8.1 Questions
2) Spending less than budgeted for maintenance costs will result in a(n) ________ variance. When actual
revenues exceed budgeted revenues, this results in a(n) ________ variance.
A) unfavorable; unfavorable
B) unfavorable; favorable
C) favorable; unfavorable
D) favorable; favorable
Answer: D
Diff: 2
LO: 8-1
AACSB: Reflective thinking skills
Learning Outcome: Discuss standard costing and variance analysis
4) If actual expenses are less than expected expenses, the expense variance will be unfavorable.
Answer: FALSE
Diff: 2
LO: 8-1
AACSB: Analytic skills
Learning Outcome: Discuss standard costing and variance analysis
1
Copyright © 2014 Pearson Education
5) A favorable expense variance is when budgeted expenses are less than actual expenses.
Answer: FALSE
Diff: 2
LO: 8-1
AACSB: Analytic skills
Learning Outcome: Discuss standard costing and variance analysis
8.2 Questions
3) The static budget is based on the ________ level of output and the flexible budget is based on the
________ level of output.
A) actual; expected
B) expected; actual
C) expected; planned
D) actual; projected
Answer: B
Diff: 2
LO: 8-2
AACSB: Reflective thinking skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
2
Copyright © 2014 Pearson Education
4) A static budget is prepared for one expected level of activity.
Answer: TRUE
Diff: 1
LO: 8-2
AACSB: Reflective thinking skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
7) A flexible budget adjusts for changes in sales volume and other cost-drivers.
Answer: TRUE
Diff: 1
LO: 8-2
AACSB: Reflective thinking skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
8.3 Questions
3
Copyright © 2014 Pearson Education
2) When preparing a flexible budget income statement, ________ costs are constant at different levels of
activity.
A) variable
B) step
C) contributed
D) fixed
Answer: D
Diff: 2
LO: 8-3
AACSB: Reflective thinking skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
In the flexible budget at 10,000 units, what is the total manufacturing cost?
A) $250,000
B) $420,000
C) $520,000
D) $700,000
Answer: B
Diff: 2
LO: 8-3
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
4
Copyright © 2014 Pearson Education
5) Perez Company had the following information available:
In the flexible budget at 15,000 units, what is the total manufacturing cost?
A) $480,000
B) $580,000
C) $680,000
D) $780,000
Answer: B
Diff: 2
LO: 8-3
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
6) Huntsman Company's variable selling and administrative expenses are $48,000 at a production level of
6,000 units. If the production level is 8,000 units, what are the variable selling administrative expenses?
A) $48,000
B) $56,000
C) $64,000
D) $80,000
Answer: C
Diff: 1
LO: 8-3
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
5
Copyright © 2014 Pearson Education
8) A company that has an activity-based costing system with multiple cost drivers will prepare a(n)
________ budget.
A) financial planning
B) short-range planning
C) activity-based flexible
D) strategic
Answer: C
Diff: 2
LO: 8-3
AACSB: Reflective thinking skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
9) When should a company use an activity-based flexible budget with multiple cost drivers instead of a
simple flexible budget with one cost driver?
A) when a significant portion of costs vary with only one cost driver
B) when a significant portion of costs vary with the number of units of output
C) when a significant portion of costs vary with the number of units of sales
D) when a significant portion of costs vary with cost drivers other than units of output
Answer: D
Diff: 2
LO: 8-3
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
10) Perez Company uses activity-based costing. The company is trying to estimate the costs of the
processing activity in the factory. The company has developed the following flexible budget formula:
Y = $10.50X + $13,000
Where: Y = Total processing cost per quarter and X = Number of machine hours
If 10,000 machine hours are used next quarter, total variable costs are ________ and total fixed costs are
________.
A) $105,000; $13,000
B) $105,000; $130,000,000
C) $113,000; $130,000,000
D) $10.50; $13,000
Answer: A
Diff: 2
LO: 8-3
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
6
Copyright © 2014 Pearson Education
11) Garcia Company planned to produce 12,000 units. This level of activity required 40 setups at a cost of
$18,000 plus $500 per setup. Actual production was 10,000 units, requiring 15 setups. Actual setup cost
was $26,000. What is the static budget amount for total setup costs?
A) $21,000
B) $25,500
C) $26,000
D) $38,000
Answer: D
Diff: 2
LO: 8-3
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
12) Sanchez Company planned to produce 12,000 units. This level of activity required 20 setups at a cost
of $22,000 plus $500 per setup. Actual production was 10,000 units, requiring 15 setups. Actual setup cost
was $26,000. At 10,000 units, what is the flexible budget amount for total setup costs?
A) $7,500
B) $22,000
C) $26,000
D) $29,500
Answer: D
Diff: 2
LO: 8-3
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
7
Copyright © 2014 Pearson Education
13) Fill in the blanks to complete the flexible budget for Mammoth Company. Assume the different levels
of output are in the relevant range.
