R size and documenting
the photographs in suitable albums.
The Contractor shall not be entitled to any
extension of time due to his failure to The negatives of the photographs shall
allow for a reasonble period of time be the property of the Government and
necessary for obtaining approval and no prints from these negatives may be
completing the work. supplied to any person or persons except
with the approval of the S.O.
APPENDIX 1A
APPENDIX 1B
SCOPE OF WORKS
APPENDIX 1C
Type D - 2000 c.c. four-wheel-drive, air-conditioned Trooper or equivalent with hard top;
APPENDIX 1D
The Contractor shall provide and maintain the following testing laboratory equipment which shall
become the property of the Contractor at the end of the Contract :-
No.
(4) Atterberg limit machine calibrated with a grooving device as specified in B.S. 1377. 1
(8) 203 mm diameter B.S. sieves - 75 mm, 63 mm, 50 mm, 37.5 mm,
28 mm, 25 mm, 20 mm, 14 mm, 12.5 mm, 10 mm, 9.5 mm, 6.3 mm,
5 mm, 4.75 mm, 3.35 mm, 2.36 mm, 2 mm, 1.18 mm, 600 um,
425 um, 300 um, 212 um, 150 um, 75 um. Lid and pan together with
vibrating machine. 1 of each
(14) Standard compaction hammer, electric motor operated, as specified in B.S. 1377. 1
No.
(22) Compression machine suitable for laboratory and field C.B.R.'s with all
fittings necessary for field and laboratory operation as specified in B.S. 1377. 1
(23) C.B.R. moulds fitted with collars and base plates for compaction and soaking
and tripods for small measurement fitted with dial gauges having 0.01 mm
divisions and 25 mm travel as specified in B.S. 1377. 10
(26) Complete field density kit, sand replacement type suitable for volume
measurement of 0.005 cu.m to an accuracy of not less than 0.0001
cu.m as specified in B.S. 1377. 2
(27) Hand auger suitable for boring to depths of 3 m and supplied with 100 mm
diameter heads suitable for boring in cohesive and cohesionless soils. 1
(30) British Standard 1377 - "Methods of Test for Soils for Civil Engineering
Purposes", latest edition. 1
No.
(1) 152 mm x 152 mm x 152 mm standard concrete test cube steel moulds
as specified in B.S. 1881. 6
(1) Metal tray, 0.6 m square or similar suitable for measuring spray rates of
bituminous materials and spread rates of cover aggregate for surface dressing. 4
(2) Metal thickness gauge (or set of slotted sleeves) as specified in M.S. 30 for
determination of aggregate flakiness index. 1
(4) Steel moulds for Marshall test specimens (100 mm diameter) with base,
extension collar, extraction collar and extraction plate as specified in B.S. 598. 6
(5) Extractor for removing Marshall test specimens from moulds without distortion
or shock as specified in B.S. 598. 1
(6) Compaction hammer and automatic compactor for Marshall test specimens as
specified in B.S. 598. 1 of each
(7) Compaction pedestal and mould holder for Marshall test as specified
in B.S. 598. 1 of each
(9) Thermometers for use in laboratory and in asphaltic mixes for Marshall test as
specified in B.S. 598. 2 of each
No.
(13) Pavement coring machine of the thin-walled diamond bit type for
obtaining 100 mm diameter samples of bituminous surfacings. 1
(14) 100 mm diameter thin-walled diamond bits for use with pavement
coring machine. As needed
(16) Machine to rotate the bottles about their longitudinal axes at a speed of
between 10 rev/min to 30 rev/min as specified in B.S. 598. 1
(22) Pressure filter of appropriate size, air pump and funnel for extraction
of bitumen by direct determination as specified in B.S. 598. 1 of each
No.
Further items required for asphaltic concrete :-
(23) Wire basket of 6.5 mm or smaller mesh with wire hanger as specified in
M.S. 30, for determination of specific gravity and water absorption
of aggregates. 1
(30) Compression testing machine with proving ring, capable of applying loads of
up to at least 22 kN at a constant rate of strain of 50 mm + 3 mm per minute
and recording the maximum load achieved as specified in B.S. 598. 1
(31) Dial gauge and mounting assembly for measuring Marshall test flows of up to
10 mm with accuracy of + 0.1 mm as specified in B.S. 598. 1
Testing which is specifically required in the Contract and any test defined in quoted British
Standard Specifications which are required to ensure compliance with the Contract but cannot be
done in the Site testing laboratory shall be carried out at approved laboratories off the Site. These
tests shall be carried out as directed by the S.O. The cost incurred by the Contractor shall be
deemed to have been included in the tendered rates.
APPENDIX 1E
SURVEY EQUIPMENT
The Contractor shall provide and maintain the following instruments and equipment for the
purpose of measurements and setting out. These shall become the property of the Contractor at the
end of the Contract :-
Figure 1.1