Академический Документы
Профессиональный Документы
Культура Документы
Solved by …..
Ahmed saad abd elhamid
Level 3
1
Project.1
Find the unknown parametres ( diameter, discharge, F , K) in the given pipeline shown in
figure. All pipes are new cast iron with the following available data. Pipe J 2X is designed to
develop maximum power at the end X. Find also the nozzel diametr at X. The elevation of
pipe at T = (72.00) and pressure head of 30m and elevation at X= (48.00). if the elevation at
H = (43.00) Find the pressur at H. Calculate the pump head hence calculate the pump HP
in KW
2
Project.1
Firstly …
I will start with the final loop (RSTU)
I will assume the Q and then get
The velocity by
V=Q/A
Then get Re number
Re=(V*D)/v
And from mody chart we get the friction
factor F .
Then get K
K=8FL/G(D^5)(𝜋^2)
To make iteration in this table
3
Project.1
PIPE Q D A V RE MODY F K K*Q K*Q^2 KQ L KQQ NQ
RS 0.35 0.3 0.07875 4.444444 1333333 0.008667 0.031 635.3086 222.358 77.82531 238.4015 600 79.49998 -0.16674
ST 0.05 0.3 0.07875 0.634921 190476.2 0.008667 0.032 437.2016 21.86008 1.093004 400
RT -0.1 0.5 0.19625 -0.50955 -254777 0.0052 0.03 58.1664 -5.81664 0.581664 730
0
RT 0.1 0.5 0.19625 0.509554 254777.1 0.0052 0.03 58.1664 5.81664 0.581664 -3184.5 730 214.566 0.033689
RU -0.15 0.2 0.0314 -4.77707 -955414 0.013 0.035 3631.25 -544.688 81.70313 400
UT -0.05 0.2 0.0314 -1.59236 -318471 0.013 0.34 52912.5 -2645.63 132.2813 600
Another iteration
4
Project.1
6
Project.1
An* Vn =Ap * Vp =Q =.45 cms
An=.015 sm Dn =.13 sm
Hf=KQ^2=20.6*F/D^5=.5*Vn^2/19.6
=20.4m when F=.02 D=.45m
The flow rate in FJ2 is
=.6+.45+.706=1.756 cms
So the the flow rate in J1E is
1.756+.4+.5+.6= 3.256 cms
The first iteration in tow loops EFGI
&GHI
7
Project.1
8
Project.1
The head at J1 =113.42-1.9-6.4-1.7=
103.42m
The head loss between J1 and
103.42-70 =33.42 m
HL =F L V^2 /(D *2g) assume fully
turbulent F=.031
V=(.36/F)^.5=3.4m/s
Re=1.3*10^6 F=.03 V=3.4m/s
The head loss between J1&B is 16.58 m
V=(.22/F)^.5 fully turbulent F=.032
V=2.6 m/s Re =988000 F =.031
V=2.6m/s
The HP =103.42-60-1.5=41.9m
9
Project.1
POWER PUMP
=9800*41.9*3.9=1601418=1601.4KW
10