Malik MIJ Chunxing Resources Recycling Co.

L
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD

Concrete Pavement & Walkways


for IPC 09
16-09-2017 to 31-10-2017
Quantity
As per
Accumulative
Construc-
Item No. Description of Items Unit Quantity till
tion
IPC 09
drawings

SECTION R-21 CEMENT CONCRETE PAVEMENT


AD-31 Re-Compacton of subbase for concrete M2 0.00 960.00
TOTAL:Amount
s Recycling Co. Ltd,
SE-1A
AISALABAD

ent & Walkways


r IPC 09
to 31-10-2017
Claim
Total Rate As per
Total Claim Claim for
Claim till Contract Amount
till IPC 09 IPC 09 Claim Justification
last IPC Agreement (Rs)

960.00 - 960.00 538.00 516,480.00


- - - 516,480
Malik MIJ Chunxing Resources Recycling Co. Ltd,
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD

Main Plant Builing


Excess Work Claims
for IPC 09
16-09-2017 to 31-10-2017
A B C=B-A D E=C-D
Quantity Claim for
As per Accumulative Total IPC 09
Item Total Claim
Description of Items Unit Construc-tion Quantity till Claim till
No. till IPC 09
drawings IPC 09 last IPC

SECTION-17 SPECIAL ITEMS

17.1 Miscellaneous Special Items


17.1.4 Provide and lay selected granular material bedding of footings
comprising 70% crushed stone and 30% sand compacted upto
98% Modification Proctor Dry Density (M.P.D.) complete in all
respect as shown in drawing and as additionally directed by the
Engineer.

a) 98% compaction under Footings / Brick M3 8680 9,794.40 1,114.40 660.00 454.40
Foundations & under floor
SECTION-2 CONCRETE WORKS
2.4 Structural Concrete
AD-31 Re-Compaction of floor for concrete M2 - 1,008.00 1,008.00 - 1,008.00
AD-32 Additonal work of labor for cleaning, vibrating and compaction Lumsump - - - - -
TOTAL:Amount
F Z=F X E

Rate As per Claim Claim Justification


Contract
Agreement Amount
(Rs)

3,200.00 1,454,080

538.00 542,304
- 1,000,000
2,996,384
Malik MIJ Chunxing Resources Recycling C
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD
External Sewerage Syste
for IPC 08
30.6.2017 to 15.9.2017
Quantity
As per Accumulative
Item No. Description of Items Unit Construc- Quantity till IPC
tion 08
drawings

SECTION W-2 WATER SUPPLY PIPE LINES

W1.4
PN16 conforming to DIN STANDARD of 8074 / 8075
and ps 3580 made by "Dadex" or approved equivalent
for water supply lines with specials and fittings
according to SDR-17 including cutting, jointing and
testing as per Manufacturer's Specifications, supported
on walls or run in chases or under floors including pipe - -
hangers, supports, making requisite number of holes
where
required and making good the holes and chases,
complete.

a) 200mm RM - 6.00
b) 75mm RM - 8.60
c) 125mm RM - 744.00
TOTAL:Amount
esources Recycling Co. Ltd,
50 PHASE-1A
AL CITY FAISALABAD
l Sewerage System
IPC 08
7 to 15.9.2017
Rate As per Claim
Total Claim Claim till Claim for
Contract
till IPC 08 IPC 07 IPC 08
Agreement Amount
(Rs)

- - - - -

- - 6.00 3,600.00 -
- - 8.60 2,800.00 -
- - 744.00 2,300.00 -
-
Claim Justification
Complete revised design provided by Chinese
Engineer and installed under their supervision and
approved by PM through CMD#10
Malik MIJ Chunxing Resources Recycling Co. Ltd,
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD
SUMMARY OF CLAIMS

for IPC 09
16-09-2017 to 31-10-2017
Excess work claim
Sr. till IPC 09
Description
No.
Amount (Rs)

Main Plant Building (A)


1 2,996,384
o Civil Works
4 Concrete Pavement & Walkways
o Civil Works 516,480

Total Claim Amount: 3,512,864


cycling Co. Ltd,
A
ALABAD

17
Remarks