____________________________________________________________
Budget Various Levels of Output
Formula
Per Unit
Units 3,000 4,000 5,000
Sales $25 _____ _____ _____
Variable costs:
Manufacturing _____ _____ $32,000 _____
Administrative $2.625 _____ _____ _____
Fixed costs:
Manufacturing _____ _____ $25,000
Administrative $12,500 _____ _____
8
Copyright © 2014 Pearson Education
14) Use the following data to prepare a flexible budget for possible production levels of 5,000, 5,500 and
6,000 units. Assume all levels of production are in the same relevant range.
8.4 Questions
1) The activity-level variance for fixed costs equals zero when ________.
A) the actual level of output equals the static budget level of output
B) the actual level of output is greater than the static budget level of output
C) the actual level of output is less than the static budget level of output
D) all of the above
Answer: D
Diff: 3
LO: 8-4
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
9
Copyright © 2014 Pearson Education
2) In the relevant range, the sales-activity variance for fixed costs is always ________.
A) greater than the flexible budget variance
B) less than the flexible budget variance
C) greater than the static budget variance
D) zero
Answer: D
Diff: 3
LO: 8-4
AACSB: Reflective thinking skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
3) The static budget variance is the difference between the ________ and the ________.
A) amounts for the flexible budget; amounts for the static budget
B) flexible budget variance; activity level variance
C) actual results; amounts for the static budget
D) actual results; amounts for the flexible budget
Answer: C
Diff: 2
LO: 8-4
AACSB: Reflective thinking skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
4) The static budget variance is equal to the sum of ________ and ________.
A) direct materials variance; direct labor variance
B) fixed overhead variance; variable overhead variance
C) flexible budget variance; activity-level variance
D) direct materials price variance; direct materials quantity variance
Answer: C
Diff: 2
LO: 8-4
AACSB: Reflective thinking skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
10
Copyright © 2014 Pearson Education
5) Kilsdonk Company has the following information available:
The cost driver of product costs is units of output. What is the static budget variance for direct material
costs?
A) $20,000 Unfavorable
B) $20,000 Favorable
C) $60,000 Favorable
D) $60,000 Unfavorable
Answer: C
Diff: 2
LO: 8-4
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
The cost driver of product costs is units of output. What is the flexible budget variance for direct material
costs?
A) $20,000 Unfavorable
B) $20,000 Favorable
C) $60,000 Favorable
D) $60,000 Unfavorable
Answer: A
Diff: 2
LO: 8-4
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
11
Copyright © 2014 Pearson Education
7) Corrao Company had a static budgeted operating income of $8.6 million. Actual operating income was
$6.4 million. The flexible budget operating income at the actual level of output is $7,000,000. What is the
static-budget variance of operating income?
A) $1.6 million Favorable
B) $1.6 million Unfavorable
C) $2.2 million Favorable
D) $2.2 million Unfavorable
Answer: D
Diff: 2
LO: 8-4
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
8) For the current year, LeBombard Company's static budget sales were $225,000. Actual sales for the
current year were $220,000. Actual sales last year were $219,000. Expected sales last year were $225,000.
What is the static budget variance for sales in the current year?
A) $5,000 Favorable
B) $5,000 Unfavorable
C) $6,000 Favorable
D) $6,000 Unfavorable
Answer: B
Diff: 2
LO: 8-4
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
9) Differences between the actual results and the flexible budget at the actual level of output achieved are
________ variances.
A) static budget
B) activity budget
C) flexible budget
D) operating budget
Answer: C
Diff: 2
LO: 8-4
AACSB: Reflective thinking skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
12
Copyright © 2014 Pearson Education
10) Conner Company has the following information:
Assume units of output are the cost driver for product costs. What is the static budget variance for
operating income?
A) $11,000 Unfavorable
B) $12,000 Unfavorable
C) $23,000 Unfavorable
D) $23,000 Favorable
Answer: C
Diff: 2
LO: 8-4
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
Assume the cost driver of product costs is units of production. What is the flexible budget variance for
operating income?
A) $5,000 Unfavorable
B) $11,000 Unfavorable
C) $16,000 Unfavorable
D) $16,000 Favorable
Answer: C
Diff: 2
LO: 8-4
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
13
Copyright © 2014 Pearson Education
12) Assume sales are the cost driver for product costs. The difference between the static budget amount
for sales and the flexible budget amount for sales at the actual level of sales is called the ________. The
difference between the flexible budget amount for sales at the actual level of sales and the actual amount
for sales is called the ________.
A) static variance; flexible budget variance
B) master variance; flexible budget variance
C) quantity variance; static budget variance
D) sales activity variance; flexible budget variance
Answer: D
Diff: 2
LO: 8-4
AACSB: Reflective thinking skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
13) Differences between actual results and the static budget at the original planned level of output are
________ variances.
A) flexible budget
B) financial budget
C) operating budget
D) static budget
Answer: D
Diff: 2
LO: 8-4
AACSB: Reflective thinking skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
14) Flexible budget variances are the deviations of actual results from the ________.
A) flexible budget amounts for the achieved level of activity
B) flexible budget amounts for the static level of activity
C) static budget amounts for the expected level of activity
D) static budget amounts for last year's level of activity
Answer: A
Diff: 2
LO: 8-4
AACSB: Reflective thinking skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
15) The amount of actual operating income may differ from the static budget amount for operating
income because ________.
