Additional Resources Question: I have a vessel design that requires an "RT2" designation. I selected 100% (full) RT on the longitudinal seams and Spot RT on
the circumferential (girth) seams but the COMPRESS summary reports "RT3" in the summary report. How do I get COMPRESS
FAQs by Topic to report "RT2"?

Power User’s Guide


Answer: The RT designation is determined automatically by COMPRESS based on the types of radiography specified for the
Training circumferential and longitudinal welds on the shell components.
Learn About Data Export
ASME VIII-1, paragraph UG-116(e)(2), states that an "RT 2" designation requires the complete vessel to satisfy the rules of UW
Get Updates 11(a)(5) and the spot radiography requirements of UW-11(a)(5)(b). Specifying spot radiography (RT) without also meeting the
requirements of UW-11(a)(5)(b) will not meet the requirements of RT 2.

COMPRESS provides options to specify special versions of Spot radiography that indicate the requirements of UW-11(a)(5)(b)
have been met for that joint; both Type 1 and Type 2 joints are available. In the typical head dialog below, there are selections
near the top of the radiography list for "Spot UW-11(b)". Further down the list are selections for "Spot UW-11(a)(5)(b)". Selecting
these for all applicable seams will cause COMPRESS to report an RT 2 designation for the vessel. Note that the Code may
require additional spot radiographs in order to meet UW-11(a)(5) and therefore RT 2.

Site Map Press Room Contact Codeware About Codeware Join Mailing List Privacy Policy Trademarks Careers

Copyright © 2010 Codeware, Inc. All Rights Reserved.

http://www.codeware.com/support/faq/1219.html 8/27/2010 9:38:31 AM

Вам также может понравиться