Вы находитесь на странице: 1из 4

Rates of work at 132 KV GSS

Rate (in Work done


Sr. No. Activity Unit
INR) at GSS
Description
1 132kV BPI Nos. 1,200.00 0.00
2 33kV BPI Nos. 700 21
3 132kV CVT Nos. 2,200.00 0.00
132kV LA including surge
4 Nos. 1,900.00 0.00
monitor
Moose conductor stringing
5 Meter 50 0
132Kv
Moose conductor stringing
6 Meter 50 480
33Kv
7 Connectors of all type & sizes Nos. 200 63

Installation & connection of


complete Earthing grid
8 including excavation & Meter 50 0
backfilling (including MS Rods,
GI Flats of various sizes)

9 LA structure 33kV Nos. 1,200.00 3.00

10 BPI Structure 33kV Nos. 1,200.00 3.00

Structure Fabrication (cutting,


11 Nos. 28 0
hole punching, welding, etc.)

12 HF Cable Laying & Termination Meter 6 0

Power Cable Laying &


13 Meter 14 0
Termination
132kV Control Relay Panels
14 shifting, mounting and Nos. 5,000 0
commissioning
33kV Control Relay Panels
15 shifting, mounting and Nos. 4,500 0
commissioning

AC DB shifting, mounting and


16 Nos. 4,500 0
commissioning
DC DB shifting, mounting and
17 Nos. 4,500 0
commissioning

PLCC panel shifting, mounting


18 Nos. 3,000 0
and commissioning
Complete installation of disc
19 insulator string (1x11) with Nos. 1,500.00 0.00
hardware fittings 132Kv

Complete installation of disc


20 insulator string (1x5) with Nos. 750.00 39.00
hardware fittings 33Kv
33kV BMK shifting and
21 Nos. 1,500.00 0.00
mounting
22 132kV LA dismantling Nos. 1,200.00 0.00
23 33kV A-Frame Nos. 5,500 7
24 B1 Beam Nos. 8,500 0
25 T16 Tower Nos. 5,500 0
Excavation, Installation of PVC
26 pipes of various sizes and Meter 30 0
backfilling
Total Amount
Total Amount
0.00
14,700.00
0.00
0.00

0.00

24,000.00
12,600.00

0.00

3,600.00

3,600.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

29,250.00

0.00

0.00
38,500.00
0.00
0.00

0.00

0.00
126,250.00