A) actual output levels were not the same as in the static budget
B) actual variable costs were higher than expected variable costs
C) actual fixed costs were higher than expected fixed costs
D) all of the above
Answer: D
Diff: 2
LO: 8-4
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
14
Copyright © 2014 Pearson Education
16) Which is NOT a reason for a static budget variance?
A) Actual sales volume was higher than projected sales volume.
B) Actual variable costs were higher than static budget variable costs.
C) Actual fixed costs were higher than static budget fixed costs.
D) Actual sales volume in current period was higher than projected sales volume in last period.
Answer: D
Diff: 2
LO: 8-4
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
17) If sales are the cost driver, unfavorable flexible budget variances result from ________.
A) actual costs exceeding planned costs
B) planned costs exceeding actual costs
C) actual sales exceeding planned sales
D) planned sales exceeding actual sales
Answer: A
Diff: 2
LO: 8-4
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
18) Flexible budget variances are the difference between the actual results and ________.
A) the static budget for the planned level of output
B) the flexible budget for the planned level of output
C) the flexible budget for the actual level of output
D) the master budget for the planned level of output
Answer: C
Diff: 2
LO: 8-4
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
15
Copyright © 2014 Pearson Education
19) The following data are for Pablo Corporation:
16
Copyright © 2014 Pearson Education
21) The following data are for Sandy Corporation:
22) If the flexible budget variance was $6,000 Favorable and the sales activity variance was $3,000
Favorable, then the static budget variance was ________.
A) $3,000 Favorable
B) $3,000 Unfavorable
C) $9,000 Favorable
D) $9,000 Unfavorable
Answer: C
Diff: 2
LO: 8-4
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
23) Who is usually responsible for sales activity variances for income?
A) operating managers in factory
B) marketing managers
C) research and development function
D) product design function
Answer: B
Diff: 2
LO: 8-4
AACSB: Reflective thinking skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
17
Copyright © 2014 Pearson Education
24) If the sales activity variance was $8,000 Favorable and the static budget variance was $10,000
Favorable, then the flexible budget variance was ________.
A) $2,000 Favorable
B) $2,000 Unfavorable
C) $18,000 Favorable
D) $18,000 Unfavorable
Answer: A
Diff: 2
LO: 8-4
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
25) The sales activity variance for ________ will always be zero.
A) sales
B) contribution margin
C) variable costs
D) fixed costs
Answer: D
Diff: 2
LO: 8-4
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
26) Brad Company planned to produce 12,000 units. This level of production required 20 setups at a cost
of $18,000 plus $500 per setup. Actual production was 10,000 units, requiring 15 setups. Actual setup cost
was $26,000. What is the static budget variance for setup costs?
A) $2,000 Favorable
B) $2,000 Unfavorable
C) $2,500 Favorable
D) $2,500 Unfavorable
Answer: A
Diff: 2
LO: 8-4
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
27) Leshan Company planned to produce 12,000 units. This level of production required 20 setups at a
cost of $18,000 plus $500 per setup. Actual production was 10,000 units, requiring 15 setups. Actual setup
cost was $26,000. What is the flexible budget variance for setup costs?
A) $500 Favorable
B) $500 Unfavorable
C) $2,000 Favorable
D) $2,000 Unfavorable
Answer: B
Diff: 3
LO: 8-4
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
18
Copyright © 2014 Pearson Education
28) Which statement would NOT be a reason for a flexible budget variance?
A) Material prices were different than expected.
B) Labor prices were different than expected.
C) Actual volume of activity was different than expected.
D) Amount of labor used per unit of output was different than expected.
Answer: C
Diff: 3
LO: 8-4
AACSB: Analytic skills
Learning Outcome: Discuss standard costing and variance analysis
29) Total static budget variances are equal to the sum of activity-level variances and flexible budget
variances.
Answer: TRUE
Diff: 3
LO: 8-4
AACSB: Reflective thinking skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
30) The static budget variance is the difference between actual results and the static budget for the
original planned level of output.
Answer: TRUE
Diff: 2
LO: 8-4
AACSB: Reflective thinking skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
31) If the total sales-activity variance and the static-budget variance are equal, there is no flexible budget
variance.
Answer: TRUE
Diff: 2
LO: 8-4
AACSB: Reflective thinking skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
19
Copyright © 2014 Pearson Education
32) The following data are for the month of January for the Soloway Company. Assume the cost driver is
the number of units sold.
Actual results:
Sales of 9,600 pairs at $87 per pair
Variable costs of $72 per pair
Total fixed costs $109,200
Required:
A) What is the static budget operating income?
B) What is the sales activity variance for operating income?
C) What is the flexible budget variance for operating income?
Answer:
Actual Flexible Budget Static Budget
Sales $835,200 $864,000 $810,000
Variable costs 691,200 662,400 621,000
Fixed costs 109,200 108,000 108,000
Operating income $34,800 $93,600 $81,000
A) $81,000
B) $12,600 Favorable
C) $58,800 Unfavorable
Diff: 2
LO: 8-4
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
20
Copyright © 2014 Pearson Education
33) Sunday Corporation prepared the following performance report for variable overhead costs for the
last quarter of the year. Machine hours are the cost driver for all overhead costs.
