Вы находитесь на странице: 1из 1

Republic of the Philippines

NATIONAL POWER CORPORATION


Agus 1 & 2 Hydroelectric Power Plant Complex
Saguiaran, Lanao del Sur

This is to certify that

ABUBAKR S. DIMASANGKA

of St. Peter’s College, Iligan City has very satisfactorily completed the
Three Hundred Twenty (320) training hours along the field of Electrical
Engineering from April 27, 2017 to June 26, 2017 in the Agus 1 & 2
Hydroelectric Power Plant Complex, Saguiaran, Lanao del Sur as a
school requirement for graduation.

Issued this 11th day of February, 2018 at Agus 1 & 2 Hydroelectric


Power Plant Complex, Saguiaran, Lanao del Sur

P.A LOMONDAYA, DM. Ph. D.


Plant Manager, Agus 1 & 2 HEPP

Вам также может понравиться