1. CIVIL/STRUCTURAL WORK
Page 2 to 7.
2. ARCHITECTURAL WORK
Page 8 to 18.
3. PLUMBING WORK
Page 19 to 28.
4. HVAC WORK
Page 29 to 41.
5. ELECTRICAL WORK
Page 42 to 55.
TOTAL AMOUNT
In Words :
Notes :
a.) All dismantled items / materials with value
and which are required to be re-used shall
be removed with care, protect from damage
and store in a place as instructed by the
Engineer.
3.1 CURBSTONE :
Including concrete bedding below curbstone.
Page Sub-total
FACILITY : MAIN BUILDING
3.5 LANDSCAPING :
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
FACILITY : MAIN BUILDING
6.0 CONCRETE :
Including formwork, reinforcement, sundries,
embedded items not included elsewhere,
waterstopper, other concreting materials and
accessories.
6.7 Reinforced concrete for elevator lift wall (LW1 & M3 113
LW2) above ground level.
Page Sub-total
FACILITY : MAIN BUILDING
7.6 Epoxy resin base, non toxic high build solvent M2 300
for all internal surfaces of water tanks.
Page Sub-total
Page Sub-total
FACILITY : MAIN BUILDING
4.0 INSULATION :
5.1.1.1 40mm thick Hard wood solid core door type D-1, Ea 62
with cherry wood veneer, single leaf, swing type
on hardwood door jamb. Provide door closer,
all fixing fittings and all necessary accessories.
(1.00 x 2.20m)
5.1.1.2 40mm thick Hard wood solid core door type D-2, Ea 16
with cherry wood veneer, double leaf, swing type
on hardwood door jamb. Provide door closer,
all fixing fittings and all necessary accessories.
(1.50 x 2.20m)
Page Sub-total
FACILITY : MAIN BUILDING
5.1.1.4 40mm thick Hard wood solid core door type D-4, Ea 21
with cherry wood veneer, with door grill, single
leaf, swing type on hardwood jamb. Provide all
fixing fittings and all necessary accessories.
(0.750 x 2.10m)
5.1.1.6 40mm thick hard wood solid core door type D-9, Ea 10
with cherry wood veneer, single leaf, swing type
on hardwood door jamb. Provide door closer, all
fixing fittings and all necessary accessories.
(0.90 x 2.20m)
Page Sub-total
FACILITY : MAIN BUILDING
6.0 WINDOWS:
Including glazing, painting, hardware,
attachment materials and accessories
complete as per drawing and schedule.
Checked actual clear dimension on site prior
to final fabrication and installation.
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
FACILITY : MAIN BUILDING
8.0 PARTITION
Including attachment materials, paint,
hardware and accessories.
9.0 PLASTERING:
Page Sub-total
FACILITY : MAIN BUILDING
10.0 FINISHES :
Page Sub-total
FACILITY : MAIN BUILDING
10.3 BASE:
10.5.1 350 x 250 x 6mm thick glazed ceramic wall tiles M2 1,050
Page Sub-total
FACILITY : MAIN BUILDING
12.0 PAINTING :
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
1.2 VALVES :
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
FACILITY : MAIN BUILDING
2.9 VALVES :
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
FACILITY : MAIN BUILDING
3.3 VALVES :
Page Sub-total
FACILITY : MAIN BUILDING
3.5 100mm dia. Truck fill point (G.I) with cap and Ea 1
chain including necessary non-return valve.
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
FACILITY : MAIN BUILDING
7.0 Same as above, but Sump pit, size 1.40 x 1.40 x Job 1
1.80m depth as per drawing.
Page Sub-total
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
FACILITY : MAIN BUILDING
Basement:
Page Sub-total
FACILITY : MAIN BUILDING
Ground floor:
First floor:
Second floor:
Third floor:
Page Sub-total
Page Sub-total
FACILITY : MAIN BUILDING
6.1 DIFFUSERS :
Page Sub-total
FACILITY : MAIN BUILDING
6.2 GRILLES:
Page Sub-total
FACILITY : MAIN BUILDING
6.3 LOUVERS:
Including 50mm thick aluminum filters and
accessories.
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
Branches:
2 - 630AT / 630AF, 3P, MCCB
1 - 300AT / 400AF, 3P, MCCB
1 - 250AT / 250AF, 3P, MCCB
4 - 150AT / 250AF, 3P, MCCB
1 - 250AT / 400AF, 3P, MCCB, tapped before
Main breaker as per drawing.
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
FACILITY : MAIN BUILDING
2.0 CABLING :
Supply, installation, testing and commissioning of
cables on wall, roof or ground with suitable G.S.
clamps, spacers, supports, conduits, cable
trays, grounding, trenching, end connections,
concreting etc. from their corresponding panel
boards. All are in accordance with the drawing
and specifications.
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total
FACILITY : MAIN BUILDING
Page Sub-total