Static
Cost Driver(Machine Hours) Actual Budget
Variable Overhead Costs: 38,000 35,000 Variances
Utilities $15,700 $14,000 $1,700 U
Indirect Labor 86,500 80,500 6,000 U
Supplies 26,000 21,000 5,000 U
Maintenance 44,900 42,000 2,900 U
Total Variable Overhead Costs $173,100 $157,500 $15,600 U
The cost formulas used for the variable overhead costs are:
Your boss called you into the office and reprimanded you for the unfavorable variances. The boss says
you are fired unless you can explain why the variances are all unfavorable.
Required:
Calculate the flexible budget variances and the activity-level variances for each cost.
Answer:
Flexible Activity
Budget Flexible Level Static
Actual Variances Budget Variances Budget
Utilities $15,700 $500 U $15,200 $1,200 U $14,000
Indirect Labor 86,500 900 F 87,400 6,900 U 80,500
Supplies 26,000 3,200 U 22,800 1,800 U 21,000
Maintenance 44,900 700 F 45,600 3,600 U 42,000
Total $173,100 $2,100 U $171,000 $13,500 U $157,500
Diff: 3
LO: 8-4
AACSB: Analytic skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
21
Copyright © 2014 Pearson Education
34) Differentiate between a static budget variance and a flexible budget variance.
Answer: A static budget variance is the difference between the originally planned (static) amount and the
actual amount. In the case of sales, the static budget variance for sales is the difference between sales at
the planned level of operations and sales at the actual level of operations.
A flexible budget variance is the difference between the actual amount and the amount that is expected
for the actual level of output achieved. In the case of sales, the flexible budget variance is the difference
between sales at the actual level of operations and expected sales at the actual level of operations.
Diff: 3
LO: 8-4
AACSB: Reflective thinking skills
Learning Outcome: Prepare a flexible budget and discuss the interpretation and use of flexible budgets
8.5 Questions
1) One variance often influences another variance. If the direct materials price variance is favorable, then
it is possible that this variance will cause ________.
A) the direct materials quantity variance to be unfavorable
B) the direct labor price variance to be unfavorable
C) the direct labor price variance to be favorable
D) the direct materials quantity variance to be favorable
Answer: A
Diff: 2
LO: 8-5
AACSB: Reflective thinking skills
Learning Outcome: Discuss standard costing and variance analysis
3) Purple Rain Company planned to sell 35,000 units. Actual sales were 30,000 units. Based on this
information, Blue Company was ________.
A) efficient
B) inefficient
C) effective
D) ineffective
Answer: D
Diff: 1
LO: 8-5
AACSB: Analytic skills
Learning Outcome: Discuss standard costing and variance analysis
22
Copyright © 2014 Pearson Education
4) Yellow Cake Company planned to produce and sell 900 units at a total cost of $180,000. Actual
production and sales were 900 units at a cost of $170,000. The company was ________.
A) efficient and ineffective
B) inefficient and ineffective
C) inefficient and effective
D) efficient and effective
Answer: D
Diff: 1
LO: 8-5
AACSB: Analytic skills
Learning Outcome: Discuss standard costing and variance analysis
5) ________ is the degree to which an organization minimizes the ________ used to achieve an objective.
A) Efficiency; costs
B) Efficiency; resources
C) Effectiveness; resources
D) Effectiveness; costs
Answer: B
Diff: 2
LO: 8-5
AACSB: Reflective thinking skills
Learning Outcome: Discuss standard costing and variance analysis
6) When a firm meets a sales goal, it is said to be ________. When a firm incurs more direct material costs
to manufacture products than expected, the firm is said to be ________.
A) effective; ineffective
B) efficient; inefficient
C) effective; inefficient
D) efficient; ineffective
Answer: C
Diff: 2
LO: 8-5
AACSB: Analytic skills
Learning Outcome: Discuss standard costing and variance analysis
7) A favorable materials price variance can affect all of the following variances except ________.
A) labor rate variance
B) labor efficiency variance
C) materials quantity variance
D) flexible budget variance for direct materials
Answer: A
Diff: 2
LO: 8-5
AACSB: Analytic skills
Learning Outcome: Discuss standard costing and variance analysis
23
Copyright © 2014 Pearson Education
8) Which of the following statements about perfection standards is TRUE?
A) It is generally believed that they have a negative influence on employee morale.
B) They are expressions of the most efficient performance possible.
C) They usually result in unfavorable variances.
D) All of the above
Answer: D
Diff: 2
LO: 8-5
AACSB: Reflective thinking skills
Learning Outcome: Discuss standard costing and variance analysis
12) Sales-activity variances measure how efficient managers have been in meeting the planned sales goal.
Answer: FALSE
Diff: 2
LO: 8-5
AACSB: Reflective thinking skills
Learning Outcome: Discuss standard costing and variance analysis
24
Copyright © 2014 Pearson Education
13) Perfection standards and ideal standards are different.
