REVISION HISTORY
REVIEWED APPROVED
REV DATE DESCRIPTION PREPARED BY
BY BY
04
Roby
00 December First Release Imam M Dewi Yuliana
Syahputra
2017
THIS PROCEDURE IS INVALID WITHOUT COVER PAGE AND SIGNATURE AND COMPANY STAMP LEFT BLANK.
DAFTAR DISTRIBUSI
DISTRIBUTION LIST
DISTRIBUTION
STATUS DEPARTMENT PIC
NO.
01 Original QHSE QHSE Coordinator
02 Controlled Copy NDT NDT Manager
03 Controlled Copy HT HT Manager
04 Controlled Copy HRGA HRGA Coordinator
05 Controlled Copy FINANCE FINANCE Coordinator
06 Controlled Copy LOGISTIC LOGISTIC Coordinator
07 Controlled Copy BD BD Manager
08 Controlled Copy Branch Office Branch Manager
THIS PROCEDURE IS INVALID WITHOUT COVER PAGE AND SIGNATURE AND COMPANY STAMP LEFT BLANK.
DAFTAR ISI
LIST OF CONTENTS
1. TUJUAN 5
PURPOSE
2. RUANG LINGKUP 5
SCOPE
3. ACUAN 5
REFERENCE
4. TANGGUNGJAWAB 6
RESPONSIBILITY
5. DEFINISI 6
DEFINITIONS
6. PROSEDUR 7
PROCEDURE
7. DOKUMEN TERKAIT 10
RELATED DOCUMENTS
8. LAMPIRAN 10
ATTACHMENT
THIS PROCEDURE IS INVALID WITHOUT COVER PAGE AND SIGNATURE AND COMPANY STAMP LEFT BLANK.
1. TUJUAN
PURPOSE
2. RUANG LINGKUP
SCOPE
Prosedure ini berlaku bagi seluruh bagian terkait yang ada di PT CAST
INSPECTION AND ENGINEERING dan pihak pihak yang berhubungan dengan
PT. Cast Inspection and Engineering.
This procedure applies to all the relevant sections in PT CAST INSPECTION &
ENGINEERING and parties concerned with PT. Cast Inspection and Engineering.
3. ACUAN
REFERENCES
THIS PROCEDURE IS INVALID WITHOUT COVER PAGE AND SIGNATURE AND COMPANY STAMP LEFT BLANK.
4. TANGGUNG JAWAB
RESPONSIBILITY
a. Manajemen puncak, didukung oleh Manajer QHSE bertanggung jawab atas
Pengawasan dan berkoordinasi dengan kegiatan operasional sesuai dengan
standar operasi perusahaan dengan mempertimbangkan resiko dan
mengelola dan mengidentifikasi risiko untuk mencapai hasil sesuai
kebutuhan.
Top management, supported by QHSE Manager is responsible for Oversee
and coordinates with operational activities in accordance with the standards
of the company's operations with consider risk and manage and identified
the risk to reach the result as per required.
5. DEFINISI / ISTILAH
DEFINITION
THIS PROCEDURE IS INVALID WITHOUT COVER PAGE AND SIGNATURE AND COMPANY STAMP LEFT BLANK.
b. Potensial Resiko adalah sumber atau situasi dimana ada potensi yang dapat
menyebabkan kegagalan, kerusakan pada properti, lingkungan kerja atau
kombinasi keduanya.
Potensial Risk adalah is the source or situations where there is a potential
that may cause failure, damage to property, work environment or any
combination thereof.
6. PROSEDUR
PROCEDURE
6.1 Sumber Identifikasi Resiko.
Source of Risk Identification.
THIS PROCEDURE IS INVALID WITHOUT COVER PAGE AND SIGNATURE AND COMPANY STAMP LEFT BLANK.
THIS PROCEDURE IS INVALID WITHOUT COVER PAGE AND SIGNATURE AND COMPANY STAMP LEFT BLANK.
THIS PROCEDURE IS INVALID WITHOUT COVER PAGE AND SIGNATURE AND COMPANY STAMP LEFT BLANK.
8. LAMPIRAN
ATTACHMENT
THIS PROCEDURE IS INVALID WITHOUT COVER PAGE AND SIGNATURE AND COMPANY STAMP LEFT BLANK.
HRN/RISK SCORE
ACTION
CATEGORY SCORE
Work should not be started or continued until the risk has been reduced. If it is
HIGH 15-25 not possible to reduce the risk even with unlimited resources, work must remain
prohibited and a safer method found to complete the task
Efforts should be made to reduce the risk where practical. Risk reduction
MEDIUM 7-14 measures should be implemented within a defined time period. Where risk involves
work in progress, action should be taken
Hazards with risk ratings in the lighter shaded areas can be considered as
adequately controlled risk. No additional controls are required. Consideration may
LOW 1-6 be given to more cost-effective solution or improvement that imposes no
additional cost burden. Monitoring is required to ensure that the controls are
maintained
THIS PROCEDURE IS INVALID WITHOUT COVER PAGE AND SIGNATURE AND COMPANY STAMP LEFT BLANK.
Probability
Score 5 4 3 2 1
1 (
L
Negligible 1 5 (LOW) 4 (LOW) 3 (LOW) 2 (LOW) O
W
)
THIS PROCEDURE IS INVALID WITHOUT COVER PAGE AND SIGNATURE AND COMPANY STAMP LEFT BLANK.
CAST/IV/SM/26-01
Risk
No. Activity/Step Potensial S (1-5) P (1-5) Control Measures/Comment S (1-5) P (1-5) Risk
Score Action By
Score
THIS PROCEDURE IS INVALID WITHOUT COVER PAGE AND SIGNATURE AND COMPANY STAMP LEFT BLANK.