Вы находитесь на странице: 1из 10

Project.

Solved by …..
Ahmed saad abd elhamid
Level 3

1
Project.1
Find the unknown parametres ( diameter, discharge, F , K) in the given pipeline shown in
figure. All pipes are new cast iron with the following available data. Pipe J 2X is designed to
develop maximum power at the end X. Find also the nozzel diametr at X. The elevation of
pipe at T = (72.00) and pressure head of 30m and elevation at X= (48.00). if the elevation at
H = (43.00) Find the pressur at H. Calculate the pump head hence calculate the pump HP
in KW

2
Project.1
Firstly …
I will start with the final loop (RSTU)
I will assume the Q and then get
The velocity by
V=Q/A
Then get Re number
Re=(V*D)/v
And from mody chart we get the friction
factor F .
Then get K
K=8FL/G(D^5)(𝜋^2)
To make iteration in this table

3
Project.1
PIPE Q D A V RE MODY F K K*Q K*Q^2 KQ L KQQ NQ
RS 0.35 0.3 0.07875 4.444444 1333333 0.008667 0.031 635.3086 222.358 77.82531 238.4015 600 79.49998 -0.16674
ST 0.05 0.3 0.07875 0.634921 190476.2 0.008667 0.032 437.2016 21.86008 1.093004 400
RT -0.1 0.5 0.19625 -0.50955 -254777 0.0052 0.03 58.1664 -5.81664 0.581664 730
0
RT 0.1 0.5 0.19625 0.509554 254777.1 0.0052 0.03 58.1664 5.81664 0.581664 -3184.5 730 214.566 0.033689
RU -0.15 0.2 0.0314 -4.77707 -955414 0.013 0.035 3631.25 -544.688 81.70313 400
UT -0.05 0.2 0.0314 -1.59236 -318471 0.013 0.34 52912.5 -2645.63 132.2813 600

Another iteration

PIPE Q D A V RE MO F K K*Q K*Q KQ L KQQ NQ


DY ^2
RS 0.19 0.3 0.07 2.41 723 0.00 0.03 717. 136. 25.8 75.6 600 35.0 -
875 269 809. 866 5 284 284 939 377 952 0.23
8 5 7 5 7 7 2
ST - 0.3 0.07 - - 0.00 0.03 423. - 5.12 400
0.11 875 1.39 419 866 1 539 46.5 482
683 048 7 1 893 3
RT - 0.5 0.19 - - 0.00 0.02 48.4 - 4.07 730
0.29 625 1.47 738 52 5 72 14.0 649
771 854 569 5
0
RT 0.29 0.5 0.19 1.47 738 0.00 0.02 48.4 14.0 4.07 - 730 79.7 0.02
625 770 853. 52 5 72 568 649 165 725 411
7 5 8 5 4.24 1
RU - 0.2 0.03 - - 0.01 0.03 352 - 50.7 400
0.12 14 3.82 764 3 4 7.5 423. 96
166 331 3
UT - 0.2 0.03 - - 0.01 0.04 622 - 24.9 600
0.02 14 0.63 127 3 50 124
694 389 5

4
Project.1

We now get K for RT and we have a


head at point T and we have K of J2R
Q=.6 cms V=1.9 m/s Re =1.1*10^6
K=20.4
so we can get the head at point J by
this equation
Hj = Ht +KQ^2(J2R)+KQ^2(RT)
Hj = 102 +7.35+4.07=113.42m
We have ahead of point D =100 m
So H(loss between J2 and D) =Hj2 – Hd
Hl = 113.42-100=13.42 m
When Hl =(F *L* V^2)/(D * 2 *g)
5
Project.1
We assume the flow is fully turbulent so
F=.017
V=((H*D*2*g)/(F*L))^.5 =2.35 m/s
Then
Re =1.4 *10^6 F =.019
V = 2.24 m/s
Q =A* V =.706 cms
The pipe (J2 X) we know the elevation
at point X =48 m and the total head at
J2 is 113.42 m so the bernoly equation
is
113.42 =Hf +Hn +48
61.42 = 1.5 Hn
61.42 = 1.5 ((V^2)/ 2*g) Vn=28.3m/s

6
Project.1
An* Vn =Ap * Vp =Q =.45 cms
An=.015 sm Dn =.13 sm
Hf=KQ^2=20.6*F/D^5=.5*Vn^2/19.6
=20.4m when F=.02 D=.45m
The flow rate in FJ2 is
=.6+.45+.706=1.756 cms
So the the flow rate in J1E is
1.756+.4+.5+.6= 3.256 cms
The first iteration in tow loops EFGI
&GHI

7
Project.1

The second iteration is

Then the the head at H is


HJ2-KQ^2(J2F)-KQ^2(FG)-KQ^2(GH)=
113.42-1.9-62.7-3.1=45.73m
The preasure head at point H is 2.73 m

8
Project.1
The head at J1 =113.42-1.9-6.4-1.7=
103.42m
The head loss between J1 and
103.42-70 =33.42 m
HL =F L V^2 /(D *2g) assume fully
turbulent F=.031
V=(.36/F)^.5=3.4m/s
Re=1.3*10^6 F=.03 V=3.4m/s
The head loss between J1&B is 16.58 m
V=(.22/F)^.5 fully turbulent F=.032
V=2.6 m/s Re =988000 F =.031
V=2.6m/s
The HP =103.42-60-1.5=41.9m

9
Project.1
POWER PUMP
=9800*41.9*3.9=1601418=1601.4KW

10

Вам также может понравиться