Answer: FALSE
Diff: 2
LO: 8-5
AACSB: Reflective thinking skills
Learning Outcome: Discuss standard costing and variance analysis
14) Ideal standards make no provision for waste, spoilage and machine breakdowns.
Answer: TRUE
Diff: 2
LO: 8-5
AACSB: Reflective thinking skills
Learning Outcome: Discuss standard costing and variance analysis
16) As the terms are used in the budgeting process, it is possible for a company to be efficient at the same
time it is ineffective.
Answer: TRUE
Diff: 2
LO: 8-5
AACSB: Reflective thinking skills
Learning Outcome: Discuss standard costing and variance analysis
18) Currently attainable standards do not make allowances for spoilage and waste.
Answer: FALSE
Diff: 2
LO: 8-5
AACSB: Reflective thinking skills
Learning Outcome: Discuss standard costing and variance analysis
25
Copyright © 2014 Pearson Education
19) Currently attainable standards are levels of performance that can be achieved by realistic levels of
effort.
Answer: TRUE
Diff: 2
LO: 8-5
AACSB: Reflective thinking skills
Learning Outcome: Discuss standard costing and variance analysis
20) The unfavorable variances resulting from ideal standards are intended to constantly remind
personnel of the continuous need for improvement.
Answer: TRUE
Diff: 2
LO: 8-5
AACSB: Reflective thinking skills
Learning Outcome: Discuss standard costing and variance analysis
21) One of the first questions a manager should consider when explaining a large variance is whether
expectations are valid.
Answer: TRUE
Diff: 2
LO: 8-5
AACSB: Reflective thinking skills
Learning Outcome: Discuss standard costing and variance analysis
22) In most companies, variances are investigated only if they exceed a minimum dollar amount or
percentage deviation from budgeted amounts.
Answer: TRUE
Diff: 2
LO: 8-5
AACSB: Reflective thinking skills
Learning Outcome: Discuss standard costing and variance analysis
26
Copyright © 2014 Pearson Education
8.6 Questions
27
Copyright © 2014 Pearson Education
3) The following information is presented for the Marathon Manufacturing Company.
— Direct labor rate standard is $11.55.
— Direct labor efficiency standard is 2.5 hours per unit.
— Budgeted production is 1,200 units.
— Production required 2,910 direct labor hours at a cost of $33,174.
— Actual production is 1,150 units.
What is the direct labor price variance?
A) $172.50 Favorable
B) $180.00 Unfavorable
C) $436.50 Favorable
D) $435.50 Unfavorable
Answer: C
Diff: 2
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
28
Copyright © 2014 Pearson Education
6) Johnsen Company reported a flexible budget variance for direct labor of $8,000 Favorable for the
current year. If the direct labor price variance was $2,000 Unfavorable, what was the direct labor
efficiency variance?
A) $6,000 Unfavorable
B) $6,000 Favorable
C) $10,000 Favorable
D) $10,000 Unfavorable
Answer: C
Diff: 2
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
7) Christian Company reported a flexible budget variance for direct materials costs of $10,000 Favorable
for the current year. If the direct materials price variance was $2,000 Favorable, what was the direct
materials quantity variance?
A) $8,000 Unfavorable
B) $8,000 Favorable
C) $12,000 Favorable
D) $12,000 Unfavorable
Answer: B
Diff: 2
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
8) A company has the following information available about one of its products:
29
Copyright © 2014 Pearson Education
9) A company has the following information available about one of its products:
10) Beckowski Company had the following information available for its specialty product:
If the Direct Materials Price Variance is $4,600 Unfavorable, what is the actual cost per pound of direct
materials used?
A) $1.80
B) $1.90
C) $2.00
D) $2.10
Answer: D
Diff: 3
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
30
Copyright © 2014 Pearson Education
11) Parrish Company had the following information available for its specialty product:
If the Direct Materials Quantity Variance is $7,000 Unfavorable, what is the actual quantity of direct
materials used?
A) 7,000
B) 42,500
C) 46,000
D) 47,000
Answer: C
Diff: 3
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
12) Cornell Company had the following information available for its specialty product:
If the Direct Labor Price Variance is $4,600 Unfavorable, what is the actual labor rate per hour?
A) $16.00
B) $16.50
C) $17.10
D) $17.15
Answer: D
Diff: 3
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
31
Copyright © 2014 Pearson Education
13) Gollerowski Company had the following information available for its specialty product:
If the Direct Labor Efficiency Variance is $4,000 Unfavorable, what are the actual number of hours
worked?
A) $4,000
B) $4,250
C) $4,400
D) $4,500
Answer: D
Diff: 3
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
14) The quantity variance for direct materials can be computed by multiplying the standard price by the
difference between the ________.
A) standard inputs allowed and expected inputs allowed at actual output
B) quantity of inputs actually used and the quantity of inputs that should have been used for the expected
output
C) standard inputs allowed and expected inputs allowed for expected output
D) quantity of inputs actually used and the quantity of inputs that should have been used for actual
output
Answer: D
Diff: 2
LO: 8-6
AACSB: Reflective thinking skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
15) Rate variances are the same as ________ variances. Efficiency variances are the same as ________
variances.
