This company has developed its first project in Lamjung district. Midim khola
(Karapu) 3MW project is on the verse of operation is financed by Sanima Bank and
Sunrise Bank Ltd. Hydro Consult Engineering Pvt. Ltd. (HCE) is the Design
Consultant. High Himalaya Hydro construction, Cream Hydel Pvt. Ltd, Qiankang
Allonward Hydro-Equipment CO. Pvt. Ltd are the Civil, Hydro-Mechanical and
Electro-Mechanical contractor respectively.
Features/Projects Midim Khola HEP Mewa Khola HEP Hongu Khola HEP Upper Tamor A HEP
Q35=17.26,Q40=14.36
Design Discharge(m3/s) Q40=7.3 Q40=3.16 Q40=11.41
, Q45=11.49
Gross Head (m) 51.48 875 330 800
Q35=108,@Q40=90,
Installed Capacity (MW) 3 23 29.6
@Q45=72
Q35=592,@Q40=525,
Energy(GWh) 16.8 135.6 172.5
@Q45=459
Project Cost (NRs Million) 800 4894 6789 14113
Location Lamjung Taplejung Solukhumbu Taplejung
Construction Feasibility Study Feasibility Study Feasibility Study
Status
Completed going on going on going on
Hydro Consult
Swachchha Urja
Consultant Engineering Pvt. Feedback Nepal
Bikash Pvt. Ltd
Ltd. (HCE)