Project

Monthly Report No.23 TRANSMISSION LINE WORKS

Period: (01/06- 30/06)

Civil contractor HSE statistics as below table


N SUBJECT May 2015 June 2015 Since to Project
O
1 Total Man - Hours Worked 14.713 9.224 228.312
2 Cumulative No. of Employees 55 41 120
3 Fatality 0 0 0
4 Lost Time Injury (LTI) 0 0 0
5 LTI -Rate 0,0000 0,0000 0,0000
6 Restrcited Work Case (RWC) 0 0 0
7 Medical Treatment Case (MTC) 0 0 0
8 First Aid Case (FAC) 0 0 0
9 Environmental Damage (ED) 0 0 4
10 Material Damage (MD) 0 0 0
11 Motor Vehicle Accident (MVA) 0 0 1
12 Near Miss (NM) 0 0 2
13 Total Recordable Injuries (TRI) 0 0 0
14 TRI - Rate 0,0000 0,0000 0,0000
15 Unwanted Occurences (UO) 0 0 0
16 Reporting of UO - Rate 0,0000 0,0000 0,0000
17 Total No. of Inducted Employees 55 55 95
18 Number of Day 31 30 600
19 Average of Employees 45 35 120
20 Other (incident) 0 0 4
21 Number Of JHA (Job hazard analysis) 0 0 291
22 Total No of HSE inspections 23 23 396
23 Total No of Environmental inspections 0 0 64
24 Total No of Toolbox 0 0 18
25 Total No of Non-conformities 3 0 163
26 Total No of the fuel oil spend (ton) 7.5 3.5 212.5
27 Total No of the water spend (ton) 5.8 2.1 503.9
28 Total No of the garbage spend (ton) 3.1 1.5 27.9
29 Total No of the energy spend (kW) 12.000 5.000 140.486

Author: Arber Dogani Page 1 of 8


Project

Monthly Report No.23 TRANSMISSION LINE WORKS

Period: (01/06- 30/06)

Type of accident / Description of accident / incident Corrective Actions


incident

N/A N/A N/A

N/A N/A N/A

 HSE inspections have been done by Company HSE department.

 Company HSE department is maintained NON-CONFORMITY register up-to date for all the non-
conformities issues and Corrective actions taken.
 Company has applied weekly to DHP_HSE for the ( PtW Permit to work) for the, Stringing activities and
correction activities at Canyon Area the situation is clear.

 During this month we have finish stringing works at Canyon Area and during next month we purpose to finish
all the project.

 As we have promise to DHP we are sending via e-mail all the information’s of the places that we close the work
activities in order to DHP_HSE to make all the HSE Inspections that they need to do.

 Local employment is being done effectively. You can see chart as below. (Last Updated on 27/06/15 )

Company Local employment Total employment % Rate


Company 40 131 %8
Subcontractors 7 112 %6
Total 47 143 %10

*Some HSE issues of Company company during this month as below*

1. Behaviour safety report from Mr.Arber Dogani to Company Company during this month ,he report to Mr.Edison Barhani
for the worker that he wasn’t wear Climbing Helmet during the work at height.His Name: Palani Settu,company has give to
him final warning.

Author: Arber Dogani Page 2 of 8


Project

Monthly Report No.23 TRANSMISSION LINE WORKS

Period: (01/06- 30/06)

2. Another
issue during
this month was that one of Erection Group have leaving some garbage at the end of the works. For this issue during routine
HSE Inspections Mr.Arber Dogani HSE Officer has reported to DMP Mr. Edison Barhani this issue and during this week
Company Company has take corrective actions and has leave the place free of Garbage’s at Tower no:4.

Garbage at T4

Author: Arber Dogani Page 3 of 8


Project

Monthly Report No.23 TRANSMISSION LINE WORKS

Period: (01/06- 30/06)

Corrective actions after HSE Department reported this


issue to
Project

Manager

3.During this mont Company company has seen that at Tower No :77 Joint Box and 40 meters of OPGW was missing and for
this issue we have reported the Police.

Author: Arber Dogani Page 4 of 8


Project

Monthly Report No.23 TRANSMISSION LINE WORKS

Period: (01/06- 30/06)

4.Behaviour email is reported from Company HSE Lead to Project Manager during this week ;

‘’At Tower 64 some workers was working without mandatory PPE.

Author: Arber Dogani Page 5 of 8


Project

Monthly Report No.23 TRANSMISSION LINE WORKS

Period: (01/06- 30/06)

*SOME PHOTOS OF COMPANY HSE


INSPECTION*

Author: Arber Dogani Page 6 of 8


Project

Monthly Report No.23 TRANSMISSION LINE WORKS

Period: (01/06- 30/06)

Author: Arber Dogani Page 7 of 8


Project

Monthly Report No.23 TRANSMISSION LINE WORKS

Period: (01/06- 30/06)

Author: Arber Dogani Page 8 of 8