Академический Документы
Профессиональный Документы
Культура Документы
3 4 4
5
6 • 20% market share, 15.5M lines deployed
7 8
Rank
9
9
11 12
13
FTTx • 20% market share, 11M lines deployed
15
Source:OVUM
SPLLITER
10G PON
10G PON NGN
ONU
10G
10G PON
AAWG
TWDM
10G ONU ONU
SPLLITER
PON 10G Multiplexer Splitter
10G PON INTERNET
ONU
10G 10G PON ONU
ONU
IPTV ONU
• 1st generation system released in 2012 • 32 wavelength for now, roadmap for 80
• 2nd generation system is on going • Support 1G/2.5G per wavelength
5
Great Contribution to Standards
ITU-T SG15 Vice Chairman ITU-T Experts
Zhao zisen
Dr. Yu shaohua
Global 11 15 19 25 32 39 28%
The global average broadband speed continues to grow and will quadruple from 2011 to 2016,
from 11 Mbps to 39 Mbps.
8
FTTx is growing fast
MSAN/DSLAM Phone
Splitter TV
GPON
PC
MDU xDSL/LAN
Phone
OLT
10G PON/WPON
xPON/10G PON λTTH
xPON+xDSL FTTH IP
FTTx IP NG-OLT
IP OLT ODN
Unified OAM
ODN λ1 … λn
OLT
ODN ONU
MxU ONU
ONU
Smooth
Roadmap
High
Bandwidth
FTTH is the final goal, but FTTB/C/N will coexist with FTTH for a long time.
12
Challenges for FTTx
Huge investment
FTTH
Low take up ratio Long ROI period
13
How to save CAPEX
14
Flexible deploy methods
Internet
NGN/IMS
CATV
CO Curb Building Home
Fiber To The Home
FTTH
ONU
Fiber
Fiber To The Building LAN
FTTB+LAN
ONU NT
Fiber Ethernet
Fiber To The Curb xDSL
FTTC+DSL
OLT ONU NT
Fiber Copper
Fiber To The Curb EoC FTTC+EoC
ONU NT
Fiber Cable
Fiber To The Building WLAN FTTB+WLAN
ONU NT
Fiber
SNI UNI
Green Brown Enterprises/
field field Business
15
Villa Scenario
ONU
Green
field
Centre Office
FTB
Patch cord
FDP FDP
-1 -2
Splitter
FDC
OLT ODF
Closure Closure Closure
Business ONU
ONU
ONU
Splitter ONU
Patch cord
ONU
G floor ONU
FDC
OLT ODF
Closure Closure Closure
N floors
Centre Office
Patch cord
Splitter
G floor
FDC FDP
OLT ODF
Closure Closure Closure
FTTB+LAN/xDSL/Coaxial is preferred
18
How to save CAPEX
19
Simplify ISP(In Site Plant)
Initial Service applied Initial Service applied
20
How to achieve fast ROI
21
Network “Scissor Effect”
Bandwidth
Demand
User 25%
Revenue
Revenue 20%
• Huge traffic between subscribers and ICP/ISP but carrier’s ROI is pretty low
• Most of the revenues go to ICP/ISP, but they just pay for fixed bandwidth lease fee
service3
service4
IPTV/VOD High
Internet/SP/CP
Public sub pipe1
…
互联网管道
Public sub pipe2 Low
Public sub pipen… Visible, controllable
Service auto-sense, dynamic
pipe(DBA & QoS)
26
Service auto deployment
Name
Resource
system 10000
FiberHome xPON auto deployment system:
system diagnosis
Logic SN based
replacement”.
Input SN
ITMS
TR069
orders.
27
E2E fault diagnosis
AN5116-06B
SS RMS ANM2000
SW Splitter ONU
TL1/XML
CORBA
IPTV BRAS
Server
28
FTTx diagnostic system
&
OLM(OTDR) OLS
ANM2000
OTDR card FTTB
1:N
FTTH
OLT
Phone
TV PC
• Dual stack for IPv4 & IPv6 • 2 million shipments per year
32
MDU Portfolios
SYNC.
Sync E, OPERATING
-30℃~60℃ Biggest capacity in 8U
1588v2 TEMP
• Flexible service cards & uplink
Data & Power Supply • Max. 1K subs access
Small Cell for
Mobile Back Haul Outdoor Monitoring AN5006-30
WAP
33
FiberHome FTTx solution
IPTV
STB
Internet
SDH/MSTP
Internet SFU
E1/STM-1
FTTH
VOIP OLT
IPTV Server
SR/CR
VDSL
Vectoring PE
modem
FTTdp
GE/10GE
IP Network Softswitch
PE
FTTB/C
MDU PE
Business PBX FTTM MME/SGW
E1
PoE
CBU ONU
FE
ANM2000 RNC
Residential
xDSL+POTS
1588 clock
FE/GE
Voice MTU/ONT
BTS/Node B
1pps+TOD
Data
GPON
E1/FE/GE First Purchase Order
ONT
OLT Splitter
Mobile backhaul
MSTP Product Type Product Name Qty
/PTN
Indonesia 35
PLDT FTTH Turnkey Project
Challenge
• Existing equipment is old, OPEX is high
• Power cost is high
• No E2E network deploy experience
• Broadband speed is lower than the average level in the region
FiberHome solution highlight
• ODN part is passive, need not the power, save the CAPEX;
• One stop FTTH solution, the active and passive equipments and
ODN designing/planning/constructing
• OLT and ONU power consumption are the lowest in the FTTx field,
save the electricity
• 1st GPON turkey deployment in PLDT and Philippines.
36
TM R&D – FH Joint Lab
Phase II
RoF P2MP ATP
Signing New (June 2015)
MoA
( Aug 2014)
Workshop
with TM-TM
Phase I R&D-FH
RoF P2P Demo (June 2014)
acceptance inspection
successfully
( Dec, 2013)
37
Thanks