A) spending; effective
B) activity; static
C) usage; quantity
D) price; quantity
Answer: D
Diff: 1
LO: 8-6
AACSB: Reflective thinking skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
32
Copyright © 2014 Pearson Education
16) A ________ is most likely to be held accountable for price variances for direct materials.
A) machine operator
B) production supervisor
C) purchasing manager
D) marketing director
Answer: C
Diff: 1
LO: 8-6
AACSB: Reflective thinking skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
17) In which of the following scenarios can Eastman Company NOT have favorable flexible budget
variance for direct materials?: When direct material price variance is ________, and when direct material
quantity variance is ________,
A) favorable; unfavorable
B) unfavorable; favorable
C) unfavorable; unfavorable
D) favorable; favorable
Answer: C
Diff: 2
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
18) If the direct labor price variance is $800 Favorable and the direct labor usage variance is $700
Unfavorable, then ________.
A) the flexible budget variance for direct labor is $100 Favorable
B) actual total wages paid were $800 more than expected
C) actual labor hours were less than expected
D) actual material prices were less than expected
Answer: A
Diff: 2
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
33
Copyright © 2014 Pearson Education
19) The following information is for Brankov Corporation:
20) Barber Company produces 2,500 units. Each unit was expected to require 2 labor hours at a cost of $10
per hour. Total labor cost was $52,250 for 4,750 hours worked. Direct labor is measured in labor hours.
What is the direct labor price variance?
A) $2,500 Favorable
B) $2,500 Unfavorable
C) $4,750 Favorable
D) $4,750 Unfavorable
Answer: D
Diff: 2
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
21) Butters Company produces 2,500 units. Each unit was expected to require 2 labor hours at a cost of
$10 per hour. Total labor cost was $52,250 for 4,750 hours worked. Direct labor is measured in labor
hours. What is the direct labor quantity variance?
A) $2,500 Favorable
B) $2,500 Unfavorable
C) $2,750 Favorable
D) $2,750 Unfavorable
Answer: A
Diff: 2
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
34
Copyright © 2014 Pearson Education
22) Ivanovich Company produces 2,500 units. Each unit was expected to require 2 labor hours at a cost of
$10 per hour. Total labor cost was $52,250 for 4,750 hours worked. Direct labor is measured in labor
hours. What is the flexible budget variance for direct labor?
A) $2,250 Favorable
B) $2,250 Unfavorable
C) $7,500 Favorable
D) $7,500 Unfavorable
Answer: B
Diff: 2
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
23) The Cheeseman Company makes tables and the following standards have been developed:
Production of 230 tables was expected in July, but 250 tables were actually completed. Direct materials
purchased and used were 2,200 pounds at an actual price of $4.50 per pound. Direct labor cost for the
month was $10,620, and the actual pay per hour was $18.00. What is the direct material price variance for
July?
A) $800 Favorable
B) $800 Unfavorable
C) $1,100 Favorable
D) $1,100 Unfavorable
Answer: D
Diff: 2
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
35
Copyright © 2014 Pearson Education
24) The Cornell Company makes tables for which the following standards have been developed:
Production of 200 tables was expected in July, but 220 tables were actually completed. Direct materials
purchased and used were 2,000 pounds at an actual price of $4.40 per pound. Direct labor cost for the
month was $10,620, and the actual pay per hour was $18.00. What is the direct material quantity variance
for July?
A) $800 Favorable
B) $800 Unfavorable
C) $880 Favorable
D) $880 Unfavorable
Answer: A
Diff: 2
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
25) The Matthew Company makes tables for which the following standards have been developed:
Production of 200 tables was expected in May, but 220 tables were actually completed. Direct materials
purchased and used were 2,100 pounds at an actual price of $4.40 per pound. Direct labor cost for the
month was $10,620, and the actual pay per hour was $18.00. What is the direct labor price variance for the
month of May?
A) $1,180 Favorable
B) $1,180 Unfavorable
C) $1,200 Favorable
D) $1,200 Unfavorable
Answer: B
Diff: 2
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
36
Copyright © 2014 Pearson Education
26) The Quinn Company makes tables for which the following standards have been developed:
Production of 200 tables was expected in June, but 220 tables were actually completed. Direct materials
purchased and used were 2,100 pounds at an actual price of $4.40 per pound. Direct labor cost for the
month was $10,620, and the actual pay per hour was $18.00. What is the direct labor quantity variance for
the month of June?
A) $1,120 Favorable
B) $1,120 Unfavorable
C) $1,260 Favorable
D) $1,260 Unfavorable
Answer: A
Diff: 2
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
27) The Brucker Company makes mugs for which the following standards have been developed:
Production of 400 mugs was expected in July, but 440 mugs were actually completed. Direct materials
purchased and used were 2,100 ounces at an actual price of $2.30 per ounce. Direct labor cost for the
month was $5,310, and the actual pay per hour was $9.00. What is the direct material price variance for
July?
