_""
.....-...------~
- --
- -- -----
-- -- --- ---
----- -~
-.. -~~-
---- ---
---
--
Engineers & Contractors
Specialist: Head Office:
Mechanical, Electrical & Civil Construction Works. Flat # 8, 1st Floor, 2 Civic Centre,
Erection, Installation & Commissioning Works on Gas Fields, Moon Market, Faisal Town, Lahore.
Oil Refineries, Power Plants & Industrial Units. Tel # (92-42) 35162347
Fabrication of Steel Towers & Build Out RoofTop/Green Field Sites Fax. # (92-42) 35162394
E-mail: info@hariseng.com
Web: www.hariseng.com

Chenab Steel 'Iill Dall:d , ovcmlu r 10 ",17


f aisalabad. Rei II( I \111.

Attn: Engr. Tullah "Iunir

Subject:: PROPOSAL FOR PRE-FABRICATED STEEL STRUCTURE SHED

Dear Sir:

With reference to your Inquiry and detailed discussions regarding the above cited subject. We are submitting herewith our
proposal for your kind consideration. Details as follow:

Pre- Fabricated Shed alonw ith Ci\ il Foundation Works


As per drawings and specifications provided by the client.

I. Civ il Foundation Wod,s:


Total covered area 6379 sq It
Rate per sq. n. Rs. 250/- per sq n.
Total amount payable: Rs.I.594,750.00

1 Shed Structural Steel Fabrication Works


1uta I cox ered area 6379 sq ft.
RUle per sq ft. Rs.1615perfqft.
Fetal amount payable: Rs.IO,302,085.00

3. Shed Structural Steel trection Works


Total CO\ ered area 6379 sq ft
Rate per sq ft. Rs. 245 per fq It.
1 oral amount payable: Rs. 1.562.955.00

Total Amount Payable Civil works and Shed Structure Rs. 13,459,790.00

Delivery Schedule' Civil work and Supply of Shed Materials, fabrication in our workshop and erection at site
with in 3-4 months

Proposal Validity: till November 30, 2017

Force Majeure
The force majeure mean an event which IS non-preventable event and which IS entirely outside thc' dr .ct or Indirect centro! ( I
contractor rains. storm. strikes etc Such delays will Impact the construction schedule

Escalation Factor
Our Rates are based on current market prices. If any escalation in material prices raised by Fed/Prov//Sernl Govt. latter-on, the
client will compensate to the contractor for the increases made in the structure material prices and Civil items cement/sand/crush
etc

We hope that you will find our proposal most feasible/competitive in all respects. If you need any further information in this
regard pleas e contact us. Thanking you and assuring you our best services. We remain,
Best RefJard '/I<.~'.l~~~(\

Workshop: 2-KM Raiwind - Sundar Road, Chowk Burhanpura, Lahore. Tel # (92-42) 35394699 Cell: (92-300) 4002461