1. GENERALIDADES
Proyecto: Mantenimiento Periódico de los Pavimentos del Aeropuerto de Chachapoyas.
Nº PI SENT. DELTA RADIO TANG. L.C. Ext. P.I. P.C. P.T. NORTE ESTE
0 ---- ---- ---- ---- ---- ---- 0 + 000.000 ---- ---- 9314197.927 183052.075
1 I 4º58'40" 150.000 6.520 13.032 0.142 0 + 058.850 0 + 052.330 0 + 065.362 9314139.633 183060.151
2 I 9º29'10" 100.000 8.297 16.556 0.344 0 + 111.850 0 + 103.553 0 + 120.109 9314087.956 183071.953
3 I 9º28'10" 100.000 8.283 16.527 0.342 0 + 167.144 0 + 158.861 0 + 175.389 9314036.780 183092.992
4 I 13º43'20" 100.000 12.032 23.950 0.721 0 + 195.320 0 + 183.288 0 + 207.237 9314012.806 183107.867
5 I 6º47'10" 150.000 8.893 17.766 0.263 0 + 222.400 0 + 213.507 0 + 231.273 9313993.759 183127.278
6 I 18º50'30" 75.000 12.444 24.664 1.025 0 + 281.300 0 + 268.856 0 + 293.519 9313957.750 183173.916
7 D 7º54'20" 150.000 10.365 20.697 0.358 0 + 337.230 0 + 326.865 0 + 347.562 9313939.628 183227.066
8 D 44º57'50" 85.000 35.177 66.705 6.991 0 + 404.200 0 + 369.023 0 + 435.728 9313909.487 183286.906
9 I 22º12'00" 60.000 11.772 23.248 1.144 0 + 664.050 0 + 652.278 0 + 675.526 9313659.318 183369.654
10 I 29º16'10" 60.000 15.668 30.651 2.012 0 + 770.100 0 + 754.432 0 + 785.083 9313578.456 183438.723
11 I 9º22'10" 120.000 9.834 19.623 0.402 0 + 804.350 0 + 794.516 0 + 814.140 9313566.377 183471.503
12 D 3º34'30" 150.000 4.681 9.359 0.073 0 + 853.920 0 + 849.239 0 + 858.598 9313557.029 183520.228
13 D 49º55'30" 35.000 16.293 30.497 3.606 1 + 336.100 1 + 319.807 1 + 350.305 9313436.827 183987.188
14 D 83º20'00" 15.000 13.349 21.817 5.080 1 + 363.660 1 + 350.311 1 + 372.128 9313410.098 184000.017
15 I 105º36'00" 20.000 26.349 36.861 13.080 1 + 599.260 1 + 572.911 1 + 609.772 9313281.574 183796.762
16 I 85º06'30" 30.000 27.542 44.563 10.726 2 + 000.150 1 + 972.608 2 + 017.170 9313002.231 184106.002
17 ---- ---- ---- ---- ---- ---- 2 + 090.000 ---- ---- 9313070.705 184179.390
2.1.2 TRAMO II
Nº PI SENT. DELTA RADIO TANG. L.C. Ext. P.I. P.C. P.T. NORTE ESTE
18 ---- ---- ---- ---- ---- ---- 2 + 090.000 ---- ---- 9313048.082 184253.604
19 D 52º10'30" 35.000 17.137 31.872 3.970 2 + 152.950 2 + 135.813 2 + 167.685 9313000.918 184295.296
20 I 54º30'30" 35.000 18.029 33.297 4.371 2 + 259.750 2 + 241.721 2 + 275.018 9312893.614 184275.023
21 I 4º40' 00" 200.000 8.149 16.290 0.166 2 + 315.550 2 + 307.401 2 + 323.690 9312851.353 184315.562
22 I 42º10'00" 30.000 11.566 22.078 2.152 2 + 582.020 2 + 570.454 2 + 592.532 9312674.690 184515.065
23 I 42º44'00" 30.000 11.737 22.375 2.214 2 + 604.270 2 + 592.533 2 + 614.908 9312674.951 184538.367
24 I 16º46'00" 100.000 14.737 29.263 1.080 2 + 648.350 2 + 633.613 2 + 662.876 9312705.978 184571.206
25 ---- ---- ---- ---- ---- ---- 2 + 786.000 ---- ---- 9312825.539 184639.842
Se colocó BMs, cada 500 metros, pintados con pintura roja sobre cabezal de
alcantarillas y estacas, lo que detallo a continuación:
RELACION DE BMs
BM 1 : COTA 2520.00 msnm. sobre cabezal alc. km 0+032.40 lado izquierdo
BM 2 : COTA 2521.543 msnm. sobre cabezal alc. km 0+0438.00 lado izquierdo
BM 3 : COTA 2532.559 msnm. sobre estaca alc. km 1+000 lado izquierdo
BM 4 : COTA 2524.848 msnm. sobre cabezal alc. km 1+530 lado izquierdo
BM 5 : COTA 2547.411 msnm. sobre tapa buzo. km 2+090 lado derecho
BM 6 : COTA 2548.883 msnm. sobre cemento drenaje. km 0+090 lado izquierdo
BM 7 : COTA 2544.480 msnm. sobre cabezal alc. km 2+596 lado izquierdo
BM 8 : COTA 2547.601 msnm. sobre estaca alc. km 2+786 lado izquierdo
Nº ALC PROGRESIVA
01 0+032.50
02 0+438.00
03 0+861.00
04 0+892.00
05 1+200.00
06 1+280.00
07 1+530.00
08 2+098.00
09 2+596.00
4. EQUIIPOS DE TRABAJO
- 01 Topógrafo
- 03 auxiliares de Topografía
- 01 Nivelador
6. CONCLUSIONES