A) $400 Favorable
B) $400 Unfavorable
C) $630 Favorable
D) $630 Unfavorable
Answer: D
Diff: 2
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
37
Copyright © 2014 Pearson Education
28) The Savage Company makes mugs for which the following standards have been developed:
Production of 400 mugs was expected in July, but 440 mugs were actually completed. Direct materials
purchased and used were 2,100 ounces at an actual price of $2.20 per ounce. Direct labor cost for the
month was $5,310, and the actual pay per hour was $9.00. What is the direct material quantity variance
for July?
A) $200 Favorable
B) $200 Unfavorable
C) $220 Favorable
D) $220 Unfavorable
Answer: A
Diff: 2
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
29) The Tulip Company makes mugs for which the following standards have been developed:
Production of 400 mugs was expected in August, but 440 mugs were actually completed. Direct materials
purchased and used were 2,100 ounces at an actual price of $2.20 per ounce. Direct labor cost for the
month was $5,310, and the actual pay per hour was $9.00. What is the direct labor price variance for
August?
A) $420 Favorable
B) $420 Unfavorable
C) $590 Favorable
D) $590 Unfavorable
Answer: D
Diff: 2
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
38
Copyright © 2014 Pearson Education
30) The Banks Company makes mugs for which the following standards have been developed:
Production of 400 mugs was expected in July, but 440 mugs were actually completed. Direct materials
purchased and used were 2,100 ounces at an actual price of $2.30 per ounce. Direct labor cost for the
month was $5,310, and the actual pay per hour was $9.00. What is the direct labor quantity variance for
July?
A) $560 Favorable
B) $560 Unfavorable
C) $630 Favorable
D) $630 Unfavorable
Answer: A
Diff: 2
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
31) In a manufacturing area of a firm, poor product design and problems with the quality of materials
will, more than likely, result in a(n) ________ variance or ________ variance.
A) unfavorable material efficiency; unfavorable labor usage
B) favorable material efficiency; unfavorable labor price
C) unfavorable material price; unfavorable labor rate
D) unfavorable material price; unfavorable labor usage
Answer: A
Diff: 2
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
32) One cause of a flexible budget variance for direct labor may be a difference between standard and
actual hourly wage rates for factory workers.
Answer: TRUE
Diff: 2
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
39
Copyright © 2014 Pearson Education
33) A quantity variance for direct materials measures the deviation between the quantity of inputs that
should have been used to achieve the actual output and the actual quantity of inputs used to achieve the
actual output.
Answer: TRUE
Diff: 2
LO: 8-6
AACSB: Reflective thinking skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
34) The direct materials price variance is based on the standard quantity of inputs allowed for the actual
output.
Answer: FALSE
Diff: 2
LO: 8-6
AACSB: Reflective thinking skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
35) The flexible budget variance for direct labor can be broken down into a price variance and an
effectiveness variance.
Answer: FALSE
Diff: 2
LO: 8-6
AACSB: Reflective thinking skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
36) The quantity variance and efficiency variance for direct labor are different types of variances.
Answer: FALSE
Diff: 1
LO: 8-6
AACSB: Reflective thinking skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
37) The flexible budget variance for direct labor equals the labor price variance plus the labor quantity
variance.
Answer: TRUE
Diff: 2
LO: 8-6
AACSB: Reflective thinking skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
38) A favorable materials price variance may lead to an unfavorable materials usage variance.
Answer: TRUE
Diff: 2
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
40
Copyright © 2014 Pearson Education
39) Direct Material Direct Labor
Std. price per unit of input $12 per foot $14 per hour
Actual price per unit of input $14 per foot $13 per hour
Std. inputs allowed per unit of output 5 feet 3 hours
Actual units of input 2,500 feet 1,550 hours
Required:
Compute the price and quantity variances for direct materials and direct labor.
Answer: Direct material:
Price variance: ($14 - $12) × 2,500 = $5,000 Unfavorable
Quantity variance: [2,500 - (600 × 5)] × $12 = $6,000 Favorable
Direct labor:
Price variance: ($13 - $14) × 1,550 = $1,550 Favorable
Quantity variance: [1,550 - (600 × 3)] × $14 = $3,500 Favorable
Diff: 2
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
40) The following data was obtained for a company that makes statues:
During the month of July, the company actually produced 1,000 statutes, which is 100 units less than
expected. Direct material purchased and used amounted to 5,500 pounds at a cost of $12.50 per pound.
Actual direct labor was 1,450 hours at an actual cost of $13.00 per hour.
Required:
A) Compute the price and quantity variances for direct materials.
B) Compute the price and quantity variances for direct labor.
Answer: A) Price variance = ($12.50 - $12.00) × 5,500 = $2,750 Unfavorable
Quantity variance = (5,500 - 5,000) × $12 = $6,000 Unfavorable
B) Price variance = ($13.00 - $12.00) × 1,450 = $1,450 Unfavorable
Quantity variance = (1,450 - 1,500) × $12.00 = $600 Favorable
Diff: 2
LO: 8-6
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
41
Copyright © 2014 Pearson Education
41) What are some common causes of unfavorable quantity variances for direct labor?
Answer: Some common causes are poor quality of material, untrained workers, poor workmanship,
changes in production method, new workers, machine breakdowns, faulty product designs, and
inefficient machines.
