Union Hydropower Limited

Union Hydropower Limited was established on 2064 B.S. as a private limited


company by a highly esteemed team of Professionals. It went on being public
Limited Company on 30th Falgun, 2072 with an aim to foster potential hydropower
sector of Nepal. Our central office located in Lalitpur -3, Dhobighat easily
accessible and open during office hours 6 days a week. The authorized capital of
our Company is NRs. 1000 million & issued capital is NRs. 750 million. Our
Company has more than 700 shareholders.

This company has developed its first project in Lamjung district. Midim khola
(Karapu) 3MW project is on the verse of operation is financed by Sanima Bank and
Sunrise Bank Ltd. Hydro Consult Engineering Pvt. Ltd. (HCE) is the Design
Consultant. High Himalaya Hydro construction, Cream Hydel Pvt. Ltd, Qiankang
Allonward Hydro-Equipment CO. Pvt. Ltd are the Civil, Hydro-Mechanical and
Electro-Mechanical contractor respectively.

Features/Projects Midim Khola HEP Mewa Khola HEP Hongu Khola HEP Upper Tamor A HEP
Q35=17.26,Q40=14.36
Design Discharge(m3/s) Q40=7.3 Q40=3.16 Q40=11.41
, Q45=11.49
Gross Head (m) 51.48 875 330 800
Q35=108,@Q40=90,
Installed Capacity (MW) 3 23 29.6
@Q45=72
Q35=592,@Q40=525,
Energy(GWh) 16.8 135.6 172.5
@Q45=459
Project Cost (NRs Million) 800 4894 6789 14113
Location Lamjung Taplejung Solukhumbu Taplejung
Construction Feasibility Study Feasibility Study Feasibility Study
Status
Completed going on going on going on
Hydro Consult
Swachchha Urja
Consultant Engineering Pvt. Feedback Nepal
Bikash Pvt. Ltd
Ltd. (HCE)

Union Hydropower Limited. Email: unionhppl@gmail.com


Lalitpur-3, Dhobighat, Nepal. Post Box No. 12637, Kathmandu
Tel: +977 1 5525406 Web site: http://www.unionhydropower.com.np