Diff: 2
LO: 8-6
AACSB: Reflective thinking skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
8.7 Questions
2) Simmons Company has the following information available for variable overhead costs. Direct labor
hours are the cost driver for variable overhead costs.
42
Copyright © 2014 Pearson Education
3) Dooley Company has the following information available for variable overhead costs. Direct labor
hours are the cost driver for variable overhead costs.
4) Indian Company has the following information available for variable overhead costs. Direct labor
hours are the cost driver for variable overhead costs.
43
Copyright © 2014 Pearson Education
5) Switsdorf Company has the following information available for variable overhead costs. Direct labor
hours are the cost driver for variable overhead costs.
6) At 60,000 machine hours, Norwall Company's static budget for variable overhead costs is $180,000. At
60,000 machine hours, the company's static budget for fixed overhead costs is $300,000. Machine hours
are the cost driver of all overhead costs. The static budget is based on 60,000 machine hours. At 60,000
machine hours, the company produces 40,000 units. The following data is available:
44
Copyright © 2014 Pearson Education
7) The flexible budget variance for variable overhead costs is composed of a(n) ________ variance and a(n)
________ variance.
A) efficiency; effective
B) spending; rate
C) quantity; efficiency
D) spending; efficiency
Answer: D
Diff: 2
LO: 8-7
AACSB: Reflective thinking skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
8) The variable overhead efficiency variance depends on whether the quantity of the cost driver used is
more or less than ________.
A) the standard amount of output for the expected amount of output
B) the quantity allowed for the expected amount of output
C) the quantity allowed for the static budget amount of output
D) the standard quantity allowed for the actual output
Answer: D
Diff: 2
LO: 8-7
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
9) The variable overhead spending variance combines ________ and ________ effects.
A) price; quantity
B) price; efficiency
C) efficiency; sales activity
D) rate; sales activity
Answer: A
Diff: 2
LO: 8-7
AACSB: Reflective thinking skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
10) Variable overhead efficiency variances are unfavorable when actual cost driver activity exceeds the
________.
A) standard cost-driver activity allowed for the actual output
B) activity allowed for the expected output
C) activity allowed for the planned output
D) activity allowed for last period's output
Answer: A
Diff: 2
LO: 8-7
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
45
Copyright © 2014 Pearson Education
11) The variable overhead spending variance is the difference between the actual variable overhead cost
and the amount of variable overhead cost budgeted for the actual level of cost driver activity.
Answer: TRUE
Diff: 2
LO: 8-7
AACSB: Reflective thinking skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
12) The variable overhead efficiency variance indicates to management how much variable overhead cost
it may waste by not controlling the use of cost-driver activity.
Answer: TRUE
Diff: 2
LO: 8-7
AACSB: Reflective thinking skills
13)
Answer: Spending variance = $20,570 - (2,450 × $8) = $970 Unfavorable
Efficiency variance = [2,450 - (500 × 5)] × $8 = $400 Favorable
variances
Diff: 2
LO: 8-7
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
8.8 Questions
1) For fixed overhead costs, the spending variance is ________ equal to the flexible-budget variance.
A) always
B) sometimes
C) never
D) indeterminate
Answer: A
Diff: 2
LO: 8-8
AACSB: Reflective thinking skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
46
Copyright © 2014 Pearson Education
2) Wendel Company has actual fixed overhead costs of $14,700. Fixed overhead costs based on the flexible
budget and the actual use of the cost driver are $14,400. Actual variable overhead costs are $14,500. What
is the flexible-budget variance for fixed overhead costs?
A) $300 Favorable
B) $300 Unfavorable
C) $100 Favorable
D) $100 Unfavorable
Answer: B
Diff: 3
LO: 8-8
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
3) Wetzel Company has actual fixed overhead costs of $14,500. Fixed overhead costs based on the flexible
budget and the standard use of the cost driver are $14,400. Actual variable overhead costs are $14,700.
Flexible budget costs for variable overhead costs are $15,000. What is the flexible-budget variance for
fixed overhead costs?
A) $100 Favorable
B) $100 Unfavorable
C) $300 Favorable
D) $300 Unfavorable
Answer: B
Diff: 3
LO: 8-8
AACSB: Analytic skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
47
Copyright © 2014 Pearson Education
5) At 60,000 machine hours, Clark Company's static budget for variable overhead costs is $180,000. At
60,000 machine hours, the company's static budget for fixed overhead costs is $300,000. Machine hours
are the cost driver of all overhead costs. The static budget is based on 60,000 machine hours. At 60,000
machine hours, the company produces 40,000 units. The following data is available:
6) The flexible budget variance for fixed overhead costs equals the ________ variance.
A) efficiency
B) spending
C) static budget
D) operating budget
Answer: B
Diff: 2
LO: 8-8
AACSB: Reflective thinking skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
48
Copyright © 2014 Pearson Education
7) Sloth Company reports the following information for the last year of operations:
8) In the relevant range, fixed overhead costs do not vary with cost driver activity.
Answer: TRUE
Diff: 2
LO: 8-8
AACSB: Reflective thinking skills
Learning Outcome: Discuss and calculate the direct material, direct labor and overhead variances
49
Copyright © 2014 Pearson Education